Project Number,Technology Type,Nameplate Capacity (kW),Export Capacity (kW),Category Assignment,Location,Substation Name,Circuit Name,Current Application Status,Application Complete Date,Current Status,Interconnection Agreement Sign Date AE-30917,"Solar PV, Battery/Storage",14.78,,Category 1,"Beloit, Rock County, WI",Substation 529,Circuit 1352,Active,7/7/2026,Application Technical Review, AE-30914,Solar PV,9.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,Active,7/7/2026,Application Technical Review, AE-30887,Solar PV,5.9,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,Approved,7/6/2026,Installation & Construction, AE-30866,Solar PV,4.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,Active,7/1/2026,Application Technical Review, AE-30876,"Solar PV, Battery/Storage",21.76,,Category 2,"Keshena, Menominee County, WI",Substation 384,Circuit 944,Approved,7/1/2026,Installation & Construction, AE-30874,"Solar PV, Battery/Storage",11.58,,Category 1,"Keshena, Menominee County, WI",Substation 384,Circuit 944,Approved,7/1/2026,Installation & Construction, AE-30884,"Solar PV, Battery/Storage",11.58,,Category 1,"Keshena, Menominee County, WI",Substation 384,Circuit 943,Active,7/1/2026,Supplemental Engineering Studies, AE-30881,Solar PV,13.4,,Category 1,"Cuba City, Grant County, WI",Substation 386,Circuit 2180,Active,7/1/2026,Application Technical Review, AE-30878,Solar PV,10,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 301,Approved,7/1/2026,Installation & Construction, AE-30872,"Solar PV, Battery/Storage",19.1,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,Approved,7/1/2026,Installation & Construction, AE-30879,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2103,Approved,7/1/2026,Installation & Construction, AE-30857,Solar PV,5.7,,Category 1,"Cobb, Iowa County, WI",Substation 241,Circuit 584,Approved,6/30/2026,Installation & Construction, AE-30875,"Solar PV, Battery/Storage",11.58,,Category 1,"Neopit, Menominee County, WI",,Circuit 1331,Active,6/30/2026,Supplemental Engineering Studies, AE-30849,Solar PV,3.5,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,Approved,6/30/2026,Installation & Construction, AE-30848,Solar PV,3.8,,Category 1,"Omro, Winnebago County, WI",Substation 550,Circuit 1450,Approved,6/30/2026,Installation & Construction, AE-30831,Solar PV,20.1,,Category 2,"Verona, Dane County, WI",Substation 722,Circuit 1970,Approved,6/30/2026,Installation & Construction, AE-30858,Solar PV,7.8,,Category 1,"Belleville, Dane County, WI",Substation 280,Circuit 670,Approved,6/29/2026,Installation & Construction, AE-30823,Solar PV,3,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,Approved,6/26/2026,Installation & Construction, AE-30830,Solar PV,16.6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,Active,6/26/2026,Application Technical Review, AE-30825,Solar PV,3.5,,Category 1,"Edgerton, Rock County, WI",,Circuit 570,Approved,6/25/2026,Installation & Construction, AE-30821,Solar PV,8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,Approved,6/25/2026,Installation & Construction, AE-30804,Solar PV,7.5,,Category 1,"Clintonville, Waupaca County, WI",Substation 69,Circuit 169,Approved,6/24/2026,Installation & Construction, AE-30810,Solar PV,7.6,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2173,Approved,6/24/2026,Installation & Construction, AE-30808,Solar PV,13.3,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,Approved,6/24/2026,Installation & Construction, AE-30805,Solar PV,7.6,,Category 1,"Cross Plains, Dane County, WI",Substation 686,Circuit 1895,Approved,6/23/2026,Installation & Construction, AE-30801,Solar PV,5.8,,Category 1,"Verona, Dane County, WI",,,In service,6/23/2026,Permission to Operate,7/8/2026 AE-30768,Solar PV,8.4,,Category 1,"Marshall, Dane County, WI",Substation 679,Circuit 1877,Approved,6/15/2026,Installation & Construction, AE-30769,Solar PV,3,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1168,Approved,6/15/2026,Installation & Construction, AE-30762,Solar PV,4.1,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,Approved,6/15/2026,Installation & Construction, AE-30771,Solar PV,16.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,Approved,6/15/2026,Installation & Construction, AE-30741,Solar PV,6.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,Approved,6/12/2026,Installation & Construction, AE-30755,Solar PV,4.9,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,Approved,6/12/2026,Commissioning Review & Witness Test, AE-30744,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,Approved,6/12/2026,Installation & Construction, AE-30734,Solar PV,6.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,Approved,6/10/2026,Installation & Construction, AE-30737,Solar PV,8.4,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1043,Approved,6/10/2026,Installation & Construction, AE-30727,Solar PV,5.2,,Category 1,"Beloit, Rock County, WI",,Circuit 154,Approved,6/9/2026,Installation & Construction, AE-30725,Solar PV,3,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1737,Approved,6/9/2026,Installation & Construction, AE-30724,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,Approved,6/9/2026,Installation & Construction, AE-30722,"Solar PV, Battery/Storage",19.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1267,Approved,6/9/2026,Installation & Construction, AE-30708,Solar PV,70.4,,Category 2,"Janesville, Rock County, WI",Substation 369,Circuit 907,Approved,6/8/2026,Installation & Construction, AE-30715,Solar PV,6.3,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,Approved,6/8/2026,Installation & Construction, AE-30709,Solar PV,4.9,,Category 1,"Prairie Du Sac, Columbia County, WI",,Circuit 493,Approved,6/8/2026,Commissioning Review & Witness Test, AE-30672,Solar PV,4.6,,Category 1,"Friendship, Adams County, WI",Substation 283,Circuit 677,Approved,6/8/2026,Installation & Construction, AE-30622,Solar PV,5000,,Category 4,"Troy, Sauk County, WI",,,Active,6/8/2026,Application Technical Review, AE-30620,"Solar PV, Battery/Storage",23.02,,Category 2,"Genoa City, Walworth County, WI",Substation 375,Circuit 925,Approved,6/5/2026,Installation & Construction, AE-30696,Solar PV,4.6,,Category 1,"Beloit, Rock County, WI",,Circuit 1680,Approved,6/5/2026,Commissioning Review & Witness Test, AE-30693,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",,Circuit 1872,Approved,6/5/2026,Commissioning Review & Witness Test, AE-30674,Solar PV,7.6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1736,Approved,6/4/2026,Installation & Construction, AE-30680,Solar PV,19.2,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1185,Approved,6/4/2026,Installation & Construction, AE-30677,Solar PV,9.6,,Category 1,"Highland, Iowa County, WI",Substation 45,Circuit 129,Approved,6/4/2026,Installation & Construction, AE-30694,"Solar PV, Battery/Storage",11.5,,Category 1,"Lone Rock, Richland County, WI",,Circuit 1057,Approved,6/4/2026,Installation & Construction, AE-30665,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",,,Approved,6/3/2026,Installation & Construction, AE-30676,Solar PV,2.7,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,Approved,6/3/2026,Installation & Construction, AE-30639,"Solar PV, Battery/Storage",13.9,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,Approved,6/1/2026,Installation & Construction, AE-30652,Solar PV,8.4,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,Approved,6/1/2026,Installation & Construction, AE-30641,Solar PV,8.3,,Category 1,"Princeton, Green Lake County, WI",Substation 596,Circuit 1609,Approved,5/28/2026,Installation & Construction, AE-30637,Solar PV,6.8,,Category 1,"Madison, Dane County, WI",,,Approved,5/27/2026,Commissioning Review & Witness Test, AE-30638,Solar PV,11,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,Approved,5/27/2026,Installation & Construction, AE-30629,Solar PV,12,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,Active,5/27/2026,Application Technical Review, AE-30634,Solar PV,9.6,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 316,Approved,5/27/2026,Installation & Construction, AE-30613,Solar PV,5.7,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,5/22/2026,Permission to Operate,6/4/2026 AE-30612,Solar PV,7.6,,Category 1,"New Glarus, Green County, WI",,Circuit 1328,Approved,5/22/2026,Installation & Construction, AE-30615,Solar PV,5.9,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,Approved,5/22/2026,Installation & Construction, AE-30595,Solar PV,25.1,,Category 2,"Bloomington, Grant County, WI",Substation 80,Circuit 211,Approved,5/21/2026,Commissioning Review & Witness Test, AE-30582,Solar PV,19.1,,Category 1,"Brandon, Fond du Lac County, WI",Substation 615,Circuit 1660,Approved,5/21/2026,Installation & Construction, AE-30602,"Solar PV, Battery/Storage",11.5,,Category 1,"Berlin, Waushara County, WI",Substation 633,Circuit 1722,Approved,5/21/2026,Commissioning Review & Witness Test, AE-30601,Solar PV,6.1,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,Approved,5/20/2026,Installation & Construction, AE-30600,Solar PV,14.4,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 404,Circuit 1000,Approved,5/20/2026,Installation & Construction, AE-30599,Solar PV,4.1,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,Approved,5/20/2026,Installation & Construction, AE-29904,Solar PV,5.1,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 197,Approved,5/18/2026,Installation & Construction, AE-30215,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,Approved,5/18/2026,Installation & Construction, AE-30572,Solar PV,7.6,,Category 1,"Monticello, Green County, WI",,,Approved,5/18/2026,Commissioning Review & Witness Test, AE-30556,Solar PV,8.9,,Category 1,"Edmund, Iowa County, WI",Substation 406,Circuit 1009,Approved,5/15/2026,Installation & Construction, AE-30517,Solar PV,7.6,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,5/13/2026,Permission to Operate,6/17/2026 AE-30491,Solar PV,7.6,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 671,Approved,5/8/2026,Installation & Construction, AE-30483,"Solar PV, Battery/Storage",20,20,Category 1,"Winneconne, Winnebago County, WI",,,In service,5/8/2026,Permission to Operate,7/8/2026 AE-30464,Solar PV,7.6,,Category 1,"Poynette, Columbia County, WI",Substation 547,Circuit 1432,Approved,5/7/2026,Installation & Construction, AE-30471,Solar PV,9.6,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 61,Approved,5/7/2026,Commissioning Review & Witness Test, AE-30394,Solar PV,4000,,Category 4,"Berlin, Green Lake County, WI",,,Active,5/7/2026,Supplemental Engineering Studies, AE-30393,Solar PV,5000,,Category 4,"Friendship, Fond du Lac County, WI",,,Active,5/7/2026,Supplemental Engineering Studies, AE-30417,"Solar PV, Battery/Storage",7.7,0,Category 1,"Sun Prairie, Dane County, WI",Substation 698,Circuit 1920,Approved,5/5/2026,Installation & Construction, AE-30424,"Solar PV, Battery/Storage",11.58,,Category 1,"Mt. Horeb, Dane County, WI",Substation 483,Circuit 1212,Approved,5/4/2026,Installation & Construction, AE-30427,Solar PV,12.5,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,Approved,5/4/2026,Commissioning Review & Witness Test, AE-30132,"Solar PV, Battery/Storage",20,,Category 1,"Stoughton, Dane County, WI",,Circuit 1140,Approved,5/1/2026,Installation & Construction, AE-30387,Solar PV,10.3,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,Approved,5/1/2026,Installation & Construction, AE-30370,Solar PV,19.9,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1650,Approved,5/1/2026,Installation & Construction, AE-30358,,299.7,,Category 3,"Madison, Dane County, WI",,,Approved,5/1/2026,Installation & Construction, AE-29967,Solar PV,9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 326,In service,4/29/2026,Permission to Operate,6/19/2026 AE-30396,Solar PV,9.6,,Category 1,"Eldorado, Fond du Lac County, WI",Substation 615,Circuit 1659,Approved,4/29/2026,Installation & Construction, AE-30388,Solar PV,22.8,,Category 2,"Juneau, Dodge County, WI",Substation 53,Circuit 148,Approved,4/29/2026,Installation & Construction, AE-30297,"Solar PV, Battery/Storage",23,,Category 2,"Columbus, Columbia County, WI",Substation 335,Circuit 791,Approved,4/29/2026,Commissioning Review & Witness Test, AE-30316,"Solar PV, Battery/Storage",14.73,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 4,Circuit 3,Approved,4/29/2026,Installation & Construction, AE-30379,Solar PV,3.5,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,4/27/2026,Permission to Operate,6/25/2026 AE-30347,"Solar PV, Battery/Storage",11.5,,Category 1,"Wittenberg, Marathon County, WI",Substation 624,Circuit 1688,In service,4/22/2026,Permission to Operate,7/3/2026 AE-30349,Solar PV,9.1,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,4/22/2026,Permission to Operate,6/12/2026 AE-30319,Solar PV,7.1,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1171,In service,4/21/2026,Permission to Operate,5/20/2026 AE-30332,Solar PV,18.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,4/21/2026,Permission to Operate,6/12/2026 AE-30323,Solar PV,9.8,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,4/20/2026,Permission to Operate,7/3/2026 AE-30318,Solar PV,7.7,,Category 1,"Deforest, Dane County, WI",,Circuit 477,Approved,4/20/2026,Commissioning Review & Witness Test, AE-30277,Solar PV,8.7,,Category 1,"Sauk City, Sauk County, WI",Substation 710,Circuit 1947,Active,4/17/2026,Supplemental Engineering Studies, AE-30263,"Solar PV, Battery/Storage",13.48,,Category 1,"Blanchardville, Green County, WI",Substation 280,Circuit 672,In service,4/17/2026,Permission to Operate,6/22/2026 AE-30278,Solar PV,4.4,,Category 1,"Fond du Lac, Fond du Lac County, WI",,,Withdrawn,4/17/2026,None, AE-30302,"Solar PV, Battery/Storage",11.5,11.5,Category 1,"Antigo, Langlade County, WI",,,In service,4/17/2026,Permission to Operate,5/13/2026 AE-30287,Solar PV,11,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,Approved,4/16/2026,Installation & Construction, AE-30274,Solar PV,15.2,,Category 1,"Blanchardville, Dane County, WI",Substation 280,Circuit 672,Approved,4/16/2026,Commissioning Review & Witness Test, AE-30251,Solar PV,13.3,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,4/13/2026,Permission to Operate,6/26/2026 AE-30249,"Solar PV, Battery/Storage",17.9,,Category 1,"Middleton, Dane County, WI",Substation 686,Circuit 1894,In service,4/13/2026,Permission to Operate,5/18/2026 AE-30237,Solar PV,4.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,4/10/2026,Permission to Operate,5/21/2026 AE-30236,Solar PV,10.6,,Category 1,"Stoughton, Dane County, WI",,Circuit 1140,In service,4/10/2026,Permission to Operate,5/14/2026 AE-30228,Solar PV,7,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,Approved,4/10/2026,Installation & Construction, AE-30213,Solar PV,8.4,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1639,In service,4/7/2026,Permission to Operate,6/29/2026 AE-30211,Solar PV,9.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,4/7/2026,Permission to Operate,5/12/2026 AE-30171,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/6/2026,Installation & Construction, AE-30168,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/6/2026,Installation & Construction, AE-30167,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/6/2026,Installation & Construction, AE-29991,Solar PV,5.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,Approved,4/6/2026,Installation & Construction, AE-30105,Solar PV,22.7,,Category 2,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1732,Approved,4/6/2026,Installation & Construction, AE-30165,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/6/2026,Installation & Construction, AE-29853,Solar PV,9.1,,Category 1,"Genoa City, Walworth County, WI",,Circuit 1666,Approved,4/6/2026,Installation & Construction, AE-30194,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/6/2026,Installation & Construction, AE-30172,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/6/2026,Installation & Construction, AE-30177,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/6/2026,Installation & Construction, AE-30170,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/6/2026,Installation & Construction, AE-30166,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/6/2026,Installation & Construction, AE-30169,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/6/2026,Installation & Construction, AE-30191,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,Approved,4/3/2026,Installation & Construction, AE-30155,Solar PV,7.7,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,4/3/2026,Permission to Operate,6/12/2026 AE-30175,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30182,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,Approved,4/3/2026,Installation & Construction, AE-30174,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30181,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30180,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30184,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30183,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,Approved,4/3/2026,Installation & Construction, AE-30192,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30190,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,Approved,4/3/2026,Installation & Construction, AE-30189,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30176,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30187,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30179,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30188,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30185,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,Approved,4/3/2026,Installation & Construction, AE-30193,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30178,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30186,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,Approved,4/3/2026,Installation & Construction, AE-30173,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",,,Approved,4/3/2026,Installation & Construction, AE-30120,Solar PV,12.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1518,In service,4/2/2026,Permission to Operate,6/5/2026 AE-30074,"Solar PV, Battery/Storage",26.86,,Category 1,"Fitchburg, Dane County, WI",Substation 722,Circuit 1968,Approved,4/2/2026,Installation & Construction, AE-30130,Solar PV,20.2,,Category 2,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,Approved,4/2/2026,Installation & Construction, AE-30118,"Solar PV, Battery/Storage",13.88,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,3/30/2026,Permission to Operate,6/26/2026 AE-30103,Solar PV,11.5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,3/30/2026,Permission to Operate,5/29/2026 AE-30110,Solar PV,6.3,,Category 1,"New Glarus, Green County, WI",,Circuit 1327,In service,3/30/2026,Permission to Operate,7/1/2026 AE-30116,Solar PV,4.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 4,Circuit 5,In service,3/30/2026,Permission to Operate,5/14/2026 AE-30106,Solar PV,22.8,,Category 2,"Verona, Dane County, WI",Substation 119,Circuit 331,Approved,3/30/2026,Commissioning Review & Witness Test, AE-29889,Solar PV,14.7,,Category 1,"Rudolph, Wood County, WI",Substation 630,Circuit 1714,Approved,3/27/2026,Installation & Construction, AE-30061,Solar PV,313.6,,Category 3,"Oregon, Dane County, WI",,Circuit 1456,In service,3/26/2026,Permission to Operate,6/26/2026 AE-30082,"Solar PV, Battery/Storage",35.344,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,3/26/2026,Permission to Operate,5/21/2026 AE-30081,"Solar PV, Battery/Storage",35.344,,Category 1,"Oregon, Dane County, WI",,,In service,3/26/2026,Permission to Operate,5/13/2026 AE-30069,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,3/25/2026,Permission to Operate,5/13/2026 AE-30062,"Solar PV, Battery/Storage",11.5,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1230,Approved,3/25/2026,Installation & Construction, AE-29803,Solar PV,5000,,Category 4,"Darlington, Lafayette County, WI",,,Active,3/25/2026,Supplemental Engineering Studies, AE-30068,Solar PV,19.2,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,3/24/2026,Permission to Operate,5/20/2026 AE-30085,"Solar PV, Battery/Storage",18.5,7,Category 1,"Omro, Winnebago County, WI",Substation 550,Circuit 1452,In service,3/24/2026,Permission to Operate,5/13/2026 AE-30059,Solar PV,5.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,3/23/2026,Permission to Operate,5/11/2026 AE-30033,"Solar PV, Battery/Storage",467.8,,Category 3,"Mcfarland, Dane County, WI",,Circuit 1143,Approved,3/23/2026,Installation & Construction, AE-30038,Solar PV,12.2,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,3/20/2026,Permission to Operate,6/16/2026 AE-30023,Solar PV,7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,3/20/2026,Permission to Operate,5/29/2026 AE-30051,Solar PV,3.8,,Category 1,"Warrens, Grant County, WI",,Circuit 2113,In service,3/20/2026,Permission to Operate,5/20/2026 AE-30060,"Solar PV, Battery/Storage",11.5,,Category 1,"Keshena, Menominee County, WI",Substation 384,Circuit 944,In service,3/20/2026,Permission to Operate,6/18/2026 AE-30034,Solar PV,7,,Category 1,"Warrens, Monroe County, WI",,Circuit 2113,In service,3/20/2026,Permission to Operate,5/20/2026 AE-30039,Solar PV,8,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,3/20/2026,Permission to Operate,5/29/2026 AE-30020,Solar PV,23,,Category 2,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1877,In service,3/18/2026,Permission to Operate,4/6/2026 AE-29946,Solar PV,20,,Category 1,"Wautoma, Waushara County, WI",Substation 742,Circuit 2035,Approved,3/18/2026,Commissioning Review & Witness Test, AE-29994,Solar PV,11.4,,Category 1,"Plain, Sauk County, WI",Substation 710,Circuit 1946,Approved,3/17/2026,Installation & Construction, AE-29802,Solar PV,5000,,Category 4,"Monroe, Green County, WI",,,Active,3/17/2026,Supplemental Engineering Studies, AE-30014,Solar PV,9.6,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,3/16/2026,Permission to Operate,4/24/2026 AE-29985,"Solar PV, Battery/Storage",16.02,,Category 1,"Madison, Dane County, WI",Substation 76,Circuit 186,In service,3/13/2026,Permission to Operate,6/4/2026 AE-29999,Solar PV,15.4,,Category 1,"Blanchardville, Green County, WI",Substation 77,Circuit 192,In service,3/12/2026,Permission to Operate,6/4/2026 AE-29995,Solar PV,7.6,,Category 1,"Berlin, Waushara County, WI",Substation 633,Circuit 1722,Approved,3/12/2026,Installation & Construction, AE-30000,"Solar PV, Battery/Storage",14.3,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1191,Approved,3/12/2026,Commissioning Review & Witness Test, AE-29983,Solar PV,11.1,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,Approved,3/11/2026,Installation & Construction, AE-29890,Solar PV,20,,Category 1,"Wautoma, Waushara County, WI",,,In service,3/6/2026,Permission to Operate,6/29/2026 AE-29970,"Solar PV, Battery/Storage",11.28,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,Approved,3/5/2026,Commissioning Review & Witness Test, AE-29956,Solar PV,7.6,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 696,Approved,3/4/2026,Commissioning Review & Witness Test, AE-29947,Solar PV,5.7,,Category 1,"Beaver Dam, Dodge County, WI",,,Approved,3/4/2026,Installation & Construction, AE-29930,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/2/2026,Permission to Operate,4/24/2026 AE-29941,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/2/2026,Permission to Operate,4/24/2026 AE-29931,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/2/2026,Permission to Operate,4/22/2026 AE-29929,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/2/2026,Permission to Operate,4/22/2026 AE-29932,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/2/2026,Permission to Operate,4/24/2026 AE-29933,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/2/2026,Permission to Operate,5/5/2026 AE-29910,Solar PV,5000,,Category 4,"Spring Green, Sauk County, WI",,,Active,2/27/2026,Supplemental Engineering Studies, AE-29911,Solar PV,3750,,Category 4,"Brooklyn, Dane County, WI",,,Active,2/27/2026,Supplemental Engineering Studies, AE-29909,Solar PV,5000,,Category 4,"Brooklyn, Dane County, WI",,,Active,2/27/2026,Supplemental Engineering Studies, AE-29913,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,2/25/2026,Permission to Operate,6/25/2026 AE-29912,Solar PV,6.7,,Category 1,"Edgerton, Dane County, WI",Substation 196,Circuit 451,In service,2/24/2026,Permission to Operate,4/27/2026 AE-29579,Solar PV,5.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,Approved,2/23/2026,Installation & Construction, AE-29905,"Solar PV, Battery/Storage",11.5,,Category 1,"Green Lake, Green Lake County, WI",,Circuit 454,Approved,2/23/2026,Commissioning Review & Witness Test, AE-29891,Solar PV,12.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,2/20/2026,Permission to Operate,4/24/2026 AE-29901,Solar PV,5,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,2/20/2026,Permission to Operate,5/5/2026 AE-29888,Solar PV,5.8,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,Approved,2/20/2026,Commissioning Review & Witness Test, AE-29897,"Solar PV, Battery/Storage",11.5,,Category 1,"Mount Horeb, Dane County, WI",,,Approved,2/20/2026,Installation & Construction, AE-29500,Solar PV,7.6,,Category 1,"Deerfield, Dane County, WI",,,Approved,2/19/2026,Installation & Construction, AE-29884,Solar PV,7.7,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1304,In service,2/17/2026,Permission to Operate,5/14/2026 AE-29875,Solar PV,6.1,,Category 1,"Mineral Point, Lafayette County, WI",Substation 59,Circuit 161,In service,2/16/2026,Permission to Operate,5/18/2026 AE-29873,Solar PV,286,,Category 3,"Janesville, Rock County, WI",,Circuit 1683,Approved,2/16/2026,Installation & Construction, AE-29871,Solar PV,6.6,,Category 1,"Portage, Columbia County, WI",,Circuit 1551,In service,2/12/2026,Permission to Operate,3/13/2026 AE-29799,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,2/12/2026,Permission to Operate,5/4/2026 AE-29860,Solar PV,3.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,2/10/2026,Permission to Operate,4/24/2026 AE-29861,"Solar PV, Battery/Storage",18.5,,Category 1,"Scandanavia, Waupaca County, WI",,,In service,2/10/2026,Permission to Operate,3/30/2026 AE-29545,Solar PV,3,,Category 1,"Delevan, Walworth County, WI",Substation 81,Circuit 226,In service,2/9/2026,Permission to Operate,3/18/2026 AE-29838,Solar PV,13.3,,Category 1,"Williams Bay, Walworth County, WI",,Circuit 2067,In service,2/6/2026,Permission to Operate,5/12/2026 AE-29840,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1935,Approved,2/6/2026,Commissioning Review & Witness Test, AE-29846,"Solar PV, Battery/Storage",11.5,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 862,In service,2/5/2026,Permission to Operate,6/4/2026 AE-29831,Solar PV,7.6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,2/4/2026,Permission to Operate,5/14/2026 AE-29671,Solar PV,8.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,Approved,2/4/2026,Installation & Construction, AE-29830,Solar PV,16.6,,Category 1,"Sauk City, Dane County, WI",,Circuit 496,In service,2/2/2026,Permission to Operate,6/16/2026 AE-29826,Solar PV,14.3,,Category 1,"Tomah, Monroe County, WI",,Circuit 386,In service,1/30/2026,Permission to Operate,6/26/2026 AE-29480,Solar PV,9.3,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,1/30/2026,Permission to Operate,4/27/2026 AE-29822,Solar PV,19.8,,Category 1,"Wisconsin Dells, Adams County, WI",Substation 387,Circuit 956,In service,1/30/2026,Permission to Operate,4/17/2026 AE-29741,Solar PV,5.1,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,Approved,1/30/2026,Commissioning Review & Witness Test, AE-29824,Solar PV,10.2,,Category 1,"Belleville, Green County, WI",,,Withdrawn,1/30/2026,None, AE-29806,Solar PV,7.5,,Category 1,"Tomah, Monroe County, WI",Substation 277,Circuit 653,In service,1/28/2026,Permission to Operate,3/12/2026 AE-29801,Solar PV,5.6,,Category 1,"Mauston, Juneau County, WI",Substation 776,Circuit 2106,In service,1/28/2026,Permission to Operate,5/8/2026 AE-29783,Solar PV,10.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,1/27/2026,Permission to Operate,4/17/2026 AE-29722,Solar PV,15,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,1/23/2026,Permission to Operate,6/4/2026 AE-29794,Solar PV,13.6,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1218,In service,1/23/2026,Permission to Operate,7/1/2026 AE-29789,Solar PV,13,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 860,In service,1/22/2026,Permission to Operate,5/20/2026 AE-29790,"Solar PV, Battery/Storage",11.5,,Category 1,"Wautoma, Waushara County, WI",Substation 327,Circuit 783,In service,1/22/2026,Permission to Operate,5/19/2026 AE-29788,Solar PV,7.7,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 302,Approved,1/22/2026,Installation & Construction, AE-29782,Solar PV,4.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,Approved,1/21/2026,Installation & Construction, AE-29288,Solar PV,6.9,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 355,Circuit 855,In service,1/20/2026,Permission to Operate,6/26/2026 AE-29777,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1585,In service,1/20/2026,Permission to Operate,4/24/2026 AE-29775,Solar PV,7.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2201,In service,1/19/2026,Permission to Operate,2/18/2026 AE-29761,Solar PV,6.1,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,1/14/2026,Permission to Operate,4/7/2026 AE-29760,Solar PV,3,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,Approved,1/14/2026,Installation & Construction, AE-29749,Solar PV,6.4,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1435,In service,1/13/2026,Permission to Operate,5/7/2026 AE-29751,"Solar PV, Battery/Storage",19.6,,Category 1,"Lone Rock, Richland County, WI",Substation 606,Circuit 1636,In service,1/13/2026,Permission to Operate,6/4/2026 AE-29756,Solar PV,8.3,,Category 1,"Potosi, Grant County, WI",,Circuit 2218,Approved,1/13/2026,Commissioning Review & Witness Test, AE-29691,Solar PV,7.6,,Category 1,"Vesper, Wood County, WI",Substation 723,Circuit 1974,Approved,1/13/2026,Installation & Construction, AE-29753,Solar PV,7.7,,Category 1,"Portage, Columbia County, WI",,Circuit 1554,In service,1/13/2026,Permission to Operate,4/6/2026 AE-29750,Solar PV,10.6,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2173,In service,1/12/2026,Permission to Operate,5/14/2026 AE-29733,Solar PV,12.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,1/12/2026,Permission to Operate,4/27/2026 AE-29748,"Solar PV, Battery/Storage",11.5,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 61,In service,1/12/2026,Permission to Operate,3/19/2026 AE-29746,Solar PV,11.4,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 318,In service,1/12/2026,Permission to Operate,5/8/2026 AE-29743,Solar PV,5.3,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,1/9/2026,Permission to Operate,4/24/2026 AE-29742,Solar PV,11,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,1/9/2026,Permission to Operate,3/18/2026 AE-29475,Solar PV,4.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,1/9/2026,Permission to Operate,4/21/2026 AE-29417,Solar PV,7.4,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1737,In service,1/9/2026,Permission to Operate,6/23/2026 AE-29416,Solar PV,6.7,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,1/9/2026,Permission to Operate,7/3/2026 AE-29653,Solar PV,7.7,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,1/9/2026,Permission to Operate,5/29/2026 AE-29738,Solar PV,4.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,1/8/2026,Permission to Operate,3/2/2026 AE-29551,Solar PV,6.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,1/8/2026,Permission to Operate,5/14/2026 AE-29695,"Solar PV, Battery/Storage",33.05,,Category 2,"Edgerton, Jefferson County, WI",,Circuit 569,In service,1/8/2026,Permission to Operate,2/20/2026 AE-29727,Solar PV,4.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,1/6/2026,Permission to Operate,6/5/2026 AE-29732,Solar PV,6.5,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,1/6/2026,Permission to Operate,2/11/2026 AE-29465,Solar PV,2.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,1/6/2026,Permission to Operate,2/2/2026 AE-29712,Solar PV,3.9,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1304,In service,1/2/2026,Permission to Operate,5/5/2026 AE-28105,Solar PV,3.5,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,1/2/2026,Permission to Operate,2/20/2026 AE-29565,Solar PV,3.2,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1199,In service,1/2/2026,Permission to Operate,4/24/2026 AE-29717,Solar PV,11.2,,Category 1,"Fox Lake, Dodge County, WI",Substation 278,Circuit 663,In service,1/2/2026,Permission to Operate,2/25/2026 AE-29387,Solar PV,4.5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,1/2/2026,Permission to Operate,2/18/2026 AE-29422,Solar PV,5.4,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,1/2/2026,Permission to Operate,2/18/2026 AE-29555,Solar PV,3.5,,Category 1,"Arlington, Columbia County, WI",Substation 13,Circuit 53,Approved,1/2/2026,Installation & Construction, AE-29364,Solar PV,7,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1043,In service,1/2/2026,Permission to Operate,2/6/2026 AE-29713,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,12/31/2025,Permission to Operate,4/14/2026 AE-29698,Solar PV,7.7,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,12/29/2025,Permission to Operate,3/2/2026 AE-29694,Solar PV,11.4,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1521,In service,12/29/2025,Permission to Operate,2/13/2026 AE-29672,"Solar PV, Battery/Storage",701.1,,Category 3,"Oregon, Dane County, WI",,Circuit 1459,Active,12/29/2025,Application Technical Review, AE-29669,"Solar PV, Battery/Storage",261,,Category 3,"Oregon, Dane County, WI",,Circuit 1459,Active,12/29/2025,Application Technical Review, AE-29684,Solar PV,9.9,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,12/26/2025,Permission to Operate,2/12/2026 AE-29687,Solar PV,7,,Category 1,"Hancock, Waushara County, WI",Substation 327,Circuit 786,Approved,12/26/2025,Commissioning Review & Witness Test, AE-29679,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,12/23/2025,Permission to Operate,2/11/2026 AE-29680,Solar PV,5.2,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,12/23/2025,Permission to Operate,4/29/2026 AE-29674,Solar PV,6.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,12/23/2025,Permission to Operate,4/24/2026 AE-29661,"Solar PV, Battery/Storage",17.62,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 360,In service,12/19/2025,Permission to Operate,2/4/2026 AE-29658,Solar PV,3.5,,Category 1,"Edgerton, Rock County, WI",,Circuit 570,In service,12/19/2025,Permission to Operate,2/20/2026 AE-29666,Solar PV,3.5,,Category 1,"Bloomington, Grant County, WI",Substation 80,Circuit 209,In service,12/19/2025,Permission to Operate,3/9/2026 AE-29673,Solar PV,6.6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 124,Circuit 337,In service,12/19/2025,Permission to Operate,2/24/2026 AE-29678,Solar PV,3.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1734,In service,12/19/2025,Permission to Operate,2/5/2026 AE-29657,Solar PV,14.6,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 507,In service,12/17/2025,Permission to Operate,4/17/2026 AE-29645,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,Approved,12/17/2025,Installation & Construction, AE-29668,"Solar PV, Battery/Storage",15.8,,Category 1,"Fox Lake, Dodge County, WI",Substation 278,Circuit 662,In service,12/17/2025,Permission to Operate,5/7/2026 AE-29637,Solar PV,5.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,Approved,12/17/2025,Installation & Construction, AE-29659,Solar PV,11.5,,Category 1,"Montfort, Iowa County, WI",,,Approved,12/17/2025,Installation & Construction, AE-29648,Solar PV,3.9,,Category 1,"Horicon, Dodge County, WI",,Circuit 808,In service,12/16/2025,Permission to Operate,1/22/2026 AE-29649,Solar PV,11.8,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1118,In service,12/16/2025,Permission to Operate,1/22/2026 AE-29628,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,Approved,12/12/2025,Installation & Construction, AE-29622,"Solar PV, Battery/Storage",11.5,,Category 1,"Hillsboro, Vernon County, WI",Substation 340,Circuit 805,In service,12/12/2025,Permission to Operate,4/24/2026 AE-29623,"Solar PV, Battery/Storage",11.5,,Category 1,"Hillsboro, Vernon County, WI",,,In service,12/12/2025,Permission to Operate,5/11/2026 AE-29548,"Solar PV, Battery/Storage",10,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,Approved,12/12/2025,Installation & Construction, AE-29621,"Solar PV, Battery/Storage",11.5,,Category 1,"Hillsboro, Vernon County, WI",Substation 340,Circuit 805,In service,12/12/2025,Permission to Operate,4/24/2026 AE-29618,Solar PV,5.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,12/11/2025,Permission to Operate,2/10/2026 AE-29629,Solar PV,9.8,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1117,In service,12/11/2025,Permission to Operate,1/30/2026 AE-29616,Solar PV,3.9,,Category 1,"Horicon, Dodge County, WI",,Circuit 808,In service,12/11/2025,Permission to Operate,1/27/2026 AE-29606,Solar PV,7,,Category 1,"Pine River, Waushara County, WI",Substation 281,Circuit 675,In service,12/11/2025,Permission to Operate,2/3/2026 AE-29608,Solar PV,5.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,12/10/2025,Permission to Operate,2/5/2026 AE-29526,Solar PV,5000,,Category 4,"Albany, Green County, WI",,,Active,12/10/2025,Supplemental Engineering Studies, AE-29492,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,12/9/2025,Permission to Operate,2/10/2026 AE-29491,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,12/9/2025,Permission to Operate,2/10/2026 AE-29593,Solar PV,7.8,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,Approved,12/9/2025,Installation & Construction, AE-29583,Solar PV,4.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,12/8/2025,Permission to Operate,5/5/2026 AE-29582,Solar PV,6.6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 124,Circuit 335,In service,12/8/2025,Permission to Operate,1/21/2026 AE-29577,Solar PV,5.9,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1117,In service,12/8/2025,Permission to Operate,1/21/2026 AE-29388,Solar PV,12,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,12/8/2025,Permission to Operate,2/25/2026 AE-29603,Solar PV,7.2,,Category 1,"Waupun, Fond du Lac County, WI",,Circuit 1279,In service,12/8/2025,Permission to Operate,1/29/2026 AE-29602,Solar PV,7,,Category 1,"Fond du Lac, Fond du Lac County, WI",,,In service,12/8/2025,Permission to Operate,7/2/2026 AE-29547,"Solar PV, Battery/Storage",27.4,,Category 2,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,Approved,12/5/2025,Installation & Construction, AE-29546,Battery/Storage,11.5,0,Category 1,"Albany, Green County, WI",,,In service,12/5/2025,Permission to Operate,3/12/2026 AE-29356,"Solar PV, Battery/Storage",14.5,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 346,Circuit 831,Approved,12/4/2025,Installation & Construction, AE-29514,Solar PV,9.8,,Category 1,"Randolph, Dodge County, WI",,Circuit 1593,In service,12/3/2025,Permission to Operate,1/22/2026 AE-29544,Solar PV,7.2,,Category 1,"Shawano, Shawano County, WI",Substation 652,Circuit 1789,In service,12/3/2025,Permission to Operate,12/29/2025 AE-29554,Solar PV,3.8,,Category 1,"Wild Rose, Waukesha County, WI",Substation 771,Circuit 2084,In service,12/3/2025,Permission to Operate,5/5/2026 AE-29556,Solar PV,7.9,,Category 1,"Randolph, Dodge County, WI",,Circuit 1591,In service,12/3/2025,Permission to Operate,2/18/2026 AE-29559,Solar PV,7.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,12/3/2025,Permission to Operate,1/23/2026 AE-28688,Solar PV,15.2,,Category 1,"Clintonville, Shawano County, WI",Substation 69,Circuit 168,In service,12/3/2025,Permission to Operate,1/21/2026 AE-29561,Solar PV,9.8,,Category 1,"Fox Lake, Dodge County, WI",,,Approved,12/3/2025,Installation & Construction, AE-29227,Solar PV,8.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,12/2/2025,Permission to Operate,2/18/2026 AE-29519,Solar PV,4.6,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,12/2/2025,Permission to Operate,2/6/2026 AE-29517,Solar PV,3.9,,Category 1,"Fox Lake, Dodge County, WI",Substation 278,Circuit 662,In service,12/2/2025,Permission to Operate,1/13/2026 AE-29490,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/26/2025,Permission to Operate,1/29/2026 AE-29493,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/26/2025,Permission to Operate,1/29/2026 AE-29470,Solar PV,3.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 625,In service,11/26/2025,Permission to Operate,2/18/2026 AE-29459,Solar PV,4.5,,Category 1,"De Forest, Dane County, WI",Substation 726,Circuit 1984,In service,11/26/2025,Permission to Operate,12/31/2025 AE-29507,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1198,In service,11/26/2025,Permission to Operate,1/6/2026 AE-29474,"Solar PV, Battery/Storage",23,,Category 2,"Mcfarland, Dane County, WI",,Circuit 1141,In service,11/26/2025,Permission to Operate,1/6/2026 AE-29512,Solar PV,8.4,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,Approved,11/26/2025,Installation & Construction, AE-29154,Solar PV,3000,,Category 4,"Rudolph, Wood County, WI",,,Active,11/26/2025,Supplemental Engineering Studies, AE-29477,Solar PV,20,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1815,In service,11/25/2025,Permission to Operate,5/13/2026 AE-29355,"Solar PV, Battery/Storage",16.8,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 346,Circuit 831,Approved,11/25/2025,Installation & Construction, AE-29290,"Solar PV, Battery/Storage",40.2,,Category 2,"Verona, Dane County, WI",Substation 280,Circuit 670,Approved,11/24/2025,Commissioning Review & Witness Test, AE-29464,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/21/2025,Permission to Operate,1/29/2026 AE-29270,Solar PV,9.4,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,11/21/2025,Permission to Operate,5/13/2026 AE-29463,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/21/2025,Permission to Operate,1/29/2026 AE-29444,"Solar PV, Battery/Storage",19.5,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 778,In service,11/21/2025,Permission to Operate,2/11/2026 AE-29461,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/21/2025,Permission to Operate,1/29/2026 AE-29460,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/21/2025,Permission to Operate,1/29/2026 AE-29449,Solar PV,3.5,,Category 1,"Browntown, Lafayette County, WI",,Circuit 930,Approved,11/21/2025,Installation & Construction, AE-29435,Solar PV,13.1,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,In service,11/20/2025,Permission to Operate,5/12/2026 AE-29415,Solar PV,5.9,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,11/20/2025,Permission to Operate,1/14/2026 AE-28104,Solar PV,4.8,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 535,Circuit 1380,Approved,11/20/2025,Installation & Construction, AE-29397,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,11/14/2025,Permission to Operate,2/6/2026 AE-29269,"Solar PV, Battery/Storage",16.18,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,11/14/2025,Permission to Operate,6/5/2026 AE-29379,"Solar PV, Battery/Storage",15.68,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,11/13/2025,Permission to Operate,12/23/2025 AE-28139,Solar PV,5.4,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,11/12/2025,Permission to Operate,1/13/2026 AE-29370,"Solar PV, Battery/Storage",19.8,,Category 1,"Baraboo, Sauk County, WI",Substation 418,Circuit 1039,In service,11/12/2025,Permission to Operate,1/7/2026 AE-28852,"Solar PV, Battery/Storage",16.88,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,11/12/2025,Permission to Operate,1/21/2026 AE-29357,Solar PV,7.5,,Category 1,"Milton, Dane County, WI",Substation 419,Circuit 1043,In service,11/12/2025,Permission to Operate,1/16/2026 AE-29330,"Solar PV, Battery/Storage",11.5,,Category 1,"Hillsboro, Vernon County, WI",Substation 340,Circuit 805,In service,11/11/2025,Permission to Operate,5/8/2026 AE-29348,Solar PV,11.5,,Category 1,"Berlin, Waushara County, WI",Substation 633,Circuit 1722,In service,11/11/2025,Permission to Operate,12/18/2025 AE-29265,Solar PV,4.2,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1927,In service,11/11/2025,Permission to Operate,2/11/2026 AE-29345,Solar PV,4.9,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 316,In service,11/10/2025,Permission to Operate,5/18/2026 AE-29286,Solar PV,15.2,,Category 1,"Poynette, Columbia County, WI",Substation 335,Circuit 790,In service,11/10/2025,Permission to Operate,2/25/2026 AE-29303,Solar PV,8.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,11/10/2025,Permission to Operate,1/30/2026 AE-29145,"Solar PV, Battery/Storage",11.52,,Category 1,"Mazomanie, Dane County, WI",,,Approved,11/10/2025,Installation & Construction, AE-28498,"Solar PV, Battery/Storage",7.64,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1664,In service,11/7/2025,Permission to Operate,1/27/2026 AE-29326,"Solar PV, Battery/Storage",12.38,,Category 1,"Manawa, Waupaca County, WI",Substation 433,Circuit 1099,In service,11/7/2025,Permission to Operate,1/16/2026 AE-27593,Solar PV,6.1,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,11/6/2025,Permission to Operate,12/17/2025 AE-29283,"Solar PV, Battery/Storage",15,,Category 1,"Brodhead, Green County, WI",Substation 96,Circuit 259,In service,11/6/2025,Permission to Operate,12/31/2025 AE-29199,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,11/5/2025,Permission to Operate,2/2/2026 AE-29262,Solar PV,38.5,,Category 2,"Keshena, Menominee County, WI",Substation 652,Circuit 1789,In service,11/5/2025,Permission to Operate,3/18/2026 AE-29194,Solar PV,4.9,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,11/5/2025,Permission to Operate,11/26/2025 AE-29257,Solar PV,7,,Category 1,"Hancock, Waushara County, WI",Substation 327,Circuit 783,In service,11/5/2025,Permission to Operate,3/24/2026 AE-29204,Solar PV,8.5,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,11/5/2025,Permission to Operate,1/7/2026 AE-29221,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,11/5/2025,Permission to Operate,1/30/2026 AE-29191,Solar PV,8.4,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,11/5/2025,Permission to Operate,12/23/2025 AE-29190,Solar PV,2.9,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,11/5/2025,Permission to Operate,12/3/2025 AE-28858,Solar PV,9.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 106,Circuit 292,In service,11/5/2025,Permission to Operate,2/4/2026 AE-29201,Solar PV,19.9,,Category 1,"Brooklyn, Washington County, WI",Substation 108,Circuit 303,In service,11/5/2025,Permission to Operate,1/22/2026 AE-29226,Solar PV,8.6,,Category 1,"Ridgeway, Iowa County, WI",Substation 37,Circuit 94,In service,11/5/2025,Permission to Operate,2/20/2026 AE-29209,Solar PV,4.7,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1168,In service,11/4/2025,Permission to Operate,12/21/2025 AE-29189,Solar PV,9.9,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 2154,In service,11/4/2025,Permission to Operate,3/3/2026 AE-29188,Solar PV,8.99,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1637,In service,11/4/2025,Permission to Operate,6/9/2026 AE-29170,Solar PV,8.4,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1212,In service,11/4/2025,Permission to Operate,3/9/2026 AE-29208,Solar PV,8.6,,Category 1,"Ridgeway, Iowa County, WI",,,In service,11/4/2025,Permission to Operate,2/11/2026 AE-28277,Solar PV,7.6,,Category 1,"Wisconsin Dells, Adams County, WI",,,Approved,11/4/2025,Installation & Construction, AE-29143,"Solar PV, Battery/Storage",15.884,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,11/3/2025,Permission to Operate,12/12/2025 AE-29185,Solar PV,12.5,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 91,Circuit 249,In service,11/3/2025,Permission to Operate,1/12/2026 AE-29183,Solar PV,4.9,,Category 1,"Potosi, Grant County, WI",,Circuit 2218,In service,11/3/2025,Permission to Operate,1/6/2026 AE-29106,Solar PV,7.2,,Category 1,"Wonewoc, Juneau County, WI",,Circuit 1959,In service,11/3/2025,Permission to Operate,2/20/2026 AE-29132,Solar PV,5.9,,Category 1,"Blanchardville, Green County, WI",Substation 77,Circuit 192,In service,10/31/2025,Permission to Operate,1/27/2026 AE-29141,Solar PV,4.1,,Category 1,"Platteville, Grant County, WI",,,In service,10/31/2025,Permission to Operate,3/4/2026 AE-29095,Solar PV,7.3,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1501,In service,10/30/2025,Permission to Operate,1/22/2026 AE-29087,Solar PV,4.9,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,10/29/2025,Permission to Operate,2/4/2026 AE-29059,Solar PV,4.1,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,10/29/2025,Permission to Operate,12/8/2025 AE-29062,Solar PV,4.1,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,10/29/2025,Permission to Operate,11/26/2025 AE-29072,Solar PV,7,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,10/29/2025,Permission to Operate,1/30/2026 AE-29050,Solar PV,11,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1894,In service,10/29/2025,Permission to Operate,12/18/2025 AE-29046,Solar PV,12.5,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1191,In service,10/29/2025,Permission to Operate,12/10/2025 AE-29187,Solar PV,6.3,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,10/29/2025,Permission to Operate,2/2/2026 AE-29180,Solar PV,4.7,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1698,In service,10/29/2025,Permission to Operate,1/14/2026 AE-28972,Solar PV,11.4,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,In service,10/28/2025,Permission to Operate,1/8/2026 AE-29025,Solar PV,8.4,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,10/28/2025,Permission to Operate,6/10/2026 AE-29029,"Solar PV, Battery/Storage",11.5,,Category 1,"Avoca, Iowa County, WI",Substation 783,Circuit 2137,In service,10/28/2025,Permission to Operate,1/27/2026 AE-29040,Solar PV,9.8,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,10/28/2025,Permission to Operate,2/3/2026 AE-29019,Solar PV,7.3,,Category 1,"Cassville, Grant County, WI",Substation 517,Circuit 1325,In service,10/28/2025,Permission to Operate,2/2/2026 AE-29016,Solar PV,16,,Category 1,"Blanchardville, Green County, WI",Substation 280,Circuit 672,In service,10/27/2025,Permission to Operate,1/29/2026 AE-28997,Solar PV,6.3,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 861,In service,10/27/2025,Permission to Operate,12/10/2025 AE-29014,Solar PV,10.8,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 61,In service,10/27/2025,Permission to Operate,1/9/2026 AE-29100,Solar PV,7,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,10/27/2025,Permission to Operate,1/7/2026 AE-29020,Solar PV,17.2,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 106,Circuit 294,In service,10/24/2025,Permission to Operate,1/16/2026 AE-28945,Solar PV,7,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,10/24/2025,Permission to Operate,12/3/2025 AE-28924,"Solar PV, Battery/Storage",15,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 496,Circuit 1257,In service,10/23/2025,Permission to Operate,12/31/2025 AE-28906,Solar PV,5.9,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1519,In service,10/23/2025,Permission to Operate,11/26/2025 AE-29079,Solar PV,5.8,,Category 1,"Shawano, Shawano County, WI",Substation 652,Circuit 1788,In service,10/23/2025,Permission to Operate,12/3/2025 AE-28928,Solar PV,7.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 623,In service,10/23/2025,Permission to Operate,1/6/2026 AE-28916,Solar PV,5.8,,Category 1,"Princeton, Green Lake County, WI",Substation 596,Circuit 1608,In service,10/23/2025,Permission to Operate,12/24/2025 AE-28920,"Solar PV, Battery/Storage",20,20,Category 1,"Cross Plains, Dane County, WI",Substation 686,Circuit 1895,Approved,10/23/2025,Installation & Construction, AE-29077,Solar PV,4.6,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 23,In service,10/23/2025,Permission to Operate,2/18/2026 AE-28556,Solar PV,4.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,10/21/2025,Permission to Operate,1/28/2026 AE-28611,Solar PV,7.6,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1639,In service,10/21/2025,Permission to Operate,11/21/2025 AE-28600,"Solar PV, Battery/Storage",38.8,,Category 2,"Cross Plains, Dane County, WI",Substation 483,Circuit 1209,In service,10/21/2025,Permission to Operate,2/4/2026 AE-28969,Solar PV,7.6,,Category 1,"Montello, Marquette County, WI",,,Approved,10/21/2025,Installation & Construction, AE-28689,Solar PV,3.8,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,10/20/2025,Permission to Operate,11/25/2025 AE-28882,Solar PV,7.6,,Category 1,"New Glarus, Green County, WI",,Circuit 1327,In service,10/20/2025,Permission to Operate,12/10/2025 AE-28853,Solar PV,7.6,,Category 1,"Mt. Horeb, Dane County, WI",Substation 280,Circuit 670,In service,10/20/2025,Permission to Operate,1/14/2026 AE-28856,"Solar PV, Battery/Storage",37.1,,Category 2,"Mcfarland, Dane County, WI",Substation 146,Circuit 390,Approved,10/20/2025,Installation & Construction, AE-28746,Solar PV,13,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 670,In service,10/17/2025,Permission to Operate,2/3/2026 AE-28825,Solar PV,6.4,,Category 1,"Delavan, Walworth County, WI",Substation 52,Circuit 146,In service,10/17/2025,Permission to Operate,2/9/2026 AE-28826,Solar PV,4.5,,Category 1,"Fitchburg, Dane County, WI",Substation 579,Circuit 1521,In service,10/17/2025,Permission to Operate,2/6/2026 AE-28824,Solar PV,5.1,,Category 1,"Pardeeville, Columbia County, WI",Substation 448,Circuit 1115,In service,10/17/2025,Permission to Operate,1/15/2026 AE-28897,Solar PV,52.8,,Category 2,"Merimac, Sauk County, WI",Substation 466,Circuit 1157,In service,10/17/2025,Permission to Operate,1/16/2026 AE-28814,Solar PV,9.2,,Category 1,"Stoughton, Dane County, WI",Substation 676,Circuit 1871,In service,10/17/2025,Permission to Operate,12/12/2025 AE-28792,Solar PV,7.7,,Category 1,"Richland Center, Richland County, WI",Substation 606,Circuit 1636,In service,10/17/2025,Permission to Operate,12/31/2025 AE-28749,Solar PV,5.7,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1815,In service,10/17/2025,Permission to Operate,12/23/2025 AE-28769,Solar PV,12,,Category 1,"Mount Horeb, Green County, WI",Substation 280,Circuit 672,In service,10/16/2025,Permission to Operate,12/30/2025 AE-28775,Solar PV,7.6,,Category 1,"Marshfield, Wood County, WI",Substation 573,Circuit 1508,In service,10/16/2025,Permission to Operate,12/21/2025 AE-28781,Solar PV,9.1,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,10/16/2025,Permission to Operate,2/10/2026 AE-28708,Solar PV,10,,Category 1,"Columbus, Columbia County, WI",Substation 269,Circuit 632,In service,10/13/2025,Permission to Operate,2/6/2026 AE-28734,"Solar PV, Battery/Storage",25.56,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1129,In service,10/13/2025,Permission to Operate,12/8/2025 AE-28739,Solar PV,9.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,10/13/2025,Permission to Operate,1/7/2026 AE-28722,Solar PV,14.7,,Category 1,"Windsor, Dane County, WI",,Circuit 2144,Approved,10/13/2025,Installation & Construction, AE-28748,Solar PV,4.4,,Category 1,"Platteville, Grant County, WI",,,Active,10/13/2025,Application Technical Review, AE-28675,Solar PV,14.732,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/10/2025,Permission to Operate,12/29/2025 AE-28703,Solar PV,5.1,,Category 1,"Pardeeville, Columbia County, WI",Substation 448,Circuit 1115,In service,10/10/2025,Permission to Operate,1/23/2026 AE-28677,Solar PV,4.9,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,10/10/2025,Permission to Operate,1/8/2026 AE-28535,Solar PV,2.9,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1432,In service,10/10/2025,Permission to Operate,12/8/2025 AE-28647,Solar PV,4.9,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/10/2025,Permission to Operate,12/10/2025 AE-28646,"Solar PV, Battery/Storage",32.36,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,Approved,10/10/2025,Installation & Construction, AE-28537,Solar PV,6.2,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1988,Approved,10/10/2025,Installation & Construction, AE-28147,Solar PV,5.4,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,Approved,10/10/2025,Installation & Construction, AE-28660,Solar PV,26.6,,Category 2,"Delavan, Walworth County, WI",,,Approved,10/10/2025,Installation & Construction, AE-28630,"Solar PV, Battery/Storage",23,,Category 2,"Marshfield, Wood County, WI",Substation 573,Circuit 1508,In service,10/9/2025,Permission to Operate,1/13/2026 AE-28639,Solar PV,11.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,10/9/2025,Permission to Operate,12/17/2025 AE-28633,Solar PV,8.4,,Category 1,"Warrens, Monroe County, WI",,,Approved,10/9/2025,Installation & Construction, AE-28719,Solar PV,9.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1306,In service,10/8/2025,Permission to Operate,12/21/2025 AE-28745,Solar PV,11.8,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2197,In service,10/8/2025,Permission to Operate,12/18/2025 AE-28773,Solar PV,7.6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,10/8/2025,Permission to Operate,12/23/2025 AE-28635,Solar PV,5.6,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,10/7/2025,Permission to Operate,11/22/2025 AE-28672,Solar PV,38.3,,Category 2,"Prairie Du Sac, Sauk County, WI",Substation 710,Circuit 1948,In service,10/7/2025,Permission to Operate,4/6/2026 AE-28361,Solar PV,20,,Category 1,"Gratiot, Lafayette County, WI",Substation 770,Circuit 2082,In service,10/6/2025,Permission to Operate,2/20/2026 AE-28565,Solar PV,8,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,10/6/2025,Permission to Operate,2/3/2026 AE-28571,Solar PV,7.6,,Category 1,"Ripon, Fond du Lac County, WI",Substation 537,Circuit 1403,In service,10/6/2025,Permission to Operate,12/12/2025 AE-28563,Solar PV,8.7,,Category 1,"Cross Plains, Dane County, WI",Substation 686,Circuit 1895,In service,10/6/2025,Permission to Operate,2/12/2026 AE-28601,Solar PV,9.8,,Category 1,"Verona, Dane County, WI",Substation 57,Circuit 152,In service,10/6/2025,Permission to Operate,12/8/2025 AE-28575,Solar PV,3.5,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,10/6/2025,Permission to Operate,12/3/2025 AE-28603,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,10/6/2025,Permission to Operate,12/21/2025 AE-28246,"Solar PV, Battery/Storage",20,20,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,10/6/2025,Permission to Operate,12/24/2025 AE-28287,Solar PV,6.6,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1226,In service,10/6/2025,Permission to Operate,11/26/2025 AE-28564,Solar PV,10.1,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,10/6/2025,Permission to Operate,2/25/2026 AE-28557,Solar PV,4.9,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,10/6/2025,Permission to Operate,1/30/2026 AE-28322,Solar PV,9,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 202,In service,10/6/2025,Permission to Operate,12/3/2025 AE-28534,Solar PV,7.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,10/3/2025,Permission to Operate,2/18/2026 AE-28481,Solar PV,7.6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,10/3/2025,Permission to Operate,12/17/2025 AE-28522,Solar PV,11.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1304,In service,10/3/2025,Permission to Operate,12/17/2025 AE-28477,Solar PV,14.4,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,10/3/2025,Permission to Operate,12/8/2025 AE-28490,Solar PV,9.8,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2197,In service,10/3/2025,Permission to Operate,12/3/2025 AE-28529,Solar PV,6.3,,Category 1,"Mineral Point, Iowa County, WI",Substation 525,Circuit 1344,In service,10/3/2025,Permission to Operate,11/26/2025 AE-28435,Solar PV,10,,Category 1,"Baraboo, Sauk County, WI",Substation 466,Circuit 1155,In service,10/2/2025,Permission to Operate,12/14/2025 AE-28093,Solar PV,11.4,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,10/2/2025,Permission to Operate,2/3/2026 AE-28496,Solar PV,9.1,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,10/2/2025,Permission to Operate,1/15/2026 AE-28504,Solar PV,8,,Category 1,"Verona, Waukesha County, WI",Substation 119,Circuit 327,In service,10/2/2025,Permission to Operate,12/10/2025 AE-28448,Solar PV,5.9,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,10/2/2025,Permission to Operate,12/8/2025 AE-28434,Solar PV,7.9,,Category 1,"Merrimac, Sauk County, WI",Substation 466,Circuit 1156,In service,10/2/2025,Permission to Operate,12/21/2025 AE-28411,Solar PV,7.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 342,Circuit 818,In service,10/2/2025,Permission to Operate,11/7/2025 AE-28438,Solar PV,5.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 625,In service,10/2/2025,Permission to Operate,1/7/2026 AE-28484,"Solar PV, Battery/Storage",17.66,,Category 1,"Vesper, Wood County, WI",Substation 573,Circuit 1507,In service,10/2/2025,Permission to Operate,11/20/2025 AE-28366,"Solar PV, Battery/Storage",23,,Category 2,"Fitchburg, Dane County, WI",Substation 119,Circuit 326,In service,10/2/2025,Permission to Operate,11/26/2025 AE-28486,"Solar PV, Battery/Storage",15,,Category 1,"Brodhead, Green County, WI",Substation 96,Circuit 259,In service,10/2/2025,Permission to Operate,1/7/2026 AE-28431,"Solar PV, Battery/Storage",16.3,,Category 1,"Avoca, Iowa County, WI",Substation 783,Circuit 2137,In service,10/1/2025,Permission to Operate,1/9/2026 AE-28469,Solar PV,5.9,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,10/1/2025,Permission to Operate,12/29/2025 AE-28439,Solar PV,2.9,,Category 1,"Verona, Richland County, WI",Substation 579,Circuit 1521,In service,10/1/2025,Permission to Operate,4/28/2026 AE-28468,Solar PV,6.3,,Category 1,"Darien, Walworth County, WI",Substation 662,Circuit 1822,In service,10/1/2025,Permission to Operate,2/18/2026 AE-28415,Solar PV,12.2,,Category 1,"Janesville, Rusk County, WI",Substation 279,Circuit 664,In service,10/1/2025,Permission to Operate,2/13/2026 AE-28384,Solar PV,7.6,,Category 1,"Friendship, Adams County, WI",Substation 283,Circuit 678,In service,10/1/2025,Permission to Operate,1/12/2026 AE-28402,Solar PV,7.9,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,10/1/2025,Permission to Operate,11/13/2025 AE-28357,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 907,In service,10/1/2025,Permission to Operate,1/13/2026 AE-28341,Solar PV,8.4,,Category 1,"Delavan, Walworth County, WI",Substation 52,Circuit 146,In service,10/1/2025,Permission to Operate,1/27/2026 AE-28430,"Solar PV, Battery/Storage",12.48,,Category 1,"Kendall, Monroe County, WI",Substation 217,Circuit 515,In service,10/1/2025,Permission to Operate,1/16/2026 AE-28412,Solar PV,11.3,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,10/1/2025,Permission to Operate,12/23/2025 AE-28407,Solar PV,11.8,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,10/1/2025,Permission to Operate,1/7/2026 AE-28408,Solar PV,11.2,,Category 1,"Orfordville, Rock County, WI",Substation 551,Circuit 1461,In service,10/1/2025,Permission to Operate,12/17/2025 AE-27844,Solar PV,19.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,Approved,10/1/2025,Installation & Construction, AE-28465,Solar PV,7,,Category 1,"Juda, Green County, WI",Substation 101,Circuit 269,Approved,10/1/2025,Installation & Construction, AE-28368,Solar PV,9.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 623,In service,9/30/2025,Permission to Operate,12/14/2025 AE-28356,Solar PV,10,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1168,In service,9/30/2025,Permission to Operate,12/17/2025 AE-27591,Solar PV,4.2,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,9/29/2025,Permission to Operate,1/14/2026 AE-28330,Solar PV,5.3,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,9/26/2025,Permission to Operate,11/3/2025 AE-28363,Solar PV,20,,Category 1,"Cuba City, Lafayette County, WI",Substation 248,Circuit 595,In service,9/26/2025,Permission to Operate,1/26/2026 AE-28331,Solar PV,11.2,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1432,In service,9/26/2025,Permission to Operate,1/7/2026 AE-28352,Solar PV,5.3,,Category 1,"Juda, Green County, WI",Substation 15,Circuit 62,In service,9/26/2025,Permission to Operate,12/11/2025 AE-28347,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,9/26/2025,Permission to Operate,12/31/2025 AE-28349,Solar PV,18.1,,Category 1,"Necedah, Juneau County, WI",Substation 516,Circuit 1321,In service,9/26/2025,Permission to Operate,1/23/2026 AE-28329,Solar PV,5.5,,Category 1,"Wisconsin Dells, Adams County, WI",Substation 387,Circuit 956,In service,9/26/2025,Permission to Operate,11/20/2025 AE-28338,"Solar PV, Battery/Storage",23,,Category 2,"Auburndale, Marathon County, WI",Substation 626,Circuit 1690,In service,9/26/2025,Permission to Operate,12/31/2025 AE-28225,Solar PV,6.9,,Category 1,"Deforest, Dane County, WI",,Circuit 474,In service,9/24/2025,Permission to Operate,2/18/2026 AE-28290,Solar PV,6.6,,Category 1,"Merrimac, Sauk County, WI",,Circuit 494,In service,9/24/2025,Permission to Operate,12/11/2025 AE-27860,Solar PV,6.4,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,9/24/2025,Permission to Operate,11/20/2025 AE-28260,Solar PV,5.2,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 900,In service,9/24/2025,Permission to Operate,1/7/2026 AE-28136,Solar PV,7.7,,Category 1,"La Valle, Sauk County, WI",,Circuit 110,In service,9/24/2025,Permission to Operate,1/12/2026 AE-28301,Solar PV,5.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1696,In service,9/24/2025,Permission to Operate,10/29/2025 AE-27024,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,9/24/2025,Permission to Operate,12/31/2025 AE-28165,Solar PV,12.5,,Category 1,"Hillpoint, Sauk County, WI",Substation 421,Circuit 1051,In service,9/24/2025,Permission to Operate,12/12/2025 AE-28323,Solar PV,16.4,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,9/24/2025,Permission to Operate,1/12/2026 AE-28178,Solar PV,10.5,,Category 1,"Loganville, Sauk County, WI",Substation 421,Circuit 1050,In service,9/24/2025,Permission to Operate,11/21/2025 AE-28310,Solar PV,5.2,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,9/24/2025,Permission to Operate,12/8/2025 AE-28269,Solar PV,6.6,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2199,In service,9/24/2025,Permission to Operate,12/18/2025 AE-28176,"Solar PV, Battery/Storage",16.2,,Category 1,"Sauk City, Dane County, WI",Substation 547,Circuit 1433,In service,9/24/2025,Permission to Operate,11/21/2025 AE-27883,Solar PV,3.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,9/24/2025,Permission to Operate,1/30/2026 AE-27837,Solar PV,6.4,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,9/24/2025,Permission to Operate,12/3/2025 AE-28320,"Solar PV, Battery/Storage",17.6,,Category 1,"Juneau, Dodge County, WI",Substation 351,Circuit 836,Approved,9/24/2025,Installation & Construction, AE-28297,Solar PV,4.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 624,In service,9/24/2025,Permission to Operate,10/22/2025 AE-28259,Solar PV,11.4,,Category 1,"Tomah, Monroe County, WI",,Circuit 2113,In service,9/23/2025,Permission to Operate,1/12/2026 AE-28262,Solar PV,5.8,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,9/23/2025,Permission to Operate,1/21/2026 AE-28317,Solar PV,20,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1733,In service,9/23/2025,Permission to Operate,12/31/2025 AE-28266,Solar PV,7.9,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,9/23/2025,Permission to Operate,1/7/2026 AE-28288,Solar PV,8.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,9/22/2025,Permission to Operate,11/5/2025 AE-28236,Solar PV,7.8,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,9/19/2025,Permission to Operate,10/21/2025 AE-28148,Solar PV,7.6,,Category 1,"Amherst Junction, Portage County, WI",Substation 624,Circuit 1689,In service,9/18/2025,Permission to Operate,10/12/2025 AE-28031,Solar PV,39,,Category 2,"Iron Ridge, Dodge County, WI",,,In service,9/18/2025,Permission to Operate,2/26/2026 AE-28123,Solar PV,11.2,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2199,In service,9/18/2025,Permission to Operate,11/13/2025 AE-28229,"Solar PV, Battery/Storage",15,,Category 2,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,9/18/2025,Permission to Operate,12/9/2025 AE-28183,Solar PV,5.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 624,In service,9/18/2025,Permission to Operate,12/3/2025 AE-28239,Solar PV,12.5,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,9/16/2025,Permission to Operate,11/6/2025 AE-28214,Solar PV,8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/16/2025,Permission to Operate,12/31/2025 AE-27801,Solar PV,12.1,,Category 1,"Lancaster, Grant County, WI",Substation 398,Circuit 988,In service,9/16/2025,Permission to Operate,12/17/2025 AE-27779,Solar PV,3.8,,Category 1,"Richland Center, Richland County, WI",Substation 572,Circuit 1505,In service,9/16/2025,Permission to Operate,1/8/2026 AE-28130,Solar PV,9.8,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,9/16/2025,Permission to Operate,12/8/2025 AE-28280,"Solar PV, Battery/Storage",15,,Category 1,"Lone Rock, Richland County, WI",,Circuit 1057,In service,9/16/2025,Permission to Operate,12/21/2025 AE-28281,Solar PV,5.2,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,9/16/2025,Permission to Operate,12/14/2025 AE-28208,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,9/16/2025,Permission to Operate,1/29/2026 AE-28206,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,9/16/2025,Permission to Operate,11/25/2025 AE-28026,"Solar PV, Battery/Storage",14.78,,Category 1,"Beloit, Rock County, WI",Substation 255,Circuit 620,In service,9/15/2025,Permission to Operate,12/12/2025 AE-28174,Solar PV,11.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,9/15/2025,Permission to Operate,1/9/2026 AE-28173,Solar PV,7,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,9/15/2025,Permission to Operate,12/17/2025 AE-28167,Solar PV,5.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,9/15/2025,Permission to Operate,1/20/2026 AE-28138,Solar PV,15.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,9/15/2025,Permission to Operate,12/3/2025 AE-27346,Solar PV,9.9,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1191,In service,9/15/2025,Permission to Operate,1/7/2026 AE-28142,Solar PV,11.2,,Category 1,"New Lisbon, Juneau County, WI",Substation 344,Circuit 824,In service,9/15/2025,Permission to Operate,1/15/2026 AE-28131,Solar PV,6.6,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,9/12/2025,Permission to Operate,12/21/2025 AE-28133,Solar PV,8.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,9/12/2025,Permission to Operate,11/10/2025 AE-28052,Solar PV,9.8,,Category 1,"Brandon, Fond du Lac County, WI",Substation 615,Circuit 1660,In service,9/11/2025,Permission to Operate,12/14/2025 AE-27950,Solar PV,7.6,,Category 1,"Juneau, Dodge County, WI",,Circuit 18,In service,9/11/2025,Permission to Operate,2/3/2026 AE-27551,Solar PV,5.4,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/10/2025,Permission to Operate,11/10/2025 AE-28089,Solar PV,7.7,,Category 1,"Stratford, Marathon County, WI",Substation 626,Circuit 1690,In service,9/10/2025,Permission to Operate,10/29/2025 AE-27815,Solar PV,8.3,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,9/10/2025,Permission to Operate,11/14/2025 AE-28103,Solar PV,7.6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,9/10/2025,Permission to Operate,11/13/2025 AE-27428,Solar PV,3.8,,Category 1,"Genoa City, Walworth County, WI",Substation 660,Circuit 1810,In service,9/10/2025,Permission to Operate,3/27/2026 AE-28040,Solar PV,10.8,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1189,Approved,9/10/2025,Installation & Construction, AE-28032,Solar PV,15.7,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1269,In service,9/9/2025,Permission to Operate,12/3/2025 AE-28027,Solar PV,19.1,,Category 1,"Malone, Fond du Lac County, WI",Substation 411,Circuit 1024,In service,9/9/2025,Permission to Operate,1/21/2026 AE-28028,Solar PV,7.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 20,In service,9/9/2025,Permission to Operate,10/3/2025 AE-27663,Solar PV,4.6,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1215,In service,9/8/2025,Permission to Operate,9/29/2025 AE-28060,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/8/2025,Permission to Operate,1/22/2026 AE-27843,Solar PV,13.3,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1355,In service,9/8/2025,Permission to Operate,12/3/2025 AE-28035,Solar PV,6.6,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,9/8/2025,Permission to Operate,12/8/2025 AE-27933,Solar PV,7.2,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 419,In service,9/8/2025,Permission to Operate,12/9/2025 AE-27936,Solar PV,7.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/8/2025,Permission to Operate,10/14/2025 AE-27622,Solar PV,6.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,Approved,9/8/2025,Installation & Construction, AE-28054,"Solar PV, Battery/Storage",25.21,,Category 1,"Monticello, Green County, WI",,,In service,9/8/2025,Permission to Operate,4/17/2026 AE-27788,Solar PV,9.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,9/5/2025,Permission to Operate,12/23/2025 AE-27979,Solar PV,5.2,,Category 1,"Evansville, Rock County, WI",Substation 629,Circuit 1710,In service,9/5/2025,Permission to Operate,12/17/2025 AE-27999,Solar PV,6.6,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,9/5/2025,Permission to Operate,12/11/2025 AE-27978,Solar PV,6.6,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1044,In service,9/5/2025,Permission to Operate,11/20/2025 AE-27855,"Solar PV, Battery/Storage",31,,Category 2,"New Glarus, Green County, WI",,Circuit 1328,In service,9/5/2025,Permission to Operate,12/8/2025 AE-27819,Solar PV,11.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,9/4/2025,Permission to Operate,11/5/2025 AE-27938,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,9/4/2025,Permission to Operate,10/12/2025 AE-27945,Solar PV,9.1,,Category 1,"Dodgeville, Iowa County, WI",Substation 357,Circuit 860,In service,9/4/2025,Permission to Operate,11/7/2025 AE-27592,Solar PV,4.8,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,9/4/2025,Permission to Operate,9/23/2025 AE-27914,Solar PV,2.6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,9/4/2025,Permission to Operate,10/14/2025 AE-27800,Solar PV,47.4,,Category 2,"Lancaster, Grant County, WI",Substation 398,Circuit 988,In service,9/3/2025,Permission to Operate,12/21/2025 AE-27848,Solar PV,10,,Category 1,"Lodi, Dane County, WI",Substation 547,Circuit 1433,In service,9/3/2025,Permission to Operate,11/22/2025 AE-27364,Solar PV,7.6,,Category 1,"Scandinavia, Waupaca County, WI",Substation 651,Circuit 1786,In service,9/3/2025,Permission to Operate,12/8/2025 AE-27747,Solar PV,6.8,,Category 1,"Almond, Waushara County, WI",Substation 771,Circuit 2085,In service,9/3/2025,Permission to Operate,10/20/2025 AE-27884,Solar PV,5.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1699,In service,9/3/2025,Permission to Operate,11/11/2025 AE-27893,Solar PV,18.2,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 779,In service,9/2/2025,Permission to Operate,12/11/2025 AE-27210,Solar PV,5.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,9/2/2025,Permission to Operate,4/24/2026 AE-27314,Solar PV,6.7,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,Approved,9/2/2025,Installation & Construction, AE-27827,Solar PV,6.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,8/29/2025,Permission to Operate,10/22/2025 AE-27798,Solar PV,3.8,,Category 1,"Prairie Du Sac, Sauk County, WI",Substation 710,Circuit 1948,In service,8/29/2025,Permission to Operate,10/30/2025 AE-27868,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,8/29/2025,Permission to Operate,12/11/2025 AE-27846,Solar PV,7.3,,Category 1,"Blue River, Richland County, WI",Substation 100,Circuit 261,In service,8/29/2025,Permission to Operate,11/5/2025 AE-27794,Solar PV,6.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,8/29/2025,Permission to Operate,10/27/2025 AE-27832,Solar PV,10,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,8/28/2025,Permission to Operate,10/29/2025 AE-27728,Solar PV,20,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 658,Circuit 1802,In service,8/28/2025,Permission to Operate,4/6/2026 AE-27312,"Solar PV, Battery/Storage",11.6,11.52,Category 1,"Tomah, Monroe County, WI",,Circuit 2231,In service,8/28/2025,Permission to Operate,1/28/2026 AE-27302,Solar PV,3.5,,Category 1,"Auburndale, Wood County, WI",Substation 43,Circuit 119,In service,8/28/2025,Permission to Operate,11/6/2025 AE-27822,Solar PV,9.4,,Category 1,"Highland, Grant County, WI",Substation 241,Circuit 583,In service,8/28/2025,Permission to Operate,11/26/2025 AE-27691,Solar PV,2.9,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,8/27/2025,Permission to Operate,10/27/2025 AE-27780,Solar PV,5.8,,Category 1,"Monroe, Dane County, WI",Substation 484,Circuit 1215,In service,8/26/2025,Permission to Operate,10/23/2025 AE-27778,Solar PV,13.1,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,8/26/2025,Permission to Operate,12/11/2025 AE-27789,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 908,In service,8/26/2025,Permission to Operate,12/31/2025 AE-27757,Solar PV,4.5,,Category 1,"Genoa City, Walworth County, WI",,Circuit 1666,In service,8/25/2025,Permission to Operate,1/29/2026 AE-26840,Solar PV,6.8,,Category 1,"Beloit, Rock County, WI",,Circuit 1682,In service,8/25/2025,Permission to Operate,11/5/2025 AE-27216,Solar PV,4.6,,Category 1,"Kohler, Sheboygan County, WI",Substation 404,Circuit 2187,In service,8/25/2025,Permission to Operate,3/9/2026 AE-27690,Solar PV,4.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,8/21/2025,Permission to Operate,11/28/2025 AE-27639,Solar PV,40.1,,Category 2,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1287,Approved,8/21/2025,Installation & Construction, AE-27667,Solar PV,7.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 580,In service,8/21/2025,Permission to Operate,10/29/2025 AE-27604,"Solar PV, Battery/Storage",12.6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,8/21/2025,Permission to Operate,12/18/2025 AE-27547,Solar PV,8.7,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2244,In service,8/20/2025,Permission to Operate,12/21/2025 AE-27487,Solar PV,4.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 686,In service,8/20/2025,Permission to Operate,10/21/2025 AE-27485,Solar PV,6.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2201,In service,8/20/2025,Permission to Operate,10/21/2025 AE-27313,Solar PV,7.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 2159,In service,8/20/2025,Permission to Operate,12/3/2025 AE-27601,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,8/19/2025,Permission to Operate,10/16/2025 AE-27561,Solar PV,3.7,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 194,In service,8/19/2025,Permission to Operate,10/14/2025 AE-27543,Solar PV,7.6,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1987,In service,8/18/2025,Permission to Operate,10/22/2025 AE-27548,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,8/18/2025,Permission to Operate,12/17/2025 AE-27569,Solar PV,11.4,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,8/18/2025,Permission to Operate,12/10/2025 AE-27578,Solar PV,5.9,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 859,In service,8/18/2025,Permission to Operate,11/5/2025 AE-27559,Solar PV,6.4,,Category 1,"Howards Grove, Sheboygan County, WI",Substation 346,Circuit 833,In service,8/18/2025,Permission to Operate,10/16/2025 AE-27550,Solar PV,8.5,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,8/18/2025,Permission to Operate,12/31/2025 AE-27523,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,8/14/2025,Permission to Operate,9/17/2025 AE-27476,"Solar PV, Battery/Storage",31.4,,Category 2,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 2154,In service,8/14/2025,Permission to Operate,9/9/2025 AE-26957,"Solar PV, Battery/Storage",25.35,,Category 1,"Neshkoro, Marquette County, WI",Substation 656,Circuit 1792,In service,8/14/2025,Permission to Operate,12/18/2025 AE-27469,Solar PV,10,,Category 1,"North Freedom, Sauk County, WI",Substation 710,Circuit 1947,In service,8/14/2025,Permission to Operate,9/30/2025 AE-27513,Solar PV,12.5,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,8/14/2025,Permission to Operate,1/6/2026 AE-27521,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,8/14/2025,Permission to Operate,10/22/2025 AE-27531,Solar PV,11.8,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 202,In service,8/14/2025,Permission to Operate,12/9/2025 AE-27529,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,8/14/2025,Permission to Operate,10/31/2025 AE-27522,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,8/14/2025,Permission to Operate,9/17/2025 AE-27520,Solar PV,12.5,,Category 1,"Janesville, Rock County, WI",,Circuit 1872,In service,8/14/2025,Permission to Operate,12/31/2025 AE-27505,Solar PV,9.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,8/13/2025,Permission to Operate,12/31/2025 AE-27480,Solar PV,11.4,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,8/13/2025,Permission to Operate,10/21/2025 AE-27451,Solar PV,17.5,,Category 1,"Lake Geneva, Walworth County, WI",Substation 660,Circuit 1809,In service,8/13/2025,Permission to Operate,1/29/2026 AE-27478,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,8/13/2025,Permission to Operate,12/8/2025 AE-27484,Solar PV,2.2,,Category 1,"Fitchburg, Dane County, WI",Substation 579,Circuit 1521,In service,8/13/2025,Permission to Operate,3/31/2026 AE-27497,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 908,In service,8/13/2025,Permission to Operate,1/7/2026 AE-27467,Solar PV,10.3,,Category 1,"Verona, Dane County, WI",Substation 280,Circuit 670,In service,8/13/2025,Permission to Operate,10/22/2025 AE-27141,Solar PV,6.1,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,8/13/2025,Permission to Operate,12/3/2025 AE-27474,Solar PV,11.2,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1359,In service,8/13/2025,Permission to Operate,10/1/2025 AE-27140,Solar PV,6.7,,Category 1,"Beaver Dam, Dodge County, WI",Substation 124,Circuit 337,In service,8/13/2025,Permission to Operate,2/10/2026 AE-27142,Solar PV,3.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,8/13/2025,Permission to Operate,2/25/2026 AE-27477,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1933,In service,8/13/2025,Permission to Operate,12/3/2025 AE-27453,Solar PV,7.9,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,8/13/2025,Permission to Operate,11/14/2025 AE-27449,Solar PV,10.3,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,8/13/2025,Permission to Operate,11/10/2025 AE-27279,Solar PV,11.4,,Category 1,"Van Dyne, Fond du Lac County, WI",,Circuit 2158,In service,8/12/2025,Permission to Operate,12/3/2025 AE-27345,"Solar PV, Battery/Storage",19.1,,Category 1,"New Glarus, Green County, WI",,Circuit 1327,In service,8/11/2025,Permission to Operate,11/25/2025 AE-27212,Solar PV,11.52,,Category 1,"Dodgeville, Iowa County, WI",Substation 783,Circuit 2138,In service,8/8/2025,Permission to Operate,3/4/2026 AE-27084,Solar PV,8,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1435,In service,8/7/2025,Permission to Operate,11/6/2025 AE-27390,Solar PV,8.5,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,8/6/2025,Permission to Operate,12/23/2025 AE-27343,"Solar PV, Battery/Storage",16.2,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,8/5/2025,Permission to Operate,12/10/2025 AE-27321,Solar PV,7.6,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,8/5/2025,Permission to Operate,12/30/2025 AE-26892,"Solar PV, Battery/Storage",29.6,,Category 2,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 579,In service,8/5/2025,Permission to Operate,10/3/2025 AE-27359,Solar PV,7.9,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,8/5/2025,Permission to Operate,11/20/2025 AE-27208,Solar PV,5.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,8/4/2025,Permission to Operate,12/31/2025 AE-26900,Solar PV,19.1,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,8/4/2025,Permission to Operate,10/1/2025 AE-27308,Solar PV,7.9,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 903,In service,8/4/2025,Permission to Operate,11/20/2025 AE-27317,Solar PV,6.6,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,8/4/2025,Permission to Operate,11/13/2025 AE-27083,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2126,In service,8/4/2025,Permission to Operate,1/30/2026 AE-27300,Solar PV,7.6,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 202,In service,8/4/2025,Permission to Operate,10/27/2025 AE-27234,Solar PV,7.9,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2197,In service,8/1/2025,Permission to Operate,10/10/2025 AE-27242,Solar PV,14.4,,Category 1,"Mineral Point, Lafayette County, WI",,Circuit 1186,In service,7/31/2025,Permission to Operate,11/13/2025 AE-27299,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,7/31/2025,Permission to Operate,12/11/2025 AE-27219,"Solar PV, Battery/Storage",46,,Category 2,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,7/31/2025,Permission to Operate,12/17/2025 AE-27207,Solar PV,8.4,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,7/31/2025,Permission to Operate,12/18/2025 AE-27158,Solar PV,11.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,7/31/2025,Permission to Operate,10/10/2025 AE-27206,Solar PV,5,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,7/31/2025,Permission to Operate,10/8/2025 AE-27135,Solar PV,7.7,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 270,In service,7/29/2025,Permission to Operate,11/26/2025 AE-27147,Solar PV,4.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,7/29/2025,Permission to Operate,11/5/2025 AE-27139,Solar PV,7.5,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,7/29/2025,Permission to Operate,1/6/2026 AE-27146,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 906,In service,7/29/2025,Permission to Operate,12/11/2025 AE-26944,Solar PV,7,,Category 1,"Omro, Winnebago County, WI",,,In service,7/29/2025,Permission to Operate,9/8/2025 AE-27109,Solar PV,6.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,7/28/2025,Permission to Operate,1/16/2026 AE-26791,Solar PV,7.7,,Category 1,"Hollandale, Iowa County, WI",Substation 525,Circuit 1342,In service,7/28/2025,Permission to Operate,2/26/2026 AE-27105,Solar PV,4.9,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,In service,7/28/2025,Permission to Operate,10/3/2025 AE-27106,Solar PV,15,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,7/28/2025,Permission to Operate,12/24/2025 AE-27123,Solar PV,7.5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,7/28/2025,Permission to Operate,11/20/2025 AE-26857,Solar PV,6.1,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,7/28/2025,Permission to Operate,10/10/2025 AE-27095,Solar PV,5.6,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 889,In service,7/25/2025,Permission to Operate,10/22/2025 AE-27078,Solar PV,11.4,,Category 1,"Mc Farland, Dane County, WI",,Circuit 1142,In service,7/24/2025,Permission to Operate,11/13/2025 AE-27063,Solar PV,6.932,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/24/2025,Permission to Operate,9/12/2025 AE-26693,"Solar PV, Battery/Storage",38.2,,Category 2,"Deforest, Dane County, WI",,Circuit 475,In service,7/22/2025,Permission to Operate,12/12/2025 AE-27023,Solar PV,16.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,7/22/2025,Permission to Operate,2/18/2026 AE-26999,Solar PV,16.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,7/22/2025,Permission to Operate,11/25/2025 AE-26955,"Solar PV, Battery/Storage",14.68,,Category 1,"Merrimac, Columbia County, WI",Substation 135,Circuit 359,In service,7/22/2025,Permission to Operate,8/27/2025 AE-27061,Solar PV,3.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1269,In service,7/22/2025,Permission to Operate,8/28/2025 AE-27009,Solar PV,4.9,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 581,In service,7/21/2025,Permission to Operate,10/3/2025 AE-26998,Solar PV,3.9,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,7/21/2025,Permission to Operate,10/23/2025 AE-26980,Solar PV,5.7,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,7/17/2025,Permission to Operate,12/9/2025 AE-26947,Solar PV,5.9,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,7/15/2025,Permission to Operate,10/27/2025 AE-26952,Solar PV,6.4,,Category 1,"Sextonville, Richland County, WI",Substation 606,Circuit 1636,In service,7/15/2025,Permission to Operate,11/7/2025 AE-26967,Solar PV,11.4,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 267,In service,7/15/2025,Permission to Operate,10/29/2025 AE-26819,Solar PV,7.3,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,7/15/2025,Permission to Operate,10/20/2025 AE-26956,Solar PV,8.5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,7/15/2025,Permission to Operate,11/5/2025 AE-26931,Solar PV,11.2,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1003,In service,7/14/2025,Permission to Operate,11/6/2025 AE-26919,Solar PV,9.2,,Category 1,"Town Of Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,7/14/2025,Permission to Operate,10/3/2025 AE-26970,Solar PV,19.908,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1711,Approved,7/14/2025,Installation & Construction, AE-26895,Solar PV,2.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,7/11/2025,Permission to Operate,12/18/2025 AE-26335,Solar PV,8.3,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,Approved,7/11/2025,Installation & Construction, AE-26881,Solar PV,6.1,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,7/10/2025,Permission to Operate,12/23/2025 AE-26855,Solar PV,13.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,7/10/2025,Permission to Operate,10/8/2025 AE-26844,Solar PV,5.7,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2137,In service,7/10/2025,Permission to Operate,9/24/2025 AE-26854,Solar PV,7.9,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1525,In service,7/9/2025,Permission to Operate,10/31/2025 AE-26845,"Solar PV, Battery/Storage",30.6,,Category 2,"Ripon, Fond du Lac County, WI",,,In service,7/9/2025,Permission to Operate,12/8/2025 AE-26779,Solar PV,49.7,,Category 2,"Beloit, Rock County, WI",Substation 79,Circuit 201,In service,7/8/2025,Permission to Operate,4/6/2026 AE-26771,Solar PV,3.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,7/8/2025,Permission to Operate,11/5/2025 AE-26774,Solar PV,20,,Category 1,"Junction City, Portage County, WI",Substation 630,Circuit 1712,In service,7/8/2025,Permission to Operate,10/12/2025 AE-26709,Solar PV,10.5,,Category 1,"Town Of Milton, Rock County, WI",Substation 639,Circuit 1744,In service,7/8/2025,Permission to Operate,12/8/2025 AE-26763,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,7/7/2025,Permission to Operate,9/10/2025 AE-26815,Solar PV,7.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,7/7/2025,Permission to Operate,11/3/2025 AE-26775,Solar PV,18.2,,Category 1,"Ridgeway, Iowa County, WI",,,In service,7/3/2025,Permission to Operate,10/3/2025 AE-26790,Solar PV,5.2,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,7/3/2025,Permission to Operate,10/29/2025 AE-26590,"Solar PV, Battery/Storage",19.1,7.6,Category 1,"Omro, Winnebago County, WI",Substation 550,Circuit 1450,In service,7/3/2025,Permission to Operate,9/8/2025 AE-26301,Solar PV,15.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 18,In service,7/3/2025,Permission to Operate,10/21/2025 AE-26766,Solar PV,4.5,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 616,In service,7/2/2025,Permission to Operate,9/28/2025 AE-26757,Solar PV,11.4,,Category 1,"Pardeville, Columbia County, WI",Substation 591,Circuit 1576,In service,7/2/2025,Permission to Operate,9/29/2025 AE-26751,Solar PV,7.5,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,7/2/2025,Permission to Operate,10/20/2025 AE-26698,Solar PV,19.1,,Category 1,"Madison, Dane County, WI",,,Approved,7/2/2025,Installation & Construction, AE-26753,Solar PV,7.2,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,7/1/2025,Permission to Operate,9/17/2025 AE-26745,Solar PV,4.8,,Category 1,"Lake Geneva, Walworth County, WI",Substation 660,Circuit 1809,Approved,7/1/2025,Installation & Construction, AE-26442,"Solar PV, Battery/Storage",11.52,,Category 1,"Omro, Winnebago County, WI",Substation 766,Circuit 2077,In service,6/30/2025,Permission to Operate,12/21/2025 AE-26697,Solar PV,5.9,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,6/30/2025,Permission to Operate,1/23/2026 AE-26707,Solar PV,3.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,6/30/2025,Permission to Operate,10/3/2025 AE-26705,Solar PV,5.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/30/2025,Permission to Operate,11/25/2025 AE-26708,Solar PV,10.6,,Category 1,"Fitchburg, Dane County, WI",Substation 579,Circuit 1522,In service,6/30/2025,Permission to Operate,8/27/2025 AE-26686,Solar PV,7.9,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,6/30/2025,Permission to Operate,9/16/2025 AE-26712,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,6/30/2025,Permission to Operate,9/16/2025 AE-26685,Solar PV,15.2,,Category 1,"Black Earth, Dane County, WI",Substation 483,Circuit 1209,In service,6/27/2025,Permission to Operate,9/3/2025 AE-26599,Solar PV,13.3,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,6/27/2025,Permission to Operate,10/12/2025 AE-26615,Solar PV,3.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,6/25/2025,Permission to Operate,10/3/2025 AE-26663,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,6/25/2025,Permission to Operate,11/5/2025 AE-26623,Solar PV,11.8,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,6/25/2025,Permission to Operate,10/30/2025 AE-26609,Solar PV,11.8,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,6/25/2025,Permission to Operate,10/29/2025 AE-26669,Solar PV,3.7,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,6/25/2025,Permission to Operate,10/16/2025 AE-26619,Solar PV,13.7,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,6/25/2025,Permission to Operate,12/17/2025 AE-26333,Solar PV,6.7,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,6/23/2025,Permission to Operate,8/5/2025 AE-26470,Solar PV,6.1,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 925,In service,6/23/2025,Permission to Operate,1/12/2026 AE-26600,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,6/23/2025,Permission to Operate,10/3/2025 AE-26604,Solar PV,9.3,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1043,In service,6/23/2025,Permission to Operate,10/21/2025 AE-26605,Solar PV,7.7,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,6/23/2025,Permission to Operate,9/16/2025 AE-26602,Solar PV,2.9,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,6/23/2025,Permission to Operate,7/23/2025 AE-26494,Solar PV,7.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 404,Circuit 1000,In service,6/23/2025,Permission to Operate,8/22/2025 AE-26598,Solar PV,5.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,6/23/2025,Permission to Operate,1/16/2026 AE-26466,Solar PV,8.8,,Category 1,"Browntown, Green County, WI",Substation 95,Circuit 2164,In service,6/23/2025,Permission to Operate,12/17/2025 AE-26476,Solar PV,7.7,,Category 1,"Tomah, Monroe County, WI",,Circuit 386,In service,6/20/2025,Permission to Operate,2/5/2026 AE-26463,"Solar PV, Battery/Storage",16.1,,Category 1,"Walworth, Walworth County, WI",,Circuit 2019,In service,6/19/2025,Permission to Operate,12/3/2025 AE-26247,Solar PV,4.5,,Category 1,"De Forest, Dane County, WI",,Circuit 479,In service,6/19/2025,Permission to Operate,7/17/2025 AE-26277,Solar PV,6.1,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,6/19/2025,Permission to Operate,10/14/2025 AE-26278,Solar PV,4.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,6/19/2025,Permission to Operate,1/14/2026 AE-26513,Solar PV,7.3,,Category 1,"Berlin, Green Lake County, WI",,Circuit 173,In service,6/19/2025,Permission to Operate,10/6/2025 AE-26525,Solar PV,10.5,,Category 1,"Trenton, Dodge County, WI",,Circuit 1305,In service,6/19/2025,Permission to Operate,10/3/2025 AE-26562,Solar PV,8.7,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 360,In service,6/18/2025,Permission to Operate,8/26/2025 AE-26394,"Solar PV, Battery/Storage",94.91,,Category 2,"Mayville, Dodge County, WI",Substation 456,Circuit 1118,In service,6/18/2025,Permission to Operate,11/12/2025 AE-26549,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,6/18/2025,Permission to Operate,8/22/2025 AE-26482,Solar PV,3.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1734,In service,6/17/2025,Permission to Operate,10/30/2025 AE-26540,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,6/17/2025,Permission to Operate,9/10/2025 AE-26543,Solar PV,10.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,6/17/2025,Permission to Operate,9/29/2025 AE-26541,Solar PV,10,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,6/17/2025,Permission to Operate,10/23/2025 AE-26526,Solar PV,6.8,,Category 1,"Fitchburg, Dane County, WI",Substation 579,Circuit 1522,In service,6/16/2025,Permission to Operate,9/23/2025 AE-26529,Solar PV,11.4,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,6/16/2025,Permission to Operate,8/6/2025 AE-26111,Solar PV,3.7,,Category 1,"Beloit, Rock County, WI",,,Withdrawn,6/16/2025,None, AE-26286,Solar PV,6.1,,Category 1,"Tigerton, Shawano County, WI",Substation 494,Circuit 1237,In service,6/13/2025,Permission to Operate,10/12/2025 AE-26502,Solar PV,5.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,6/13/2025,Permission to Operate,9/29/2025 AE-26492,"Solar PV, Battery/Storage",15.2,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2173,In service,6/13/2025,Permission to Operate,10/27/2025 AE-26493,Solar PV,5.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,6/13/2025,Permission to Operate,9/2/2025 AE-26517,Solar PV,2.9,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,6/13/2025,Permission to Operate,9/2/2025 AE-26461,Solar PV,10,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,6/11/2025,Permission to Operate,8/27/2025 AE-26473,Solar PV,8.4,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1209,In service,6/11/2025,Permission to Operate,9/2/2025 AE-26464,Solar PV,4.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,6/11/2025,Permission to Operate,7/28/2025 AE-26437,Solar PV,5.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,6/10/2025,Permission to Operate,10/3/2025 AE-26451,"Solar PV, Battery/Storage",13.77,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,6/10/2025,Permission to Operate,10/22/2025 AE-26457,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,6/10/2025,Permission to Operate,8/29/2025 AE-26450,Solar PV,7.6,,Category 1,"Barneveld, Iowa County, WI",,Circuit 222,In service,6/10/2025,Permission to Operate,9/17/2025 AE-26449,Solar PV,30.1,,Category 2,"Mauston, Juneau County, WI",Substation 776,Circuit 2106,In service,6/10/2025,Permission to Operate,2/4/2026 AE-26441,Solar PV,9.5,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,6/10/2025,Permission to Operate,8/22/2025 AE-26446,Solar PV,19,,Category 1,"Ontario, Vernon County, WI",Substation 217,Circuit 514,In service,6/10/2025,Permission to Operate,10/30/2025 AE-26265,Solar PV,9.2,,Category 1,"Tigerton, Shawano County, WI",Substation 494,Circuit 1237,In service,6/10/2025,Permission to Operate,10/12/2025 AE-26432,Solar PV,5.2,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1047,In service,6/9/2025,Permission to Operate,12/17/2025 AE-26203,Solar PV,7.7,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1877,In service,6/9/2025,Permission to Operate,9/2/2025 AE-26015,Solar PV,4950,,Category 4,"Ridgeway, Iowa County, WI",,,Active,6/9/2025,Supplemental Engineering Studies, AE-26234,Solar PV,13.8,,Category 1,"Wilf Rose, Waushara County, WI",Substation 771,Circuit 2085,In service,6/6/2025,Permission to Operate,9/12/2025 AE-26415,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,6/6/2025,Permission to Operate,9/28/2025 AE-26414,Solar PV,3.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,6/6/2025,Permission to Operate,8/6/2025 AE-25755,Solar PV,100,,Category 2,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,6/6/2025,Permission to Operate,11/7/2025 AE-26380,"Solar PV, Battery/Storage",16.4,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,6/6/2025,Permission to Operate,9/4/2025 AE-26302,Solar PV,4.2,,Category 1,"Beaver Dam, Dodge County, WI",,,Withdrawn,6/6/2025,None, AE-26341,Solar PV,4.2,,Category 1,"Vesper, Wood County, WI",Substation 723,Circuit 1977,In service,6/5/2025,Permission to Operate,8/26/2025 AE-26358,Solar PV,4.6,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1226,In service,6/5/2025,Permission to Operate,7/18/2025 AE-26382,Solar PV,15.6,,Category 1,"Verona, Dunn County, WI",Substation 722,Circuit 1973,In service,6/5/2025,Permission to Operate,9/4/2025 AE-26276,Solar PV,11.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,6/5/2025,Permission to Operate,8/7/2025 AE-26343,Solar PV,13,,Category 1,"Cuba City, Grant County, WI",Substation 386,Circuit 2179,In service,6/5/2025,Permission to Operate,8/25/2025 AE-26376,Solar PV,4.1,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,6/5/2025,Permission to Operate,8/13/2025 AE-26324,Solar PV,9.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,6/4/2025,Permission to Operate,12/23/2025 AE-26329,Solar PV,4.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 357,Circuit 860,In service,6/4/2025,Permission to Operate,9/11/2025 AE-26360,Solar PV,8.4,,Category 1,"Waunakee, Dane County, WI",Substation 726,Circuit 1986,In service,6/4/2025,Permission to Operate,8/28/2025 AE-26216,Solar PV,5.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 21,In service,6/4/2025,Permission to Operate,10/30/2025 AE-26330,Solar PV,7,,Category 1,"Dodgeville, Iowa County, WI",Substation 357,Circuit 860,In service,6/4/2025,Permission to Operate,9/11/2025 AE-25884,Solar PV,7.6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 124,Circuit 337,In service,6/4/2025,Permission to Operate,9/25/2025 AE-26033,Solar PV,3.5,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,6/4/2025,Permission to Operate,4/24/2026 AE-26295,Solar PV,6.6,,Category 1,"Village Of Windsor, Dane County, WI",Substation 698,Circuit 1920,In service,6/3/2025,Permission to Operate,7/17/2025 AE-26226,"Solar PV, Battery/Storage",18.98,,Category 1,"Marshall, Dane County, WI",Substation 679,Circuit 1877,In service,6/2/2025,Permission to Operate,9/3/2025 AE-26291,Solar PV,12,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,6/2/2025,Permission to Operate,9/17/2025 AE-26255,"Solar PV, Battery/Storage",11.5,,Category 1,"Genoa City, Kenosha County, WI",Substation 375,Circuit 927,In service,5/30/2025,Permission to Operate,10/21/2025 AE-26266,Solar PV,7.7,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,5/30/2025,Permission to Operate,7/28/2025 AE-26231,Solar PV,6.8,,Category 1,"Monticello, Green County, WI",Substation 57,Circuit 153,In service,5/28/2025,Permission to Operate,7/24/2025 AE-26245,Solar PV,6.1,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,5/28/2025,Permission to Operate,7/23/2025 AE-26230,Solar PV,20,,Category 1,"Genoa City, Kenosha County, WI",Substation 375,Circuit 927,In service,5/28/2025,Permission to Operate,10/29/2025 AE-26208,"Solar PV, Battery/Storage",12.68,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2134,In service,5/23/2025,Permission to Operate,8/27/2025 AE-26210,Solar PV,14.2,,Category 1,"Windsor, Dane County, WI",,Circuit 2140,In service,5/23/2025,Permission to Operate,7/8/2025 AE-26032,Solar PV,4.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,5/23/2025,Permission to Operate,7/23/2025 AE-26220,Solar PV,6.6,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1432,In service,5/23/2025,Permission to Operate,9/29/2025 AE-26153,Solar PV,19.1,,Category 1,"Janesville, Rock County, WI",Substation 419,Circuit 1047,In service,5/23/2025,Permission to Operate,1/16/2026 AE-26218,Solar PV,8.6,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,5/23/2025,Permission to Operate,10/10/2025 AE-26227,Solar PV,14.8,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,5/23/2025,Permission to Operate,11/26/2025 AE-26055,Solar PV,4.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,5/23/2025,Permission to Operate,8/22/2025 AE-26052,Solar PV,5.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,5/23/2025,Permission to Operate,9/10/2025 AE-26206,Solar PV,7.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,5/23/2025,Permission to Operate,8/22/2025 AE-26192,"Solar PV, Battery/Storage",11.5,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,5/23/2025,Permission to Operate,7/3/2025 AE-26038,Solar PV,5.8,,Category 1,"Edgerton, Dane County, WI",,Circuit 570,In service,5/23/2025,Permission to Operate,7/2/2025 AE-26166,Solar PV,6.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 496,Circuit 1257,In service,5/22/2025,Permission to Operate,9/19/2025 AE-26179,Solar PV,7,,Category 1,"Lomira, Dodge County, WI",Substation 456,Circuit 1120,In service,5/22/2025,Permission to Operate,11/21/2025 AE-26165,Solar PV,5.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 23,In service,5/22/2025,Permission to Operate,9/3/2025 AE-26185,Solar PV,6.8,,Category 1,"Mcfarland, Dane County, WI",,,Approved,5/22/2025,Installation & Construction, AE-26157,Solar PV,5.9,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 20,In service,5/21/2025,Permission to Operate,8/27/2025 AE-26160,Solar PV,7.7,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,5/21/2025,Permission to Operate,8/5/2025 AE-26144,Solar PV,5.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,5/21/2025,Permission to Operate,7/28/2025 AE-26143,Solar PV,5.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,5/21/2025,Permission to Operate,7/28/2025 AE-25909,Solar PV,15,,Category 1,"La Valle, Sauk County, WI",,Circuit 110,In service,5/21/2025,Permission to Operate,12/31/2025 AE-26141,Solar PV,6.8,,Category 1,"Blanchardville, Lafayette County, WI",Substation 77,Circuit 192,In service,5/20/2025,Permission to Operate,9/11/2025 AE-26129,Solar PV,11.4,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1639,In service,5/20/2025,Permission to Operate,7/17/2025 AE-26145,Solar PV,5.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,5/20/2025,Permission to Operate,7/29/2025 AE-26142,Solar PV,5.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,5/20/2025,Permission to Operate,7/28/2025 AE-26127,Solar PV,15.2,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1358,In service,5/20/2025,Permission to Operate,9/30/2025 AE-26126,Solar PV,15,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 22,In service,5/19/2025,Permission to Operate,9/5/2025 AE-26121,Solar PV,12.2,,Category 1,"White Lake, Langlade County, WI",Substation 578,Circuit 1516,In service,5/19/2025,Permission to Operate,10/1/2025 AE-26001,Solar PV,15.2,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,5/16/2025,Permission to Operate,9/9/2025 AE-26095,Solar PV,7.6,,Category 1,"Eureka, Winnebago County, WI",Substation 549,Circuit 1449,In service,5/15/2025,Permission to Operate,9/15/2025 AE-26098,Solar PV,6.3,,Category 1,"Omro, Winnebago County, WI",Substation 766,Circuit 2077,In service,5/15/2025,Permission to Operate,9/3/2025 AE-26030,Solar PV,10.5,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1735,In service,5/13/2025,Permission to Operate,11/25/2025 AE-26018,Solar PV,5.9,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 23,In service,5/13/2025,Permission to Operate,10/20/2025 AE-26010,Solar PV,5.9,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 22,In service,5/13/2025,Permission to Operate,8/29/2025 AE-25724,Solar PV,8.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,5/13/2025,Permission to Operate,10/23/2025 AE-26024,Solar PV,8.5,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,5/13/2025,Permission to Operate,9/5/2025 AE-26036,Solar PV,7.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 23,In service,5/13/2025,Permission to Operate,10/3/2025 AE-26134,Solar PV,4.8,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,5/9/2025,Permission to Operate,8/22/2025 AE-26016,Solar PV,3.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,5/9/2025,Permission to Operate,9/8/2025 AE-26112,Solar PV,4.2,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2132,In service,5/9/2025,Permission to Operate,8/15/2025 AE-26103,Solar PV,5.1,,Category 1,"Poynette, Columbia County, WI",Substation 448,Circuit 1112,In service,5/9/2025,Permission to Operate,11/12/2025 AE-25941,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,5/9/2025,Permission to Operate,6/23/2025 AE-26117,Solar PV,12.1,,Category 1,"Cleveland, Manitowoc County, WI",Substation 346,Circuit 832,In service,5/9/2025,Permission to Operate,7/15/2025 AE-25937,"Solar PV, Battery/Storage",7.6,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1664,In service,5/9/2025,Permission to Operate,9/8/2025 AE-25983,"Solar PV, Battery/Storage",11.5,11.4,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,5/8/2025,Permission to Operate,9/29/2025 AE-26100,Solar PV,14.7,,Category 1,"New Glarus, Green County, WI",,Circuit 1328,In service,5/8/2025,Permission to Operate,9/29/2025 AE-26099,Solar PV,11.8,,Category 1,"Stoughton, Dane County, WI",,Circuit 973,In service,5/8/2025,Permission to Operate,8/15/2025 AE-26074,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,5/7/2025,Permission to Operate,6/30/2025 AE-26039,Solar PV,6.6,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,5/7/2025,Permission to Operate,8/28/2025 AE-25982,Solar PV,4.2,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1650,In service,5/7/2025,Permission to Operate,7/31/2025 AE-26034,Solar PV,36.1,,Category 2,"Town Of Vermont, Dane County, WI",Substation 483,Circuit 1209,In service,5/7/2025,Permission to Operate,10/10/2025 AE-25989,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,5/7/2025,Permission to Operate,6/23/2025 AE-26078,"Solar PV, Battery/Storage",15,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1209,In service,5/7/2025,Permission to Operate,10/3/2025 AE-26067,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,5/7/2025,Permission to Operate,8/6/2025 AE-26042,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,5/7/2025,Permission to Operate,6/25/2025 AE-25949,Solar PV,13.1,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 364,Circuit 895,In service,5/7/2025,Permission to Operate,9/12/2025 AE-26076,Solar PV,2.9,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 202,In service,5/7/2025,Permission to Operate,7/23/2025 AE-26060,Solar PV,5.7,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,5/7/2025,Permission to Operate,7/3/2025 AE-25468,Solar PV,5,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 623,In service,5/6/2025,Permission to Operate,7/31/2025 AE-26017,Solar PV,11.4,,Category 1,"Hillsboro, Vernon County, WI",Substation 340,Circuit 805,In service,5/5/2025,Permission to Operate,10/30/2025 AE-25765,"Solar PV, Battery/Storage",7.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,5/5/2025,Permission to Operate,9/16/2025 AE-26002,Solar PV,5.8,,Category 1,"Hazel Green, Grant County, WI",Substation 386,Circuit 2180,In service,5/5/2025,Permission to Operate,7/30/2025 AE-25981,Solar PV,6.8,,Category 1,"Dane, Dane County, WI",Substation 201,Circuit 459,In service,5/2/2025,Permission to Operate,6/18/2025 AE-25990,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,5/2/2025,Permission to Operate,6/23/2025 AE-25749,Solar PV,5,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 82,In service,5/2/2025,Permission to Operate,9/9/2025 AE-25847,"Solar PV, Battery/Storage",11.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 623,In service,5/2/2025,Permission to Operate,5/21/2025 AE-25976,Solar PV,7.2,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,5/2/2025,Permission to Operate,8/28/2025 AE-25988,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,5/2/2025,Permission to Operate,6/23/2025 AE-25958,Solar PV,6.9,,Category 1,"Sun Prairie, Dane County, WI",Substation 76,Circuit 186,In service,5/2/2025,Permission to Operate,8/20/2025 AE-25951,Solar PV,200,,Category 2,"Monroe, Green County, WI",Substation 360,Circuit 889,In service,5/2/2025,Permission to Operate,11/7/2025 AE-25894,Solar PV,5.9,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 135,In service,5/1/2025,Permission to Operate,9/9/2025 AE-25930,Solar PV,19.8,,Category 1,"Waunakee, Dane County, WI",Substation 201,Circuit 458,In service,4/30/2025,Permission to Operate,8/29/2025 AE-25914,Solar PV,14.4,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 889,In service,4/30/2025,Permission to Operate,8/15/2025 AE-25907,Solar PV,9.5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,4/30/2025,Permission to Operate,6/18/2025 AE-25920,"Solar PV, Battery/Storage",16.2,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,4/30/2025,Permission to Operate,9/28/2025 AE-25837,Solar PV,18,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,4/29/2025,Permission to Operate,7/15/2025 AE-25904,Solar PV,7.6,,Category 1,"Spring Green, Sauk County, WI",Substation 783,Circuit 2138,In service,4/29/2025,Permission to Operate,6/25/2025 AE-25906,Solar PV,5.6,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,4/29/2025,Permission to Operate,11/6/2025 AE-25889,Solar PV,7.6,,Category 1,"Lake Geneva, Walworth County, WI",Substation 660,Circuit 1810,In service,4/28/2025,Permission to Operate,9/11/2025 AE-25778,Solar PV,5.3,,Category 1,"Sauk City, Sauk County, WI",,Circuit 496,In service,4/28/2025,Permission to Operate,8/25/2025 AE-25891,Solar PV,15.7,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 1140,In service,4/28/2025,Permission to Operate,10/14/2025 AE-25877,Solar PV,3.8,,Category 1,"Sun Prairie, Dane County, WI",Substation 698,Circuit 1920,In service,4/24/2025,Permission to Operate,10/10/2025 AE-25752,Solar PV,7.7,,Category 1,"Pittsville, Wood County, WI",Substation 573,Circuit 1506,In service,4/22/2025,Permission to Operate,8/15/2025 AE-25852,Solar PV,4.3,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 615,In service,4/21/2025,Permission to Operate,7/8/2025 AE-25842,Solar PV,28.7,,Category 2,"Monroe, Green County, WI",Substation 481,Circuit 1190,In service,4/21/2025,Permission to Operate,10/24/2025 AE-25849,Solar PV,7.7,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,4/21/2025,Permission to Operate,6/4/2025 AE-25856,Solar PV,4.6,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,4/21/2025,Permission to Operate,9/3/2025 AE-25781,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,4/18/2025,Permission to Operate,6/5/2025 AE-25827,Solar PV,3.9,,Category 1,"Village Of Windsor, Dane County, WI",Substation 698,Circuit 1923,In service,4/18/2025,Permission to Operate,8/5/2025 AE-25817,Solar PV,5.9,,Category 1,"Town Of Pacific, Columbia County, WI",Substation 448,Circuit 1112,In service,4/18/2025,Permission to Operate,9/16/2025 AE-25708,"Solar PV, Battery/Storage",17.62,,Category 1,"Keshena, Menominee County, WI",Substation 384,Circuit 943,In service,4/18/2025,Permission to Operate,10/8/2025 AE-25835,Solar PV,8.1,,Category 1,"Mauston, Juneau County, WI",Substation 776,Circuit 2106,In service,4/18/2025,Permission to Operate,7/9/2025 AE-25813,Solar PV,9.8,,Category 1,"Village Of Windsor, Dane County, WI",Substation 698,Circuit 1923,In service,4/18/2025,Permission to Operate,7/17/2025 AE-25707,"Solar PV, Battery/Storage",13.08,,Category 1,"Keshena, Menominee County, WI",Substation 384,Circuit 943,In service,4/18/2025,Permission to Operate,11/14/2025 AE-25824,Solar PV,4.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 518,In service,4/18/2025,Permission to Operate,9/17/2025 AE-25838,Solar PV,5.2,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,4/18/2025,Permission to Operate,8/7/2025 AE-25739,"Solar PV, Battery/Storage",23,,Category 2,"Marion, Shawano County, WI",Substation 111,Circuit 310,In service,4/17/2025,Permission to Operate,9/4/2025 AE-25706,Solar PV,66.3,,Category 2,"Keshena, Menominee County, WI",Substation 384,Circuit 943,In service,4/16/2025,Permission to Operate,9/3/2025 AE-25595,Solar PV,8.5,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1217,In service,4/16/2025,Permission to Operate,8/26/2025 AE-25789,Solar PV,7,,Category 1,"Hazel Green, Grant County, WI",Substation 386,Circuit 2181,In service,4/16/2025,Permission to Operate,7/19/2025 AE-25782,Solar PV,4.6,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1539,In service,4/16/2025,Permission to Operate,8/1/2025 AE-25754,Solar PV,6.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,4/14/2025,Permission to Operate,7/11/2025 AE-25761,Solar PV,2.8,,Category 1,"Blanchardville, Lafayette County, WI",Substation 77,Circuit 192,In service,4/14/2025,Permission to Operate,7/17/2025 AE-25689,Solar PV,10.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,4/14/2025,Permission to Operate,7/2/2025 AE-25731,Solar PV,7.9,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 579,In service,4/10/2025,Permission to Operate,7/19/2025 AE-25330,Solar PV,6.1,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,4/10/2025,Permission to Operate,6/10/2025 AE-25741,Solar PV,11.8,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 889,In service,4/10/2025,Permission to Operate,8/5/2025 AE-25730,Solar PV,8.5,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,4/10/2025,Permission to Operate,8/27/2025 AE-25693,Solar PV,5.9,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1653,In service,4/10/2025,Permission to Operate,10/28/2025 AE-25733,Solar PV,5.2,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1432,In service,4/10/2025,Permission to Operate,6/26/2025 AE-25655,Solar PV,4.1,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,4/10/2025,Permission to Operate,10/29/2025 AE-25717,Solar PV,17.3,,Category 1,"Rio, Columbia County, WI",Substation 335,Circuit 790,In service,4/10/2025,Permission to Operate,7/2/2025 AE-25718,Solar PV,3.9,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1813,In service,4/10/2025,Permission to Operate,8/6/2025 AE-25711,Solar PV,5.3,,Category 1,"Veron, Dane County, WI",Substation 119,Circuit 327,In service,4/8/2025,Permission to Operate,6/4/2025 AE-25627,Solar PV,4.6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 900,In service,4/8/2025,Permission to Operate,8/26/2025 AE-25475,Solar PV,8.7,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,4/7/2025,Permission to Operate,7/29/2025 AE-25611,Solar PV,6.6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,4/7/2025,Permission to Operate,7/22/2025 AE-25597,Solar PV,10.3,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1737,In service,4/7/2025,Permission to Operate,5/21/2025 AE-25678,Solar PV,13.3,,Category 1,"Madison, Dane County, WI",Substation 698,Circuit 1922,In service,4/4/2025,Permission to Operate,6/21/2025 AE-25657,"Solar PV, Battery/Storage",18.56,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,4/4/2025,Permission to Operate,7/31/2025 AE-25683,"Solar PV, Battery/Storage",39.9,,Category 2,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,4/4/2025,Permission to Operate,4/13/2026 AE-25578,Solar PV,8.5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,4/3/2025,Permission to Operate,8/25/2025 AE-25592,"Solar PV, Battery/Storage",16.1,,Category 1,"Winnecone, Winnebago County, WI",Substation 766,Circuit 2076,In service,4/3/2025,Permission to Operate,8/1/2025 AE-25566,Solar PV,4.1,,Category 1,"Marion, Waupaca County, WI",Substation 494,Circuit 1234,In service,4/2/2025,Permission to Operate,7/19/2025 AE-25478,Solar PV,3.7,,Category 1,"Berlin, Green Lake County, WI",,Circuit 172,In service,4/2/2025,Permission to Operate,9/2/2025 AE-25644,Solar PV,8.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,4/2/2025,Permission to Operate,7/15/2025 AE-25656,Solar PV,8.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,4/2/2025,Permission to Operate,7/11/2025 AE-25625,Solar PV,33.1,,Category 2,"Genoa, Walworth County, WI",Substation 375,Circuit 925,In service,4/1/2025,Permission to Operate,7/19/2025 AE-25593,Solar PV,12.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,3/28/2025,Permission to Operate,7/15/2025 AE-25499,Solar PV,10.8,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,3/28/2025,Permission to Operate,4/29/2025 AE-25095,"Solar PV, Battery/Storage",23,,Category 2,"Merrimac, Sauk County, WI",,Circuit 494,In service,3/28/2025,Permission to Operate,1/7/2026 AE-25610,Solar PV,4.6,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1217,In service,3/28/2025,Permission to Operate,6/13/2025 AE-25560,Solar PV,74.1,,Category 2,"Mayville, Dodge County, WI",Substation 664,Circuit 1830,In service,3/28/2025,Permission to Operate,9/5/2025 AE-25605,Solar PV,100,,Category 2,"Madison, Dane County, WI",Substation 31,Circuit 85,In service,3/28/2025,Permission to Operate,10/12/2025 AE-25585,"Solar PV, Battery/Storage",15,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,3/28/2025,Permission to Operate,5/27/2025 AE-25561,Solar PV,17.1,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1120,In service,3/28/2025,Permission to Operate,8/6/2025 AE-25607,Solar PV,8.6,,Category 1,"Monroe, Green County, WI",,Circuit 930,In service,3/28/2025,Permission to Operate,6/26/2025 AE-25603,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 280,Circuit 670,In service,3/28/2025,Permission to Operate,6/30/2025 AE-25582,Solar PV,7.2,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1226,In service,3/27/2025,Permission to Operate,6/19/2025 AE-25554,Solar PV,8.4,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,3/27/2025,Permission to Operate,6/21/2025 AE-25559,Solar PV,375,,Category 3,"Mayville, Dodge County, WI",Substation 456,Circuit 1118,In service,3/27/2025,Permission to Operate,9/12/2025 AE-25583,Solar PV,3.9,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1226,In service,3/27/2025,Permission to Operate,8/27/2025 AE-25458,Solar PV,114,,Category 2,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1288,Approved,3/27/2025,Commissioning Review & Witness Test, AE-25548,Solar PV,8.5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,3/26/2025,Permission to Operate,7/17/2025 AE-25564,Solar PV,5,,Category 1,"Soldiers Grove, Crawford County, WI",Substation 288,Circuit 696,In service,3/26/2025,Permission to Operate,7/14/2025 AE-25266,Solar PV,9.4,,Category 1,"Antigo, Langlade County, WI",Substation 225,Circuit 543,In service,3/26/2025,Permission to Operate,4/29/2025 AE-25569,Solar PV,7.9,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,3/26/2025,Permission to Operate,6/4/2025 AE-25576,Solar PV,13.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/26/2025,Permission to Operate,5/27/2025 AE-25544,Solar PV,11.4,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1043,In service,3/25/2025,Permission to Operate,7/2/2025 AE-25558,Solar PV,11.4,,Category 1,"Wisconsin Dells, Adams County, WI",Substation 387,Circuit 956,In service,3/24/2025,Permission to Operate,7/17/2025 AE-25535,Solar PV,7.2,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1216,In service,3/24/2025,Permission to Operate,7/24/2025 AE-25545,Solar PV,5.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/24/2025,Permission to Operate,7/15/2025 AE-25540,Solar PV,6.6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 153,In service,3/24/2025,Permission to Operate,7/23/2025 AE-25273,Solar PV,3.7,,Category 1,"Sun Prairie, Dane County, WI",Substation 76,Circuit 186,In service,3/24/2025,Permission to Operate,6/2/2025 AE-25454,Solar PV,5.7,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1737,In service,3/24/2025,Permission to Operate,5/1/2025 AE-25507,Solar PV,7.2,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1818,In service,3/21/2025,Permission to Operate,8/5/2025 AE-25127,Solar PV,10,,Category 1,"Wild Rose, Waushara County, WI",Substation 771,Circuit 2085,In service,3/21/2025,Permission to Operate,4/15/2025 AE-25509,Solar PV,4.8,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 908,In service,3/21/2025,Permission to Operate,8/5/2025 AE-25315,Solar PV,7.3,,Category 1,"White Lake, Langlade County, WI",Substation 578,Circuit 1516,In service,3/21/2025,Permission to Operate,5/21/2025 AE-25437,Solar PV,12.2,,Category 1,"Prairie Du Sac, Columbia County, WI",,Circuit 493,In service,3/21/2025,Permission to Operate,5/23/2025 AE-25496,Solar PV,4.2,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1731,In service,3/20/2025,Permission to Operate,6/13/2025 AE-25166,Solar PV,100,,Category 2,"Milton, Rock County, WI",Substation 419,Circuit 1044,Approved,3/20/2025,Commissioning Review & Witness Test, AE-25474,Solar PV,13.3,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,3/19/2025,Permission to Operate,6/23/2025 AE-25477,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,3/19/2025,Permission to Operate,10/2/2025 AE-25062,Solar PV,10,,Category 1,"Hazel Green, Grant County, WI",Substation 67,Circuit 165,In service,3/19/2025,Permission to Operate,6/5/2025 AE-25483,Solar PV,7.2,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,3/19/2025,Permission to Operate,7/8/2025 AE-25467,Solar PV,4.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,3/18/2025,Permission to Operate,7/23/2025 AE-25469,Solar PV,5.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,3/17/2025,Permission to Operate,5/5/2025 AE-25389,Solar PV,5.2,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1228,In service,3/17/2025,Permission to Operate,6/6/2025 AE-25472,Solar PV,6.6,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,3/17/2025,Permission to Operate,6/13/2025 AE-25466,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1518,In service,3/17/2025,Permission to Operate,4/25/2025 AE-25462,Solar PV,10.1,,Category 1,"Darlington, Lafayette County, WI",,Circuit 1606,In service,3/17/2025,Permission to Operate,9/9/2025 AE-25456,Solar PV,10.4,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1877,In service,3/17/2025,Permission to Operate,4/30/2025 AE-25470,Solar PV,7.2,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,3/17/2025,Permission to Operate,7/11/2025 AE-25442,Solar PV,12.2,,Category 1,"Delavan, Walworth County, WI",Substation 662,Circuit 1822,In service,3/14/2025,Permission to Operate,3/31/2025 AE-25169,Solar PV,8,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,3/14/2025,Permission to Operate,6/13/2025 AE-25425,"Solar PV, Battery/Storage",11.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,3/14/2025,Permission to Operate,6/6/2025 AE-25146,Solar PV,13.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,3/14/2025,Permission to Operate,6/6/2025 AE-25371,Solar PV,11.2,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1129,In service,3/14/2025,Permission to Operate,6/23/2025 AE-25405,Solar PV,3.8,,Category 1,"Nekoosa, Wood County, WI",Substation 584,Circuit 1535,In service,3/14/2025,Permission to Operate,4/25/2025 AE-25201,Solar PV,4.1,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,3/14/2025,Permission to Operate,6/25/2025 AE-25200,Solar PV,4.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,3/14/2025,Permission to Operate,6/6/2025 AE-25429,Solar PV,3.6,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,3/14/2025,Permission to Operate,6/4/2025 AE-25443,Solar PV,9.2,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,3/14/2025,Permission to Operate,7/15/2025 AE-25359,Solar PV,3.7,,Category 1,"Madison, Dane County, WI",Substation 698,Circuit 1922,In service,3/13/2025,Permission to Operate,6/26/2025 AE-25403,Solar PV,19.995,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,3/13/2025,Permission to Operate,9/10/2025 AE-25353,Solar PV,6.7,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,3/11/2025,Permission to Operate,5/1/2025 AE-25377,Solar PV,10.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,3/10/2025,Permission to Operate,4/8/2025 AE-25357,Solar PV,7.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,3/6/2025,Permission to Operate,6/30/2025 AE-25189,"Solar PV, Battery/Storage",35.6,,Category 2,"Ripon, Fond du Lac County, WI",Substation 537,Circuit 1403,In service,3/6/2025,Permission to Operate,10/10/2025 AE-25367,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,3/6/2025,Permission to Operate,7/30/2025 AE-25192,"Solar PV, Battery/Storage",23,,Category 2,"Prairie Du Sac, Sauk County, WI",,Circuit 494,In service,3/6/2025,Permission to Operate,5/27/2025 AE-25327,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 390,In service,3/5/2025,Permission to Operate,4/17/2025 AE-25326,Solar PV,11.4,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,3/5/2025,Permission to Operate,4/18/2025 AE-25349,Solar PV,20,,Category 1,"Eastman, Crawford County, WI",Substation 645,Circuit 1762,In service,3/5/2025,Permission to Operate,5/7/2025 AE-25341,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1933,In service,3/5/2025,Permission to Operate,6/6/2025 AE-25342,Solar PV,19.99,,Category 1,"Edgerton, Dane County, WI",,Circuit 570,In service,3/5/2025,Permission to Operate,11/22/2025 AE-25347,Solar PV,6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,3/5/2025,Permission to Operate,7/8/2025 AE-25334,Solar PV,16.7,,Category 1,"Monroe, Green County, WI",Substation 15,Circuit 62,In service,3/5/2025,Permission to Operate,1/23/2026 AE-25328,"Solar PV, Battery/Storage",16,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,3/4/2025,Permission to Operate,9/26/2025 AE-25329,Solar PV,13.3,,Category 1,"Edgerton, Dane County, WI",Substation 639,Circuit 1744,In service,3/4/2025,Permission to Operate,6/2/2025 AE-25316,Solar PV,4.6,,Category 1,"Stoughton, Dane County, WI",Substation 146,Circuit 390,In service,3/3/2025,Permission to Operate,4/22/2025 AE-25322,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,3/3/2025,Permission to Operate,6/16/2025 AE-25300,Solar PV,11.4,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,3/3/2025,Permission to Operate,6/18/2025 AE-25321,Solar PV,7.9,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1584,In service,3/3/2025,Permission to Operate,6/21/2025 AE-25299,Solar PV,6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,2/28/2025,Permission to Operate,6/11/2025 AE-25309,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/28/2025,Permission to Operate,4/18/2025 AE-25142,Solar PV,7.6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,2/27/2025,Permission to Operate,6/30/2025 AE-25168,Solar PV,13.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 496,Circuit 1257,In service,2/27/2025,Permission to Operate,4/25/2025 AE-25145,Solar PV,3.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,2/27/2025,Permission to Operate,4/4/2025 AE-25285,Solar PV,6.1,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,2/27/2025,Permission to Operate,4/11/2025 AE-25286,"Solar PV, Battery/Storage",18,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 358,In service,2/27/2025,Permission to Operate,7/30/2025 AE-25288,Solar PV,20,,Category 1,"Blue Mounds, Iowa County, WI",Substation 37,Circuit 96,In service,2/27/2025,Permission to Operate,8/7/2025 AE-25068,Solar PV,3.5,,Category 1,"Iola, Waupaca County, WI",Substation 364,Circuit 892,In service,2/26/2025,Permission to Operate,6/18/2025 AE-25253,Solar PV,8.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,2/26/2025,Permission to Operate,10/27/2025 AE-25254,Solar PV,8.5,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,2/25/2025,Permission to Operate,6/4/2025 AE-25116,Solar PV,7.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 342,Circuit 814,In service,2/25/2025,Permission to Operate,4/10/2025 AE-25250,Solar PV,8.5,,Category 1,"Janesville, Rock County, WI",Substation 730,Circuit 2005,In service,2/25/2025,Permission to Operate,6/12/2025 AE-25262,Solar PV,7.7,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1815,In service,2/25/2025,Permission to Operate,5/1/2025 AE-25242,"Solar PV, Battery/Storage",15,,Category 1,"Lone Rock, Sauk County, WI",,Circuit 1056,In service,2/25/2025,Permission to Operate,6/13/2025 AE-25240,Solar PV,6.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,2/25/2025,Permission to Operate,5/7/2025 AE-25113,Solar PV,5.9,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2197,In service,2/25/2025,Permission to Operate,4/10/2025 AE-25255,Solar PV,7.9,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1585,In service,2/25/2025,Permission to Operate,4/25/2025 AE-25248,Solar PV,9.2,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,2/25/2025,Permission to Operate,5/21/2025 AE-25249,Solar PV,8.5,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,2/25/2025,Permission to Operate,6/21/2025 AE-25118,Solar PV,4.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1285,In service,2/25/2025,Permission to Operate,5/5/2025 AE-25228,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1583,In service,2/24/2025,Permission to Operate,7/2/2025 AE-25208,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,2/24/2025,Permission to Operate,6/4/2025 AE-25226,Solar PV,9.2,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1585,In service,2/24/2025,Permission to Operate,8/5/2025 AE-25224,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,2/24/2025,Permission to Operate,4/15/2025 AE-25241,Solar PV,8.5,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 903,In service,2/24/2025,Permission to Operate,7/11/2025 AE-25218,Solar PV,8.5,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,2/24/2025,Permission to Operate,6/21/2025 AE-25104,Solar PV,5,,Category 1,"Dodgevile, Iowa County, WI",Substation 218,Circuit 520,In service,2/20/2025,Permission to Operate,7/28/2025 AE-25207,Solar PV,7.6,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,2/20/2025,Permission to Operate,6/18/2025 AE-25205,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,2/20/2025,Permission to Operate,6/30/2025 AE-25204,Solar PV,9.8,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,2/20/2025,Permission to Operate,6/10/2025 AE-25083,Solar PV,9.3,,Category 1,"Reedsburg, Sauk County, WI",Substation 106,Circuit 294,In service,2/20/2025,Permission to Operate,6/26/2025 AE-25102,"Solar PV, Battery/Storage",11.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,2/19/2025,Permission to Operate,4/8/2025 AE-24418,Solar PV,10,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,2/19/2025,Permission to Operate,5/21/2025 AE-25141,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,2/19/2025,Permission to Operate,6/4/2025 AE-25077,Solar PV,5.2,,Category 1,"Eldorado, Fond du Lac County, WI",Substation 615,Circuit 1658,In service,2/19/2025,Permission to Operate,5/12/2025 AE-25170,"Solar PV, Battery/Storage",16.3,,Category 1,"Gays Mills, Crawford County, WI",,,Approved,2/19/2025,Installation & Construction, AE-25066,"Solar PV, Battery/Storage",24.48,,Category 1,"Marion, Shawano County, WI",Substation 111,Circuit 310,In service,2/18/2025,Permission to Operate,7/2/2025 AE-25150,Solar PV,4.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,2/17/2025,Permission to Operate,4/9/2025 AE-25149,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,2/17/2025,Permission to Operate,4/10/2025 AE-25148,Solar PV,7.7,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,2/17/2025,Permission to Operate,5/21/2025 AE-25139,Solar PV,11.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,2/14/2025,Permission to Operate,5/21/2025 AE-25023,Solar PV,4.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 625,In service,2/13/2025,Permission to Operate,4/10/2025 AE-25109,Solar PV,5.9,,Category 1,"Delavan, Walworth County, WI",Substation 81,Circuit 226,In service,2/13/2025,Permission to Operate,8/27/2025 AE-25111,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,2/13/2025,Permission to Operate,4/22/2025 AE-25125,Solar PV,11.4,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,2/13/2025,Permission to Operate,4/8/2025 AE-25024,Solar PV,6.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1699,In service,2/12/2025,Permission to Operate,5/5/2025 AE-25078,Solar PV,11.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,2/12/2025,Permission to Operate,4/29/2025 AE-25075,"Solar PV, Battery/Storage",12.88,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,2/12/2025,Permission to Operate,4/8/2025 AE-25038,"Solar PV, Battery/Storage",16.7,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,2/12/2025,Permission to Operate,4/10/2025 AE-25092,Solar PV,7.2,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1217,In service,2/12/2025,Permission to Operate,6/13/2025 AE-24926,Solar PV,5.2,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2199,In service,2/12/2025,Permission to Operate,6/6/2025 AE-24967,Solar PV,9.1,,Category 1,"Wisconsin Dells, Columbia County, WI",Substation 106,Circuit 294,In service,2/11/2025,Permission to Operate,7/2/2025 AE-25057,Solar PV,5.9,,Category 1,"Jansville, Rock County, WI",Substation 727,Circuit 1992,In service,2/11/2025,Permission to Operate,5/8/2025 AE-25020,Solar PV,5.9,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2197,In service,2/11/2025,Permission to Operate,6/11/2025 AE-25067,Solar PV,9.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,2/7/2025,Permission to Operate,3/17/2025 AE-24965,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,2/7/2025,Permission to Operate,4/8/2025 AE-25056,Solar PV,15.1,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,2/6/2025,Permission to Operate,7/31/2025 AE-25054,Solar PV,7.7,,Category 1,"Soldier'S Grove, Crawford County, WI",Substation 288,Circuit 696,In service,2/6/2025,Permission to Operate,6/6/2025 AE-24917,Solar PV,4.6,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 22,In service,2/5/2025,Permission to Operate,3/18/2025 AE-25030,Solar PV,4.03,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 903,In service,2/5/2025,Permission to Operate,11/25/2025 AE-25031,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/5/2025,Permission to Operate,9/10/2025 AE-24956,Solar PV,10.5,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2197,In service,2/5/2025,Permission to Operate,6/13/2025 AE-24966,Solar PV,7.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1696,In service,2/5/2025,Permission to Operate,4/10/2025 AE-24923,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2103,In service,2/5/2025,Permission to Operate,6/11/2025 AE-24924,Solar PV,5.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1697,In service,2/5/2025,Permission to Operate,4/4/2025 AE-24960,Solar PV,7.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 342,Circuit 818,In service,2/5/2025,Permission to Operate,4/4/2025 AE-24955,Solar PV,3.9,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2197,In service,2/5/2025,Permission to Operate,6/2/2025 AE-24890,Solar PV,5.1,,Category 1,"Cassville, Grant County, WI",Substation 517,Circuit 1325,In service,2/4/2025,Permission to Operate,9/3/2025 AE-24940,Solar PV,4.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 625,In service,2/4/2025,Permission to Operate,4/17/2025 AE-24943,Solar PV,57,,Category 2,"Elton, Langlade County, WI",Substation 578,Circuit 1516,In service,2/4/2025,Permission to Operate,7/19/2025 AE-24866,Fuel Oil,7500,0,Category 4,"Cuba City, Grant County, WI",,,Approved,2/4/2025,Installation & Construction, AE-25009,Solar PV,3,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1652,In service,2/3/2025,Permission to Operate,6/18/2025 AE-25011,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,2/3/2025,Permission to Operate,5/1/2025 AE-25010,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,2/3/2025,Permission to Operate,6/4/2025 AE-25012,Solar PV,6.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,2/3/2025,Permission to Operate,4/1/2025 AE-24993,Solar PV,6.3,,Category 1,"Cambridge, Dane County, WI",,Circuit 971,In service,1/31/2025,Permission to Operate,5/7/2025 AE-24975,Solar PV,13.1,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,1/31/2025,Permission to Operate,5/5/2025 AE-24886,Solar PV,3.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 625,In service,1/31/2025,Permission to Operate,3/28/2025 AE-24927,Solar PV,5.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 496,Circuit 1257,In service,1/31/2025,Permission to Operate,3/28/2025 AE-24961,Solar PV,8.6,,Category 1,"Tomah, Monroe County, WI",,Circuit 388,In service,1/30/2025,Permission to Operate,4/1/2025 AE-24957,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,1/30/2025,Permission to Operate,3/17/2025 AE-24968,Solar PV,3.9,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,1/30/2025,Permission to Operate,3/14/2025 AE-24896,Solar PV,7.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1697,In service,1/29/2025,Permission to Operate,3/28/2025 AE-24903,Solar PV,4.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 624,In service,1/29/2025,Permission to Operate,3/28/2025 AE-24909,Solar PV,4.3,,Category 1,"White Lake, Langlade County, WI",Substation 578,Circuit 1516,In service,1/29/2025,Permission to Operate,5/23/2025 AE-24949,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,1/29/2025,Permission to Operate,6/6/2025 AE-24908,Solar PV,15.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 411,Circuit 1026,In service,1/29/2025,Permission to Operate,6/30/2025 AE-24919,Solar PV,3.9,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,1/29/2025,Permission to Operate,4/29/2025 AE-24892,Solar PV,8.5,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2199,In service,1/28/2025,Permission to Operate,5/5/2025 AE-24841,Solar PV,6.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 688,In service,1/28/2025,Permission to Operate,2/20/2025 AE-24913,Solar PV,7.6,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,1/22/2025,Permission to Operate,2/19/2025 AE-24922,Solar PV,7.9,,Category 1,"Delavan, Walworth County, WI",Substation 662,Circuit 1822,In service,1/22/2025,Permission to Operate,3/3/2025 AE-24925,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,1/22/2025,Permission to Operate,5/2/2025 AE-24914,Solar PV,3.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,1/22/2025,Permission to Operate,4/18/2025 AE-24928,"Solar PV, Battery/Storage",11.5,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1434,In service,1/22/2025,Permission to Operate,3/26/2025 AE-24891,Solar PV,7.6,,Category 1,"Windsor, Dane County, WI",,Circuit 2144,In service,1/20/2025,Permission to Operate,4/1/2025 AE-24807,Solar PV,10,,Category 1,"New Glarus, Green County, WI",,Circuit 1327,In service,1/20/2025,Permission to Operate,6/27/2025 AE-24905,Solar PV,8.6,,Category 1,"Cuba City, Grant County, WI",Substation 386,Circuit 2180,In service,1/20/2025,Permission to Operate,7/19/2025 AE-24752,Solar PV,7.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,1/17/2025,Permission to Operate,2/20/2025 AE-24698,Solar PV,7.6,,Category 1,"Ripon, Green Lake County, WI",Substation 610,Circuit 1643,In service,1/17/2025,Permission to Operate,4/4/2025 AE-24839,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,1/17/2025,Permission to Operate,2/20/2025 AE-24889,Solar PV,8.7,,Category 1,"Blanchardville, Lafayette County, WI",Substation 77,Circuit 192,In service,1/17/2025,Permission to Operate,9/17/2025 AE-24758,"Solar PV, Battery/Storage",20,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 888,In service,1/16/2025,Permission to Operate,3/4/2025 AE-24837,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,1/16/2025,Permission to Operate,2/21/2025 AE-24657,Solar PV,360,,Category 3,"Deerfield, Dane County, WI",Substation 403,Circuit 997,Approved,1/15/2025,Commissioning Review & Witness Test, AE-24838,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,1/14/2025,Permission to Operate,2/20/2025 AE-24859,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,1/14/2025,Permission to Operate,2/20/2025 AE-24833,Solar PV,14.4,,Category 1,"Delavan, Walworth County, WI",Substation 662,Circuit 1822,In service,1/14/2025,Permission to Operate,4/25/2025 AE-24791,Solar PV,12.5,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1699,In service,1/13/2025,Permission to Operate,2/20/2025 AE-24797,Solar PV,3.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,1/13/2025,Permission to Operate,3/7/2025 AE-24821,"Solar PV, Wind",7.2,,Category 1,"Darlington, Lafayette County, WI",,Circuit 1605,In service,1/13/2025,Permission to Operate,8/1/2025 AE-24811,Solar PV,17.3,,Category 1,"Barneveld, Iowa County, WI",Substation 525,Circuit 1342,In service,1/10/2025,Permission to Operate,9/8/2025 AE-24767,Solar PV,8.5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,1/8/2025,Permission to Operate,4/25/2025 AE-24746,"Solar PV, Battery/Storage",11.5,,Category 1,"Polar, Langlade County, WI",Substation 578,Circuit 1516,In service,1/8/2025,Permission to Operate,4/22/2025 AE-24787,Solar PV,8.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 519,In service,1/8/2025,Permission to Operate,6/6/2025 AE-24768,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,1/7/2025,Permission to Operate,6/18/2025 AE-24738,Solar PV,7.6,,Category 1,"Woodford, Lafayette County, WI",,Circuit 930,In service,1/7/2025,Permission to Operate,3/4/2025 AE-24754,Solar PV,3,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,1/7/2025,Permission to Operate,8/26/2025 AE-24692,Solar PV,5.9,,Category 1,"Tomah, Monroe County, WI",,Circuit 387,In service,1/7/2025,Permission to Operate,4/29/2025 AE-24740,"Solar PV, Battery/Storage",17.88,,Category 1,"Soldiers Grove, Crawford County, WI",Substation 288,Circuit 696,In service,1/3/2025,Permission to Operate,4/30/2025 AE-24628,Solar PV,1375,,Category 4,"Mcfarland, Dane County, WI",,,In service,1/3/2025,Permission to Operate,6/8/2026 AE-24732,Solar PV,6.1,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,1/3/2025,Permission to Operate,3/7/2025 AE-24659,Solar PV,2.9,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,1/3/2025,Permission to Operate,2/6/2025 AE-24739,Solar PV,220,,Category 3,"Vesper, Wood County, WI",Substation 573,Circuit 1507,In service,1/3/2025,Permission to Operate,11/6/2025 AE-24702,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1894,In service,1/2/2025,Permission to Operate,4/1/2025 AE-24531,Solar PV,5.7,,Category 1,"Merrimac, Sauk County, WI",Substation 466,Circuit 1157,In service,12/31/2024,Permission to Operate,2/12/2025 AE-24712,Solar PV,15.2,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,12/27/2024,Permission to Operate,2/19/2025 AE-24688,Solar PV,19.99,,Category 1,"Stratford, Marathon County, WI",Substation 626,Circuit 1690,In service,12/27/2024,Permission to Operate,5/12/2025 AE-24706,Solar PV,7.6,,Category 1,"Delavan, Walworth County, WI",,Circuit 2065,In service,12/27/2024,Permission to Operate,4/4/2025 AE-24707,Solar PV,7.7,,Category 1,"Berlin, Waushara County, WI",Substation 633,Circuit 1722,In service,12/27/2024,Permission to Operate,4/10/2025 AE-24686,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,12/26/2024,Permission to Operate,2/7/2025 AE-24690,Solar PV,5.7,,Category 1,"Fitchburg, Dane County, WI",Substation 722,Circuit 1971,In service,12/26/2024,Permission to Operate,1/23/2025 AE-24662,Solar PV,7.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 622,In service,12/26/2024,Permission to Operate,3/7/2025 AE-24687,Solar PV,7.6,,Category 1,"Rio, Columbia County, WI",,Circuit 2000,In service,12/26/2024,Permission to Operate,2/19/2025 AE-24669,Solar PV,7.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1269,In service,12/26/2024,Permission to Operate,2/20/2025 AE-24335,Solar PV,6.6,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 317,In service,12/23/2024,Permission to Operate,2/13/2025 AE-24674,Solar PV,13.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 689,In service,12/19/2024,Permission to Operate,4/8/2025 AE-24646,Solar PV,11.2,,Category 1,"Reedsburg, Sauk County, WI",Substation 106,Circuit 294,In service,12/19/2024,Permission to Operate,2/4/2025 AE-24463,"Solar PV, Battery/Storage",14.43,,Category 1,"Cambria, Columbia County, WI",,Circuit 2168,In service,12/18/2024,Permission to Operate,4/4/2025 AE-24622,Solar PV,3.8,,Category 1,"Fox Lake, Dodge County, WI",Substation 278,Circuit 662,In service,12/18/2024,Permission to Operate,2/7/2025 AE-24663,"Solar PV, Battery/Storage",11.5,,Category 1,"Rio, Columbia County, WI",,Circuit 2000,In service,12/18/2024,Permission to Operate,2/19/2025 AE-24544,"Solar PV, Battery/Storage",34.3,,Category 2,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,12/18/2024,Permission to Operate,3/14/2025 AE-24353,Solar PV,4.2,,Category 1,"Rio, Columbia County, WI",Substation 335,Circuit 790,In service,12/18/2024,Permission to Operate,6/13/2025 AE-24616,Solar PV,7.5,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,12/17/2024,Permission to Operate,2/5/2025 AE-24673,Solar PV,5.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,12/17/2024,Permission to Operate,4/29/2025 AE-24671,Solar PV,7.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,12/17/2024,Permission to Operate,2/17/2025 AE-24680,Solar PV,15,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 390,In service,12/17/2024,Permission to Operate,3/14/2025 AE-24592,Solar PV,8.7,,Category 1,"Delavan, Walworth County, WI",Substation 207,Circuit 483,In service,12/13/2024,Permission to Operate,3/21/2025 AE-24618,Solar PV,6.7,,Category 1,"Fitchburg, Dane County, WI",Substation 579,Circuit 1522,In service,12/13/2024,Permission to Operate,1/21/2025 AE-24346,"Solar PV, Battery/Storage",39.9,,Category 2,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,12/12/2024,Permission to Operate,4/13/2026 AE-24575,Solar PV,9.7,,Category 1,"Tomah, Monroe County, WI",,Circuit 2231,In service,12/12/2024,Permission to Operate,3/14/2025 AE-24481,"Solar PV, Battery/Storage",7.3,,Category 1,"Burlington, Kenosha County, WI",Substation 714,Circuit 1954,In service,12/12/2024,Permission to Operate,2/11/2025 AE-24600,Solar PV,6.5,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 860,In service,12/12/2024,Permission to Operate,8/15/2025 AE-24576,Solar PV,7.2,,Category 1,"Sharon, Walworth County, WI",Substation 648,Circuit 1782,In service,12/12/2024,Permission to Operate,2/25/2025 AE-24376,"Solar PV, Battery/Storage",18.52,,Category 1,"Omro, Winnebago County, WI",Substation 549,Circuit 1449,In service,12/12/2024,Permission to Operate,1/22/2025 AE-24525,Solar PV,120.8,0,Category 3,"Middleton, Dane County, WI",,,In service,12/12/2024,Permission to Operate,6/29/2026 AE-24503,Solar PV,9.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1696,In service,12/6/2024,Permission to Operate,2/20/2025 AE-24494,Solar PV,6.3,,Category 1,"Oshkosh, Winnebago County, WI",Substation 276,Circuit 651,In service,12/6/2024,Permission to Operate,2/3/2025 AE-24364,Solar PV,7,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1745,In service,12/5/2024,Permission to Operate,1/21/2025 AE-24117,Solar PV,21,,Category 2,"Oregon, Dane County, WI",,Circuit 1880,In service,12/5/2024,Permission to Operate,5/27/2025 AE-24543,Solar PV,3.2,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 315,In service,12/4/2024,Permission to Operate,5/23/2025 AE-24343,Solar PV,16.7,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1664,In service,12/4/2024,Permission to Operate,1/15/2025 AE-24442,Solar PV,11.4,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1197,In service,12/4/2024,Permission to Operate,3/21/2025 AE-24425,Solar PV,20.1,,Category 2,"Baraboo, Sauk County, WI",Substation 46,Circuit 134,In service,12/3/2024,Permission to Operate,12/17/2024 AE-24423,"Solar PV, Battery/Storage",10.8,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2243,In service,12/3/2024,Permission to Operate,11/21/2025 AE-24537,"Solar PV, Battery/Storage",15,,Category 1,"Rio, Columbia County, WI",Substation 335,Circuit 790,In service,12/2/2024,Permission to Operate,6/10/2025 AE-24416,Solar PV,8.7,,Category 1,"Stoughton, Dane County, WI",Substation 676,Circuit 1870,In service,11/27/2024,Permission to Operate,2/7/2025 AE-24415,Solar PV,19.1,,Category 1,"Stoughton, Dane County, WI",Substation 676,Circuit 1870,In service,11/27/2024,Permission to Operate,2/18/2025 AE-24476,Solar PV,5.2,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1359,In service,11/27/2024,Permission to Operate,2/21/2025 AE-24368,Solar PV,11.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1304,In service,11/27/2024,Permission to Operate,4/15/2025 AE-24424,Solar PV,8.5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,11/27/2024,Permission to Operate,4/8/2025 AE-24400,Solar PV,13,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1354,In service,11/27/2024,Permission to Operate,4/7/2025 AE-24495,Solar PV,7.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,11/27/2024,Permission to Operate,2/7/2025 AE-24444,Solar PV,3.9,,Category 1,"Stoughton, Dane County, WI",,Circuit 1140,In service,11/27/2024,Permission to Operate,5/23/2025 AE-24428,Solar PV,9.2,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1877,In service,11/27/2024,Permission to Operate,6/6/2025 AE-24414,Solar PV,9.6,,Category 1,"Stoughton, Dane County, WI",Substation 676,Circuit 1870,In service,11/27/2024,Permission to Operate,2/18/2025 AE-24021,Solar PV,5.2,,Category 1,"Lavalle, Sauk County, WI",,Circuit 110,In service,11/25/2024,Permission to Operate,2/19/2025 AE-24160,Solar PV,8.6,,Category 1,"Eland, Shawano County, WI",,Circuit 834,In service,11/25/2024,Permission to Operate,4/8/2025 AE-24392,Solar PV,5.8,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,11/19/2024,Permission to Operate,4/8/2025 AE-24372,Solar PV,19.1,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1355,In service,11/18/2024,Permission to Operate,6/4/2025 AE-24190,"Solar PV, Battery/Storage",19.1,,Category 1,"White Lake, Langlade County, WI",Substation 578,Circuit 1516,In service,11/14/2024,Permission to Operate,1/14/2025 AE-24315,Solar PV,11.5,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 411,Circuit 1026,In service,11/14/2024,Permission to Operate,5/5/2025 AE-24342,Solar PV,8.7,,Category 1,"Hollandale, Iowa County, WI",Substation 280,Circuit 671,In service,11/14/2024,Permission to Operate,1/13/2025 AE-23925,"Solar PV, Battery/Storage",17.82,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 110,In service,11/14/2024,Permission to Operate,5/23/2025 AE-24303,"Solar PV, Battery/Storage",10.24,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,11/14/2024,Permission to Operate,2/18/2025 AE-24183,Solar PV,9.8,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,11/14/2024,Permission to Operate,2/7/2025 AE-24311,Solar PV,10.5,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1584,In service,11/13/2024,Permission to Operate,4/15/2025 AE-24302,Solar PV,265,,Category 3,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,11/13/2024,Permission to Operate,1/20/2025 AE-24327,Solar PV,5.8,,Category 1,"Marshfield, Wood County, WI",Substation 573,Circuit 1508,In service,11/13/2024,Permission to Operate,12/17/2024 AE-24331,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,11/13/2024,Permission to Operate,1/30/2025 AE-24290,Solar PV,7.8,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,11/12/2024,Permission to Operate,2/24/2025 AE-24018,Solar PV,7.2,,Category 1,"Beaver Dam, Dodge County, WI",Substation 124,Circuit 337,In service,11/12/2024,Permission to Operate,3/11/2025 AE-24263,Solar PV,6.5,,Category 1,"Brodhead, Green County, WI",Substation 96,Circuit 259,In service,11/11/2024,Permission to Operate,6/10/2025 AE-23965,Solar PV,3.7,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1226,In service,11/11/2024,Permission to Operate,4/2/2025 AE-23906,Solar PV,5.8,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1230,In service,11/7/2024,Permission to Operate,6/25/2025 AE-24241,Solar PV,7.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 614,In service,11/6/2024,Permission to Operate,2/21/2025 AE-24258,Solar PV,5.8,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,11/6/2024,Permission to Operate,3/11/2025 AE-24224,Solar PV,2.8,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1745,In service,11/6/2024,Permission to Operate,1/8/2025 AE-24261,Solar PV,5.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,11/6/2024,Permission to Operate,6/25/2025 AE-24182,Solar PV,3.8,,Category 1,"Beloit, Rock County, WI",Substation 255,Circuit 620,In service,11/6/2024,Permission to Operate,3/14/2025 AE-24225,Solar PV,19.5,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 338,Circuit 804,In service,11/6/2024,Permission to Operate,6/11/2025 AE-24141,Solar PV,3.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 124,Circuit 335,In service,11/6/2024,Permission to Operate,3/27/2025 AE-23736,Solar PV,5.8,,Category 1,"Hollandale, Iowa County, WI",Substation 280,Circuit 671,In service,11/5/2024,Permission to Operate,2/5/2025 AE-24125,Solar PV,11.7,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1433,In service,11/5/2024,Permission to Operate,3/3/2025 AE-23985,Solar PV,14.8,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,11/5/2024,Permission to Operate,1/15/2025 AE-24137,Solar PV,4.1,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,11/5/2024,Permission to Operate,1/8/2025 AE-23832,Solar PV,3.48,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,11/5/2024,Permission to Operate,2/3/2025 AE-24188,Solar PV,6.2,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,11/5/2024,Permission to Operate,5/23/2025 AE-24145,Solar PV,6.6,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,11/5/2024,Permission to Operate,4/2/2025 AE-24095,Solar PV,3.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,11/5/2024,Permission to Operate,3/11/2025 AE-24133,Solar PV,7.9,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,11/5/2024,Permission to Operate,2/7/2025 AE-24187,Solar PV,3.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,11/5/2024,Permission to Operate,6/6/2025 AE-24142,Solar PV,3.9,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,11/5/2024,Permission to Operate,3/27/2025 AE-24189,Solar PV,5.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,11/5/2024,Permission to Operate,3/7/2025 AE-24102,Solar PV,7.9,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,11/4/2024,Permission to Operate,1/30/2025 AE-24045,Solar PV,11.4,,Category 1,"Rosendale, Fond du Lac County, WI",,Circuit 686,In service,11/4/2024,Permission to Operate,3/27/2025 AE-23750,Solar PV,3.48,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1700,In service,11/4/2024,Permission to Operate,6/19/2025 AE-24098,Solar PV,6.3,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,11/4/2024,Permission to Operate,1/8/2025 AE-24107,Solar PV,6.6,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,11/4/2024,Permission to Operate,1/6/2025 AE-24044,"Solar PV, Battery/Storage",45.69,,Category 2,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,11/4/2024,Permission to Operate,6/5/2025 AE-24022,"Solar PV, Battery/Storage",11.9,,Category 1,"Lyndon Station, Sauk County, WI",Substation 216,Circuit 507,In service,11/1/2024,Permission to Operate,2/20/2025 AE-24065,Solar PV,6.8,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 404,Circuit 1000,In service,11/1/2024,Permission to Operate,2/25/2025 AE-24034,Solar PV,4.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,11/1/2024,Permission to Operate,5/8/2025 AE-24082,"Solar PV, Battery/Storage",11.5,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,11/1/2024,Permission to Operate,6/10/2025 AE-24084,Solar PV,5.9,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,11/1/2024,Permission to Operate,2/24/2025 AE-24063,Solar PV,2.6,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,10/31/2024,Permission to Operate,5/2/2025 AE-24067,Solar PV,4.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1518,In service,10/31/2024,Permission to Operate,8/15/2025 AE-24064,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,10/31/2024,Permission to Operate,3/21/2025 AE-24056,Solar PV,8.4,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,10/31/2024,Permission to Operate,1/30/2025 AE-24069,Solar PV,10,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,10/31/2024,Permission to Operate,2/17/2025 AE-23705,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,10/29/2024,Permission to Operate,12/3/2024 AE-23946,Solar PV,7.6,,Category 1,"Monroe, Green County, WI",Substation 481,Circuit 1190,In service,10/29/2024,Permission to Operate,3/17/2025 AE-24037,Solar PV,5.2,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,10/25/2024,Permission to Operate,12/2/2024 AE-23979,Solar PV,6.6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,10/25/2024,Permission to Operate,4/8/2025 AE-23974,Solar PV,3.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 124,Circuit 335,In service,10/25/2024,Permission to Operate,2/19/2025 AE-23978,Solar PV,15.1,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,10/25/2024,Permission to Operate,3/3/2025 AE-24043,Solar PV,6.8,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,10/25/2024,Permission to Operate,1/8/2025 AE-23940,Solar PV,4.6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 124,Circuit 337,In service,10/25/2024,Permission to Operate,3/27/2025 AE-23957,Solar PV,7.2,,Category 1,"Beaver Dam, Dodge County, WI",Substation 124,Circuit 335,In service,10/25/2024,Permission to Operate,3/3/2025 AE-23924,Solar PV,10.5,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1198,In service,10/23/2024,Permission to Operate,1/7/2025 AE-24028,Solar PV,9.2,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,10/23/2024,Permission to Operate,1/6/2025 AE-24019,Solar PV,11.8,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1877,In service,10/23/2024,Permission to Operate,12/13/2024 AE-23955,Solar PV,4.6,,Category 1,"Ripon, Fond du Lac County, WI",Substation 537,Circuit 1403,In service,10/22/2024,Permission to Operate,2/13/2025 AE-24001,"Solar PV, Battery/Storage",11.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,10/22/2024,Permission to Operate,4/11/2025 AE-23995,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,10/22/2024,Permission to Operate,12/13/2024 AE-23994,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,10/22/2024,Permission to Operate,12/13/2024 AE-23913,Solar PV,31.8,,Category 2,"Prairie Du Chein, Crawford County, WI",Substation 91,Circuit 247,In service,10/21/2024,Permission to Operate,7/10/2025 AE-23998,Solar PV,2.9,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,10/21/2024,Permission to Operate,12/30/2024 AE-23930,Solar PV,57.9,,Category 2,"Prairie Du Chien, Crawford County, WI",Substation 91,Circuit 247,In service,10/21/2024,Permission to Operate,3/7/2025 AE-23950,"Solar PV, Battery/Storage",50.24,,Category 2,"Fitchburg, Dane County, WI",,Circuit 1880,In service,10/21/2024,Permission to Operate,9/10/2025 AE-23927,Solar PV,19.2,,Category 1,"Birnamwood, Marathon County, WI",Substation 74,Circuit 179,In service,10/21/2024,Permission to Operate,7/15/2025 AE-23973,Solar PV,7.2,,Category 1,"Mt Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,10/18/2024,Permission to Operate,7/7/2025 AE-23933,Solar PV,4.2,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1226,In service,10/18/2024,Permission to Operate,11/26/2024 AE-23960,Solar PV,9.1,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,10/18/2024,Permission to Operate,2/19/2025 AE-23939,Solar PV,7.6,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 862,In service,10/18/2024,Permission to Operate,1/16/2025 AE-23961,"Battery/Storage, Battery/Storage",0,,Category 1,"Fontana, Walworth County, WI",Substation 118,Circuit 319,In service,10/18/2024,Permission to Operate,5/6/2025 AE-23855,Solar PV,5.8,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,10/18/2024,Permission to Operate,8/6/2025 AE-23981,Solar PV,4.244,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,10/18/2024,Permission to Operate,1/21/2025 AE-23993,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,10/18/2024,Permission to Operate,12/10/2024 AE-23992,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,10/18/2024,Permission to Operate,12/13/2024 AE-23963,"Solar PV, Battery/Storage",20.6,,Category 1,"Verona, Dane County, WI",Substation 280,Circuit 670,In service,10/18/2024,Permission to Operate,1/13/2025 AE-23919,Solar PV,9.6,,Category 1,"Blue Mounds, Iowa County, WI",,Circuit 220,In service,10/17/2024,Permission to Operate,12/17/2024 AE-23861,Solar PV,7.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 22,In service,10/17/2024,Permission to Operate,2/17/2025 AE-23792,"Solar PV, Battery/Storage",132.96,44.72,Category 2,"Custer, Portage County, WI",,,Withdrawn,10/17/2024,None, AE-23941,Solar PV,11.6,,Category 1,"Monticello, Green County, WI",,Circuit 1326,In service,10/16/2024,Permission to Operate,1/8/2025 AE-23592,Solar PV,10.8,,Category 1,"Necedah, Juneau County, WI",Substation 516,Circuit 1321,In service,10/16/2024,Permission to Operate,11/20/2024 AE-23851,Solar PV,11.8,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1734,In service,10/16/2024,Permission to Operate,2/13/2025 AE-23699,Solar PV,5.1,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1290,In service,10/16/2024,Permission to Operate,7/18/2025 AE-23847,Solar PV,7.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1304,In service,10/16/2024,Permission to Operate,1/24/2025 AE-23843,Solar PV,9.1,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 778,In service,10/15/2024,Permission to Operate,1/8/2025 AE-23862,Solar PV,6.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,10/14/2024,Permission to Operate,7/25/2025 AE-23803,"Solar PV, Battery/Storage",15,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,10/11/2024,Permission to Operate,12/17/2024 AE-23820,Solar PV,11.3,,Category 1,"Verona, Dane County, WI",Substation 280,Circuit 670,In service,10/11/2024,Permission to Operate,1/21/2025 AE-23776,Solar PV,7,,Category 1,"Neshkoro, Waushara County, WI",Substation 656,Circuit 1792,In service,10/10/2024,Permission to Operate,12/13/2024 AE-23752,Solar PV,10.4,,Category 1,"Vermont, Dane County, WI",Substation 483,Circuit 1211,In service,10/10/2024,Permission to Operate,12/16/2024 AE-23857,Solar PV,2.6,,Category 1,"Deforest, Dane County, WI",,Circuit 474,In service,10/8/2024,Permission to Operate,5/1/2025 AE-23455,Solar PV,3.2,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,10/8/2024,Permission to Operate,12/19/2024 AE-23848,"Solar PV, Battery/Storage",12.2,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1664,In service,10/8/2024,Permission to Operate,3/11/2025 AE-23888,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 698,Circuit 1922,In service,10/8/2024,Permission to Operate,1/24/2025 AE-23900,Solar PV,11.5,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1666,In service,10/8/2024,Permission to Operate,12/13/2024 AE-23863,Solar PV,7.2,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,10/8/2024,Permission to Operate,2/5/2025 AE-23894,Solar PV,3.5,,Category 1,"Marshfield, Wood County, WI",Substation 573,Circuit 1508,In service,10/8/2024,Permission to Operate,1/13/2025 AE-23521,Solar PV,4.6,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,10/8/2024,Permission to Operate,12/2/2024 AE-23790,Solar PV,6.6,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,10/7/2024,Permission to Operate,1/24/2025 AE-23815,Solar PV,6.9,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,10/7/2024,Permission to Operate,1/22/2025 AE-23809,Solar PV,7.2,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,10/7/2024,Permission to Operate,12/2/2024 AE-23814,Solar PV,11.8,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,10/7/2024,Permission to Operate,1/30/2025 AE-23827,Solar PV,19.99,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,10/7/2024,Permission to Operate,1/15/2025 AE-23891,Solar PV,3.1,,Category 1,"Stoughton, Dane County, WI",,Circuit 1140,In service,10/4/2024,Permission to Operate,10/30/2024 AE-23779,Solar PV,3.9,,Category 1,"Sun Prairie, Dane County, WI",Substation 698,Circuit 1920,In service,10/3/2024,Permission to Operate,1/13/2025 AE-23785,Solar PV,7.5,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,10/3/2024,Permission to Operate,12/10/2024 AE-23738,Solar PV,6.264,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1638,In service,10/3/2024,Permission to Operate,12/10/2024 AE-23771,"Solar PV, Battery/Storage",21,,Category 2,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2148,In service,10/3/2024,Permission to Operate,12/23/2024 AE-23737,Solar PV,11.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,10/3/2024,Permission to Operate,11/8/2024 AE-23768,Solar PV,49.7,,Category 2,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1650,In service,10/3/2024,Permission to Operate,10/27/2025 AE-23744,Solar PV,6.1,,Category 1,"Endeavor, Marquette County, WI",Substation 252,Circuit 607,In service,10/3/2024,Permission to Operate,12/10/2024 AE-23718,Solar PV,7,,Category 1,"Edgerton, Dane County, WI",Substation 676,Circuit 1870,In service,10/2/2024,Permission to Operate,11/13/2024 AE-23715,Solar PV,5.8,,Category 1,"Eastman, Crawford County, WI",Substation 645,Circuit 1762,In service,10/2/2024,Permission to Operate,12/17/2024 AE-23724,Solar PV,5.2,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,10/2/2024,Permission to Operate,11/22/2024 AE-23622,Solar PV,5,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1433,In service,10/2/2024,Permission to Operate,11/26/2024 AE-23725,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/2/2024,Permission to Operate,11/13/2024 AE-23729,Solar PV,9.7,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1217,In service,10/2/2024,Permission to Operate,1/8/2025 AE-23728,Solar PV,6.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,10/2/2024,Permission to Operate,11/13/2024 AE-23733,Solar PV,5.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,10/2/2024,Permission to Operate,11/19/2024 AE-23710,Solar PV,16.8,,Category 1,"New Glarus, Dane County, WI",Substation 57,Circuit 152,In service,10/1/2024,Permission to Operate,3/21/2025 AE-23712,Solar PV,3,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1184,In service,10/1/2024,Permission to Operate,1/8/2025 AE-23711,Solar PV,7,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1639,In service,10/1/2024,Permission to Operate,1/29/2025 AE-23675,Solar PV,12.2,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1734,In service,9/30/2024,Permission to Operate,11/22/2024 AE-23660,"Solar PV, Battery/Storage",11.5,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,9/27/2024,Permission to Operate,12/10/2024 AE-23698,Solar PV,8.7,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,9/27/2024,Permission to Operate,1/8/2025 AE-23754,"Solar PV, Battery/Storage",21.2,,Category 2,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,9/25/2024,Permission to Operate,2/5/2025 AE-23591,Solar PV,3.8,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 419,In service,9/25/2024,Permission to Operate,6/5/2025 AE-23610,Solar PV,3.5,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,9/25/2024,Permission to Operate,1/8/2025 AE-23672,Solar PV,11.5,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,In service,9/25/2024,Permission to Operate,10/15/2024 AE-23648,"Solar PV, Battery/Storage",31.1,,Category 2,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/25/2024,Permission to Operate,6/6/2025 AE-23434,Solar PV,15,,Category 1,"Birnamwood, Marathon County, WI",Substation 74,Circuit 179,In service,9/23/2024,Permission to Operate,12/10/2024 AE-23566,Solar PV,5.4,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 906,In service,9/20/2024,Permission to Operate,1/16/2025 AE-23666,Solar PV,6,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,9/20/2024,Permission to Operate,12/2/2024 AE-23674,Solar PV,11.6,,Category 1,"De Forest, Dane County, WI",,Circuit 477,In service,9/20/2024,Permission to Operate,12/31/2024 AE-23679,Solar PV,5.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,9/20/2024,Permission to Operate,2/18/2025 AE-23231,"Solar PV, Battery/Storage",17.5,,Category 1,"Prairie Du Sac, Columbia County, WI",,Circuit 493,In service,9/19/2024,Permission to Operate,12/30/2024 AE-23621,Solar PV,5.2,,Category 1,"Portage, Columbia County, WI",,Circuit 1551,In service,9/19/2024,Permission to Operate,1/22/2025 AE-23649,Solar PV,5.9,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 778,In service,9/19/2024,Permission to Operate,11/8/2024 AE-23558,Solar PV,7.7,,Category 1,"Town Of Verona, Dane County, WI",Substation 119,Circuit 327,In service,9/19/2024,Permission to Operate,10/18/2024 AE-23393,Solar PV,60,,Category 2,"Amhurst Juction, Portage County, WI",Substation 30,Circuit 79,In service,9/18/2024,Permission to Operate,12/3/2024 AE-23578,Solar PV,5.2,,Category 1,"Portage, Columbia County, WI",,Circuit 1551,In service,9/18/2024,Permission to Operate,11/8/2024 AE-23536,"Solar PV, Battery/Storage",20.4,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1925,In service,9/18/2024,Permission to Operate,12/10/2024 AE-23584,Solar PV,5.9,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,9/18/2024,Permission to Operate,11/4/2024 AE-23559,Solar PV,6.6,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,9/18/2024,Permission to Operate,11/4/2024 AE-23570,Solar PV,4.9,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,9/18/2024,Permission to Operate,11/13/2024 AE-23538,"Solar PV, Battery/Storage",10.4,,Category 1,"Prairie Du Sac, Sauk County, WI",,Circuit 493,In service,9/18/2024,Permission to Operate,12/4/2024 AE-23511,Solar PV,7.3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/18/2024,Permission to Operate,11/26/2024 AE-23490,Solar PV,12.2,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,9/18/2024,Permission to Operate,10/7/2024 AE-23541,Solar PV,7.2,,Category 1,"Arlington, Columbia County, WI",Substation 13,Circuit 53,In service,9/18/2024,Permission to Operate,1/13/2025 AE-23372,Solar PV,7.8,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,9/17/2024,Permission to Operate,11/22/2024 AE-23452,Solar PV,7.5,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,9/17/2024,Permission to Operate,9/20/2024 AE-23510,Solar PV,5.2,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,9/16/2024,Permission to Operate,11/22/2024 AE-23473,Solar PV,6.2,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,9/16/2024,Permission to Operate,1/2/2025 AE-23407,Solar PV,9.8,,Category 1,"Prairie Du Sac, Columbia County, WI",,Circuit 493,In service,9/16/2024,Permission to Operate,11/13/2024 AE-23408,Solar PV,13.1,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 135,In service,9/16/2024,Permission to Operate,4/21/2025 AE-23308,Solar PV,4.9,,Category 1,"Wild Rose, Waushara County, WI",Substation 771,Circuit 2084,In service,9/16/2024,Permission to Operate,2/26/2025 AE-23513,Solar PV,11.8,,Category 1,"Mineral Point, Lafayette County, WI",,Circuit 1186,In service,9/16/2024,Permission to Operate,1/13/2025 AE-23519,Solar PV,10,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,9/16/2024,Permission to Operate,4/2/2025 AE-23509,Solar PV,8.5,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,9/16/2024,Permission to Operate,11/8/2024 AE-23529,Solar PV,3.5,,Category 1,"Cuba City, Lafayette County, WI",Substation 248,Circuit 595,In service,9/16/2024,Permission to Operate,1/22/2025 AE-23518,Solar PV,7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/16/2024,Permission to Operate,10/30/2024 AE-23334,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,9/12/2024,Permission to Operate,12/2/2024 AE-23485,Solar PV,6.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,9/11/2024,Permission to Operate,11/8/2024 AE-23487,Solar PV,6.6,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,9/11/2024,Permission to Operate,3/27/2025 AE-23498,Solar PV,7.9,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 779,In service,9/11/2024,Permission to Operate,11/8/2024 AE-23503,Solar PV,6.6,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1432,In service,9/11/2024,Permission to Operate,11/4/2024 AE-23483,Solar PV,9.8,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1984,In service,9/10/2024,Permission to Operate,11/4/2024 AE-23482,Solar PV,5.2,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,9/10/2024,Permission to Operate,11/13/2024 AE-23367,Solar PV,4.6,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,9/10/2024,Permission to Operate,10/16/2024 AE-23257,Solar PV,11.4,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1433,In service,9/6/2024,Permission to Operate,10/25/2024 AE-23021,Solar PV,3,,Category 1,"Keshena, Menominee County, WI",Substation 384,Circuit 943,In service,9/5/2024,Permission to Operate,4/8/2025 AE-23355,Solar PV,6.4,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,9/5/2024,Permission to Operate,10/22/2024 AE-23424,Solar PV,5.2,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 778,In service,9/3/2024,Permission to Operate,12/10/2024 AE-23426,Solar PV,11.2,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1434,In service,9/3/2024,Permission to Operate,11/4/2024 AE-23411,Solar PV,3.9,,Category 1,"Portage, Columbia County, WI",,Circuit 1551,In service,9/3/2024,Permission to Operate,12/10/2024 AE-23078,"Solar PV, Battery/Storage",38.4,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 83,In service,9/3/2024,Permission to Operate,11/20/2024 AE-23438,Solar PV,10.1,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 535,Circuit 1381,In service,9/3/2024,Permission to Operate,3/11/2025 AE-23404,Solar PV,8.5,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1432,In service,9/3/2024,Permission to Operate,11/4/2024 AE-23148,Solar PV,16.9,,Category 1,"Mineral Point, Lafayette County, WI",Substation 59,Circuit 161,In service,8/29/2024,Permission to Operate,9/17/2025 AE-23383,Solar PV,10.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/29/2024,Permission to Operate,12/3/2024 AE-23287,Solar PV,5.9,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,8/29/2024,Permission to Operate,11/13/2024 AE-23374,Solar PV,8.4,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1639,In service,8/29/2024,Permission to Operate,11/13/2024 AE-23376,Solar PV,6.1,,Category 1,"Belleville, Dane County, WI",Substation 722,Circuit 1971,In service,8/29/2024,Permission to Operate,4/10/2025 AE-23387,Solar PV,11.4,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 316,In service,8/29/2024,Permission to Operate,10/21/2024 AE-23375,Solar PV,2.3,,Category 1,"Belleville, Dane County, WI",Substation 722,Circuit 1971,In service,8/29/2024,Permission to Operate,4/10/2025 AE-23378,Solar PV,6.6,,Category 1,"Portage, Columbia County, WI",,Circuit 1551,In service,8/29/2024,Permission to Operate,10/25/2024 AE-23395,Solar PV,8.4,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2000,In service,8/29/2024,Permission to Operate,1/13/2025 AE-23051,"Solar PV, Battery/Storage",24.12,,Category 1,"Clintonville, Shawano County, WI",Substation 69,Circuit 166,In service,8/28/2024,Permission to Operate,12/17/2024 AE-23232,"Solar PV, Battery/Storage",18.7,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,8/27/2024,Permission to Operate,11/26/2024 AE-23235,Solar PV,6.3,,Category 1,"Omro, Winnebago County, WI",Substation 549,Circuit 1446,In service,8/27/2024,Permission to Operate,11/8/2024 AE-23326,Solar PV,2.3,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,8/27/2024,Permission to Operate,12/10/2024 AE-23256,Solar PV,8,,Category 1,"Omro, Winnebago County, WI",Substation 549,Circuit 1446,In service,8/27/2024,Permission to Operate,11/8/2024 AE-23027,Solar PV,59.8,,Category 2,"Hollandale, Iowa County, WI",Substation 525,Circuit 1342,In service,8/27/2024,Permission to Operate,7/17/2025 AE-23096,Solar PV,6.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,8/27/2024,Permission to Operate,9/20/2024 AE-23351,Solar PV,4.5,,Category 1,"Pardeeville, Columbia County, WI",Substation 448,Circuit 1113,In service,8/27/2024,Permission to Operate,3/27/2025 AE-23103,Solar PV,14,,Category 1,"Verona, Dane County, WI",Substation 57,Circuit 152,In service,8/27/2024,Permission to Operate,3/14/2025 AE-22899,Solar PV,11.4,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1731,In service,8/27/2024,Permission to Operate,11/19/2024 AE-23177,Solar PV,7.9,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,8/27/2024,Permission to Operate,11/22/2024 AE-23173,Solar PV,5,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,8/27/2024,Permission to Operate,12/2/2024 AE-23240,Solar PV,11.9,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,8/27/2024,Permission to Operate,11/13/2024 AE-23059,Solar PV,7.2,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,8/27/2024,Permission to Operate,11/13/2024 AE-22940,Solar PV,8,,Category 1,"Ripon, Fond du Lac County, WI",Substation 537,Circuit 1403,In service,8/26/2024,Permission to Operate,1/13/2025 AE-23313,Solar PV,7.6,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,8/23/2024,Permission to Operate,10/25/2024 AE-23317,Solar PV,199.8,0,Category 2,"Janesville, Rock County, WI",,Circuit 1872,In service,8/23/2024,Permission to Operate,12/12/2025 AE-23296,Solar PV,7.6,,Category 1,"Elroy, Juneau County, WI",,Circuit 1959,In service,8/22/2024,Permission to Operate,10/17/2024 AE-23283,Solar PV,11.4,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,8/22/2024,Permission to Operate,11/4/2024 AE-23303,Solar PV,11.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,8/22/2024,Permission to Operate,7/22/2025 AE-23299,Solar PV,5.9,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 779,In service,8/22/2024,Permission to Operate,11/13/2024 AE-23281,Solar PV,5.1,,Category 1,"Mauston, Juneau County, WI",Substation 776,Circuit 2106,In service,8/21/2024,Permission to Operate,11/20/2024 AE-23251,Solar PV,7.94,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/21/2024,Permission to Operate,10/21/2024 AE-23134,"Solar PV, Battery/Storage",7.6,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 79,In service,8/21/2024,Permission to Operate,10/30/2024 AE-23254,Solar PV,2.9,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,8/21/2024,Permission to Operate,1/6/2025 AE-23191,Solar PV,9.6,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,8/20/2024,Permission to Operate,11/13/2024 AE-23091,Solar PV,10,,Category 1,"Pittsville, Wood County, WI",Substation 573,Circuit 1506,In service,8/20/2024,Permission to Operate,11/21/2024 AE-23192,Solar PV,7,,Category 1,"Deerfield, Dane County, WI",Substation 147,Circuit 394,In service,8/20/2024,Permission to Operate,1/2/2025 AE-23153,Solar PV,12.5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,8/19/2024,Permission to Operate,11/13/2024 AE-23183,Solar PV,3.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,8/19/2024,Permission to Operate,11/4/2024 AE-23157,Solar PV,6.6,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,8/16/2024,Permission to Operate,12/10/2024 AE-23160,Solar PV,7,,Category 1,"Winneconnie, Winnebago County, WI",Substation 766,Circuit 2077,In service,8/16/2024,Permission to Operate,9/30/2024 AE-23162,Solar PV,5.4,,Category 1,"Redgranite, Waushara County, WI",Substation 599,Circuit 1615,In service,8/16/2024,Permission to Operate,1/24/2025 AE-23158,Solar PV,4.5,,Category 1,"Darlington, Lafayette County, WI",,Circuit 1605,In service,8/15/2024,Permission to Operate,10/17/2024 AE-23165,Solar PV,4.6,,Category 1,"New Glarus, Green County, WI",,Circuit 1327,In service,8/15/2024,Permission to Operate,10/21/2024 AE-23109,Solar PV,6.5,,Category 1,"White Lake, Langlade County, WI",Substation 578,Circuit 1516,In service,8/15/2024,Permission to Operate,10/30/2024 AE-23121,Solar PV,4.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,8/15/2024,Permission to Operate,12/10/2024 AE-23083,Solar PV,6.3,,Category 1,"Waupaca, Portage County, WI",Substation 651,Circuit 1787,In service,8/15/2024,Permission to Operate,10/30/2024 AE-23125,Solar PV,13.1,,Category 1,"Monrow, Green County, WI",Substation 101,Circuit 270,In service,8/14/2024,Permission to Operate,10/8/2024 AE-23133,Solar PV,5.6,,Category 1,"Richland Center, Richland County, WI",Substation 606,Circuit 1636,In service,8/14/2024,Permission to Operate,11/26/2024 AE-23126,Solar PV,5.136,,Category 1,"Brodhead, Green County, WI",Substation 96,Circuit 259,In service,8/14/2024,Permission to Operate,10/2/2024 AE-23131,Solar PV,4.6,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,8/14/2024,Permission to Operate,10/8/2024 AE-23052,Solar PV,6,,Category 1,"Berlin, Waushara County, WI",Substation 633,Circuit 1722,In service,8/14/2024,Permission to Operate,12/3/2024 AE-23107,Solar PV,5.2,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,8/14/2024,Permission to Operate,10/21/2024 AE-23117,Solar PV,5,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1217,In service,8/14/2024,Permission to Operate,12/13/2024 AE-23025,Solar PV,7.6,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 318,In service,8/14/2024,Permission to Operate,11/20/2024 AE-23087,Solar PV,12.5,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,8/13/2024,Permission to Operate,11/13/2024 AE-22830,"Solar PV, Battery/Storage",21.2,,Category 2,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,8/13/2024,Permission to Operate,10/17/2024 AE-23094,Solar PV,20,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 450,In service,8/13/2024,Permission to Operate,1/8/2025 AE-23007,"Solar PV, Battery/Storage",15.2,0,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 18,In service,8/9/2024,Permission to Operate,10/2/2024 AE-23035,Solar PV,11.4,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1217,In service,8/8/2024,Permission to Operate,10/8/2024 AE-22934,Solar PV,5.1,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,8/7/2024,Permission to Operate,12/20/2024 AE-23040,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,8/7/2024,Permission to Operate,9/18/2024 AE-23067,Solar PV,7.5,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,8/7/2024,Permission to Operate,9/26/2024 AE-23071,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,8/7/2024,Permission to Operate,10/2/2024 AE-23042,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,8/7/2024,Permission to Operate,9/18/2024 AE-22992,Solar PV,11.2,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1230,In service,8/7/2024,Permission to Operate,10/11/2024 AE-23036,Solar PV,6.6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,8/7/2024,Permission to Operate,10/3/2024 AE-23066,Solar PV,7,,Category 1,"Fontana, Walworth County, WI",,Circuit 2018,In service,8/7/2024,Permission to Operate,9/20/2024 AE-23032,Solar PV,5.9,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,8/7/2024,Permission to Operate,11/13/2024 AE-23072,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,8/7/2024,Permission to Operate,10/2/2024 AE-23050,"Solar PV, Battery/Storage",11.4,,Category 1,"Prairie Du Chein, Crawford County, WI",Substation 429,Circuit 1064,In service,8/7/2024,Permission to Operate,9/26/2024 AE-23014,"Solar PV, Battery/Storage",11.5,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,8/6/2024,Permission to Operate,10/30/2024 AE-23030,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,8/6/2024,Permission to Operate,10/18/2024 AE-23026,Solar PV,4.2,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 902,In service,8/6/2024,Permission to Operate,10/31/2024 AE-23028,Solar PV,3.9,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 861,In service,8/6/2024,Permission to Operate,9/25/2024 AE-23022,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,8/6/2024,Permission to Operate,11/19/2024 AE-22980,Solar PV,10,,Category 1,"Beloit, Rock County, WI",Substation 529,Circuit 1351,In service,8/2/2024,Permission to Operate,9/19/2024 AE-23008,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,8/2/2024,Permission to Operate,12/13/2024 AE-22999,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,8/2/2024,Permission to Operate,10/11/2024 AE-22997,Solar PV,11.4,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,8/2/2024,Permission to Operate,8/26/2024 AE-22961,Solar PV,15.3,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 670,In service,7/30/2024,Permission to Operate,3/27/2025 AE-22953,Solar PV,20.1,,Category 2,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,7/30/2024,Permission to Operate,1/22/2025 AE-22942,Solar PV,6.1,,Category 1,"Hazel Green, Grant County, WI",Substation 67,Circuit 165,In service,7/30/2024,Permission to Operate,11/22/2024 AE-22956,Solar PV,5.2,,Category 1,"Beloit, Rock County, WI",Substation 529,Circuit 1351,In service,7/30/2024,Permission to Operate,8/21/2024 AE-22959,Solar PV,6.6,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 420,In service,7/30/2024,Permission to Operate,9/18/2024 AE-22936,Solar PV,5.2,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1813,In service,7/29/2024,Permission to Operate,9/18/2024 AE-22922,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,7/29/2024,Permission to Operate,9/3/2024 AE-22933,Solar PV,6.6,,Category 1,"Beloit, Rock County, WI",Substation 529,Circuit 1351,In service,7/29/2024,Permission to Operate,10/11/2024 AE-22938,Solar PV,5.8,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 14,In service,7/29/2024,Permission to Operate,12/13/2024 AE-22943,Solar PV,9.1,,Category 1,"Wilton, Monroe County, WI",Substation 217,Circuit 514,In service,7/29/2024,Permission to Operate,12/20/2024 AE-22912,Solar PV,10,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1009,In service,7/29/2024,Permission to Operate,11/4/2024 AE-22927,Solar PV,6.8,,Category 1,"Mauston, Juneau County, WI",Substation 344,Circuit 824,In service,7/29/2024,Permission to Operate,9/19/2024 AE-22931,Solar PV,10,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,7/29/2024,Permission to Operate,8/26/2024 AE-22925,Solar PV,5.3,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,7/29/2024,Permission to Operate,10/11/2024 AE-22896,Solar PV,7.6,,Category 1,"Amherst, Portage County, WI",Substation 41,Circuit 2242,In service,7/24/2024,Permission to Operate,9/3/2024 AE-22895,Solar PV,7.6,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1745,In service,7/24/2024,Permission to Operate,4/29/2025 AE-22915,Solar PV,11.2,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,7/24/2024,Permission to Operate,10/22/2024 AE-22900,Solar PV,6.6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/24/2024,Permission to Operate,8/19/2024 AE-22883,Solar PV,10.9,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1168,In service,7/24/2024,Permission to Operate,9/20/2024 AE-22892,Solar PV,7.9,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,7/24/2024,Permission to Operate,8/29/2024 AE-22874,Solar PV,7.3,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,7/24/2024,Permission to Operate,9/5/2024 AE-22807,Solar PV,4.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 625,In service,7/18/2024,Permission to Operate,9/5/2024 AE-22709,Solar PV,14.3,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 694,In service,7/16/2024,Permission to Operate,10/3/2024 AE-22707,Solar PV,19.99,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 694,In service,7/15/2024,Permission to Operate,10/3/2024 AE-22834,Solar PV,11.4,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1638,In service,7/15/2024,Permission to Operate,10/29/2024 AE-22794,Solar PV,7.6,,Category 1,"Rio, Columbia County, WI",,Circuit 2000,In service,7/15/2024,Permission to Operate,9/11/2024 AE-22837,Solar PV,8.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 153,In service,7/15/2024,Permission to Operate,9/18/2024 AE-22844,Solar PV,30,,Category 2,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,7/12/2024,Permission to Operate,9/30/2024 AE-22825,Solar PV,9.8,,Category 1,"Beloit, Rock County, WI",,Circuit 154,In service,7/12/2024,Permission to Operate,8/30/2024 AE-22819,Solar PV,6.6,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1218,In service,7/12/2024,Permission to Operate,9/11/2024 AE-22818,Solar PV,4.6,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1228,In service,7/12/2024,Permission to Operate,8/16/2024 AE-22722,Solar PV,11.6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,7/12/2024,Permission to Operate,8/28/2024 AE-22671,Solar PV,7,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,7/12/2024,Permission to Operate,11/22/2024 AE-22741,Solar PV,7.6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1736,In service,7/12/2024,Permission to Operate,9/10/2024 AE-22833,Solar PV,6.6,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,7/12/2024,Permission to Operate,8/16/2024 AE-22701,Solar PV,10.4,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 83,In service,7/12/2024,Permission to Operate,10/2/2024 AE-22826,Solar PV,5,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,7/12/2024,Permission to Operate,9/30/2024 AE-22831,Solar PV,11.2,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1215,In service,7/12/2024,Permission to Operate,9/18/2024 AE-22836,Solar PV,8.4,,Category 1,"Delavan, Walworth County, WI",Substation 662,Circuit 1822,In service,7/12/2024,Permission to Operate,11/26/2024 AE-22811,Solar PV,14.4,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1217,In service,7/11/2024,Permission to Operate,12/13/2024 AE-22806,Solar PV,10,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1745,In service,7/11/2024,Permission to Operate,1/22/2025 AE-22812,Solar PV,11.8,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,7/11/2024,Permission to Operate,9/11/2024 AE-22814,Solar PV,5.8,,Category 1,"Milladore, Wood County, WI",Substation 43,Circuit 120,In service,7/11/2024,Permission to Operate,8/28/2024 AE-22796,Solar PV,7.5,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1894,In service,7/11/2024,Permission to Operate,9/3/2024 AE-22787,Solar PV,5.8,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,7/10/2024,Permission to Operate,9/30/2024 AE-22784,Solar PV,7.9,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,7/10/2024,Permission to Operate,9/18/2024 AE-22775,Solar PV,4.3,,Category 1,"Dodgeville, Iowa County, WI",Substation 525,Circuit 1342,In service,7/10/2024,Permission to Operate,9/19/2024 AE-22527,Solar PV,7.7,,Category 1,"Endeavor, Marquette County, WI",Substation 252,Circuit 607,In service,7/10/2024,Permission to Operate,8/21/2024 AE-22788,Solar PV,9.2,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1216,In service,7/10/2024,Permission to Operate,9/26/2024 AE-22789,Solar PV,12.5,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1226,In service,7/10/2024,Permission to Operate,10/15/2024 AE-22773,Solar PV,4.2,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 270,In service,7/9/2024,Permission to Operate,9/10/2024 AE-22761,Solar PV,13.8,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,7/9/2024,Permission to Operate,9/11/2024 AE-22765,Solar PV,3.8,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 201,In service,7/9/2024,Permission to Operate,10/17/2024 AE-22752,Solar PV,9.2,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,7/9/2024,Permission to Operate,1/6/2025 AE-22753,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1584,In service,7/9/2024,Permission to Operate,9/26/2024 AE-22764,Solar PV,9.7,,Category 1,"Lone Rock, Richland County, WI",,Circuit 1055,In service,7/9/2024,Permission to Operate,10/22/2024 AE-22757,Solar PV,11.1,,Category 1,"Kohler, Sheboygan County, WI",Substation 404,Circuit 2187,In service,7/8/2024,Permission to Operate,10/15/2024 AE-22740,Solar PV,7.9,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,7/8/2024,Permission to Operate,9/17/2024 AE-22756,Solar PV,14,,Category 1,"Dickeyville, Grant County, WI",Substation 386,Circuit 2179,In service,7/8/2024,Permission to Operate,9/30/2024 AE-22749,Solar PV,7.6,,Category 1,"Hazel Green, Lafayette County, WI",Substation 67,Circuit 165,In service,7/8/2024,Permission to Operate,10/2/2024 AE-22738,Solar PV,7.2,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,7/8/2024,Permission to Operate,9/17/2024 AE-22710,Solar PV,5.8,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 694,In service,7/5/2024,Permission to Operate,10/3/2024 AE-22703,Solar PV,5.2,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,7/5/2024,Permission to Operate,8/26/2024 AE-22700,Solar PV,10.5,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,7/5/2024,Permission to Operate,9/26/2024 AE-22725,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,7/5/2024,Permission to Operate,8/21/2024 AE-22716,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,7/5/2024,Permission to Operate,9/26/2024 AE-22724,Solar PV,7.9,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1215,In service,7/5/2024,Permission to Operate,10/17/2024 AE-22723,Solar PV,10.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,7/5/2024,Permission to Operate,9/30/2024 AE-22695,Solar PV,4.6,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,7/5/2024,Permission to Operate,9/17/2024 AE-22685,Solar PV,9.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/3/2024,Permission to Operate,8/28/2024 AE-22693,Solar PV,5.2,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1215,In service,7/3/2024,Permission to Operate,9/17/2024 AE-22690,Solar PV,5.9,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1818,In service,7/3/2024,Permission to Operate,9/17/2024 AE-22683,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 903,In service,7/3/2024,Permission to Operate,8/28/2024 AE-22698,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 908,In service,7/3/2024,Permission to Operate,9/6/2024 AE-22699,Solar PV,10.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/3/2024,Permission to Operate,9/3/2024 AE-22682,Solar PV,3.9,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 419,In service,7/3/2024,Permission to Operate,8/21/2024 AE-22697,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,7/3/2024,Permission to Operate,8/26/2024 AE-22621,"Solar PV, Battery/Storage",18.1,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1737,In service,7/1/2024,Permission to Operate,9/17/2024 AE-22659,Solar PV,11.5,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1304,In service,7/1/2024,Permission to Operate,9/25/2024 AE-22623,Solar PV,7.6,,Category 1,"Plainfield, Waushara County, WI",Substation 575,Circuit 1512,In service,7/1/2024,Permission to Operate,10/11/2024 AE-22670,Solar PV,10.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,7/1/2024,Permission to Operate,9/3/2024 AE-22629,"Solar PV, Battery/Storage",14.328,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,6/28/2024,Permission to Operate,9/19/2024 AE-22680,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,6/28/2024,Permission to Operate,8/28/2024 AE-22681,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,6/28/2024,Permission to Operate,8/14/2024 AE-22607,Solar PV,17.4,,Category 1,"Loganville, Sauk County, WI",Substation 421,Circuit 1050,In service,6/27/2024,Permission to Operate,1/10/2025 AE-22646,Solar PV,8.5,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1230,In service,6/27/2024,Permission to Operate,9/3/2024 AE-22628,Solar PV,6.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1009,In service,6/27/2024,Permission to Operate,8/26/2024 AE-22642,Solar PV,4.6,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 201,In service,6/27/2024,Permission to Operate,8/30/2024 AE-22602,Solar PV,2.1,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,6/27/2024,Permission to Operate,9/30/2024 AE-22509,Solar PV,3.8,,Category 1,"Prairie Du Sac, Columbia County, WI",,Circuit 493,In service,6/27/2024,Permission to Operate,8/28/2024 AE-22557,Solar PV,7.3,,Category 1,"Manawa, Waupaca County, WI",Substation 433,Circuit 1101,In service,6/27/2024,Permission to Operate,8/22/2024 AE-22657,"Solar PV, Battery/Storage",7.6,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,6/27/2024,Permission to Operate,10/8/2024 AE-22606,Solar PV,4.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,6/24/2024,Permission to Operate,8/28/2024 AE-22579,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,6/24/2024,Permission to Operate,8/19/2024 AE-22586,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,6/24/2024,Permission to Operate,9/26/2024 AE-22600,Solar PV,16.6,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 450,In service,6/24/2024,Permission to Operate,3/11/2025 AE-22503,Solar PV,7.3,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1117,In service,6/21/2024,Permission to Operate,11/8/2024 AE-22460,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,6/21/2024,Permission to Operate,12/17/2024 AE-22500,Solar PV,6.5,,Category 1,"Ripon, Fond du Lac County, WI",Substation 610,Circuit 1643,In service,6/21/2024,Permission to Operate,10/2/2024 AE-22528,Solar PV,7.6,,Category 1,"Van Dyne, Fond du Lac County, WI",,Circuit 2158,In service,6/21/2024,Permission to Operate,1/8/2025 AE-22566,Solar PV,7.6,,Category 1,"Kohler, Sheboygan County, WI",Substation 650,Circuit 1784,In service,6/21/2024,Permission to Operate,8/12/2024 AE-22556,Solar PV,11.2,,Category 1,"Plain, Sauk County, WI",Substation 710,Circuit 1946,In service,6/20/2024,Permission to Operate,8/30/2024 AE-22546,Solar PV,12.9,,Category 1,"Wisc. Rapids, Wood County, WI",Substation 636,Circuit 1731,In service,6/20/2024,Permission to Operate,9/10/2024 AE-22547,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,6/20/2024,Permission to Operate,8/19/2024 AE-22558,"Solar PV, Natural Gas",766.6,706.4,Category 3,"Verona, Dane County, WI",,,In service,6/20/2024,Permission to Operate,6/30/2026 AE-22530,Solar PV,3.9,,Category 1,"Beloit, Rock County, WI",Substation 529,Circuit 1351,In service,6/19/2024,Permission to Operate,8/30/2024 AE-22523,Solar PV,4.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,6/19/2024,Permission to Operate,8/14/2024 AE-22518,Solar PV,10.5,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,6/19/2024,Permission to Operate,8/19/2024 AE-22522,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,6/19/2024,Permission to Operate,8/19/2024 AE-22517,Solar PV,3.9,,Category 1,"Middlton, Dane County, WI",Substation 579,Circuit 1522,In service,6/19/2024,Permission to Operate,9/11/2024 AE-22521,Solar PV,5,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,6/19/2024,Permission to Operate,7/25/2024 AE-22469,Solar PV,4.3,,Category 1,"Darlington, Lafayette County, WI",,Circuit 1605,In service,6/17/2024,Permission to Operate,9/3/2024 AE-22507,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,6/17/2024,Permission to Operate,8/19/2024 AE-22486,Solar PV,9.9,,Category 1,"Shullsburg, Lafayette County, WI",,Circuit 1606,In service,6/17/2024,Permission to Operate,10/16/2024 AE-22480,Solar PV,7,,Category 1,"Brodhead, Green County, WI",Substation 96,Circuit 260,In service,6/17/2024,Permission to Operate,8/21/2024 AE-22482,Solar PV,14.6,,Category 1,"Rio, Columbia County, WI",Substation 781,Circuit 2133,In service,6/17/2024,Permission to Operate,8/12/2024 AE-22490,Solar PV,3.5,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,6/17/2024,Permission to Operate,8/14/2024 AE-22249,Solar PV,11.4,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,6/14/2024,Permission to Operate,8/14/2024 AE-22457,Solar PV,7.3,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 79,In service,6/13/2024,Permission to Operate,9/10/2024 AE-22307,Solar PV,5.8,,Category 1,"Winneconne, Winnebago County, WI",Substation 766,Circuit 2076,In service,6/13/2024,Permission to Operate,12/17/2024 AE-22456,Solar PV,7,,Category 1,"Merrimac, Sauk County, WI",,Circuit 494,In service,6/11/2024,Permission to Operate,8/2/2024 AE-22441,Solar PV,11.9,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,In service,6/11/2024,Permission to Operate,8/12/2024 AE-22424,Solar PV,10,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1230,In service,6/10/2024,Permission to Operate,7/25/2024 AE-22254,Diesel,9125,0,Category 4,"Fond du Lac, Fond du Lac County, WI",,,Approved,6/10/2024,Installation & Construction, AE-22324,Solar PV,6.6,,Category 1,"Markesan, Green Lake County, WI",Substation 474,Circuit 1165,In service,6/6/2024,Permission to Operate,7/22/2024 AE-22420,Solar PV,12.5,,Category 1,"Brodhead, Green County, WI",Substation 15,Circuit 60,In service,6/6/2024,Permission to Operate,8/21/2024 AE-22423,Solar PV,6,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 419,In service,6/6/2024,Permission to Operate,7/17/2024 AE-22427,Solar PV,7.9,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1518,In service,6/6/2024,Permission to Operate,8/14/2024 AE-22430,Solar PV,11.5,,Category 1,"Darien, Walworth County, WI",Substation 662,Circuit 1821,In service,6/6/2024,Permission to Operate,10/11/2024 AE-22407,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,6/5/2024,Permission to Operate,7/30/2024 AE-22403,Solar PV,10.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1525,In service,6/5/2024,Permission to Operate,8/12/2024 AE-22415,Solar PV,99.9,,Category 2,"Platteville, Grant County, WI",Substation 475,Circuit 1172,In service,6/5/2024,Permission to Operate,1/30/2025 AE-22405,Solar PV,15.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,6/5/2024,Permission to Operate,8/26/2024 AE-22378,Solar PV,10,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,6/4/2024,Permission to Operate,9/5/2024 AE-22384,Solar PV,4.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,6/4/2024,Permission to Operate,8/14/2024 AE-22391,Solar PV,11.2,,Category 1,"Tomah, Monroe County, WI",Substation 536,Circuit 1383,In service,6/4/2024,Permission to Operate,8/28/2024 AE-22383,Solar PV,7.188,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,6/3/2024,Permission to Operate,10/2/2024 AE-22376,Solar PV,7.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 2154,In service,5/31/2024,Permission to Operate,8/16/2024 AE-22359,Solar PV,8.7,,Category 1,"Tomah, Monroe County, WI",Substation 277,Circuit 653,In service,5/31/2024,Permission to Operate,7/9/2024 AE-22360,Solar PV,5.8,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,5/30/2024,Permission to Operate,8/16/2024 AE-22354,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,5/30/2024,Permission to Operate,7/25/2024 AE-22256,Solar PV,7.7,,Category 1,"Wild Rose, Waushara County, WI",Substation 771,Circuit 2085,In service,5/30/2024,Permission to Operate,7/12/2024 AE-22365,Solar PV,7.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,5/30/2024,Permission to Operate,8/19/2024 AE-22329,Solar PV,4.9,,Category 1,"Tomah, Monroe County, WI",Substation 536,Circuit 1383,In service,5/29/2024,Permission to Operate,8/28/2024 AE-22337,Solar PV,5.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,5/29/2024,Permission to Operate,7/12/2024 AE-22340,Solar PV,7.2,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,5/29/2024,Permission to Operate,7/12/2024 AE-22291,Solar PV,10,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1736,In service,5/29/2024,Permission to Operate,8/12/2024 AE-22331,Solar PV,17.6,,Category 1,"Belleville, Dane County, WI",Substation 722,Circuit 1971,In service,5/29/2024,Permission to Operate,8/12/2024 AE-22328,Solar PV,3.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,5/29/2024,Permission to Operate,8/1/2024 AE-22338,Solar PV,11.4,,Category 1,"Lodi, Dane County, WI",Substation 547,Circuit 1432,In service,5/29/2024,Permission to Operate,8/2/2024 AE-22300,Solar PV,8.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,5/28/2024,Permission to Operate,8/7/2024 AE-22312,Solar PV,3.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,5/28/2024,Permission to Operate,8/2/2024 AE-22322,Solar PV,5.2,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 317,In service,5/28/2024,Permission to Operate,8/8/2024 AE-22323,Solar PV,11.8,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,5/28/2024,Permission to Operate,8/19/2024 AE-22321,Solar PV,13.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,5/28/2024,Permission to Operate,8/26/2024 AE-22303,Solar PV,9.1,,Category 1,"Warrens, Monroe County, WI",,Circuit 2112,In service,5/28/2024,Permission to Operate,9/30/2024 AE-22320,Solar PV,7.6,,Category 1,"Poynette, Columbia County, WI",Substation 335,Circuit 790,In service,5/28/2024,Permission to Operate,7/12/2024 AE-22183,Solar PV,7.5,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 1999,In service,5/24/2024,Permission to Operate,9/30/2024 AE-22311,Solar PV,10.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,5/24/2024,Permission to Operate,8/19/2024 AE-22292,Solar PV,11.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,5/23/2024,Permission to Operate,7/22/2024 AE-22265,Solar PV,33.1,,Category 2,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,5/22/2024,Permission to Operate,8/14/2024 AE-22252,Solar PV,8.5,,Category 1,"Cross Plains, Dane County, WI",Substation 686,Circuit 1895,In service,5/21/2024,Permission to Operate,7/12/2024 AE-22184,Solar PV,7.5,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,5/21/2024,Permission to Operate,8/16/2024 AE-22248,Solar PV,8.5,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,5/21/2024,Permission to Operate,7/12/2024 AE-22253,Solar PV,10.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,5/21/2024,Permission to Operate,7/17/2024 AE-22260,Solar PV,9.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,5/21/2024,Permission to Operate,7/30/2024 AE-22243,Solar PV,9.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,5/21/2024,Permission to Operate,7/25/2024 AE-22139,Solar PV,5.8,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,5/20/2024,Permission to Operate,9/5/2024 AE-22177,Solar PV,3.8,,Category 1,"Sauk City, Dane County, WI",Substation 461,Circuit 1130,In service,5/14/2024,Permission to Operate,8/28/2024 AE-22218,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,5/8/2024,Permission to Operate,8/19/2024 AE-22227,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,5/8/2024,Permission to Operate,7/17/2024 AE-22231,Solar PV,4.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,5/8/2024,Permission to Operate,7/25/2024 AE-22221,Solar PV,5.9,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,5/8/2024,Permission to Operate,6/20/2024 AE-22224,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,5/8/2024,Permission to Operate,7/22/2024 AE-22232,Solar PV,4.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,5/8/2024,Permission to Operate,7/12/2024 AE-22213,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,5/8/2024,Permission to Operate,6/27/2024 AE-22201,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,5/7/2024,Permission to Operate,7/5/2024 AE-22197,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,5/7/2024,Permission to Operate,7/5/2024 AE-22200,Solar PV,11.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,5/7/2024,Permission to Operate,8/12/2024 AE-22205,Solar PV,12.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,5/7/2024,Permission to Operate,6/27/2024 AE-22196,Solar PV,19.1,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1198,In service,5/7/2024,Permission to Operate,9/25/2024 AE-22203,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,5/7/2024,Permission to Operate,8/30/2024 AE-22202,Solar PV,5.2,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,5/7/2024,Permission to Operate,7/5/2024 AE-22206,Solar PV,4.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1518,In service,5/7/2024,Permission to Operate,7/9/2024 AE-22129,Solar PV,98.8,,Category 2,"Wonewoc, Juneau County, WI",,Circuit 1958,In service,5/6/2024,Permission to Operate,1/8/2025 AE-22147,"Solar PV, Battery/Storage",24,,Category 2,"Mazomanie, Dane County, WI",Substation 461,Circuit 1129,In service,5/3/2024,Permission to Operate,7/5/2024 AE-22155,Solar PV,6,,Category 1,"Shawano, Shawano County, WI",Substation 111,Circuit 310,In service,5/3/2024,Permission to Operate,11/4/2024 AE-22159,Solar PV,10.4,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,5/1/2024,Permission to Operate,7/9/2024 AE-22127,Solar PV,20,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 1999,In service,4/30/2024,Permission to Operate,7/17/2024 AE-22121,Solar PV,49.7,,Category 2,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,4/30/2024,Permission to Operate,6/28/2024 AE-22123,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,4/29/2024,Permission to Operate,7/9/2024 AE-22126,Solar PV,15.1,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 462,In service,4/29/2024,Permission to Operate,8/1/2024 AE-22120,Solar PV,3.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,4/29/2024,Permission to Operate,7/5/2024 AE-22135,Solar PV,7.6,,Category 1,"New Glarus, Green County, WI",,Circuit 1327,In service,4/29/2024,Permission to Operate,7/22/2024 AE-22140,Solar PV,3.9,,Category 1,"Ripon, Fond du Lac County, WI",Substation 537,Circuit 1403,In service,4/29/2024,Permission to Operate,7/22/2024 AE-22134,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,4/29/2024,Permission to Operate,8/17/2024 AE-22119,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,4/29/2024,Permission to Operate,8/28/2024 AE-22118,Solar PV,5.6,,Category 1,"Ontario, Vernon County, WI",Substation 217,Circuit 514,In service,4/26/2024,Permission to Operate,7/15/2024 AE-22107,Solar PV,6.3,,Category 1,"Ontario, Monroe County, WI",Substation 217,Circuit 514,In service,4/26/2024,Permission to Operate,8/14/2024 AE-22090,"Solar PV, Battery/Storage",23,,Category 2,"Berlin, Winnebago County, WI",,Circuit 170,In service,4/24/2024,Permission to Operate,8/21/2024 AE-22111,Solar PV,7,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1731,In service,4/24/2024,Permission to Operate,6/20/2024 AE-22113,Solar PV,3.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,4/23/2024,Permission to Operate,7/12/2024 AE-22098,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,4/23/2024,Permission to Operate,5/31/2024 AE-22106,Solar PV,8.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,4/23/2024,Permission to Operate,7/9/2024 AE-22115,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2126,In service,4/23/2024,Permission to Operate,6/20/2024 AE-22041,Solar PV,7.3,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,4/23/2024,Permission to Operate,6/18/2024 AE-22117,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,4/23/2024,Permission to Operate,7/9/2024 AE-22088,Solar PV,5.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,4/22/2024,Permission to Operate,7/17/2024 AE-22074,Solar PV,10.5,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,4/19/2024,Permission to Operate,6/3/2024 AE-22020,Solar PV,11.4,,Category 1,"La Valle, Sauk County, WI",,Circuit 110,In service,4/19/2024,Permission to Operate,5/16/2024 AE-22076,Solar PV,8.5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,4/19/2024,Permission to Operate,6/20/2024 AE-22084,Solar PV,6.3,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1919,In service,4/19/2024,Permission to Operate,7/30/2024 AE-21729,"Solar PV, Battery/Storage",23,,Category 2,"Waupun, Dodge County, WI",,Circuit 1279,In service,4/18/2024,Permission to Operate,7/9/2024 AE-22063,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,4/17/2024,Permission to Operate,5/31/2024 AE-22050,Solar PV,8.4,,Category 1,"Wisconsin Dells, Columbia County, WI",Substation 387,Circuit 956,In service,4/17/2024,Permission to Operate,10/17/2024 AE-22015,Solar PV,5,,Category 1,"Browntown, Green County, WI",Substation 95,Circuit 2162,In service,4/17/2024,Permission to Operate,9/9/2024 AE-22055,Solar PV,3.9,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,4/17/2024,Permission to Operate,7/22/2024 AE-22060,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,4/17/2024,Permission to Operate,6/27/2024 AE-21869,Solar PV,38.5,,Category 2,"Sauk City, Sauk County, WI",Substation 710,Circuit 1947,In service,4/16/2024,Permission to Operate,8/28/2024 AE-22023,Solar PV,8.4,,Category 1,"Ripon, Fond du Lac County, WI",Substation 610,Circuit 1643,In service,4/16/2024,Permission to Operate,9/26/2024 AE-21989,Solar PV,7.5,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 18,In service,4/16/2024,Permission to Operate,9/11/2024 AE-22045,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1583,In service,4/16/2024,Permission to Operate,8/14/2024 AE-22017,Solar PV,8.4,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 906,In service,4/16/2024,Permission to Operate,5/7/2024 AE-22043,Solar PV,7.6,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,4/16/2024,Permission to Operate,7/22/2024 AE-22034,Solar PV,8.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,4/15/2024,Permission to Operate,7/1/2024 AE-22031,Solar PV,3.8,,Category 1,"Mount Horeb, Dane County, WI",Substation 686,Circuit 1895,In service,4/15/2024,Permission to Operate,6/18/2024 AE-22033,Solar PV,7.6,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,4/15/2024,Permission to Operate,7/9/2024 AE-22044,Solar PV,9.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,4/15/2024,Permission to Operate,7/17/2024 AE-22039,Solar PV,11.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,4/15/2024,Permission to Operate,6/27/2024 AE-22042,Solar PV,20,,Category 1,"Stoughton, Dane County, WI",,Circuit 1140,In service,4/15/2024,Permission to Operate,11/8/2024 AE-22040,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,4/15/2024,Permission to Operate,7/5/2024 AE-22037,Solar PV,11.4,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,4/15/2024,Permission to Operate,7/9/2024 AE-22028,Solar PV,6.3,,Category 1,"Montfort, Grant County, WI",Substation 241,Circuit 583,In service,4/10/2024,Permission to Operate,5/15/2024 AE-22025,Solar PV,13.3,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1009,In service,4/10/2024,Permission to Operate,8/30/2024 AE-21813,Solar PV,12,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1577,In service,4/8/2024,Permission to Operate,10/21/2024 AE-21999,Solar PV,9,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 360,In service,4/4/2024,Permission to Operate,6/20/2024 AE-21988,Solar PV,10,,Category 1,"Cuba City, Grant County, WI",Substation 248,Circuit 595,In service,4/3/2024,Permission to Operate,4/12/2024 AE-21981,Solar PV,5.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,4/3/2024,Permission to Operate,5/31/2024 AE-21957,Solar PV,12.8,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1209,In service,4/2/2024,Permission to Operate,10/22/2024 AE-21973,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",,,In service,4/2/2024,Permission to Operate,6/18/2024 AE-21939,Solar PV,8.5,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,3/28/2024,Permission to Operate,5/23/2025 AE-21930,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/27/2024,Permission to Operate,7/5/2024 AE-21920,Solar PV,12.8,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,3/27/2024,Permission to Operate,6/18/2024 AE-21889,Solar PV,4.7,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 389,In service,3/27/2024,Permission to Operate,5/31/2024 AE-21880,Solar PV,8,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,3/27/2024,Permission to Operate,11/22/2024 AE-21932,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,3/27/2024,Permission to Operate,7/5/2024 AE-21933,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/27/2024,Permission to Operate,7/5/2024 AE-21931,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/27/2024,Permission to Operate,7/5/2024 AE-21915,Solar PV,8.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,3/27/2024,Permission to Operate,7/12/2024 AE-21929,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/27/2024,Permission to Operate,7/5/2024 AE-21908,Solar PV,15,,Category 1,"Montfort, Iowa County, WI",Substation 241,Circuit 582,In service,3/26/2024,Permission to Operate,5/30/2024 AE-21894,Solar PV,4.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,3/26/2024,Permission to Operate,7/9/2024 AE-21878,Solar PV,10.4,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 360,In service,3/26/2024,Permission to Operate,5/7/2024 AE-21852,Solar PV,7.5,,Category 1,"Beloit, Rock County, WI",,Circuit 1680,In service,3/25/2024,Permission to Operate,6/17/2024 AE-21639,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/25/2024,Permission to Operate,9/20/2024 AE-21850,Solar PV,14.4,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,3/25/2024,Permission to Operate,6/20/2024 AE-21638,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/25/2024,Permission to Operate,9/20/2024 AE-21835,Solar PV,7.6,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,3/25/2024,Permission to Operate,6/5/2024 AE-21636,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/25/2024,Permission to Operate,9/20/2024 AE-21858,Solar PV,7.6,,Category 1,"Necedah, Juneau County, WI",Substation 516,Circuit 1321,In service,3/22/2024,Permission to Operate,5/23/2024 AE-21643,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/22/2024,Permission to Operate,9/20/2024 AE-21646,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/22/2024,Permission to Operate,9/20/2024 AE-21838,Solar PV,11.4,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,3/22/2024,Permission to Operate,4/29/2024 AE-21642,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/22/2024,Permission to Operate,9/20/2024 AE-21645,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/22/2024,Permission to Operate,9/20/2024 AE-21641,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/22/2024,Permission to Operate,9/20/2024 AE-21640,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/22/2024,Permission to Operate,9/20/2024 AE-21815,Solar PV,4.1,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,3/22/2024,Permission to Operate,7/12/2024 AE-21644,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/22/2024,Permission to Operate,9/20/2024 AE-21637,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/22/2024,Permission to Operate,9/20/2024 AE-21800,Solar PV,2.4,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,3/19/2024,Permission to Operate,4/29/2024 AE-21780,Solar PV,3.7,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 898,In service,3/18/2024,Permission to Operate,6/18/2024 AE-21841,Solar PV,18.2,,Category 1,"Kieler, Grant County, WI",Substation 386,Circuit 2181,In service,3/14/2024,Permission to Operate,11/26/2024 AE-21840,Solar PV,10.8,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 96,In service,3/14/2024,Permission to Operate,7/3/2024 AE-21845,"Solar PV, Battery/Storage",10,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 658,Circuit 1800,In service,3/14/2024,Permission to Operate,5/30/2024 AE-21822,Solar PV,3.7,,Category 1,"Delavan, Walworth County, WI",Substation 662,Circuit 1824,In service,3/14/2024,Permission to Operate,7/23/2024 AE-21834,Solar PV,7.6,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1129,In service,3/13/2024,Permission to Operate,6/5/2024 AE-21781,Solar PV,3.2,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1218,In service,3/13/2024,Permission to Operate,6/11/2024 AE-21817,Solar PV,3.8,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 318,In service,3/12/2024,Permission to Operate,6/5/2024 AE-21778,Solar PV,7.3,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,3/12/2024,Permission to Operate,5/3/2024 AE-21751,"Solar PV, Battery/Storage",23.16,,Category 2,"Gillett, Menominee County, WI",Substation 384,Circuit 944,In service,3/12/2024,Permission to Operate,6/17/2024 AE-21766,"Solar PV, Battery/Storage",12.28,,Category 1,"Keshena, Menominee County, WI",Substation 384,Circuit 945,In service,3/12/2024,Permission to Operate,6/17/2024 AE-21765,"Solar PV, Battery/Storage",21.86,,Category 2,"Keshena, Menominee County, WI",Substation 384,Circuit 943,In service,3/12/2024,Permission to Operate,6/17/2024 AE-21760,"Solar PV, Battery/Storage",12.28,,Category 1,"Neopit, Menominee County, WI",,Circuit 1331,In service,3/12/2024,Permission to Operate,6/17/2024 AE-21814,Solar PV,7.9,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,3/12/2024,Permission to Operate,5/9/2024 AE-21728,Solar PV,7.6,,Category 1,"Fox Lake, Dodge County, WI",Substation 278,Circuit 663,In service,3/8/2024,Permission to Operate,7/22/2025 AE-21773,"Solar PV, Battery/Storage",5.1,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,3/8/2024,Permission to Operate,4/4/2024 AE-21713,"Solar PV, Battery/Storage",15.2,,Category 1,"Delavan, Walworth County, WI",Substation 81,Circuit 228,In service,3/7/2024,Permission to Operate,8/20/2024 AE-21809,Solar PV,6.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,3/7/2024,Permission to Operate,4/1/2024 AE-21737,Solar PV,3.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 688,In service,3/4/2024,Permission to Operate,7/5/2024 AE-21730,Solar PV,5.2,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,3/4/2024,Permission to Operate,4/18/2024 AE-21779,Solar PV,6.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 706,In service,3/4/2024,Permission to Operate,4/18/2024 AE-21749,Solar PV,11.5,,Category 1,"Orfordville, Rock County, WI",Substation 551,Circuit 1462,In service,3/4/2024,Permission to Operate,4/25/2024 AE-21762,Solar PV,5.8,,Category 1,"Williams Bay, Walworth County, WI",,Circuit 2067,In service,3/4/2024,Permission to Operate,7/25/2024 AE-21777,Solar PV,11.2,,Category 1,"Lone Rock, Richland County, WI",,Circuit 1055,In service,3/4/2024,Permission to Operate,6/20/2024 AE-21755,Solar PV,5,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,3/1/2024,Permission to Operate,4/12/2024 AE-21768,Solar PV,6,,Category 1,"Cuba City, Grant County, WI",Substation 386,Circuit 2181,In service,3/1/2024,Permission to Operate,5/15/2024 AE-21634,Solar PV,3.8,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,2/29/2024,Permission to Operate,9/20/2024 AE-21698,Solar PV,43.5,,Category 2,"Lancaster, Grant County, WI",Substation 398,Circuit 987,In service,2/28/2024,Permission to Operate,6/11/2024 AE-21747,Solar PV,5.4,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,2/28/2024,Permission to Operate,6/18/2024 AE-21736,Solar PV,7,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,2/27/2024,Permission to Operate,4/18/2024 AE-21731,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,2/27/2024,Permission to Operate,4/18/2024 AE-21740,Solar PV,5.2,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,2/27/2024,Permission to Operate,7/12/2024 AE-21741,Solar PV,4.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,2/27/2024,Permission to Operate,4/12/2024 AE-21739,Solar PV,7.5,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,2/27/2024,Permission to Operate,4/12/2024 AE-21670,Solar PV,9.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,2/27/2024,Permission to Operate,4/12/2024 AE-21677,Solar PV,5,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,2/26/2024,Permission to Operate,4/10/2024 AE-21716,Solar PV,7,,Category 1,"Janesville, Dane County, WI",Substation 369,Circuit 903,In service,2/26/2024,Permission to Operate,7/17/2024 AE-21656,Solar PV,11.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,2/26/2024,Permission to Operate,4/29/2024 AE-21702,Solar PV,6.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1269,In service,2/26/2024,Permission to Operate,5/10/2024 AE-21720,Solar PV,7.6,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 315,In service,2/23/2024,Permission to Operate,6/18/2024 AE-21723,Solar PV,10,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 615,In service,2/23/2024,Permission to Operate,6/24/2024 AE-21726,Solar PV,11.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,2/23/2024,Permission to Operate,6/27/2024 AE-21706,Solar PV,7.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,2/22/2024,Permission to Operate,3/12/2024 AE-21705,Solar PV,7.9,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,2/22/2024,Permission to Operate,4/10/2024 AE-21718,Solar PV,11.8,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,2/22/2024,Permission to Operate,4/18/2024 AE-21704,Solar PV,8.5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,2/21/2024,Permission to Operate,3/12/2024 AE-21385,Solar PV,120,,Category 2,"Janesville, Rock County, WI",Substation 369,Circuit 905,In service,2/21/2024,Permission to Operate,6/11/2024 AE-21662,Solar PV,5.2,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,2/21/2024,Permission to Operate,4/1/2024 AE-21697,Solar PV,3.5,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 658,Circuit 1800,In service,2/20/2024,Permission to Operate,6/5/2024 AE-21696,"Solar PV, Battery/Storage",13.78,,Category 1,"Verona, Vernon County, WI",Substation 579,Circuit 1521,In service,2/20/2024,Permission to Operate,7/5/2024 AE-21671,Solar PV,6.6,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,2/20/2024,Permission to Operate,4/4/2024 AE-21647,Solar PV,5.1,,Category 1,"Wautoma, Waushara County, WI",Substation 742,Circuit 2035,In service,2/19/2024,Permission to Operate,6/27/2024 AE-21680,"Solar PV, Battery/Storage",15,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1212,In service,2/19/2024,Permission to Operate,6/19/2024 AE-21599,Solar PV,200.5,,Category 3,"Genoa City, Walworth County, WI",Substation 375,Circuit 925,In service,2/19/2024,Permission to Operate,4/19/2024 AE-21659,Solar PV,3.5,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1524,In service,2/15/2024,Permission to Operate,4/1/2024 AE-21673,Solar PV,15.1,,Category 1,"Stoughton, Dane County, WI",Substation 676,Circuit 1871,In service,2/15/2024,Permission to Operate,4/1/2024 AE-21668,Solar PV,5.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,2/15/2024,Permission to Operate,4/4/2024 AE-21648,Solar PV,6,,Category 1,"Avoca, Iowa County, WI",Substation 45,Circuit 128,In service,2/14/2024,Permission to Operate,4/30/2024 AE-21564,Solar PV,5.3,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1306,In service,2/14/2024,Permission to Operate,3/25/2024 AE-21666,Solar PV,4.6,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 390,In service,2/14/2024,Permission to Operate,3/21/2024 AE-21625,Solar PV,20,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2000,In service,2/13/2024,Permission to Operate,6/19/2024 AE-21586,Solar PV,5.5,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1746,In service,2/13/2024,Permission to Operate,4/1/2024 AE-21605,Solar PV,15.7,,Category 1,"White Lake, Langlade County, WI",Substation 578,Circuit 1516,In service,2/13/2024,Permission to Operate,7/9/2024 AE-21595,Solar PV,6,,Category 1,"Vesper, Wood County, WI",Substation 723,Circuit 1976,In service,2/13/2024,Permission to Operate,4/16/2024 AE-21424,Solar PV,1.4,,Category 1,"Auburndale, Wood County, WI",Substation 43,Circuit 118,In service,2/12/2024,Permission to Operate,9/11/2024 AE-21624,Solar PV,18.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,2/8/2024,Permission to Operate,3/21/2024 AE-21530,Solar PV,3.9,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 23,In service,2/8/2024,Permission to Operate,3/25/2024 AE-21622,Solar PV,7.2,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,2/8/2024,Permission to Operate,4/4/2024 AE-21626,Solar PV,10.1,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,2/8/2024,Permission to Operate,4/18/2024 AE-21620,Solar PV,4.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,2/8/2024,Permission to Operate,8/8/2024 AE-21611,Solar PV,5.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,2/6/2024,Permission to Operate,2/28/2024 AE-21553,Solar PV,7.6,,Category 1,"Wautoma, Waushara County, WI",Substation 742,Circuit 2034,In service,2/6/2024,Permission to Operate,6/5/2024 AE-21569,Solar PV,6.2,,Category 1,"Browntown, Green County, WI",Substation 661,Circuit 1815,In service,2/6/2024,Permission to Operate,4/4/2024 AE-21607,Solar PV,5.9,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,2/5/2024,Permission to Operate,3/21/2024 AE-21604,Solar PV,6.6,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,2/5/2024,Permission to Operate,4/4/2024 AE-21590,Solar PV,9.9,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,2/5/2024,Permission to Operate,4/12/2024 AE-21171,Solar PV,20.8,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,2/2/2024,Permission to Operate,5/23/2024 AE-21511,Solar PV,7.6,,Category 1,"Merrimac, Sauk County, WI",Substation 466,Circuit 1156,In service,2/1/2024,Permission to Operate,3/26/2024 AE-21515,Solar PV,7.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1737,In service,2/1/2024,Permission to Operate,3/29/2024 AE-21542,Solar PV,7,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,1/30/2024,Permission to Operate,6/20/2024 AE-21566,Solar PV,13.6,,Category 1,"New Glarus, Green County, WI",Substation 57,Circuit 153,In service,1/30/2024,Permission to Operate,5/9/2024 AE-21548,Solar PV,7.6,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,1/26/2024,Permission to Operate,5/7/2024 AE-21538,"Solar PV, Battery/Storage",9,,Category 1,"Morion, Fond du Lac County, WI",Substation 494,Circuit 1234,In service,1/25/2024,Permission to Operate,10/17/2024 AE-21523,Solar PV,20,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,1/24/2024,Permission to Operate,6/5/2024 AE-21526,Solar PV,7.9,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1525,In service,1/24/2024,Permission to Operate,3/7/2024 AE-21528,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 706,In service,1/24/2024,Permission to Operate,5/15/2024 AE-21460,Solar PV,7.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1737,In service,1/23/2024,Permission to Operate,3/25/2024 AE-21516,Solar PV,21.3,,Category 2,"Mcfarland, Dane County, WI",Substation 146,Circuit 390,In service,1/23/2024,Permission to Operate,7/16/2024 AE-21498,"Solar PV, Battery/Storage",16.1,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,1/19/2024,Permission to Operate,7/25/2024 AE-21486,Solar PV,6.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,1/18/2024,Permission to Operate,1/14/2025 AE-21495,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,1/18/2024,Permission to Operate,4/16/2024 AE-21476,Solar PV,15.4,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 360,In service,1/18/2024,Permission to Operate,4/18/2024 AE-21483,Solar PV,6.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,1/18/2024,Permission to Operate,9/17/2024 AE-21484,Solar PV,6.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,1/18/2024,Permission to Operate,9/17/2024 AE-21386,Solar PV,11.4,,Category 1,"Janesville, Rock County, WI",,Circuit 1873,In service,1/18/2024,Permission to Operate,7/17/2024 AE-21500,Solar PV,12.5,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 695,In service,1/18/2024,Permission to Operate,3/8/2024 AE-21455,Solar PV,6,,Category 1,"Ripon, Fond du Lac County, WI",Substation 537,Circuit 1401,In service,1/18/2024,Permission to Operate,4/4/2024 AE-21482,Solar PV,6,,Category 1,"Lake Geneva, Walworth County, WI",Substation 393,Circuit 982,In service,1/18/2024,Permission to Operate,4/4/2024 AE-21485,Solar PV,6.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,1/18/2024,Permission to Operate,1/14/2025 AE-21471,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,1/18/2024,Permission to Operate,5/7/2024 AE-21410,Solar PV,5.9,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1306,In service,1/17/2024,Permission to Operate,3/7/2024 AE-21425,Solar PV,9.1,,Category 1,"Livingston, Iowa County, WI",Substation 601,Circuit 1620,In service,1/17/2024,Permission to Operate,4/10/2024 AE-21415,Solar PV,11.2,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,1/17/2024,Permission to Operate,4/16/2024 AE-21411,Solar PV,6.2,,Category 1,"Lake Geneva, Walworth County, WI",Substation 660,Circuit 1809,In service,1/17/2024,Permission to Operate,7/23/2024 AE-21423,"Solar PV, Battery/Storage",9.94,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1666,In service,1/17/2024,Permission to Operate,3/7/2024 AE-21383,Solar PV,7.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1699,In service,1/17/2024,Permission to Operate,5/10/2024 AE-21422,Solar PV,12.2,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,1/16/2024,Permission to Operate,9/18/2024 AE-21400,Solar PV,5.8,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,1/15/2024,Permission to Operate,2/14/2024 AE-21398,"Solar PV, Battery/Storage",17.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,1/15/2024,Permission to Operate,8/26/2024 AE-21392,Solar PV,8.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,1/12/2024,Permission to Operate,3/7/2024 AE-21378,Solar PV,10,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,1/11/2024,Permission to Operate,4/12/2024 AE-21376,Solar PV,5,,Category 1,"Deforest, Dane County, WI",Substation 335,Circuit 790,In service,1/11/2024,Permission to Operate,4/4/2024 AE-21320,Solar PV,6.6,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,1/11/2024,Permission to Operate,2/14/2024 AE-21368,Solar PV,17.7,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,1/11/2024,Permission to Operate,2/21/2024 AE-21381,"Solar PV, Battery/Storage",7.6,,Category 1,"Delavan, Walworth County, WI",Substation 52,Circuit 146,In service,1/11/2024,Permission to Operate,4/4/2024 AE-21367,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,1/11/2024,Permission to Operate,2/27/2024 AE-21324,Solar PV,201.3,,Category 3,"Sheboygan, Sheboygan County, WI",Substation 658,Circuit 1802,In service,1/10/2024,Permission to Operate,10/11/2024 AE-21360,Solar PV,4.6,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,1/10/2024,Permission to Operate,2/14/2024 AE-21365,Solar PV,10,,Category 1,"Midleton, Dane County, WI",Substation 579,Circuit 1519,In service,1/10/2024,Permission to Operate,4/4/2024 AE-21324,Solar PV,201.3,,Category 3,"Sheboygan, Sheboygan County, WI",Substation 404,Circuit 2188,In service,1/10/2024,Permission to Operate,10/11/2024 AE-21351,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,1/9/2024,Permission to Operate,3/8/2024 AE-21377,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,1/9/2024,Permission to Operate,5/16/2024 AE-21188,"Solar PV, Battery/Storage",20,,Category 1,"Mt. Horeb, Dane County, WI",Substation 280,Circuit 670,In service,1/9/2024,Permission to Operate,3/22/2024 AE-21331,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,1/8/2024,Permission to Operate,4/1/2024 AE-21332,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,1/8/2024,Permission to Operate,2/9/2024 AE-21325,Solar PV,5.2,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,1/8/2024,Permission to Operate,4/10/2024 AE-21333,Solar PV,5.2,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1737,In service,1/5/2024,Permission to Operate,2/16/2024 AE-21317,Solar PV,3.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1734,In service,1/5/2024,Permission to Operate,3/25/2024 AE-21316,Solar PV,9.2,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,1/5/2024,Permission to Operate,4/29/2024 AE-21337,Solar PV,7.7,,Category 1,"Markesan, Green County, WI",,Circuit 767,In service,1/5/2024,Permission to Operate,2/23/2024 AE-21297,Solar PV,7.6,,Category 1,"Spring Green, Richland County, WI",,Circuit 1057,In service,1/4/2024,Permission to Operate,2/27/2024 AE-21093,Solar PV,5.9,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,1/4/2024,Permission to Operate,2/19/2024 AE-21315,Solar PV,10.9,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 888,In service,1/4/2024,Permission to Operate,4/1/2024 AE-21255,Solar PV,16.4,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,1/3/2024,Permission to Operate,2/27/2024 AE-21268,Solar PV,15.1,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,1/3/2024,Permission to Operate,2/14/2024 AE-21283,Solar PV,7.9,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1006,In service,1/3/2024,Permission to Operate,3/1/2024 AE-21267,Solar PV,16.4,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,1/3/2024,Permission to Operate,4/1/2024 AE-21256,Solar PV,19,,Category 1,"Fox Lake, Dodge County, WI",Substation 278,Circuit 662,In service,1/3/2024,Permission to Operate,3/8/2024 AE-21238,"Solar PV, Battery/Storage",11.9,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,1/3/2024,Permission to Operate,1/19/2024 AE-21265,Solar PV,13.1,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1304,In service,1/3/2024,Permission to Operate,2/27/2024 AE-21287,Solar PV,5.4,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,1/3/2024,Permission to Operate,2/14/2024 AE-21285,Solar PV,4.6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,1/3/2024,Permission to Operate,2/16/2024 AE-20871,Solar PV,3.6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,12/29/2023,Permission to Operate,4/10/2024 AE-21244,Solar PV,6.9,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 658,Circuit 1800,In service,12/29/2023,Permission to Operate,2/16/2024 AE-21226,"Solar PV, Battery/Storage",15,,Category 1,"Spring Green, Sauk County, WI",Substation 710,Circuit 1947,In service,12/29/2023,Permission to Operate,2/9/2024 AE-21136,Solar PV,4.3,,Category 1,"Coloma, Waushara County, WI",Substation 143,Circuit 372,In service,12/28/2023,Permission to Operate,5/7/2024 AE-21213,Solar PV,7.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,12/27/2023,Permission to Operate,2/16/2024 AE-21214,Solar PV,7.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1734,In service,12/27/2023,Permission to Operate,2/16/2024 AE-21242,Solar PV,5.9,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,12/27/2023,Permission to Operate,4/18/2024 AE-21247,Solar PV,7.6,,Category 1,"Antigo, Langlade County, WI",Substation 578,Circuit 1517,In service,12/26/2023,Permission to Operate,1/23/2024 AE-21273,Solar PV,8.1,,Category 1,"Brodhead, Green County, WI",Substation 15,Circuit 61,In service,12/26/2023,Permission to Operate,6/11/2024 AE-21263,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2103,In service,12/26/2023,Permission to Operate,10/2/2024 AE-21205,Solar PV,6.6,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1922,In service,12/22/2023,Permission to Operate,1/19/2024 AE-21210,Solar PV,9.1,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,12/22/2023,Permission to Operate,5/7/2024 AE-21201,Solar PV,3.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,12/22/2023,Permission to Operate,2/19/2024 AE-21209,Solar PV,3.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1734,In service,12/22/2023,Permission to Operate,3/12/2024 AE-21174,Solar PV,3.7,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 778,In service,12/18/2023,Permission to Operate,3/21/2024 AE-21198,Solar PV,7.5,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 14,In service,12/14/2023,Permission to Operate,2/21/2024 AE-21137,Solar PV,4.6,,Category 1,"Delavan, Walworth County, WI",Substation 662,Circuit 1823,In service,12/13/2023,Permission to Operate,2/28/2024 AE-20961,Solar PV,17.6,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,12/13/2023,Permission to Operate,2/27/2024 AE-21110,"Solar PV, Battery/Storage",17.88,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 1999,In service,12/13/2023,Permission to Operate,7/15/2024 AE-21160,Solar PV,6,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1189,In service,12/13/2023,Permission to Operate,6/11/2024 AE-21127,Solar PV,5.1,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,12/13/2023,Permission to Operate,2/27/2024 AE-21092,Solar PV,6,,Category 1,"Juda, Green County, WI",Substation 101,Circuit 267,In service,12/13/2023,Permission to Operate,3/7/2024 AE-21089,Solar PV,11.4,,Category 1,"Stoughton, Dane County, WI",Substation 676,Circuit 1871,In service,12/11/2023,Permission to Operate,3/7/2024 AE-21081,Solar PV,5.5,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,12/11/2023,Permission to Operate,1/19/2024 AE-21088,Solar PV,7.2,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2000,In service,12/11/2023,Permission to Operate,3/1/2024 AE-21067,Solar PV,60,,Category 2,"Plattville, Grant County, WI",Substation 475,Circuit 1169,In service,12/8/2023,Permission to Operate,3/1/2024 AE-20959,Solar PV,7.9,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,12/8/2023,Permission to Operate,1/15/2024 AE-21055,"Solar PV, Battery/Storage",15,,Category 1,"Loganville, Sauk County, WI",Substation 421,Circuit 1052,In service,12/7/2023,Permission to Operate,5/3/2024 AE-20988,Solar PV,6.1,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,12/6/2023,Permission to Operate,8/16/2024 AE-21063,Solar PV,6.6,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,12/6/2023,Permission to Operate,1/25/2024 AE-21064,Solar PV,5.9,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,12/6/2023,Permission to Operate,1/12/2024 AE-20846,Solar PV,11.4,,Category 1,"Adams, Adams County, WI",Substation 354,Circuit 847,In service,12/4/2023,Permission to Operate,7/9/2024 AE-21013,Solar PV,7.9,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,12/1/2023,Permission to Operate,1/12/2024 AE-21008,Solar PV,8.1,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 900,In service,12/1/2023,Permission to Operate,1/17/2024 AE-20994,Solar PV,5.1,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,11/30/2023,Permission to Operate,4/1/2024 AE-21000,Solar PV,9.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,11/30/2023,Permission to Operate,1/17/2024 AE-20912,Solar PV,399.6,230,Category 3,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,11/30/2023,Permission to Operate,1/7/2026 AE-21011,Solar PV,10.5,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,11/30/2023,Permission to Operate,1/15/2024 AE-20999,Solar PV,3.9,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,11/30/2023,Permission to Operate,12/27/2023 AE-21022,Solar PV,11.4,,Category 1,"Stratford, Marathon County, WI",Substation 626,Circuit 1690,In service,11/30/2023,Permission to Operate,3/7/2024 AE-20974,Solar PV,5.1,,Category 1,"Waupun, Fond du Lac County, WI",,Circuit 1280,In service,11/30/2023,Permission to Operate,7/5/2024 AE-21002,Solar PV,5.7,,Category 1,"Sharon, Walworth County, WI",Substation 662,Circuit 1820,In service,11/30/2023,Permission to Operate,2/27/2024 AE-21005,Solar PV,6.6,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2000,In service,11/30/2023,Permission to Operate,12/29/2023 AE-20884,Solar PV,3.9,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 900,In service,11/29/2023,Permission to Operate,12/21/2023 AE-20954,Solar PV,7.6,,Category 1,"Iola, Waupaca County, WI",Substation 364,Circuit 893,In service,11/29/2023,Permission to Operate,1/4/2024 AE-20992,Solar PV,2.9,,Category 1,"Edgerton, Rock County, WI",,Circuit 971,In service,11/29/2023,Permission to Operate,5/15/2024 AE-20968,Solar PV,15.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,11/29/2023,Permission to Operate,2/16/2024 AE-20963,Solar PV,3.8,,Category 1,"Lone Rock, Richland County, WI",,Circuit 1057,In service,11/28/2023,Permission to Operate,1/12/2024 AE-20971,"Solar PV, Battery/Storage",15.2,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1210,In service,11/28/2023,Permission to Operate,2/15/2024 AE-21003,Solar PV,4.2,,Category 1,"Sharon, Walworth County, WI",Substation 662,Circuit 1820,In service,11/28/2023,Permission to Operate,2/27/2024 AE-20962,Solar PV,15.1,,Category 1,"Blue Mounds, Dane County, WI",Substation 280,Circuit 671,In service,11/28/2023,Permission to Operate,1/4/2024 AE-20993,"Wind, Solar PV",18.3,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,11/27/2023,Permission to Operate,4/8/2024 AE-20946,Solar PV,6,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 318,In service,11/27/2023,Permission to Operate,1/25/2024 AE-20972,Solar PV,10,,Category 1,"Ripon, Fond du Lac County, WI",Substation 610,Circuit 1644,In service,11/27/2023,Permission to Operate,3/14/2024 AE-20979,Solar PV,11.4,,Category 1,"Genoa City, Walworth County, WI",,Circuit 1666,In service,11/27/2023,Permission to Operate,7/5/2024 AE-20931,Solar PV,2.6,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,11/22/2023,Permission to Operate,2/14/2024 AE-20932,Solar PV,9.9,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1664,In service,11/21/2023,Permission to Operate,1/9/2024 AE-20915,Solar PV,10,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,11/21/2023,Permission to Operate,3/1/2024 AE-20875,Solar PV,9.1,,Category 1,"Ripon, Fond du Lac County, WI",Substation 627,Circuit 1692,In service,11/20/2023,Permission to Operate,6/11/2024 AE-20720,Solar PV,5,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,11/20/2023,Permission to Operate,12/21/2023 AE-20913,"Solar PV, Battery/Storage",17.6,,Category 1,"Birnamwood, Shawano County, WI",Substation 74,Circuit 179,In service,11/20/2023,Permission to Operate,7/15/2024 AE-20904,Solar PV,11.4,,Category 1,"Stoughton, Dane County, WI",,Circuit 1140,In service,11/20/2023,Permission to Operate,12/22/2023 AE-20914,Solar PV,3.7,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,11/20/2023,Permission to Operate,3/7/2024 AE-20906,Solar PV,4.4,,Category 1,"Brooklyn, Oneida County, WI",Substation 108,Circuit 303,In service,11/20/2023,Permission to Operate,3/12/2024 AE-20879,"Solar PV, Battery/Storage",7.6,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 18,In service,11/20/2023,Permission to Operate,1/17/2024 AE-20897,Solar PV,5.1,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1697,In service,11/20/2023,Permission to Operate,2/7/2024 AE-20874,Solar PV,20.7,,Category 2,"Reedsburg, Sauk County, WI",Substation 106,Circuit 294,In service,11/17/2023,Permission to Operate,2/21/2024 AE-20873,Solar PV,9.4,,Category 1,"Richland Center, Richland County, WI",Substation 572,Circuit 1505,In service,11/17/2023,Permission to Operate,5/15/2024 AE-20819,"Solar PV, Battery/Storage",15.2,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,11/17/2023,Permission to Operate,1/23/2024 AE-20882,Solar PV,15,,Category 1,"Birnamwood, Marathon County, WI",Substation 74,Circuit 179,In service,11/16/2023,Permission to Operate,5/9/2024 AE-20849,Solar PV,6.7,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,11/15/2023,Permission to Operate,1/4/2024 AE-20856,Solar PV,3.9,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,11/15/2023,Permission to Operate,1/4/2024 AE-20836,Solar PV,4.3,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1733,In service,11/14/2023,Permission to Operate,4/4/2024 AE-20843,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/14/2023,Permission to Operate,1/19/2024 AE-20844,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/14/2023,Permission to Operate,1/15/2024 AE-20841,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,11/13/2023,Permission to Operate,1/15/2024 AE-20845,Solar PV,20,,Category 1,"Dodgeville, Iowa County, WI",Substation 357,Circuit 862,In service,11/13/2023,Permission to Operate,5/9/2024 AE-20842,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,11/13/2023,Permission to Operate,1/15/2024 AE-20832,Solar PV,9.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,11/10/2023,Permission to Operate,12/21/2023 AE-20818,Solar PV,3.6,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1199,In service,11/9/2023,Permission to Operate,2/7/2024 AE-20809,"Solar PV, Battery/Storage",9.1,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1003,In service,11/9/2023,Permission to Operate,5/7/2024 AE-20820,Solar PV,6,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,11/9/2023,Permission to Operate,1/23/2024 AE-20811,Solar PV,8.5,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,11/9/2023,Permission to Operate,12/18/2023 AE-20806,Solar PV,5.9,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,11/8/2023,Permission to Operate,12/7/2023 AE-20803,Solar PV,3.5,,Category 1,"Richland Center, Richland County, WI",Substation 606,Circuit 1636,In service,11/8/2023,Permission to Operate,3/7/2024 AE-20730,Solar PV,34.2,,Category 2,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,11/8/2023,Permission to Operate,6/18/2024 AE-20770,Solar PV,6.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 2154,In service,11/7/2023,Permission to Operate,2/9/2024 AE-20778,Solar PV,5,,Category 1,"Fitchburg, Dane County, WI",Substation 579,Circuit 1518,In service,11/7/2023,Permission to Operate,2/16/2024 AE-20767,Solar PV,15,,Category 1,"Hazel Green, Grant County, WI",Substation 386,Circuit 2180,In service,11/6/2023,Permission to Operate,3/1/2024 AE-20575,Solar PV,20.1,,Category 2,"Madison, Dane County, WI",Substation 76,Circuit 188,In service,11/3/2023,Permission to Operate,6/19/2024 AE-20574,Solar PV,59.6,,Category 2,"Madison, Dane County, WI",Substation 76,Circuit 188,In service,11/3/2023,Permission to Operate,6/19/2024 AE-20735,Solar PV,5.7,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,11/3/2023,Permission to Operate,1/25/2024 AE-20766,Solar PV,15.2,,Category 1,"Iola, Portage County, WI",Substation 364,Circuit 893,In service,11/3/2023,Permission to Operate,1/23/2024 AE-20743,Solar PV,20,,Category 1,"Belmont, Lafayette County, WI",Substation 59,Circuit 159,In service,11/2/2023,Permission to Operate,1/19/2024 AE-20732,Solar PV,4.1,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,11/2/2023,Permission to Operate,8/14/2024 AE-20751,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/2/2023,Permission to Operate,12/26/2023 AE-20710,Solar PV,10.7,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,11/1/2023,Permission to Operate,1/17/2024 AE-19703,Solar PV,10.2,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,11/1/2023,Permission to Operate,2/27/2025 AE-20699,Solar PV,6.6,,Category 1,"Sauk City, Sauk County, WI",Substation 710,Circuit 1947,In service,10/31/2023,Permission to Operate,12/26/2023 AE-20689,Solar PV,5.2,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 2154,In service,10/31/2023,Permission to Operate,1/4/2024 AE-20693,Solar PV,7.6,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,10/31/2023,Permission to Operate,1/25/2024 AE-20554,Solar PV,9.2,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,10/31/2023,Permission to Operate,12/14/2023 AE-20687,Solar PV,12.6,,Category 1,"Sauk City, Sauk County, WI",Substation 461,Circuit 1130,In service,10/31/2023,Permission to Operate,1/8/2024 AE-20704,Solar PV,11.4,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,In service,10/31/2023,Permission to Operate,1/17/2024 AE-20675,Solar PV,5.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,10/30/2023,Permission to Operate,12/26/2023 AE-20678,Solar PV,4.6,,Category 1,"Sauk City, Dane County, WI",,Circuit 496,In service,10/30/2023,Permission to Operate,4/1/2024 AE-20661,Solar PV,5.7,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,10/27/2023,Permission to Operate,4/29/2024 AE-20658,Solar PV,3.9,,Category 1,"Deforest, Dane County, WI",,Circuit 474,In service,10/26/2023,Permission to Operate,12/7/2023 AE-20636,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,10/25/2023,Permission to Operate,12/1/2023 AE-20573,Solar PV,9.8,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 317,In service,10/25/2023,Permission to Operate,12/7/2023 AE-20648,Solar PV,7.9,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/25/2023,Permission to Operate,12/27/2023 AE-20649,"Solar PV, Battery/Storage",7.6,,Category 1,"Portage, Columbia County, WI",Substation 252,Circuit 606,In service,10/25/2023,Permission to Operate,4/4/2024 AE-20657,Solar PV,11.4,,Category 1,"Beloit, Rock County, WI",Substation 529,Circuit 1353,In service,10/25/2023,Permission to Operate,5/9/2024 AE-20496,"Solar PV, Battery/Storage",22.6,,Category 2,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/23/2023,Permission to Operate,11/28/2023 AE-20640,Solar PV,7.6,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1814,In service,10/23/2023,Permission to Operate,1/25/2024 AE-20625,Solar PV,11.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,10/23/2023,Permission to Operate,1/19/2024 AE-20642,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,10/23/2023,Permission to Operate,1/17/2024 AE-20585,Solar PV,6.6,,Category 1,"Gratiot, Lafayette County, WI",Substation 770,Circuit 2082,In service,10/20/2023,Permission to Operate,1/4/2024 AE-20606,Solar PV,11.6,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 21,In service,10/20/2023,Permission to Operate,8/14/2024 AE-20615,Solar PV,20,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,10/20/2023,Permission to Operate,12/18/2023 AE-20608,Solar PV,11.4,,Category 1,"Green Lake, Green Lake County, WI",Substation 596,Circuit 1608,In service,10/19/2023,Permission to Operate,3/8/2024 AE-20613,Solar PV,7.9,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 706,In service,10/19/2023,Permission to Operate,12/7/2023 AE-20491,Solar PV,4.7,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,10/19/2023,Permission to Operate,1/15/2024 AE-20494,Solar PV,5.2,,Category 1,"North Freedom, Sauk County, WI",,Circuit 495,In service,10/18/2023,Permission to Operate,12/7/2023 AE-20564,Solar PV,12.7,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,10/18/2023,Permission to Operate,2/14/2024 AE-20563,"Solar PV, Battery/Storage",17.14,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,10/18/2023,Permission to Operate,12/28/2023 AE-20531,Solar PV,6.2,,Category 1,"Merrimac, Sauk County, WI",,Circuit 494,In service,10/18/2023,Permission to Operate,2/21/2024 AE-20572,Solar PV,6.3,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,10/17/2023,Permission to Operate,12/7/2023 AE-20546,Solar PV,20,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 670,In service,10/17/2023,Permission to Operate,11/28/2023 AE-20529,Solar PV,9.8,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,10/13/2023,Permission to Operate,11/9/2023 AE-20424,Solar PV,9,,Category 1,"Pittsville, Wood County, WI",Substation 573,Circuit 1506,In service,10/12/2023,Permission to Operate,9/18/2024 AE-20526,Solar PV,5.2,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,10/12/2023,Permission to Operate,1/4/2024 AE-20515,Solar PV,2.5,,Category 1,"Beloit, Rock County, WI",Substation 255,Circuit 620,In service,10/11/2023,Permission to Operate,1/17/2024 AE-20455,Solar PV,12.8,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,10/10/2023,Permission to Operate,12/26/2023 AE-20469,Solar PV,5.2,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,10/10/2023,Permission to Operate,11/28/2023 AE-20471,Solar PV,9.8,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,10/10/2023,Permission to Operate,1/17/2024 AE-20475,"Solar PV, Battery/Storage",12.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,10/10/2023,Permission to Operate,12/14/2023 AE-20482,Solar PV,6.6,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 317,In service,10/10/2023,Permission to Operate,4/18/2024 AE-20470,Solar PV,5.2,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,10/10/2023,Permission to Operate,11/14/2023 AE-20498,Solar PV,7,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,10/10/2023,Permission to Operate,12/22/2023 AE-20472,Solar PV,10,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 390,In service,10/10/2023,Permission to Operate,1/15/2024 AE-18974,"Solar PV, Wind",18.7,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,10/10/2023,Permission to Operate,5/6/2025 AE-20493,Solar PV,7.6,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2134,In service,10/10/2023,Permission to Operate,12/11/2023 AE-20342,Solar PV,5,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1227,In service,10/9/2023,Permission to Operate,10/26/2023 AE-20603,Solar PV,199.8,,Category 2,"Fond du Lac, Fond du Lac County, WI",,Circuit 687,In service,10/6/2023,Permission to Operate,10/19/2023 AE-20458,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,10/6/2023,Permission to Operate,2/19/2024 AE-20436,Solar PV,3.7,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1925,In service,10/6/2023,Permission to Operate,2/23/2024 AE-20467,Solar PV,8.8,,Category 1,"Auburndale, Wood County, WI",Substation 43,Circuit 119,In service,10/6/2023,Permission to Operate,11/28/2023 AE-20409,Solar PV,16.4,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/5/2023,Permission to Operate,11/28/2023 AE-20407,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,10/5/2023,Permission to Operate,12/26/2023 AE-20309,Solar PV,9.3,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,10/5/2023,Permission to Operate,11/2/2023 AE-20453,Solar PV,5.2,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,10/5/2023,Permission to Operate,11/10/2023 AE-20413,Solar PV,7.9,,Category 1,"Monticello, Green County, WI",Substation 360,Circuit 886,In service,10/4/2023,Permission to Operate,4/18/2024 AE-20439,Solar PV,15.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,10/4/2023,Permission to Operate,1/4/2024 AE-20405,Solar PV,3.5,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,10/3/2023,Permission to Operate,2/1/2024 AE-20418,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1522,In service,10/3/2023,Permission to Operate,1/30/2024 AE-20408,Solar PV,7.6,,Category 1,"Stoughton, Dane County, WI",,Circuit 972,In service,10/3/2023,Permission to Operate,2/14/2024 AE-20423,Solar PV,2.9,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,10/3/2023,Permission to Operate,1/30/2024 AE-20393,Solar PV,7.6,,Category 1,"Bryant, Langlade County, WI",Substation 578,Circuit 1516,In service,10/3/2023,Permission to Operate,2/23/2024 AE-20406,Solar PV,5.1,,Category 1,"Portage, Columbia County, WI",,Circuit 1551,In service,10/2/2023,Permission to Operate,1/25/2024 AE-20281,Solar PV,7.7,,Category 1,"Baraboo, Sauk County, WI",Substation 216,Circuit 507,In service,9/29/2023,Permission to Operate,12/7/2023 AE-20388,Solar PV,10,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,9/29/2023,Permission to Operate,11/9/2023 AE-20351,Solar PV,13.4,,Category 1,"Caroline, Shawano County, WI",Substation 111,Circuit 311,In service,9/28/2023,Permission to Operate,11/28/2023 AE-20374,"Solar PV, Battery/Storage",30.4,,Category 2,"Oregon, Dane County, WI",,Circuit 1458,In service,9/28/2023,Permission to Operate,11/16/2023 AE-20369,"Solar PV, Battery/Storage",7.2,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 358,In service,9/28/2023,Permission to Operate,12/21/2023 AE-20271,"Solar PV, Battery/Storage",7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 783,Circuit 2137,In service,9/28/2023,Permission to Operate,1/4/2024 AE-20380,Solar PV,19.4,,Category 1,"Hollandale, Iowa County, WI",Substation 280,Circuit 671,In service,9/28/2023,Permission to Operate,1/12/2024 AE-20345,Solar PV,17.4,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,9/27/2023,Permission to Operate,3/1/2024 AE-20315,Solar PV,3.7,,Category 1,"Janesville, Rock County, WI",Substation 730,Circuit 2005,In service,9/26/2023,Permission to Operate,12/11/2023 AE-20322,Solar PV,10,,Category 1,"Mauston, Juneau County, WI",Substation 776,Circuit 2106,In service,9/26/2023,Permission to Operate,11/14/2023 AE-20307,Solar PV,11.7,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,9/26/2023,Permission to Operate,4/1/2024 AE-20280,Solar PV,14,,Category 1,"Marion, Shawano County, WI",Substation 111,Circuit 312,In service,9/26/2023,Permission to Operate,6/20/2024 AE-20232,Solar PV,16.6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1521,In service,9/26/2023,Permission to Operate,12/29/2023 AE-20350,Solar PV,9.4,,Category 1,"Stoughton, Dane County, WI",,Circuit 1455,In service,9/25/2023,Permission to Operate,12/15/2023 AE-20331,Solar PV,7.9,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/25/2023,Permission to Operate,11/2/2023 AE-20256,Solar PV,7.8,,Category 1,"Burnett, Dodge County, WI",,Circuit 809,In service,9/21/2023,Permission to Operate,2/1/2024 AE-20296,Solar PV,5.1,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,9/21/2023,Permission to Operate,12/26/2023 AE-20277,Solar PV,5.9,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,9/20/2023,Permission to Operate,11/2/2023 AE-20278,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,9/20/2023,Permission to Operate,12/7/2023 AE-20273,Solar PV,3.9,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,9/20/2023,Permission to Operate,11/2/2023 AE-20261,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,9/19/2023,Permission to Operate,11/2/2023 AE-20259,Solar PV,10,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,9/19/2023,Permission to Operate,4/1/2024 AE-19720,Solar PV,7.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,9/18/2023,Permission to Operate,1/19/2024 AE-20246,Solar PV,10,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1227,In service,9/18/2023,Permission to Operate,11/17/2023 AE-20243,Solar PV,10,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 110,In service,9/18/2023,Permission to Operate,12/11/2023 AE-20249,Solar PV,7.6,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,9/18/2023,Permission to Operate,11/16/2023 AE-20252,"Solar PV, Battery/Storage",10.5,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 110,In service,9/18/2023,Permission to Operate,11/3/2023 AE-20245,Solar PV,11.4,,Category 1,"North Freedom, Sauk County, WI",Substation 659,Circuit 1807,In service,9/18/2023,Permission to Operate,12/26/2023 AE-20191,Solar PV,8.5,,Category 1,"Blue River, Grant County, WI",Substation 100,Circuit 262,In service,9/18/2023,Permission to Operate,12/18/2023 AE-20263,Solar PV,11,,Category 1,"Hillsboro, Vernon County, WI",Substation 340,Circuit 806,In service,9/18/2023,Permission to Operate,11/16/2023 AE-20265,Solar PV,5.1,,Category 1,"Beloit, Rock County, WI",Substation 529,Circuit 1352,In service,9/18/2023,Permission to Operate,12/14/2023 AE-20244,Solar PV,5.2,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,9/18/2023,Permission to Operate,11/2/2023 AE-20230,Solar PV,8.5,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,9/15/2023,Permission to Operate,11/9/2023 AE-20183,Solar PV,50,,Category 2,"Oregon, Dane County, WI",,Circuit 1880,In service,9/14/2023,Permission to Operate,4/18/2024 AE-19678,Solar PV,3.7,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,9/14/2023,Permission to Operate,6/17/2024 AE-20209,Solar PV,4.1,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1168,In service,9/14/2023,Permission to Operate,11/9/2023 AE-20208,Solar PV,8.2,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,9/14/2023,Permission to Operate,10/30/2023 AE-20187,Solar PV,4.1,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1288,In service,9/13/2023,Permission to Operate,1/19/2024 AE-20203,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,9/13/2023,Permission to Operate,1/10/2024 AE-20228,Solar PV,40.3,,Category 2,"Twin Lakes, Kenosha County, WI",,Circuit 1665,In service,9/13/2023,Permission to Operate,11/14/2024 AE-20211,Solar PV,5.1,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,9/13/2023,Permission to Operate,2/1/2024 AE-20206,Solar PV,9.3,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,9/13/2023,Permission to Operate,10/12/2023 AE-20153,Solar PV,4.9,,Category 1,"Marion, Shawano County, WI",Substation 111,Circuit 311,In service,9/13/2023,Permission to Operate,6/27/2024 AE-20170,Solar PV,5.1,,Category 1,"Beloit, Rock County, WI",,Circuit 1680,In service,9/13/2023,Permission to Operate,12/14/2023 AE-20213,Solar PV,15.2,,Category 1,"Browntown, Green County, WI",Substation 661,Circuit 1815,In service,9/13/2023,Permission to Operate,11/10/2023 AE-20178,Solar PV,8.1,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/12/2023,Permission to Operate,11/9/2023 AE-20167,Solar PV,11.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1968,In service,9/12/2023,Permission to Operate,4/1/2024 AE-20156,Solar PV,6.4,,Category 1,"Barneveld, Iowa County, WI",Substation 280,Circuit 671,In service,9/12/2023,Permission to Operate,11/7/2023 AE-20185,Solar PV,4.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/12/2023,Permission to Operate,10/19/2023 AE-20184,Solar PV,4.6,,Category 1,"Juneau, Dodge County, WI",Substation 351,Circuit 836,In service,9/12/2023,Permission to Operate,2/8/2024 AE-20168,Solar PV,11.4,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,9/12/2023,Permission to Operate,10/26/2023 AE-20108,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,9/11/2023,Permission to Operate,11/9/2023 AE-20104,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1894,In service,9/11/2023,Permission to Operate,10/30/2023 AE-20105,Solar PV,4.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,9/11/2023,Permission to Operate,11/9/2023 AE-19949,"Solar PV, Battery/Storage",7.6,,Category 1,"Walworth, Walworth County, WI",,Circuit 2017,In service,9/11/2023,Permission to Operate,11/2/2023 AE-20144,Solar PV,11.8,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/11/2023,Permission to Operate,1/17/2024 AE-20141,Solar PV,10,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,In service,9/8/2023,Permission to Operate,12/18/2023 AE-20114,Solar PV,6.3,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,9/8/2023,Permission to Operate,11/28/2023 AE-20136,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,9/8/2023,Permission to Operate,12/1/2023 AE-20115,Solar PV,8.5,,Category 1,"Poynette, Columbia County, WI",Substation 547,Circuit 1432,In service,9/7/2023,Permission to Operate,12/14/2023 AE-20132,Solar PV,7.6,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,9/7/2023,Permission to Operate,12/7/2023 AE-20130,Solar PV,9.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/7/2023,Permission to Operate,10/24/2023 AE-20123,Solar PV,9.1,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,9/7/2023,Permission to Operate,1/25/2024 AE-20076,Solar PV,7.7,,Category 1,"Barneveld, Iowa County, WI",Substation 280,Circuit 671,In service,9/6/2023,Permission to Operate,12/18/2023 AE-20122,Solar PV,4.2,,Category 1,"Milladore, Wood County, WI",Substation 43,Circuit 120,In service,9/6/2023,Permission to Operate,12/1/2023 AE-20084,Solar PV,13.7,,Category 1,"Bagley, Oconto County, WI",Substation 80,Circuit 211,In service,9/5/2023,Permission to Operate,5/15/2024 AE-20110,Solar PV,10,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1584,In service,9/5/2023,Permission to Operate,2/1/2024 AE-20082,Solar PV,6,,Category 1,"Cazenovia, Richland County, WI",Substation 606,Circuit 1636,In service,9/5/2023,Permission to Operate,2/9/2024 AE-20001,Solar PV,8.7,,Category 1,"Oshkosh, Winnebago County, WI",Substation 276,Circuit 651,In service,9/5/2023,Permission to Operate,1/30/2024 AE-20081,Solar PV,15.2,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1217,In service,9/5/2023,Permission to Operate,11/9/2023 AE-20030,Solar PV,6,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1638,In service,9/1/2023,Permission to Operate,12/29/2023 AE-20070,Solar PV,13.1,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/1/2023,Permission to Operate,10/16/2023 AE-20079,Solar PV,9.2,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,9/1/2023,Permission to Operate,11/14/2023 AE-19986,Solar PV,3.8,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,9/1/2023,Permission to Operate,12/15/2023 AE-20056,Solar PV,2.2,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,8/31/2023,Permission to Operate,12/27/2023 AE-20055,"Solar PV, Battery/Storage",9.1,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,8/31/2023,Permission to Operate,12/27/2023 AE-20065,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,8/31/2023,Permission to Operate,10/11/2023 AE-20034,Solar PV,10.8,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2000,In service,8/31/2023,Permission to Operate,12/26/2023 AE-20048,Solar PV,6,,Category 1,"Fitchburg, Dane County, WI",Substation 579,Circuit 1521,In service,8/31/2023,Permission to Operate,11/16/2023 AE-19990,Solar PV,6.7,,Category 1,"Fox Lake, Dodge County, WI",Substation 278,Circuit 662,In service,8/31/2023,Permission to Operate,12/26/2023 AE-20069,Solar PV,8,,Category 1,"Berlin, Winnebago County, WI",Substation 550,Circuit 1452,In service,8/30/2023,Permission to Operate,12/1/2023 AE-20031,Solar PV,5.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,8/30/2023,Permission to Operate,11/9/2023 AE-19945,Solar PV,10.4,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,8/30/2023,Permission to Operate,9/26/2023 AE-20039,Solar PV,5.8,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,8/30/2023,Permission to Operate,10/5/2023 AE-19974,Solar PV,4.8,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,8/30/2023,Permission to Operate,11/28/2023 AE-20038,Solar PV,6,,Category 1,"Evansville, Rock County, WI",Substation 108,Circuit 302,In service,8/30/2023,Permission to Operate,12/18/2023 AE-20018,Solar PV,7.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,8/30/2023,Permission to Operate,11/6/2023 AE-20009,Solar PV,3.8,,Category 1,"Beloit, Rock County, WI",,Circuit 154,In service,8/30/2023,Permission to Operate,11/17/2023 AE-20035,Solar PV,5.7,,Category 1,"Gratiot, Lafayette County, WI",Substation 770,Circuit 2082,In service,8/30/2023,Permission to Operate,11/10/2023 AE-19969,Solar PV,7.4,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1737,In service,8/29/2023,Permission to Operate,10/19/2023 AE-19982,Solar PV,6,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 110,In service,8/29/2023,Permission to Operate,12/11/2023 AE-20013,Solar PV,4.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,8/29/2023,Permission to Operate,10/24/2023 AE-20016,Solar PV,3.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,8/29/2023,Permission to Operate,11/28/2023 AE-19913,Solar PV,2.3,,Category 1,"Wautoma, Waushara County, WI",Substation 327,Circuit 783,In service,8/28/2023,Permission to Operate,10/20/2023 AE-19987,Solar PV,10.1,,Category 1,"Beloit, Rock County, WI",Substation 255,Circuit 620,In service,8/28/2023,Permission to Operate,12/7/2023 AE-19995,Solar PV,6.7,,Category 1,"Orfordville, Rock County, WI",Substation 551,Circuit 1461,In service,8/28/2023,Permission to Operate,12/7/2023 AE-19763,Solar PV,8.8,,Category 1,"Pardeeville, Columbia County, WI",Substation 448,Circuit 1112,In service,8/28/2023,Permission to Operate,9/26/2023 AE-19960,Solar PV,3.9,,Category 1,"Markesan, Green Lake County, WI",Substation 436,Circuit 1107,In service,8/25/2023,Permission to Operate,10/18/2023 AE-19985,Solar PV,8.7,,Category 1,"Oshkosh, Winnebago County, WI",Substation 549,Circuit 1449,In service,8/25/2023,Permission to Operate,1/4/2024 AE-19977,Solar PV,8.5,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,8/25/2023,Permission to Operate,10/11/2023 AE-19811,Solar PV,7.8,,Category 1,"Eastman, Crawford County, WI",Substation 645,Circuit 1762,In service,8/25/2023,Permission to Operate,10/5/2023 AE-19971,Solar PV,4.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,8/25/2023,Permission to Operate,9/27/2023 AE-19959,Solar PV,3.7,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 670,In service,8/24/2023,Permission to Operate,11/16/2023 AE-19954,"Solar PV, Battery/Storage",16.68,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 616,In service,8/24/2023,Permission to Operate,12/18/2023 AE-19957,Solar PV,7,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,8/24/2023,Permission to Operate,11/9/2023 AE-19967,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,8/24/2023,Permission to Operate,10/20/2023 AE-19916,Solar PV,6,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,8/23/2023,Permission to Operate,10/18/2023 AE-19882,Solar PV,3.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,8/23/2023,Permission to Operate,10/17/2023 AE-19919,Solar PV,12.2,,Category 1,"Belleville, Dane County, WI",,Circuit 1881,In service,8/23/2023,Permission to Operate,11/14/2023 AE-19939,Solar PV,4.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,8/23/2023,Permission to Operate,9/27/2023 AE-19855,Solar PV,15,,Category 1,"New Glarus, Dane County, WI",,Circuit 1328,In service,8/23/2023,Permission to Operate,1/4/2024 AE-19863,Solar PV,12.6,,Category 1,"Verona, Dane County, WI",Substation 57,Circuit 152,In service,8/23/2023,Permission to Operate,11/21/2023 AE-19711,Solar PV,7,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 153,In service,8/23/2023,Permission to Operate,12/4/2024 AE-19904,Solar PV,13.3,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,8/22/2023,Permission to Operate,11/10/2023 AE-19899,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 389,In service,8/22/2023,Permission to Operate,12/11/2023 AE-19900,Solar PV,5.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,8/22/2023,Permission to Operate,11/2/2023 AE-19903,Solar PV,5.1,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,8/22/2023,Permission to Operate,9/26/2023 AE-19928,Solar PV,7.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,8/22/2023,Permission to Operate,10/11/2023 AE-19908,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,8/22/2023,Permission to Operate,10/5/2023 AE-19884,Solar PV,3.2,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 583,In service,8/21/2023,Permission to Operate,10/26/2023 AE-19895,Solar PV,5.1,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1009,In service,8/21/2023,Permission to Operate,12/11/2023 AE-19896,Solar PV,5.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,8/21/2023,Permission to Operate,10/16/2023 AE-19893,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,8/21/2023,Permission to Operate,10/17/2023 AE-19870,Solar PV,5.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,8/17/2023,Permission to Operate,10/6/2023 AE-19862,Solar PV,6.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,8/17/2023,Permission to Operate,9/27/2023 AE-19869,Solar PV,4.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/17/2023,Permission to Operate,10/18/2023 AE-19897,Solar PV,15.4,,Category 1,"Sauk City, Sauk County, WI",Substation 710,Circuit 1947,In service,8/17/2023,Permission to Operate,10/11/2023 AE-19875,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,8/17/2023,Permission to Operate,10/18/2023 AE-19861,Solar PV,8.5,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,8/17/2023,Permission to Operate,10/18/2023 AE-19854,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,8/16/2023,Permission to Operate,9/26/2023 AE-19848,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,8/16/2023,Permission to Operate,12/13/2023 AE-19849,Solar PV,12.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,8/16/2023,Permission to Operate,10/20/2023 AE-19858,Solar PV,7.2,,Category 1,"Edgerton, Dane County, WI",,Circuit 569,In service,8/16/2023,Permission to Operate,12/21/2023 AE-19840,Solar PV,8.5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,8/16/2023,Permission to Operate,10/5/2023 AE-19843,Solar PV,4.1,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,8/16/2023,Permission to Operate,12/7/2023 AE-19823,Solar PV,3.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/16/2023,Permission to Operate,10/2/2023 AE-19838,Solar PV,3.8,,Category 1,"Sharon, Walworth County, WI",Substation 648,Circuit 1782,In service,8/16/2023,Permission to Operate,12/21/2023 AE-19837,Solar PV,5.1,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,8/16/2023,Permission to Operate,3/7/2024 AE-19841,Solar PV,7.2,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 614,In service,8/16/2023,Permission to Operate,11/27/2023 AE-19856,Solar PV,10,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,8/16/2023,Permission to Operate,9/26/2023 AE-19865,Solar PV,7,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1218,In service,8/16/2023,Permission to Operate,12/1/2023 AE-19860,Solar PV,7.3,,Category 1,"Argyle, Green County, WI",,Circuit 930,In service,8/16/2023,Permission to Operate,11/17/2023 AE-19834,Solar PV,7.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,8/15/2023,Permission to Operate,11/21/2023 AE-19836,Solar PV,3.6,,Category 1,"Waupun, Dodge County, WI",Substation 22,Circuit 69,In service,8/15/2023,Permission to Operate,8/16/2024 AE-19824,Solar PV,4.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/15/2023,Permission to Operate,10/9/2023 AE-19792,Solar PV,9.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,8/15/2023,Permission to Operate,10/2/2023 AE-19810,Solar PV,4.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/15/2023,Permission to Operate,10/2/2023 AE-19800,Solar PV,9.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 519,In service,8/11/2023,Permission to Operate,9/26/2023 AE-19798,Solar PV,7.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,8/11/2023,Permission to Operate,11/21/2023 AE-19793,Solar PV,7.8,,Category 1,"Ontario, Vernon County, WI",Substation 217,Circuit 514,In service,8/11/2023,Permission to Operate,10/18/2023 AE-19599,Solar PV,15,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 688,In service,8/10/2023,Permission to Operate,11/2/2023 AE-19770,Solar PV,7.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/10/2023,Permission to Operate,10/9/2023 AE-19761,Solar PV,7.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/10/2023,Permission to Operate,9/26/2023 AE-19742,Solar PV,8,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,8/10/2023,Permission to Operate,10/30/2023 AE-19785,Solar PV,7.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,8/10/2023,Permission to Operate,10/9/2023 AE-19712,Solar PV,7,,Category 1,"Marion, Shawano County, WI",Substation 111,Circuit 310,In service,8/10/2023,Permission to Operate,9/21/2023 AE-19609,Solar PV,5.8,,Category 1,"Merrimac, Sauk County, WI",,Circuit 494,In service,8/9/2023,Permission to Operate,10/30/2023 AE-19766,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/9/2023,Permission to Operate,10/5/2023 AE-19759,Solar PV,5.1,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 20,In service,8/9/2023,Permission to Operate,1/31/2024 AE-19724,Solar PV,7.6,,Category 1,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1685,In service,8/9/2023,Permission to Operate,12/26/2023 AE-19722,Solar PV,7.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/9/2023,Permission to Operate,10/2/2023 AE-19614,"Solar PV, Battery/Storage",27.08,,Category 2,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2146,In service,8/8/2023,Permission to Operate,2/9/2024 AE-19771,Solar PV,3.7,,Category 1,"Montello, Marquette County, WI",Substation 489,Circuit 1220,In service,8/8/2023,Permission to Operate,12/13/2023 AE-19744,Solar PV,7.6,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1226,In service,8/8/2023,Permission to Operate,4/1/2024 AE-19729,Solar PV,20,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 496,Circuit 1254,In service,8/8/2023,Permission to Operate,12/29/2023 AE-19780,Solar PV,11.8,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,8/8/2023,Permission to Operate,9/27/2023 AE-19743,Solar PV,6.3,,Category 1,"Deerfield, Dane County, WI",,Circuit 974,In service,8/8/2023,Permission to Operate,12/21/2023 AE-19728,Solar PV,7.2,,Category 1,"Belleville, Dane County, WI",Substation 722,Circuit 1971,In service,8/7/2023,Permission to Operate,9/26/2023 AE-18890,Solar PV,399.6,,Category 3,"Janesville, Rock County, WI",Substation 482,Circuit 1196,In service,8/7/2023,Permission to Operate,12/29/2025 AE-19602,Solar PV,9.8,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 22,In service,8/4/2023,Permission to Operate,11/7/2023 AE-19655,"Solar PV, Battery/Storage",21.4,,Category 2,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,8/4/2023,Permission to Operate,10/20/2023 AE-19705,Solar PV,11.8,,Category 1,"Barneveld, Iowa County, WI",Substation 525,Circuit 1342,In service,8/4/2023,Permission to Operate,10/26/2023 AE-19659,Solar PV,7.6,,Category 1,"Markesan, Green Lake County, WI",,Circuit 768,In service,8/2/2023,Permission to Operate,11/21/2023 AE-19630,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,8/2/2023,Permission to Operate,9/18/2023 AE-19679,Solar PV,4.6,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1189,In service,8/2/2023,Permission to Operate,10/26/2023 AE-19646,Solar PV,11.4,,Category 1,"Fitchburg, Dane County, WI",Substation 579,Circuit 1521,In service,8/2/2023,Permission to Operate,9/14/2023 AE-19670,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,8/2/2023,Permission to Operate,11/9/2023 AE-19675,Solar PV,12.8,,Category 1,"Ripon, Fond du Lac County, WI",Substation 537,Circuit 1404,In service,8/2/2023,Permission to Operate,9/21/2023 AE-19673,Solar PV,4.1,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,8/2/2023,Permission to Operate,9/29/2023 AE-19492,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,7/31/2023,Permission to Operate,11/6/2023 AE-19650,Solar PV,9.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,7/31/2023,Permission to Operate,10/12/2023 AE-19627,Solar PV,5.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,7/31/2023,Permission to Operate,9/13/2023 AE-19644,Solar PV,7.6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,7/31/2023,Permission to Operate,11/2/2023 AE-19637,Solar PV,6.7,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 338,Circuit 804,In service,7/31/2023,Permission to Operate,11/7/2023 AE-19605,Solar PV,8.1,,Category 1,"Albany, Green County, WI",Substation 481,Circuit 1189,In service,7/31/2023,Permission to Operate,9/27/2023 AE-19623,Solar PV,49.7,,Category 2,"Mcfarland, Dane County, WI",,Circuit 1143,In service,7/28/2023,Permission to Operate,1/15/2024 AE-19594,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,7/27/2023,Permission to Operate,9/13/2023 AE-19583,Solar PV,7.7,,Category 1,"Lone Rock, Sauk County, WI",,Circuit 1056,In service,7/27/2023,Permission to Operate,9/26/2023 AE-19611,Solar PV,6,,Category 1,"Mt. Calvary, Fond du Lac County, WI",Substation 391,Circuit 976,In service,7/27/2023,Permission to Operate,11/1/2023 AE-19619,Solar PV,6.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,7/27/2023,Permission to Operate,9/7/2023 AE-19603,Solar PV,4.6,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,7/27/2023,Permission to Operate,9/21/2023 AE-19589,Solar PV,20,,Category 2,"Omro, Winnebago County, WI",Substation 766,Circuit 2077,In service,7/27/2023,Permission to Operate,10/12/2023 AE-19555,Solar PV,10,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,7/27/2023,Permission to Operate,11/17/2023 AE-19593,Solar PV,6.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,7/27/2023,Permission to Operate,10/9/2023 AE-19494,Solar PV,6.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,7/26/2023,Permission to Operate,9/8/2023 AE-19595,Solar PV,5.2,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,7/26/2023,Permission to Operate,9/7/2023 AE-19527,Solar PV,5.2,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,7/26/2023,Permission to Operate,9/8/2023 AE-19582,Solar PV,15.2,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1519,In service,7/26/2023,Permission to Operate,3/7/2024 AE-19596,Solar PV,3.9,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/26/2023,Permission to Operate,10/11/2023 AE-19559,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,7/26/2023,Permission to Operate,8/29/2023 AE-19581,Solar PV,10,,Category 1,"Fitchburg, Dane County, WI",,Circuit 1880,In service,7/25/2023,Permission to Operate,9/7/2023 AE-19569,Solar PV,5.9,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 153,In service,7/25/2023,Permission to Operate,10/11/2023 AE-19578,Solar PV,6,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1538,In service,7/25/2023,Permission to Operate,10/18/2023 AE-19575,Solar PV,3.2,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,7/25/2023,Permission to Operate,10/5/2023 AE-19469,Solar PV,10.5,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,7/24/2023,Permission to Operate,9/13/2023 AE-19521,Solar PV,9.9,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1894,In service,7/24/2023,Permission to Operate,8/23/2023 AE-19517,Solar PV,5.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,7/24/2023,Permission to Operate,9/7/2023 AE-19496,Solar PV,6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 518,In service,7/24/2023,Permission to Operate,10/17/2023 AE-19503,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,7/24/2023,Permission to Operate,9/5/2023 AE-19579,Solar PV,8.4,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 411,Circuit 1027,In service,7/24/2023,Permission to Operate,9/13/2023 AE-19329,Solar PV,7.7,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,7/21/2023,Permission to Operate,10/24/2023 AE-19468,Solar PV,13.2,,Category 1,"Omro, Winnebago County, WI",Substation 549,Circuit 1449,In service,7/21/2023,Permission to Operate,10/30/2023 AE-19429,Solar PV,7.6,,Category 1,"Williams Bay, Walworth County, WI",,Circuit 2067,In service,7/21/2023,Permission to Operate,11/2/2023 AE-19498,Solar PV,10,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,7/20/2023,Permission to Operate,11/2/2023 AE-19511,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,7/20/2023,Permission to Operate,10/11/2023 AE-19338,Solar PV,12.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,7/20/2023,Permission to Operate,8/17/2023 AE-19467,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,7/19/2023,Permission to Operate,9/21/2023 AE-19462,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,7/19/2023,Permission to Operate,9/18/2023 AE-19486,Solar PV,5.2,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,7/19/2023,Permission to Operate,9/5/2023 AE-19476,Solar PV,5.9,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,7/19/2023,Permission to Operate,9/18/2023 AE-19479,Solar PV,5.3,,Category 1,"Burlington, Kenosha County, WI",Substation 660,Circuit 1809,In service,7/19/2023,Permission to Operate,9/13/2023 AE-19455,"Solar PV, Battery/Storage",15.2,,Category 1,"Janesville, Dane County, WI",Substation 279,Circuit 664,In service,7/19/2023,Permission to Operate,10/11/2023 AE-19431,Solar PV,9.2,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1199,In service,7/19/2023,Permission to Operate,8/29/2023 AE-19488,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,7/19/2023,Permission to Operate,9/5/2023 AE-19471,Solar PV,20.1,,Category 1,"Marshall, Dane County, WI",Substation 296,Circuit 706,In service,7/18/2023,Permission to Operate,10/12/2023 AE-19446,"Solar PV, Battery/Storage",28,,Category 2,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,7/18/2023,Permission to Operate,9/26/2023 AE-19444,Solar PV,9.3,,Category 1,"Edgerton, Rock County, WI",,Circuit 570,In service,7/17/2023,Permission to Operate,10/26/2023 AE-19460,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,7/17/2023,Permission to Operate,9/7/2023 AE-19451,Solar PV,3.7,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1521,In service,7/17/2023,Permission to Operate,11/9/2023 AE-19439,Solar PV,5.8,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,7/14/2023,Permission to Operate,9/7/2023 AE-19389,Solar PV,7.7,,Category 1,"Gratiot, Lafayette County, WI",Substation 770,Circuit 2082,In service,7/13/2023,Permission to Operate,10/16/2023 AE-19440,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 903,In service,7/13/2023,Permission to Operate,10/18/2023 AE-19386,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,7/13/2023,Permission to Operate,8/29/2023 AE-19408,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,7/13/2023,Permission to Operate,8/23/2023 AE-19421,Solar PV,4.8,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1637,In service,7/13/2023,Permission to Operate,3/21/2024 AE-19432,Solar PV,9.2,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,7/13/2023,Permission to Operate,8/28/2023 AE-19402,Solar PV,4.6,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,7/13/2023,Permission to Operate,8/28/2023 AE-19366,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 730,Circuit 2005,In service,7/13/2023,Permission to Operate,8/29/2023 AE-19377,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,7/13/2023,Permission to Operate,9/21/2023 AE-19398,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,7/13/2023,Permission to Operate,8/28/2023 AE-19359,Solar PV,9.9,,Category 1,"Genoa City, Kenosha County, WI",,Circuit 1667,In service,7/13/2023,Permission to Operate,11/28/2023 AE-19416,Solar PV,6,,Category 1,"South Wayne, Lafayette County, WI",Substation 770,Circuit 2082,In service,7/13/2023,Permission to Operate,10/9/2023 AE-19410,Solar PV,7.8,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,7/13/2023,Permission to Operate,8/29/2023 AE-19367,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,7/13/2023,Permission to Operate,8/29/2023 AE-19400,Solar PV,3.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,7/12/2023,Permission to Operate,11/16/2023 AE-19392,Solar PV,5.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,7/12/2023,Permission to Operate,11/6/2023 AE-19395,Solar PV,11.2,,Category 1,"Pardeeville, Columbia County, WI",Substation 448,Circuit 1115,In service,7/12/2023,Permission to Operate,11/10/2023 AE-19364,"Solar PV, Battery/Storage",17.5,,Category 1,"Howards Grove, Sheboygan County, WI",Substation 346,Circuit 833,In service,7/11/2023,Permission to Operate,12/22/2023 AE-19311,Solar PV,5.9,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1044,In service,7/10/2023,Permission to Operate,9/5/2023 AE-19323,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,7/10/2023,Permission to Operate,8/16/2023 AE-19350,Solar PV,21,,Category 2,"Mount Horeb, Dane County, WI",Substation 280,Circuit 671,In service,7/10/2023,Permission to Operate,11/6/2023 AE-19346,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 908,In service,7/10/2023,Permission to Operate,8/9/2023 AE-19348,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,7/10/2023,Permission to Operate,8/23/2023 AE-19328,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,7/10/2023,Permission to Operate,8/28/2023 AE-19213,Solar PV,5,,Category 1,"New Glarus, Green County, WI",,Circuit 1328,In service,7/10/2023,Permission to Operate,10/17/2023 AE-19343,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1926,In service,7/10/2023,Permission to Operate,8/16/2023 AE-19358,Solar PV,7.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,7/10/2023,Permission to Operate,8/29/2023 AE-19326,Solar PV,5.1,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 418,In service,7/10/2023,Permission to Operate,11/28/2023 AE-19353,Solar PV,8.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,7/10/2023,Permission to Operate,8/10/2023 AE-19351,Solar PV,7.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,7/10/2023,Permission to Operate,8/28/2023 AE-19352,Solar PV,7.9,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/10/2023,Permission to Operate,9/5/2023 AE-19355,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,7/10/2023,Permission to Operate,8/16/2023 AE-19360,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 903,In service,7/10/2023,Permission to Operate,8/16/2023 AE-19321,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,7/10/2023,Permission to Operate,8/9/2023 AE-19324,Solar PV,11.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2103,In service,7/10/2023,Permission to Operate,8/28/2023 AE-19139,Solar PV,20,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,7/7/2023,Permission to Operate,4/10/2024 AE-19292,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,7/6/2023,Permission to Operate,8/28/2023 AE-18941,Solar PV,2.8,,Category 1,"Brandon, Fond du Lac County, WI",Substation 89,Circuit 245,In service,7/6/2023,Permission to Operate,10/18/2023 AE-19325,Solar PV,3.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,7/6/2023,Permission to Operate,12/18/2023 AE-19238,Solar PV,10,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,7/6/2023,Permission to Operate,9/7/2023 AE-19273,Solar PV,4.1,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,7/6/2023,Permission to Operate,1/8/2024 AE-19242,Solar PV,6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 900,In service,7/3/2023,Permission to Operate,10/5/2023 AE-19156,Solar PV,15.2,,Category 1,"Clintonville, Waupaca County, WI",Substation 69,Circuit 168,In service,7/3/2023,Permission to Operate,9/29/2023 AE-19272,"Solar PV, Battery/Storage",12.6,,Category 1,"Loganville, Sauk County, WI",Substation 710,Circuit 1946,In service,7/3/2023,Permission to Operate,11/28/2023 AE-19239,Solar PV,3.7,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1686,In service,7/3/2023,Permission to Operate,9/27/2023 AE-19261,Solar PV,5.1,,Category 1,"La Valle, Sauk County, WI",,Circuit 110,In service,7/3/2023,Permission to Operate,10/11/2023 AE-19219,Solar PV,10,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 110,In service,7/3/2023,Permission to Operate,10/16/2023 AE-19253,Solar PV,5.4,,Category 1,"Neshkoro, Marquette County, WI",Substation 656,Circuit 1792,In service,7/3/2023,Permission to Operate,5/15/2024 AE-19045,Solar PV,9.1,,Category 1,"Fort Atkinson, Jefferson County, WI",Substation 115,Circuit 315,In service,6/30/2023,Permission to Operate,12/21/2023 AE-19251,Solar PV,5.1,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1639,In service,6/30/2023,Permission to Operate,9/14/2023 AE-19256,"Solar PV, Battery/Storage",11.4,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1209,In service,6/30/2023,Permission to Operate,10/5/2023 AE-19220,Solar PV,7.6,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1638,In service,6/30/2023,Permission to Operate,12/29/2023 AE-19235,Solar PV,9.1,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,6/30/2023,Permission to Operate,10/24/2023 AE-19266,Solar PV,7.6,,Category 1,"Rio, Columbia County, WI",Substation 335,Circuit 790,In service,6/30/2023,Permission to Operate,10/18/2023 AE-19215,Solar PV,6.3,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,6/30/2023,Permission to Operate,7/22/2023 AE-19288,Solar PV,3.7,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,6/30/2023,Permission to Operate,8/29/2023 AE-19187,Solar PV,12.2,,Category 1,"Spring Green, Sauk County, WI",Substation 783,Circuit 2139,In service,6/30/2023,Permission to Operate,9/21/2023 AE-19174,Solar PV,4.3,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,6/30/2023,Permission to Operate,8/23/2023 AE-19236,Solar PV,10,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,6/30/2023,Permission to Operate,8/18/2023 AE-19283,Solar PV,7.6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,6/30/2023,Permission to Operate,11/10/2023 AE-19264,Solar PV,3.7,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,6/30/2023,Permission to Operate,12/14/2023 AE-19244,Solar PV,5.1,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,6/30/2023,Permission to Operate,12/21/2023 AE-19269,Solar PV,5.1,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,6/29/2023,Permission to Operate,7/24/2023 AE-19226,Solar PV,7,,Category 1,"Omro, Winnebago County, WI",Substation 766,Circuit 2077,In service,6/29/2023,Permission to Operate,11/21/2023 AE-19275,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,6/29/2023,Permission to Operate,9/5/2023 AE-19243,Solar PV,7.9,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2103,In service,6/29/2023,Permission to Operate,8/9/2023 AE-19263,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,6/29/2023,Permission to Operate,8/9/2023 AE-19246,Solar PV,11.5,,Category 1,"Necedah, Juneau County, WI",Substation 516,Circuit 1321,In service,6/29/2023,Permission to Operate,9/29/2023 AE-19231,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 378,Circuit 932,In service,6/29/2023,Permission to Operate,8/16/2023 AE-19267,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1585,In service,6/29/2023,Permission to Operate,8/16/2023 AE-19274,"Solar PV, Battery/Storage",9.7,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1711,In service,6/29/2023,Permission to Operate,11/17/2023 AE-19217,Solar PV,3.7,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2134,In service,6/29/2023,Permission to Operate,10/20/2023 AE-19222,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,6/29/2023,Permission to Operate,8/14/2023 AE-19227,Solar PV,10.4,,Category 1,"Ripon, Fond du Lac County, WI",Substation 537,Circuit 1403,In service,6/29/2023,Permission to Operate,9/5/2023 AE-19276,Solar PV,6.1,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1926,In service,6/29/2023,Permission to Operate,9/5/2023 AE-19271,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,6/29/2023,Permission to Operate,8/16/2023 AE-19194,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,6/29/2023,Permission to Operate,9/21/2023 AE-19260,Solar PV,5.1,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 342,Circuit 813,In service,6/29/2023,Permission to Operate,11/2/2023 AE-19255,Solar PV,10,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,6/28/2023,Permission to Operate,8/28/2023 AE-19221,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1199,In service,6/28/2023,Permission to Operate,8/29/2023 AE-19258,Solar PV,6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1697,In service,6/28/2023,Permission to Operate,11/21/2023 AE-19188,"Solar PV, Battery/Storage",15.2,,Category 1,"Mount Calvary, Fond du Lac County, WI",Substation 391,Circuit 976,In service,6/26/2023,Permission to Operate,11/14/2023 AE-19184,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 378,Circuit 932,In service,6/26/2023,Permission to Operate,8/16/2023 AE-18614,Solar PV,33.6,,Category 2,"Keshena, Shawano County, WI",Substation 652,Circuit 1789,In service,6/26/2023,Permission to Operate,5/31/2024 AE-19185,Solar PV,13.8,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1585,In service,6/26/2023,Permission to Operate,8/23/2023 AE-19211,Solar PV,6.1,,Category 1,"Edgerton, Rock County, WI",,Circuit 570,In service,6/26/2023,Permission to Operate,8/3/2023 AE-19203,Solar PV,4.6,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,6/26/2023,Permission to Operate,8/16/2023 AE-19214,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,6/26/2023,Permission to Operate,8/9/2023 AE-19195,Solar PV,7.6,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 889,In service,6/26/2023,Permission to Operate,8/17/2023 AE-19210,Solar PV,7.9,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,6/26/2023,Permission to Operate,9/27/2023 AE-19270,Solar PV,3.8,,Category 1,"Edgerton, Rock County, WI",,Circuit 569,In service,6/23/2023,Permission to Operate,9/21/2023 AE-19150,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,6/23/2023,Permission to Operate,8/16/2023 AE-19190,Solar PV,7.5,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,6/23/2023,Permission to Operate,10/16/2023 AE-19200,Solar PV,12.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,6/23/2023,Permission to Operate,9/26/2023 AE-19054,Solar PV,11.2,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,6/23/2023,Permission to Operate,8/21/2024 AE-19199,"Solar PV, Battery/Storage",15.2,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,6/23/2023,Permission to Operate,8/10/2023 AE-18856,Solar PV,6.1,,Category 1,"Pell Lake, Walworth County, WI",Substation 660,Circuit 1810,In service,6/22/2023,Permission to Operate,8/16/2023 AE-19175,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,6/22/2023,Permission to Operate,10/11/2023 AE-19155,Solar PV,7.9,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,6/22/2023,Permission to Operate,8/9/2023 AE-19124,Solar PV,4.3,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,6/22/2023,Permission to Operate,8/31/2023 AE-19197,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,6/22/2023,Permission to Operate,8/17/2023 AE-19249,Solar PV,10.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,6/22/2023,Permission to Operate,7/17/2023 AE-19160,Solar PV,6.3,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,6/22/2023,Permission to Operate,9/27/2023 AE-19177,Solar PV,3.7,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,6/22/2023,Permission to Operate,10/12/2023 AE-19136,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,6/22/2023,Permission to Operate,12/1/2023 AE-18566,Solar PV,7.8,,Category 1,"Marion, Waupaca County, WI",Substation 494,Circuit 1234,In service,6/21/2023,Permission to Operate,8/18/2023 AE-19116,Solar PV,2.9,,Category 1,"Ripon, Fond du Lac County, WI",Substation 610,Circuit 1643,In service,6/21/2023,Permission to Operate,8/11/2023 AE-19077,"Solar PV, Battery/Storage",25.2,,Category 2,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,6/21/2023,Permission to Operate,10/18/2023 AE-19138,Solar PV,6,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,6/21/2023,Permission to Operate,9/5/2023 AE-19111,Solar PV,5.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,6/21/2023,Permission to Operate,8/23/2023 AE-19149,Solar PV,5.7,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 670,In service,6/21/2023,Permission to Operate,10/11/2023 AE-19127,"Solar PV, Battery/Storage",16.4,,Category 1,"Fon Du Lac, Fond du Lac County, WI",Substation 256,Circuit 622,In service,6/20/2023,Permission to Operate,9/21/2023 AE-19122,Solar PV,3.7,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,6/19/2023,Permission to Operate,10/16/2023 AE-19110,"Solar PV, Battery/Storage",11.54,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,6/19/2023,Permission to Operate,8/17/2023 AE-19099,Solar PV,4.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/16/2023,Permission to Operate,7/22/2023 AE-19096,Solar PV,8.7,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,6/16/2023,Permission to Operate,9/7/2023 AE-19078,"Solar PV, Battery/Storage",15,,Category 1,"Wilton, Monroe County, WI",Substation 217,Circuit 514,In service,6/16/2023,Permission to Operate,9/14/2023 AE-19091,Solar PV,11.2,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,6/16/2023,Permission to Operate,7/17/2023 AE-19104,Solar PV,3.9,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,6/16/2023,Permission to Operate,8/1/2023 AE-19092,Solar PV,5.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/16/2023,Permission to Operate,7/22/2023 AE-19080,Solar PV,5.3,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1120,In service,6/16/2023,Permission to Operate,10/18/2023 AE-19069,Solar PV,3.9,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/16/2023,Permission to Operate,7/27/2023 AE-19066,Solar PV,7.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/16/2023,Permission to Operate,8/3/2023 AE-19070,Solar PV,7.9,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,6/16/2023,Permission to Operate,7/17/2023 AE-19065,Solar PV,5.6,,Category 1,"Ripon, Fond du Lac County, WI",Substation 610,Circuit 1643,In service,6/15/2023,Permission to Operate,9/13/2023 AE-19044,Solar PV,20,,Category 1,"Ripon, Fond du Lac County, WI",Substation 627,Circuit 1692,In service,6/15/2023,Permission to Operate,9/1/2023 AE-19079,Solar PV,8.7,,Category 1,"Poynette, Columbia County, WI",Substation 547,Circuit 1432,In service,6/15/2023,Permission to Operate,8/11/2023 AE-19087,Solar PV,5.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/15/2023,Permission to Operate,8/3/2023 AE-19064,Solar PV,6.7,,Category 1,"Beloit, Rock County, WI",,Circuit 1680,In service,6/15/2023,Permission to Operate,7/10/2023 AE-19068,Solar PV,5.2,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1184,In service,6/15/2023,Permission to Operate,9/8/2023 AE-19061,Solar PV,7.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,6/14/2023,Permission to Operate,7/14/2023 AE-19002,Solar PV,5.6,,Category 1,"Brodhead, Green County, WI",Substation 96,Circuit 259,In service,6/13/2023,Permission to Operate,8/17/2023 AE-19041,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,6/13/2023,Permission to Operate,8/28/2023 AE-19043,Solar PV,20,,Category 1,"Ripon, Fond du Lac County, WI",Substation 627,Circuit 1692,In service,6/13/2023,Permission to Operate,8/17/2023 AE-19022,Solar PV,7.6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,6/13/2023,Permission to Operate,8/8/2023 AE-19006,Solar PV,9.8,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/13/2023,Permission to Operate,8/1/2023 AE-18905,Solar PV,10,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,6/12/2023,Permission to Operate,5/3/2024 AE-18904,Solar PV,10,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,6/12/2023,Permission to Operate,4/12/2024 AE-19019,Solar PV,7.8,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,6/12/2023,Permission to Operate,6/22/2023 AE-19017,Solar PV,20,,Category 1,"Cuba City, Lafayette County, WI",Substation 248,Circuit 595,In service,6/12/2023,Permission to Operate,8/28/2023 AE-18983,Solar PV,5.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/12/2023,Permission to Operate,9/8/2023 AE-18912,Solar PV,10,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,6/12/2023,Permission to Operate,5/3/2024 AE-19009,Solar PV,5.2,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,6/12/2023,Permission to Operate,8/9/2023 AE-18913,Solar PV,10,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,6/12/2023,Permission to Operate,5/3/2024 AE-18997,Solar PV,3.9,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 318,In service,6/8/2023,Permission to Operate,8/1/2023 AE-18915,Solar PV,10,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,6/7/2023,Permission to Operate,11/6/2025 AE-18973,Solar PV,6.2,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,6/7/2023,Permission to Operate,8/28/2023 AE-18979,Solar PV,12.3,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,6/7/2023,Permission to Operate,8/29/2023 AE-18903,Solar PV,10,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,6/7/2023,Permission to Operate,4/12/2024 AE-18956,Solar PV,5.7,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,6/7/2023,Permission to Operate,10/11/2023 AE-18962,Solar PV,3.9,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,6/7/2023,Permission to Operate,8/9/2023 AE-18975,Solar PV,5.9,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,6/7/2023,Permission to Operate,8/1/2023 AE-18907,Solar PV,10,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,6/7/2023,Permission to Operate,6/17/2024 AE-18939,Solar PV,16.7,,Category 1,"Rio, Columbia County, WI",Substation 335,Circuit 791,In service,6/7/2023,Permission to Operate,7/22/2023 AE-18976,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1199,In service,6/7/2023,Permission to Operate,8/9/2023 AE-18906,Solar PV,10,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,6/7/2023,Permission to Operate,5/3/2024 AE-18958,Solar PV,10,,Category 1,"Endeavor, Marquette County, WI",Substation 252,Circuit 607,In service,6/7/2023,Permission to Operate,11/2/2023 AE-18969,Solar PV,8.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/7/2023,Permission to Operate,8/3/2023 AE-18953,Solar PV,14.4,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 318,In service,6/5/2023,Permission to Operate,7/17/2023 AE-18935,Solar PV,20,,Category 1,"Walworth, Walworth County, WI",Substation 118,Circuit 320,In service,6/5/2023,Permission to Operate,12/11/2023 AE-18931,Solar PV,3.5,,Category 1,"Baraboo, Sauk County, WI",Substation 418,Circuit 1040,In service,6/2/2023,Permission to Operate,9/8/2023 AE-18925,Solar PV,5.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,6/2/2023,Permission to Operate,8/2/2023 AE-18870,Solar PV,199.8,,Category 2,"Madison, Dane County, WI",Substation 579,Circuit 1525,In service,6/2/2023,Permission to Operate,12/8/2023 AE-18914,Solar PV,3.9,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1653,In service,6/1/2023,Permission to Operate,9/13/2023 AE-18707,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,5/31/2023,Permission to Operate,10/12/2023 AE-18808,Solar PV,6.6,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 778,In service,5/30/2023,Permission to Operate,8/10/2023 AE-18888,Solar PV,3.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1518,In service,5/30/2023,Permission to Operate,7/17/2023 AE-18833,Solar PV,50.1,,Category 2,"Oregon, Dane County, WI",,Circuit 1880,In service,5/30/2023,Permission to Operate,7/27/2023 AE-18850,Solar PV,90.9,,Category 2,"Oregon, Dane County, WI",,Circuit 1880,In service,5/26/2023,Permission to Operate,12/21/2023 AE-18872,Solar PV,19.9,,Category 1,"Berlin, Waushara County, WI",Substation 633,Circuit 1722,In service,5/26/2023,Permission to Operate,8/29/2023 AE-18866,Solar PV,3.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,5/26/2023,Permission to Operate,8/2/2023 AE-18143,Solar PV,199.8,,Category 2,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 622,In service,5/26/2023,Permission to Operate,5/6/2024 AE-18788,Solar PV,4.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,5/25/2023,Permission to Operate,6/27/2023 AE-18852,Solar PV,5.9,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 318,In service,5/25/2023,Permission to Operate,7/11/2023 AE-18835,Solar PV,3.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,5/25/2023,Permission to Operate,8/2/2023 AE-18847,Solar PV,3.9,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 318,In service,5/25/2023,Permission to Operate,6/27/2023 AE-18832,Solar PV,5.2,,Category 1,"Columbus, Dane County, WI",,Circuit 2000,In service,5/25/2023,Permission to Operate,8/2/2023 AE-18864,Solar PV,9.6,,Category 1,"Sun Prairie, Dane County, WI",Substation 698,Circuit 1920,In service,5/25/2023,Permission to Operate,6/21/2023 AE-18860,Solar PV,3.9,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,5/25/2023,Permission to Operate,6/26/2023 AE-18831,Solar PV,13.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,5/25/2023,Permission to Operate,8/2/2023 AE-18834,Solar PV,15.7,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,5/25/2023,Permission to Operate,8/11/2023 AE-18830,Solar PV,4.4,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,5/25/2023,Permission to Operate,9/14/2023 AE-18827,Solar PV,5.8,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,5/24/2023,Permission to Operate,8/17/2023 AE-18515,"Solar PV, Battery/Storage",26.4,,Category 2,"Sun Prairie, Dane County, WI",Substation 698,Circuit 1920,In service,5/24/2023,Permission to Operate,12/29/2023 AE-18829,Solar PV,10.2,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 584,In service,5/24/2023,Permission to Operate,8/7/2023 AE-18828,Solar PV,13.3,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 390,In service,5/24/2023,Permission to Operate,6/27/2023 AE-18807,Solar PV,9.2,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2126,In service,5/23/2023,Permission to Operate,7/24/2023 AE-18795,Solar PV,7.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,5/23/2023,Permission to Operate,6/27/2023 AE-18825,Solar PV,7.6,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,5/23/2023,Permission to Operate,8/9/2023 AE-18819,Solar PV,5.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,5/23/2023,Permission to Operate,6/27/2023 AE-18813,Solar PV,5.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,5/23/2023,Permission to Operate,8/1/2023 AE-18815,Solar PV,13.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 783,Circuit 2138,In service,5/23/2023,Permission to Operate,7/24/2023 AE-18748,Solar PV,20.1,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1814,In service,5/19/2023,Permission to Operate,9/1/2023 AE-18749,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,5/19/2023,Permission to Operate,8/11/2023 AE-18796,Solar PV,10,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,5/19/2023,Permission to Operate,6/27/2023 AE-18779,Solar PV,5.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,5/19/2023,Permission to Operate,6/21/2023 AE-18801,Solar PV,9.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,5/19/2023,Permission to Operate,6/21/2023 AE-18800,Solar PV,10,,Category 1,"Cuba City, Lafayette County, WI",Substation 248,Circuit 595,In service,5/19/2023,Permission to Operate,8/25/2023 AE-18764,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,5/17/2023,Permission to Operate,7/17/2023 AE-18434,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 905,In service,5/17/2023,Permission to Operate,7/6/2023 AE-18730,Solar PV,20,,Category 1,"Shawano, Shawano County, WI",Substation 652,Circuit 1788,In service,5/17/2023,Permission to Operate,11/6/2023 AE-18686,Solar PV,11.4,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,5/17/2023,Permission to Operate,4/12/2024 AE-18763,Solar PV,7.6,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,5/17/2023,Permission to Operate,8/16/2023 AE-18684,Solar PV,5.1,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,5/17/2023,Permission to Operate,4/10/2024 AE-18757,Solar PV,7.6,,Category 1,"Auburndale, Wood County, WI",Substation 43,Circuit 118,In service,5/17/2023,Permission to Operate,7/27/2023 AE-18715,Solar PV,7,,Category 1,"Pittsville, Wood County, WI",Substation 573,Circuit 1508,In service,5/17/2023,Permission to Operate,7/6/2023 AE-18776,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1525,In service,5/17/2023,Permission to Operate,10/16/2023 AE-18731,Solar PV,20,,Category 1,"Shawano, Shawano County, WI",Substation 652,Circuit 1788,In service,5/17/2023,Permission to Operate,9/29/2023 AE-18637,Solar PV,7.8,,Category 1,"Gays Mills, Crawford County, WI",Substation 645,Circuit 1763,In service,5/17/2023,Permission to Operate,9/21/2023 AE-18759,"Solar PV, Battery/Storage",19.1,,Category 2,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1686,In service,5/15/2023,Permission to Operate,8/29/2023 AE-18723,Solar PV,9.2,,Category 1,"Plain, Sauk County, WI",,Circuit 1057,In service,5/11/2023,Permission to Operate,7/6/2023 AE-18734,Solar PV,11.4,,Category 1,"Sauk City, Dane County, WI",Substation 547,Circuit 1433,In service,5/11/2023,Permission to Operate,8/11/2023 AE-18609,Solar PV,19,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,5/10/2023,Permission to Operate,7/17/2023 AE-18695,Solar PV,75,,Category 2,"Reedsburg, Sauk County, WI",,Circuit 109,In service,5/9/2023,Permission to Operate,11/17/2023 AE-18579,Solar PV,750,25,Category 3,"Madison, Dane County, WI",Substation 31,Circuit 84,In service,5/9/2023,Permission to Operate,2/20/2026 AE-18665,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,5/8/2023,Permission to Operate,6/26/2023 AE-18636,Solar PV,9.4,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,In service,5/8/2023,Permission to Operate,6/9/2023 AE-18513,Solar PV,7.6,,Category 1,"Auburndale, Wood County, WI",Substation 43,Circuit 118,In service,5/8/2023,Permission to Operate,7/27/2023 AE-18642,Solar PV,10.4,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 671,In service,5/4/2023,Permission to Operate,11/9/2023 AE-18638,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,5/4/2023,Permission to Operate,8/14/2023 AE-18644,Solar PV,3.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,5/4/2023,Permission to Operate,6/9/2023 AE-18628,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,5/3/2023,Permission to Operate,2/21/2024 AE-18622,Solar PV,5.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 21,In service,5/3/2023,Permission to Operate,6/22/2023 AE-18592,Solar PV,11.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,5/1/2023,Permission to Operate,5/22/2023 AE-18602,Solar PV,5.1,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,5/1/2023,Permission to Operate,8/29/2023 AE-18582,"Solar PV, Battery/Storage",10.8,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,4/28/2023,Permission to Operate,10/10/2023 AE-18571,Solar PV,6.1,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,4/28/2023,Permission to Operate,6/27/2023 AE-18576,Solar PV,15.1,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,In service,4/28/2023,Permission to Operate,6/27/2023 AE-18580,Solar PV,2.8,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 355,Circuit 855,In service,4/28/2023,Permission to Operate,5/31/2023 AE-18431,Solar PV,7.8,,Category 1,"Belleville, Dane County, WI",,Circuit 1881,In service,4/27/2023,Permission to Operate,8/11/2023 AE-18483,"Solar PV, Battery/Storage",13.44,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 316,In service,4/26/2023,Permission to Operate,8/10/2023 AE-18539,Solar PV,7.3,,Category 1,"Fontana, Walworth County, WI",Substation 118,Circuit 321,In service,4/26/2023,Permission to Operate,12/11/2023 AE-18551,Solar PV,5.1,,Category 1,"De Forest, Dane County, WI",Substation 726,Circuit 1984,In service,4/26/2023,Permission to Operate,7/11/2023 AE-18267,Solar PV,14.3,,Category 1,"Keshena, Menominee County, WI",Substation 652,Circuit 1789,In service,4/26/2023,Permission to Operate,6/20/2024 AE-18521,Solar PV,18.2,,Category 1,"Stoughton, Dane County, WI",Substation 676,Circuit 1871,In service,4/25/2023,Permission to Operate,7/10/2023 AE-18511,Solar PV,11.4,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2138,In service,4/24/2023,Permission to Operate,8/9/2023 AE-18517,Solar PV,7.6,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,4/22/2023,Permission to Operate,10/24/2023 AE-18519,Solar PV,6,,Category 1,"Vesper, Wood County, WI",Substation 723,Circuit 1975,In service,4/22/2023,Permission to Operate,9/14/2023 AE-18497,Solar PV,10.6,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 461,In service,4/21/2023,Permission to Operate,8/2/2023 AE-18314,Solar PV,5.1,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,4/21/2023,Permission to Operate,5/31/2023 AE-18493,Solar PV,3.9,,Category 1,"Reedsburg, Sauk County, WI",Substation 421,Circuit 1050,In service,4/20/2023,Permission to Operate,7/21/2023 AE-18473,Solar PV,15.2,,Category 1,"Randolph, Dodge County, WI",,Circuit 1591,In service,4/20/2023,Permission to Operate,9/13/2023 AE-18272,Solar PV,7.6,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,4/19/2023,Permission to Operate,6/1/2023 AE-18480,Solar PV,11.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,4/19/2023,Permission to Operate,8/14/2023 AE-18460,Solar PV,6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1289,In service,4/18/2023,Permission to Operate,12/14/2023 AE-18446,"Solar PV, Battery/Storage",16.64,,Category 1,"Delavan, Walworth County, WI",,Circuit 2065,In service,4/17/2023,Permission to Operate,8/16/2023 AE-18442,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,4/17/2023,Permission to Operate,8/2/2023 AE-18332,Solar PV,11.2,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1538,In service,4/17/2023,Permission to Operate,6/29/2023 AE-18415,Solar PV,7.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1966,In service,4/17/2023,Permission to Operate,8/10/2023 AE-18444,Solar PV,9,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,4/17/2023,Permission to Operate,11/2/2023 AE-18301,Solar PV,19.8,,Category 1,"Belleville, Dane County, WI",,Circuit 1881,In service,4/17/2023,Permission to Operate,8/11/2023 AE-18452,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,4/17/2023,Permission to Operate,6/27/2023 AE-18373,Solar PV,5.8,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,4/17/2023,Permission to Operate,8/23/2023 AE-18429,Solar PV,5.5,,Category 1,"Mt. Horeb, Dane County, WI",Substation 280,Circuit 671,In service,4/14/2023,Permission to Operate,7/11/2023 AE-18436,Solar PV,12,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 14,In service,4/14/2023,Permission to Operate,6/15/2023 AE-18432,Solar PV,7.9,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,4/14/2023,Permission to Operate,7/6/2023 AE-18411,Solar PV,4.3,,Category 1,"Platteville, Lafayette County, WI",Substation 248,Circuit 596,In service,4/13/2023,Permission to Operate,9/1/2023 AE-18413,Solar PV,2.9,,Category 1,"Platteville, Lafayette County, WI",Substation 248,Circuit 596,In service,4/13/2023,Permission to Operate,9/1/2023 AE-18395,Solar PV,5.1,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,4/12/2023,Permission to Operate,9/21/2023 AE-18403,Solar PV,8.1,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 267,In service,4/12/2023,Permission to Operate,9/27/2023 AE-18412,Solar PV,7.6,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,In service,4/12/2023,Permission to Operate,8/16/2023 AE-17791,Solar PV,6,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 197,In service,4/12/2023,Permission to Operate,2/7/2024 AE-18333,Solar PV,5.8,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,4/11/2023,Permission to Operate,5/3/2023 AE-18383,Solar PV,3,,Category 1,"Lake Geneva, Walworth County, WI",Substation 393,Circuit 985,In service,4/11/2023,Permission to Operate,4/26/2023 AE-18377,Solar PV,7.9,,Category 1,"Wyoming, Iowa County, WI",Substation 783,Circuit 2137,In service,4/11/2023,Permission to Operate,6/30/2023 AE-17807,Solar PV,7.6,,Category 1,"Mineral Point, Iowa County, WI",Substation 59,Circuit 161,In service,4/10/2023,Permission to Operate,2/7/2024 AE-18355,Solar PV,9.7,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 96,In service,4/7/2023,Permission to Operate,8/2/2023 AE-18350,Solar PV,120.8,,Category 2,"Clinton, Rock County, WI",,Circuit 365,In service,4/7/2023,Permission to Operate,9/13/2023 AE-18293,Solar PV,10,,Category 1,"Hazel Green, Grant County, WI",Substation 67,Circuit 165,In service,4/7/2023,Permission to Operate,8/2/2023 AE-18330,Solar PV,11.4,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1047,In service,4/7/2023,Permission to Operate,8/1/2023 AE-18371,Solar PV,17.5,,Category 1,"Ripon, Fond du Lac County, WI",Substation 610,Circuit 1641,In service,4/7/2023,Permission to Operate,1/19/2024 AE-18133,Solar PV,15.5,,Category 1,"Stoughton, Dane County, WI",,Circuit 1455,In service,4/6/2023,Permission to Operate,7/17/2023 AE-18338,Solar PV,14.3,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 462,In service,4/6/2023,Permission to Operate,8/1/2023 AE-18298,Solar PV,9.9,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1968,In service,4/6/2023,Permission to Operate,10/30/2023 AE-18294,Solar PV,12.8,,Category 1,"Lone Rock, Richland County, WI",Substation 606,Circuit 1636,In service,4/6/2023,Permission to Operate,9/26/2023 AE-17786,Solar PV,6,,Category 1,"Merrimac, Sauk County, WI",Substation 466,Circuit 1156,In service,4/6/2023,Permission to Operate,7/11/2023 AE-18319,Solar PV,15.2,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1229,In service,4/5/2023,Permission to Operate,5/3/2023 AE-18312,Solar PV,21,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,4/5/2023,Permission to Operate,7/22/2023 AE-18309,Solar PV,6.5,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,4/4/2023,Permission to Operate,6/9/2023 AE-18315,Solar PV,11.6,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,4/4/2023,Permission to Operate,8/23/2023 AE-18289,Solar PV,5.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,4/4/2023,Permission to Operate,5/26/2023 AE-18240,Solar PV,11.4,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1921,In service,4/4/2023,Permission to Operate,5/26/2023 AE-18296,Solar PV,13.3,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,4/3/2023,Permission to Operate,8/14/2023 AE-18286,Solar PV,5.9,,Category 1,"Town Of Bristol, Dane County, WI",,Circuit 2001,In service,3/31/2023,Permission to Operate,5/26/2023 AE-18228,Solar PV,7.3,,Category 1,"Lone Rock, Sauk County, WI",,Circuit 1056,In service,3/30/2023,Permission to Operate,6/15/2023 AE-18263,Solar PV,3.9,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2134,In service,3/30/2023,Permission to Operate,7/11/2023 AE-18231,Solar PV,7.9,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,3/29/2023,Permission to Operate,9/5/2023 AE-18256,"Solar PV, Battery/Storage",7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/29/2023,Permission to Operate,8/23/2023 AE-18219,Solar PV,2.9,,Category 1,"Williams Bay, Walworth County, WI",,Circuit 2067,In service,3/28/2023,Permission to Operate,6/9/2023 AE-18244,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,3/28/2023,Permission to Operate,9/14/2023 AE-18243,Solar PV,5.1,,Category 1,"Redgranite, Waushara County, WI",Substation 599,Circuit 1615,In service,3/28/2023,Permission to Operate,8/28/2023 AE-18242,Solar PV,5.1,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,3/28/2023,Permission to Operate,6/9/2023 AE-18241,Solar PV,3.5,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,3/28/2023,Permission to Operate,9/1/2023 AE-18158,Solar PV,15.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/27/2023,Permission to Operate,4/12/2023 AE-18217,Solar PV,7.8,,Category 1,"Cuba City, Grant County, WI",Substation 386,Circuit 2181,In service,3/27/2023,Permission to Operate,6/9/2023 AE-18194,Solar PV,5.8,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,3/27/2023,Permission to Operate,7/27/2023 AE-18185,Solar PV,4.6,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,3/23/2023,Permission to Operate,6/2/2023 AE-18168,Solar PV,199.8,0,Category 2,"Fond du Lac, Fond du Lac County, WI",,Circuit 687,In service,3/22/2023,Permission to Operate,5/1/2024 AE-18116,Solar PV,12,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,3/16/2023,Permission to Operate,6/26/2023 AE-18141,Solar PV,4.2,,Category 1,"Green Lake, Green Lake County, WI",,Circuit 454,In service,3/16/2023,Permission to Operate,6/22/2023 AE-18118,Solar PV,7.6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,3/14/2023,Permission to Operate,4/12/2023 AE-17907,Solar PV,11.4,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,3/14/2023,Permission to Operate,6/7/2023 AE-18115,Solar PV,4.7,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 696,In service,3/13/2023,Permission to Operate,4/26/2023 AE-18049,"Solar PV, Battery/Storage",10.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,3/13/2023,Permission to Operate,10/11/2023 AE-18106,Solar PV,4.5,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 583,In service,3/13/2023,Permission to Operate,5/31/2023 AE-18088,Solar PV,8.5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,3/10/2023,Permission to Operate,5/22/2023 AE-18078,Solar PV,9.9,,Category 1,"Waupun, Dodge County, WI",Substation 538,Circuit 1419,In service,3/9/2023,Permission to Operate,8/9/2023 AE-18062,Solar PV,7.6,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,3/8/2023,Permission to Operate,4/6/2023 AE-18100,Solar PV,10.1,,Category 1,"Glen Haven, Grant County, WI",Substation 80,Circuit 211,In service,3/8/2023,Permission to Operate,7/31/2023 AE-17987,"Solar PV, Battery/Storage",4.8,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,3/8/2023,Permission to Operate,4/12/2023 AE-17161,Solar PV,16.4,,Category 1,"Neopit, Menominee County, WI",,Circuit 1331,In service,3/8/2023,Permission to Operate,6/20/2024 AE-17979,"Solar PV, Battery/Storage",15,,Category 1,"Fontana, Walworth County, WI",Substation 118,Circuit 321,In service,3/7/2023,Permission to Operate,3/24/2023 AE-17945,Solar PV,5.8,,Category 1,"Eden, Fond du Lac County, WI",,Circuit 1399,In service,3/7/2023,Permission to Operate,6/15/2023 AE-18055,Solar PV,4.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,3/7/2023,Permission to Operate,5/26/2023 AE-18048,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,3/7/2023,Permission to Operate,6/29/2023 AE-18050,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,3/7/2023,Permission to Operate,8/28/2023 AE-18040,Solar PV,6,,Category 1,"Ridgeway, Iowa County, WI",Substation 218,Circuit 519,In service,3/7/2023,Permission to Operate,5/26/2023 AE-18039,Solar PV,10,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,3/6/2023,Permission to Operate,7/11/2023 AE-18041,Solar PV,7.6,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1358,In service,3/6/2023,Permission to Operate,5/31/2023 AE-18045,Solar PV,10.9,,Category 1,"Sauk City, Dane County, WI",Substation 461,Circuit 1130,In service,3/6/2023,Permission to Operate,6/13/2023 AE-17931,"Solar PV, Battery/Storage",30.7,,Category 2,"North Freedom, Sauk County, WI",,Circuit 495,In service,3/6/2023,Permission to Operate,6/21/2023 AE-18032,Solar PV,11.4,,Category 1,"Randolph, Dodge County, WI",,Circuit 1594,In service,3/3/2023,Permission to Operate,9/19/2024 AE-18023,Solar PV,20.8,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2127,In service,3/2/2023,Permission to Operate,11/14/2023 AE-18013,Solar PV,9.7,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 861,In service,3/2/2023,Permission to Operate,7/11/2023 AE-18003,Solar PV,6,,Category 1,"Mineral Point, Iowa County, WI",Substation 525,Circuit 1344,In service,3/1/2023,Permission to Operate,8/1/2023 AE-18012,Solar PV,6.3,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 22,In service,3/1/2023,Permission to Operate,8/24/2023 AE-17929,"Solar PV, Battery/Storage",7.6,,Category 1,"Williams Bay, Walworth County, WI",,Circuit 2070,In service,3/1/2023,Permission to Operate,4/7/2023 AE-18006,Solar PV,5.8,,Category 1,"Markesan, Green Lake County, WI",,Circuit 767,In service,3/1/2023,Permission to Operate,6/9/2023 AE-18001,Solar PV,87.1,,Category 2,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,3/1/2023,Permission to Operate,12/13/2023 AE-17995,Solar PV,4.6,,Category 1,"Town Of Bristol, Dane County, WI",,Circuit 2001,In service,2/28/2023,Permission to Operate,4/11/2023 AE-17989,Solar PV,5.4,,Category 1,"Richland Center, Richland County, WI",Substation 606,Circuit 1636,In service,2/28/2023,Permission to Operate,8/8/2023 AE-17955,Solar PV,4.8,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,2/23/2023,Permission to Operate,4/18/2023 AE-17968,Solar PV,15.1,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,2/23/2023,Permission to Operate,11/2/2023 AE-17950,Solar PV,3.7,,Category 1,"Genoa City, Walworth County, WI",,Circuit 1666,In service,2/22/2023,Permission to Operate,10/9/2023 AE-17944,"Solar PV, Battery/Storage",19.8,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,2/22/2023,Permission to Operate,4/26/2023 AE-17923,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,2/21/2023,Permission to Operate,8/16/2023 AE-17926,Solar PV,6,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,2/21/2023,Permission to Operate,6/1/2023 AE-17918,Solar PV,3.7,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 419,In service,2/20/2023,Permission to Operate,6/2/2023 AE-17908,Solar PV,10,,Category 1,"Platteville, Grant County, WI",Substation 343,Circuit 821,In service,2/20/2023,Permission to Operate,5/26/2023 AE-17917,Solar PV,699.3,,Category 3,"Janesville, Rock County, WI",,Circuit 1872,In service,2/20/2023,Permission to Operate,1/25/2024 AE-17687,Solar PV,34.2,,Category 2,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 623,In service,2/20/2023,Permission to Operate,9/1/2023 AE-17903,Solar PV,6,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,2/17/2023,Permission to Operate,5/23/2023 AE-17919,Solar PV,9.2,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,2/17/2023,Permission to Operate,7/17/2023 AE-17808,Solar PV,33.3,,Category 2,"Lake Geneva, Walworth County, WI",,Circuit 1356,In service,2/17/2023,Permission to Operate,9/10/2024 AE-17882,Solar PV,1.8,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,2/17/2023,Permission to Operate,8/2/2023 AE-17906,Solar PV,4.7,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,2/17/2023,Permission to Operate,8/7/2023 AE-17905,Solar PV,7,,Category 1,"Avoca, Iowa County, WI",Substation 783,Circuit 2137,In service,2/17/2023,Permission to Operate,3/29/2023 AE-17881,Solar PV,3.6,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,2/17/2023,Permission to Operate,8/2/2023 AE-17842,Solar PV,20.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,2/17/2023,Permission to Operate,9/13/2023 AE-17878,Solar PV,10,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,2/16/2023,Permission to Operate,1/23/2024 AE-17892,Solar PV,5.2,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,2/16/2023,Permission to Operate,4/10/2023 AE-17686,Solar PV,22.8,,Category 2,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 623,In service,2/16/2023,Permission to Operate,9/1/2023 AE-17884,Solar PV,3.7,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1285,In service,2/16/2023,Permission to Operate,12/7/2023 AE-17879,Solar PV,10.5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,2/16/2023,Permission to Operate,7/11/2023 AE-17883,Solar PV,7.3,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,2/16/2023,Permission to Operate,7/27/2023 AE-17867,Solar PV,12.7,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2126,In service,2/15/2023,Permission to Operate,4/25/2023 AE-17872,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",,Circuit 1873,In service,2/15/2023,Permission to Operate,6/15/2023 AE-17871,Solar PV,3.7,,Category 1,"Beloit, Rock County, WI",Substation 255,Circuit 621,In service,2/15/2023,Permission to Operate,9/27/2023 AE-17868,Solar PV,5.9,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1654,In service,2/15/2023,Permission to Operate,5/31/2023 AE-17861,Solar PV,10,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,2/14/2023,Permission to Operate,8/16/2023 AE-17859,Solar PV,13,,Category 1,"Benton, Lafayette County, WI",Substation 67,Circuit 165,In service,2/14/2023,Permission to Operate,8/22/2023 AE-17862,Solar PV,7.2,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 584,Circuit 1533,In service,2/14/2023,Permission to Operate,5/4/2023 AE-17829,Solar PV,7.1,,Category 1,"Soldiers Grove, Crawford County, WI",Substation 288,Circuit 696,In service,2/14/2023,Permission to Operate,8/10/2023 AE-17851,Solar PV,9.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 622,In service,2/14/2023,Permission to Operate,5/26/2023 AE-17792,Solar PV,7.6,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,2/13/2023,Permission to Operate,10/2/2023 AE-17848,Solar PV,8.5,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1935,In service,2/13/2023,Permission to Operate,5/2/2023 AE-17524,"Solar PV, Battery/Storage",7.6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,2/13/2023,Permission to Operate,8/14/2023 AE-17819,Solar PV,5.1,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1653,In service,2/8/2023,Permission to Operate,8/1/2023 AE-17823,Solar PV,7.6,,Category 1,"Stoughton, Dane County, WI",Substation 676,Circuit 1871,In service,2/8/2023,Permission to Operate,6/26/2023 AE-17822,Solar PV,5.4,,Category 1,"Adams, Adams County, WI",Substation 354,Circuit 847,In service,2/8/2023,Permission to Operate,7/21/2023 AE-17814,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 389,In service,2/8/2023,Permission to Operate,7/10/2023 AE-17810,Solar PV,14.7,,Category 1,"Ripon, Green Lake County, WI",Substation 537,Circuit 1403,In service,2/7/2023,Permission to Operate,6/27/2023 AE-17765,Solar PV,10,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,2/7/2023,Permission to Operate,5/2/2023 AE-17809,Solar PV,20,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1356,In service,2/7/2023,Permission to Operate,6/1/2026 AE-17797,Solar PV,8.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,2/6/2023,Permission to Operate,5/19/2023 AE-17813,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,2/6/2023,Permission to Operate,4/18/2023 AE-17779,Solar PV,7.8,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2138,In service,2/6/2023,Permission to Operate,6/27/2023 AE-17751,Solar PV,7.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/3/2023,Permission to Operate,5/4/2023 AE-17408,Solar PV,33.1,,Category 2,"Cambridge, Dane County, WI",Substation 115,Circuit 317,In service,2/3/2023,Permission to Operate,5/24/2023 AE-17783,Solar PV,6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1285,In service,2/3/2023,Permission to Operate,6/12/2023 AE-17780,Solar PV,11.1,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2139,In service,2/2/2023,Permission to Operate,6/2/2023 AE-17880,Solar PV,13.9,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 61,In service,2/2/2023,Permission to Operate,4/26/2023 AE-17781,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1455,In service,2/2/2023,Permission to Operate,5/4/2023 AE-17697,Solar PV,8.4,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1734,In service,2/2/2023,Permission to Operate,6/22/2023 AE-17782,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,2/2/2023,Permission to Operate,3/30/2023 AE-17762,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,2/1/2023,Permission to Operate,4/18/2023 AE-17659,Solar PV,3.7,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1118,In service,2/1/2023,Permission to Operate,6/27/2023 AE-17770,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,2/1/2023,Permission to Operate,6/21/2023 AE-17763,Solar PV,11.4,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1518,In service,2/1/2023,Permission to Operate,6/2/2023 AE-17747,Solar PV,7.3,,Category 1,"Belmont, Lafayette County, WI",Substation 59,Circuit 162,In service,1/31/2023,Permission to Operate,6/13/2023 AE-17729,Solar PV,12.7,,Category 1,"Orfordville, Rock County, WI",Substation 551,Circuit 1461,In service,1/30/2023,Permission to Operate,5/16/2023 AE-17598,Solar PV,7,,Category 1,"Hollandale, Iowa County, WI",Substation 525,Circuit 1343,In service,1/25/2023,Permission to Operate,10/9/2023 AE-17704,Solar PV,5.4,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1433,In service,1/25/2023,Permission to Operate,6/21/2023 AE-17668,Solar PV,15.7,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,1/23/2023,Permission to Operate,6/1/2023 AE-16364,Solar PV,3.7,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,1/20/2023,Permission to Operate,5/26/2023 AE-17583,Solar PV,11.9,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1685,In service,1/20/2023,Permission to Operate,7/17/2023 AE-17666,Solar PV,7.6,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2150,In service,1/20/2023,Permission to Operate,6/15/2023 AE-17647,"Solar PV, Battery/Storage",16.44,,Category 1,"Clintonville, Waupaca County, WI",Substation 494,Circuit 1236,In service,1/19/2023,Permission to Operate,3/1/2023 AE-17644,Solar PV,5.1,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,1/19/2023,Permission to Operate,6/11/2024 AE-17637,Solar PV,3.7,,Category 1,"Tomah, Monroe County, WI",,Circuit 388,In service,1/19/2023,Permission to Operate,11/16/2023 AE-17662,Solar PV,4.7,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,1/19/2023,Permission to Operate,7/14/2023 AE-17638,Solar PV,5.1,,Category 1,"Delavan, Walworth County, WI",Substation 207,Circuit 483,In service,1/19/2023,Permission to Operate,9/21/2023 AE-17646,Solar PV,9.5,,Category 1,"Burlington, Kenosha County, WI",Substation 660,Circuit 1809,In service,1/19/2023,Permission to Operate,7/27/2023 AE-17602,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,1/17/2023,Permission to Operate,4/5/2023 AE-17610,Solar PV,7.9,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,1/17/2023,Permission to Operate,3/29/2023 AE-17617,Solar PV,6,,Category 1,"Delavan, Walworth County, WI",Substation 52,Circuit 146,In service,1/17/2023,Permission to Operate,8/23/2023 AE-17393,Solar PV,4.3,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1435,In service,1/16/2023,Permission to Operate,2/28/2023 AE-17551,Solar PV,3.9,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1518,In service,1/16/2023,Permission to Operate,4/24/2023 AE-17597,Solar PV,19,,Category 1,"Columbus, Dane County, WI",,Circuit 2000,In service,1/16/2023,Permission to Operate,5/26/2023 AE-17581,Solar PV,20,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,1/16/2023,Permission to Operate,8/2/2023 AE-17417,Solar PV,16.6,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,1/16/2023,Permission to Operate,5/3/2023 AE-17599,Solar PV,5.4,,Category 1,"Plainfield, Waushara County, WI",Substation 575,Circuit 1512,In service,1/13/2023,Permission to Operate,8/8/2023 AE-17595,Solar PV,6.6,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,1/13/2023,Permission to Operate,4/20/2023 AE-17585,Solar PV,3.9,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,1/12/2023,Permission to Operate,4/5/2023 AE-17589,Solar PV,5.3,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 317,In service,1/12/2023,Permission to Operate,4/18/2023 AE-17590,"Solar PV, Battery/Storage",12.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,1/12/2023,Permission to Operate,6/20/2023 AE-17108,Solar PV,9.6,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,1/12/2023,Permission to Operate,4/12/2023 AE-17564,Solar PV,9.3,,Category 1,"Fox Lake, Dodge County, WI",Substation 278,Circuit 662,In service,1/11/2023,Permission to Operate,7/11/2023 AE-17567,Solar PV,7.2,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,1/9/2023,Permission to Operate,6/21/2023 AE-17557,Solar PV,7.6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,1/6/2023,Permission to Operate,5/13/2023 AE-17215,Solar PV,8.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,1/5/2023,Permission to Operate,4/24/2023 AE-17414,Solar PV,15.6,,Category 1,"Juneau, Dodge County, WI",Substation 351,Circuit 836,In service,1/5/2023,Permission to Operate,3/20/2023 AE-17336,Solar PV,29,,Category 2,"Monroe, Green County, WI",Substation 661,Circuit 1814,In service,1/4/2023,Permission to Operate,9/5/2023 AE-17042,Solar PV,11.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 525,Circuit 1342,In service,12/30/2022,Permission to Operate,7/27/2023 AE-17478,Solar PV,11.4,,Category 1,"Pardeeville, Dane County, WI",Substation 448,Circuit 1115,In service,12/29/2022,Permission to Operate,7/6/2023 AE-17485,Solar PV,6.1,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,12/29/2022,Permission to Operate,2/24/2023 AE-17293,Solar PV,14.7,,Category 1,"Green Lake, Green Lake County, WI",,Circuit 453,In service,12/28/2022,Permission to Operate,5/19/2023 AE-17437,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,12/23/2022,Permission to Operate,5/26/2023 AE-17227,Solar PV,7.5,,Category 1,"Blue Mound, Dane County, WI",Substation 483,Circuit 1211,In service,12/23/2022,Permission to Operate,7/17/2023 AE-17491,Solar PV,20,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 888,In service,12/23/2022,Permission to Operate,6/7/2023 AE-17481,Solar PV,4.1,,Category 1,"Friendship, Adams County, WI",Substation 283,Circuit 676,In service,12/23/2022,Permission to Operate,5/2/2023 AE-17458,Solar PV,20,,Category 1,"North Freedom, Sauk County, WI",,Circuit 495,In service,12/23/2022,Permission to Operate,3/9/2023 AE-17475,Solar PV,5,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 202,In service,12/23/2022,Permission to Operate,2/1/2024 AE-17450,Solar PV,4.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 106,Circuit 292,In service,12/23/2022,Permission to Operate,6/15/2023 AE-17538,Solar PV,8,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,12/23/2022,Permission to Operate,4/5/2023 AE-17465,Solar PV,10.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,12/23/2022,Permission to Operate,3/17/2023 AE-17447,"Solar PV, Battery/Storage",12,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 614,In service,12/23/2022,Permission to Operate,6/12/2023 AE-17541,Solar PV,6,,Category 1,"Portage, Columbia County, WI",,Circuit 1551,In service,12/23/2022,Permission to Operate,9/11/2023 AE-17130,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,12/23/2022,Permission to Operate,8/2/2023 AE-17514,Solar PV,7.2,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,12/23/2022,Permission to Operate,4/3/2023 AE-17427,Solar PV,6,,Category 1,"Randolph, Columbia County, WI",,Circuit 1593,In service,12/23/2022,Permission to Operate,6/15/2023 AE-17457,Solar PV,11.4,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,12/23/2022,Permission to Operate,5/11/2023 AE-17410,Solar PV,7,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1746,In service,12/22/2022,Permission to Operate,6/15/2023 AE-17404,Solar PV,3.9,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,12/22/2022,Permission to Operate,4/14/2023 AE-17418,Solar PV,20,,Category 1,"Omro, Winnebago County, WI",Substation 550,Circuit 1451,In service,12/22/2022,Permission to Operate,7/22/2023 AE-17321,Solar PV,5.9,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1518,In service,12/20/2022,Permission to Operate,4/5/2023 AE-17387,Solar PV,11.4,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 623,In service,12/20/2022,Permission to Operate,9/8/2023 AE-17371,Solar PV,7,,Category 1,"Mauston, Juneau County, WI",Substation 344,Circuit 824,In service,12/20/2022,Permission to Operate,1/3/2023 AE-17307,Solar PV,4.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1518,In service,12/20/2022,Permission to Operate,3/23/2023 AE-17355,Solar PV,3.9,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,12/20/2022,Permission to Operate,3/8/2023 AE-17313,Solar PV,7.9,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,12/20/2022,Permission to Operate,3/8/2023 AE-17288,Solar PV,10.8,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1171,In service,12/20/2022,Permission to Operate,10/26/2023 AE-17356,Solar PV,6.4,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,12/20/2022,Permission to Operate,3/17/2023 AE-17388,Solar PV,11.4,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 623,In service,12/20/2022,Permission to Operate,9/8/2023 AE-17379,Solar PV,3.7,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1585,In service,12/20/2022,Permission to Operate,2/20/2023 AE-17366,Solar PV,6,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,12/19/2022,Permission to Operate,4/18/2023 AE-17368,Solar PV,8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,12/19/2022,Permission to Operate,7/27/2023 AE-17198,Solar PV,6,,Category 1,"Stoughton, Dane County, WI",Substation 108,Circuit 302,In service,12/16/2022,Permission to Operate,6/1/2023 AE-17266,Solar PV,31.1,,Category 2,"Monroe, Green County, WI",Substation 661,Circuit 1814,In service,12/15/2022,Permission to Operate,6/20/2023 AE-17319,Solar PV,6.4,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,12/14/2022,Permission to Operate,5/26/2023 AE-17276,Solar PV,5.7,,Category 1,"Blanchardville, Green County, WI",Substation 280,Circuit 672,In service,12/14/2022,Permission to Operate,5/24/2023 AE-17041,Solar PV,4.8,,Category 1,"Mazomanie, Dane County, WI",,Circuit 496,In service,12/14/2022,Permission to Operate,7/22/2023 AE-17281,Solar PV,19,,Category 1,"Avoca, Iowa County, WI",Substation 45,Circuit 128,In service,12/14/2022,Permission to Operate,2/2/2023 AE-17283,Solar PV,5.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,12/14/2022,Permission to Operate,5/22/2023 AE-16849,Solar PV,4.8,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,12/13/2022,Permission to Operate,4/12/2023 AE-17282,"Solar PV, Battery/Storage",19.8,,Category 1,"Waupun, Fond du Lac County, WI",,Circuit 1280,In service,12/13/2022,Permission to Operate,6/26/2023 AE-16982,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,12/13/2022,Permission to Operate,2/27/2023 AE-17167,Solar PV,7.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1267,In service,12/13/2022,Permission to Operate,7/6/2023 AE-17265,Solar PV,1375,,Category 4,"Waunakee, Dane County, WI",,,Approved,12/12/2022,Installation & Construction, AE-17148,Solar PV,5.7,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/8/2022,Permission to Operate,3/16/2023 AE-17271,Solar PV,7.6,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,12/8/2022,Permission to Operate,5/2/2023 AE-17219,Solar PV,5,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 672,In service,12/8/2022,Permission to Operate,5/2/2023 AE-17244,Solar PV,9.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,12/8/2022,Permission to Operate,3/15/2023 AE-17124,Solar PV,14,,Category 1,"Cross Plains, Dane County, WI",Substation 686,Circuit 1895,In service,12/8/2022,Permission to Operate,1/9/2023 AE-17246,Solar PV,8.9,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,12/8/2022,Permission to Operate,3/8/2023 AE-17032,"Solar PV, Battery/Storage",7.6,,Category 1,"Elkhart Lake, Sheboygan County, WI",Substation 346,Circuit 832,In service,12/8/2022,Permission to Operate,6/12/2023 AE-17220,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,12/8/2022,Permission to Operate,4/26/2023 AE-16944,Solar PV,3.7,,Category 1,"Belleville, Dane County, WI",,Circuit 1881,In service,12/8/2022,Permission to Operate,4/18/2023 AE-17256,Solar PV,5.7,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1433,In service,12/8/2022,Permission to Operate,3/21/2023 AE-17195,Solar PV,15.5,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,12/8/2022,Permission to Operate,12/29/2022 AE-16540,Solar PV,5.1,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,12/8/2022,Permission to Operate,3/1/2023 AE-16964,"Solar PV, Battery/Storage",17,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1209,In service,12/8/2022,Permission to Operate,9/21/2023 AE-17243,Solar PV,4.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,12/8/2022,Permission to Operate,3/21/2023 AE-17252,Solar PV,7.2,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,12/8/2022,Permission to Operate,6/26/2023 AE-17245,Solar PV,4.9,,Category 1,"Verona, Dane County, WI",,,In service,12/8/2022,Permission to Operate,3/17/2023 AE-17207,Solar PV,6.3,,Category 1,"Arlington, Columbia County, WI",Substation 13,Circuit 53,In service,12/7/2022,Permission to Operate,4/18/2023 AE-17186,Solar PV,7.2,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 861,In service,12/7/2022,Permission to Operate,2/24/2023 AE-17210,Solar PV,3.9,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,12/7/2022,Permission to Operate,3/15/2023 AE-17201,Solar PV,5.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,12/7/2022,Permission to Operate,6/15/2023 AE-17189,Solar PV,7.5,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,12/7/2022,Permission to Operate,1/30/2023 AE-17098,Solar PV,7.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 686,In service,12/7/2022,Permission to Operate,5/11/2023 AE-17203,Solar PV,7.6,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1434,In service,12/7/2022,Permission to Operate,7/26/2023 AE-17190,Solar PV,3.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,12/7/2022,Permission to Operate,3/29/2023 AE-16822,Solar PV,8.4,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/6/2022,Permission to Operate,2/21/2023 AE-17200,Solar PV,2250,,Category 4,"Janesville, Rock County, WI",Substation 378,Circuit 2177,In service,12/6/2022,Permission to Operate,4/29/2025 AE-17143,Solar PV,2.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,12/2/2022,Permission to Operate,4/10/2023 AE-17147,"Solar PV, Battery/Storage",16.78,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 581,In service,12/2/2022,Permission to Operate,2/21/2023 AE-17053,Solar PV,13.5,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 62,In service,12/1/2022,Permission to Operate,4/10/2023 AE-17170,Solar PV,11.1,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2243,In service,12/1/2022,Permission to Operate,1/16/2023 AE-16979,Solar PV,10.8,,Category 1,"Princeton, Green Lake County, WI",,Circuit 453,In service,12/1/2022,Permission to Operate,9/21/2023 AE-17052,Solar PV,5.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,12/1/2022,Permission to Operate,3/27/2023 AE-17169,Solar PV,10.5,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,12/1/2022,Permission to Operate,6/9/2023 AE-17051,Solar PV,6.3,,Category 1,"Richland Center, Richland County, WI",Substation 572,Circuit 1505,In service,12/1/2022,Permission to Operate,3/17/2023 AE-17184,Solar PV,7.2,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,12/1/2022,Permission to Operate,3/15/2023 AE-16991,Solar PV,7.9,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,12/1/2022,Permission to Operate,2/8/2023 AE-17166,Solar PV,4.2,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,In service,12/1/2022,Permission to Operate,1/18/2023 AE-17165,Solar PV,4.1,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2197,In service,12/1/2022,Permission to Operate,4/14/2023 AE-17090,Solar PV,7.8,,Category 1,"Wonewoc, Juneau County, WI",,Circuit 1958,In service,12/1/2022,Permission to Operate,12/28/2022 AE-16861,Solar PV,3.9,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,12/1/2022,Permission to Operate,4/14/2023 AE-17001,Solar PV,9.7,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 862,In service,11/30/2022,Permission to Operate,4/6/2023 AE-17092,Solar PV,4.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 538,Circuit 1418,In service,11/30/2022,Permission to Operate,5/19/2023 AE-17106,Solar PV,6.6,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 861,In service,11/30/2022,Permission to Operate,3/2/2023 AE-17123,Solar PV,7.8,,Category 1,"Delavan, Walworth County, WI",,Circuit 2065,In service,11/30/2022,Permission to Operate,1/12/2023 AE-17135,Solar PV,7.6,,Category 1,"Berlin, Waushara County, WI",Substation 550,Circuit 1450,In service,11/30/2022,Permission to Operate,3/8/2023 AE-17158,Solar PV,5.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,11/30/2022,Permission to Operate,4/3/2023 AE-17089,Solar PV,7.6,,Category 1,"Barneveld, Iowa County, WI",Substation 37,Circuit 96,In service,11/30/2022,Permission to Operate,5/3/2023 AE-17093,Solar PV,4.8,,Category 1,"Rio, Columbia County, WI",Substation 335,Circuit 790,In service,11/30/2022,Permission to Operate,2/16/2023 AE-17091,Solar PV,7.8,,Category 1,"Sun Prairie, Dane County, WI",Substation 698,Circuit 1920,In service,11/30/2022,Permission to Operate,12/29/2022 AE-17097,Solar PV,8.7,,Category 1,"Campbellsport, Fond du Lac County, WI",,Circuit 1400,In service,11/30/2022,Permission to Operate,5/19/2023 AE-17104,Solar PV,7.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,11/28/2022,Permission to Operate,6/26/2023 AE-17110,Solar PV,4.9,,Category 1,"Dickeyville, Grant County, WI",Substation 386,Circuit 2179,In service,11/28/2022,Permission to Operate,4/24/2023 AE-17056,Solar PV,8.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,11/23/2022,Permission to Operate,3/15/2023 AE-17088,Solar PV,7.6,,Category 1,"Hillpoint, Sauk County, WI",Substation 421,Circuit 1051,In service,11/23/2022,Permission to Operate,6/13/2023 AE-17061,Solar PV,4.3,,Category 1,"Redgranite, Waushara County, WI",Substation 599,Circuit 1614,In service,11/22/2022,Permission to Operate,3/22/2023 AE-17057,Solar PV,3.3,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,11/22/2022,Permission to Operate,12/21/2022 AE-17029,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1925,In service,11/22/2022,Permission to Operate,10/26/2023 AE-17054,Solar PV,5.3,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 905,In service,11/22/2022,Permission to Operate,5/22/2023 AE-16987,Solar PV,7,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 411,Circuit 1024,In service,11/22/2022,Permission to Operate,3/2/2023 AE-16983,Solar PV,4.9,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,11/21/2022,Permission to Operate,12/19/2022 AE-17047,Solar PV,8.5,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,11/21/2022,Permission to Operate,2/1/2023 AE-17050,Solar PV,6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,11/21/2022,Permission to Operate,12/30/2022 AE-17005,Solar PV,6,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2149,In service,11/18/2022,Permission to Operate,9/8/2023 AE-16935,"Solar PV, Battery/Storage",4.8,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 82,In service,11/18/2022,Permission to Operate,1/19/2023 AE-16975,Solar PV,11.8,,Category 1,"Edgerton, Dane County, WI",,Circuit 570,In service,11/18/2022,Permission to Operate,2/20/2023 AE-16959,Solar PV,7.5,,Category 1,"Spring Green, Sauk County, WI",Substation 710,Circuit 1947,In service,11/18/2022,Permission to Operate,9/1/2023 AE-16995,Solar PV,7.9,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,11/18/2022,Permission to Operate,3/23/2023 AE-17003,Solar PV,11.4,,Category 1,"Walworth, Walworth County, WI",Substation 118,Circuit 320,In service,11/17/2022,Permission to Operate,6/1/2023 AE-16965,Solar PV,3.2,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,11/16/2022,Permission to Operate,5/3/2023 AE-16879,Solar PV,6.5,,Category 1,"Oakfield, Fond du Lac County, WI",Substation 538,Circuit 1419,In service,11/16/2022,Permission to Operate,3/3/2023 AE-16925,Solar PV,5.1,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,11/14/2022,Permission to Operate,4/10/2023 AE-16954,Solar PV,6,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1354,In service,11/14/2022,Permission to Operate,2/23/2024 AE-16836,Solar PV,6.7,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1118,In service,11/14/2022,Permission to Operate,2/28/2023 AE-16955,Solar PV,5.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,11/14/2022,Permission to Operate,2/10/2023 AE-16952,Solar PV,20,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,11/14/2022,Permission to Operate,9/29/2023 AE-16951,Solar PV,20,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,11/14/2022,Permission to Operate,9/27/2023 AE-16369,Solar PV,6,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,11/12/2022,Permission to Operate,1/25/2023 AE-16915,Solar PV,2,,Category 1,"Wilton, Monroe County, WI",Substation 217,Circuit 514,In service,11/11/2022,Permission to Operate,2/28/2023 AE-16325,Solar PV,5.1,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1734,In service,11/11/2022,Permission to Operate,2/13/2023 AE-16873,Solar PV,10,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 580,In service,11/11/2022,Permission to Operate,1/23/2023 AE-16829,Solar PV,15.2,,Category 1,"Pickett, Winnebago County, WI",Substation 627,Circuit 1692,In service,11/11/2022,Permission to Operate,10/17/2023 AE-16902,Solar PV,7.6,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,11/10/2022,Permission to Operate,3/17/2023 AE-16910,Solar PV,9.1,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,11/10/2022,Permission to Operate,3/1/2023 AE-16914,Solar PV,12.2,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,11/10/2022,Permission to Operate,2/3/2023 AE-16900,Solar PV,8.7,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 420,In service,11/10/2022,Permission to Operate,5/11/2023 AE-16891,"Solar PV, Battery/Storage",9,,Category 1,"Wisconsin Dells, Adams County, WI",Substation 387,Circuit 957,In service,11/10/2022,Permission to Operate,12/29/2022 AE-16848,Solar PV,3.4,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1653,In service,11/10/2022,Permission to Operate,3/1/2023 AE-16924,Solar PV,8.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,11/10/2022,Permission to Operate,3/8/2023 AE-16928,"Solar PV, Battery/Storage",9,,Category 1,"Wisconsin Dells, Adams County, WI",Substation 387,Circuit 957,In service,11/10/2022,Permission to Operate,12/30/2022 AE-16916,Solar PV,7.8,,Category 1,"Wilton, Monroe County, WI",Substation 217,Circuit 514,In service,11/10/2022,Permission to Operate,1/18/2023 AE-16903,Solar PV,10,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,11/9/2022,Permission to Operate,1/11/2023 AE-16909,Solar PV,7.9,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,11/9/2022,Permission to Operate,12/6/2022 AE-16868,Solar PV,8.9,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,11/9/2022,Permission to Operate,6/29/2023 AE-16816,Solar PV,5.1,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1359,In service,11/8/2022,Permission to Operate,3/22/2023 AE-15766,"Solar PV, Battery/Storage",15.2,,Category 1,"Sun Prarie, Dane County, WI",,Circuit 1999,In service,11/8/2022,Permission to Operate,2/28/2024 AE-16875,Solar PV,3.8,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,11/7/2022,Permission to Operate,12/13/2022 AE-16825,Solar PV,11.1,,Category 1,"Winneconne, Winnebago County, WI",Substation 766,Circuit 2078,In service,11/4/2022,Permission to Operate,1/10/2023 AE-16847,Solar PV,6,,Category 1,"Loan Rock, Richland County, WI",,Circuit 1055,In service,11/4/2022,Permission to Operate,4/10/2023 AE-16826,Solar PV,8.2,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 202,In service,11/4/2022,Permission to Operate,11/29/2022 AE-16838,"Solar PV, Battery/Storage",8.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1525,In service,11/4/2022,Permission to Operate,1/13/2023 AE-16840,Solar PV,4.1,,Category 1,"Blanchardville, Lafayette County, WI",Substation 280,Circuit 672,In service,11/3/2022,Permission to Operate,2/1/2023 AE-16230,Solar PV,11.5,,Category 1,"Plymouth, Sheboygan County, WI",Substation 346,Circuit 831,In service,11/3/2022,Permission to Operate,2/22/2024 AE-16832,Solar PV,5,,Category 1,"Delevan, Walworth County, WI",,Circuit 2065,In service,11/3/2022,Permission to Operate,6/16/2023 AE-16667,Solar PV,8.8,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,11/3/2022,Permission to Operate,3/22/2023 AE-16788,Solar PV,7.6,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,11/2/2022,Permission to Operate,1/19/2023 AE-16539,Solar PV,22.8,,Category 2,"Monroe, Green County, WI",Substation 481,Circuit 1190,In service,11/2/2022,Permission to Operate,6/7/2023 AE-16811,Solar PV,6.1,,Category 1,"La Valle, Sauk County, WI",,Circuit 110,In service,11/2/2022,Permission to Operate,12/12/2022 AE-16781,Solar PV,7.6,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,11/1/2022,Permission to Operate,1/19/2023 AE-16780,Solar PV,5.2,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,10/31/2022,Permission to Operate,2/8/2023 AE-16770,Solar PV,7.6,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1733,In service,10/31/2022,Permission to Operate,12/28/2022 AE-16771,"Solar PV, Battery/Storage",9,,Category 1,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1685,In service,10/31/2022,Permission to Operate,12/29/2022 AE-16758,Solar PV,12.6,,Category 1,"Arpin, Wood County, WI",Substation 43,Circuit 118,In service,10/31/2022,Permission to Operate,2/10/2023 AE-16469,Solar PV,5,,Category 1,"Neshkoro, Waushara County, WI",Substation 599,Circuit 1614,In service,10/31/2022,Permission to Operate,3/6/2023 AE-16714,Solar PV,3.9,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 147,In service,10/28/2022,Permission to Operate,1/30/2023 AE-16702,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/27/2022,Permission to Operate,3/27/2023 AE-16663,Solar PV,10,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,10/27/2022,Permission to Operate,10/16/2023 AE-16487,"Solar PV, Battery/Storage",20.2,,Category 2,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,10/27/2022,Permission to Operate,12/16/2022 AE-16716,"Solar PV, Battery/Storage",15.2,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 364,Circuit 895,In service,10/27/2022,Permission to Operate,12/21/2022 AE-16700,Solar PV,5.1,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,10/27/2022,Permission to Operate,3/15/2023 AE-16106,Solar PV,22.8,,Category 2,"Randolph, Dodge County, WI",,Circuit 1591,In service,10/26/2022,Permission to Operate,12/19/2022 AE-16889,Battery/Storage,5000,,Category 4,"Portage, Columbia County, WI",,Circuit 1551,In service,10/25/2022,Permission to Operate,9/30/2022 AE-15803,Solar PV,8,,Category 1,"Cross Plains, Dane County, WI",Substation 686,Circuit 1894,In service,10/24/2022,Permission to Operate,12/2/2022 AE-16623,Solar PV,7,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 535,Circuit 1377,In service,10/24/2022,Permission to Operate,7/27/2023 AE-16582,Solar PV,5.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,10/24/2022,Permission to Operate,2/9/2023 AE-16611,Solar PV,3.7,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1735,In service,10/24/2022,Permission to Operate,1/9/2023 AE-16651,"Solar PV, Battery/Storage",320,,Category 3,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 2154,In service,10/24/2022,Permission to Operate,1/17/2023 AE-16078,Solar PV,7.9,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,10/24/2022,Permission to Operate,6/9/2023 AE-16116,Solar PV,5,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1735,In service,10/21/2022,Permission to Operate,2/1/2023 AE-16584,Solar PV,10,,Category 1,"Cuba City, Grant County, WI",Substation 248,Circuit 595,In service,10/21/2022,Permission to Operate,2/20/2023 AE-16612,"Solar PV, Battery/Storage",7.8,,Category 1,"Antigo, Langlade County, WI",Substation 578,Circuit 1517,In service,10/20/2022,Permission to Operate,1/18/2023 AE-16564,Solar PV,10,,Category 1,"Auburndale, Wood County, WI",Substation 626,Circuit 1690,In service,10/20/2022,Permission to Operate,1/11/2023 AE-16608,Solar PV,11.4,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 889,In service,10/20/2022,Permission to Operate,2/28/2023 AE-16614,Solar PV,18.2,,Category 1,"Rudolph, Wood County, WI",Substation 630,Circuit 1714,In service,10/20/2022,Permission to Operate,11/21/2022 AE-15553,"Solar PV, Battery/Storage",11.4,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,10/20/2022,Permission to Operate,3/8/2023 AE-16607,Solar PV,3.5,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,10/20/2022,Permission to Operate,5/3/2023 AE-16613,Solar PV,5.4,,Category 1,"Cottage Grove,, Dane County, WI",,Circuit 2174,In service,10/20/2022,Permission to Operate,4/5/2023 AE-16618,Solar PV,5.1,,Category 1,"3410 Mccann Dr, Rock County, WI",Substation 775,Circuit 2104,In service,10/20/2022,Permission to Operate,2/28/2023 AE-16617,Solar PV,7.6,,Category 1,"Fontana, Walworth County, WI",Substation 118,Circuit 321,In service,10/20/2022,Permission to Operate,12/13/2022 AE-16596,Solar PV,6.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/20/2022,Permission to Operate,2/28/2023 AE-16565,Solar PV,6.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2197,In service,10/18/2022,Permission to Operate,2/20/2023 AE-16547,Solar PV,7.6,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1043,In service,10/18/2022,Permission to Operate,1/9/2023 AE-16525,Solar PV,5.8,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1215,In service,10/17/2022,Permission to Operate,6/29/2023 AE-16544,"Solar PV, Battery/Storage",10.1,,Category 1,"Antigo, Langlade County, WI",Substation 578,Circuit 1517,In service,10/17/2022,Permission to Operate,11/15/2022 AE-16503,Solar PV,6,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1119,In service,10/15/2022,Permission to Operate,12/29/2022 AE-16521,"Solar PV, Battery/Storage",8.16,,Category 1,"New Glarus, Green County, WI",,Circuit 1328,In service,10/15/2022,Permission to Operate,4/25/2023 AE-16515,Solar PV,5.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,10/15/2022,Permission to Operate,7/11/2023 AE-16542,Solar PV,5.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,10/15/2022,Permission to Operate,2/1/2023 AE-16507,Solar PV,3.8,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,10/14/2022,Permission to Operate,11/17/2022 AE-16496,"Solar PV, Battery/Storage",12.44,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2103,In service,10/12/2022,Permission to Operate,1/19/2023 AE-16494,Solar PV,5.2,,Category 1,"North Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2197,In service,10/12/2022,Permission to Operate,2/20/2023 AE-16492,Solar PV,7.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,10/12/2022,Permission to Operate,6/12/2023 AE-16490,Solar PV,10,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1230,In service,10/12/2022,Permission to Operate,6/29/2023 AE-16491,Solar PV,11.9,,Category 1,"Stoughton, Dane County, WI",,Circuit 1140,In service,10/12/2022,Permission to Operate,1/6/2023 AE-15884,Solar PV,8.6,,Category 1,"Sun Prarie, Dane County, WI",,Circuit 1999,In service,10/11/2022,Permission to Operate,3/30/2023 AE-16485,Solar PV,9.8,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,10/11/2022,Permission to Operate,12/14/2022 AE-16368,Solar PV,4.1,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,10/11/2022,Permission to Operate,6/21/2023 AE-16473,Solar PV,3.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,10/11/2022,Permission to Operate,2/20/2023 AE-16488,Solar PV,5,,Category 1,"Delavan, Walworth County, WI",Substation 52,Circuit 146,In service,10/11/2022,Permission to Operate,11/10/2022 AE-16191,Solar PV,16.4,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 18,In service,10/11/2022,Permission to Operate,2/7/2023 AE-16415,Solar PV,7.6,,Category 1,"Bryant, Langlade County, WI",Substation 578,Circuit 1517,In service,10/11/2022,Permission to Operate,12/30/2022 AE-16486,Solar PV,5.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1697,In service,10/11/2022,Permission to Operate,3/15/2023 AE-16434,Solar PV,5.1,,Category 1,"De Forest, Dane County, WI",Substation 698,Circuit 1923,In service,10/10/2022,Permission to Operate,1/9/2023 AE-16460,Solar PV,9.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1269,In service,10/7/2022,Permission to Operate,3/2/2023 AE-16444,Solar PV,4.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1696,In service,10/7/2022,Permission to Operate,2/7/2023 AE-16446,Solar PV,5.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1697,In service,10/7/2022,Permission to Operate,2/7/2023 AE-16438,Solar PV,5,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1813,In service,10/6/2022,Permission to Operate,1/31/2023 AE-16433,Solar PV,6,,Category 1,"Sauk City, Sauk County, WI",Substation 710,Circuit 1947,In service,10/6/2022,Permission to Operate,12/9/2022 AE-16440,Solar PV,5.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,10/6/2022,Permission to Operate,1/25/2023 AE-16418,Solar PV,4.5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,10/6/2022,Permission to Operate,1/30/2023 AE-16439,Solar PV,12.5,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1355,In service,10/6/2022,Permission to Operate,8/16/2023 AE-16428,Solar PV,7,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,10/6/2022,Permission to Operate,1/13/2023 AE-16398,"Solar PV, Battery/Storage",7.6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,10/5/2022,Permission to Operate,12/1/2022 AE-16417,Solar PV,6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 342,Circuit 813,In service,10/5/2022,Permission to Operate,1/13/2023 AE-16355,Solar PV,6.1,,Category 1,"Richland Center, Richland County, WI",Substation 606,Circuit 1636,In service,10/5/2022,Permission to Operate,1/25/2023 AE-16257,Solar PV,3.3,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/5/2022,Permission to Operate,12/2/2022 AE-16399,Solar PV,3.7,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1269,In service,10/5/2022,Permission to Operate,12/1/2022 AE-16400,Solar PV,10,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,10/5/2022,Permission to Operate,4/12/2023 AE-16401,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,10/5/2022,Permission to Operate,1/9/2023 AE-16151,Solar PV,8.4,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,10/5/2022,Permission to Operate,1/4/2023 AE-16390,Solar PV,3.7,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,10/4/2022,Permission to Operate,4/10/2023 AE-16342,Solar PV,3.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1696,In service,10/3/2022,Permission to Operate,12/2/2022 AE-16341,Solar PV,5.1,,Category 1,"Campbellsport, Fond du Lac County, WI",Substation 391,Circuit 977,In service,10/3/2022,Permission to Operate,11/18/2022 AE-16290,Solar PV,5.2,,Category 1,"Oostburg, Sheboygan County, WI",Substation 355,Circuit 850,In service,10/3/2022,Permission to Operate,11/23/2022 AE-16197,Solar PV,3.7,,Category 1,"Berlin, Green Lake County, WI",,Circuit 173,In service,10/3/2022,Permission to Operate,12/9/2022 AE-15814,Solar PV,4.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,10/3/2022,Permission to Operate,12/24/2022 AE-16367,Solar PV,15.2,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,10/3/2022,Permission to Operate,1/23/2023 AE-16331,Solar PV,6.3,,Category 1,"Clintonville, Waupaca County, WI",Substation 69,Circuit 166,In service,10/3/2022,Permission to Operate,1/25/2023 AE-16345,Solar PV,3.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,10/3/2022,Permission to Operate,2/7/2023 AE-16238,Solar PV,9.5,,Category 1,"Monticello, Washington County, WI",Substation 360,Circuit 886,In service,10/3/2022,Permission to Operate,3/9/2023 AE-16237,Solar PV,7.6,,Category 1,"Spring Green, Dane County, WI",Substation 666,Circuit 1831,In service,10/3/2022,Permission to Operate,2/15/2023 AE-16239,Solar PV,5.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,10/3/2022,Permission to Operate,1/9/2023 AE-16340,Solar PV,10,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,10/3/2022,Permission to Operate,12/14/2022 AE-16200,Solar PV,15.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,10/3/2022,Permission to Operate,1/30/2023 AE-16084,Solar PV,3.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,10/3/2022,Permission to Operate,1/19/2023 AE-16339,Solar PV,5.2,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 317,In service,9/30/2022,Permission to Operate,1/23/2023 AE-16330,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 418,Circuit 1038,In service,9/30/2022,Permission to Operate,2/28/2023 AE-16313,Solar PV,7.6,,Category 1,"Portage, Portage County, WI",Substation 585,Circuit 1541,In service,9/29/2022,Permission to Operate,3/29/2023 AE-16273,Solar PV,19.1,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,9/28/2022,Permission to Operate,12/19/2022 AE-16271,Solar PV,19.1,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,9/28/2022,Permission to Operate,12/19/2022 AE-16265,Solar PV,9.8,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,9/28/2022,Permission to Operate,4/20/2023 AE-16258,Solar PV,7.7,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 302,In service,9/28/2022,Permission to Operate,4/12/2023 AE-16272,Solar PV,19.1,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,9/28/2022,Permission to Operate,12/19/2022 AE-16240,Solar PV,20,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 135,In service,9/27/2022,Permission to Operate,12/7/2022 AE-15377,Solar PV,100,,Category 2,"Cottage Grove, Dane County, WI",Substation 296,Circuit 705,In service,9/27/2022,Permission to Operate,11/28/2022 AE-15908,Solar PV,20,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 468,In service,9/27/2022,Permission to Operate,12/27/2022 AE-15933,Solar PV,8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,9/27/2022,Permission to Operate,11/11/2022 AE-15949,Solar PV,11.4,,Category 1,"Stoughton, Dane County, WI",Substation 108,Circuit 302,In service,9/27/2022,Permission to Operate,11/10/2022 AE-16256,Solar PV,8.8,,Category 1,"Reedsburg, Sauk County, WI",Substation 106,Circuit 294,In service,9/27/2022,Permission to Operate,11/15/2022 AE-16236,Solar PV,15,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,9/27/2022,Permission to Operate,5/4/2023 AE-15629,"Solar PV, Battery/Storage",7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/27/2022,Permission to Operate,12/29/2022 AE-15408,"Solar PV, Battery/Storage",17.54,,Category 2,"Oregon, Dane County, WI",,Circuit 1879,In service,9/27/2022,Permission to Operate,12/7/2022 AE-16254,Solar PV,9.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,9/27/2022,Permission to Operate,12/30/2022 AE-16170,Solar PV,12.2,,Category 1,"Berlin, Waushara County, WI",Substation 550,Circuit 1450,In service,9/26/2022,Permission to Operate,11/2/2022 AE-16226,Solar PV,3.9,,Category 1,"Orfordville, Rock County, WI",Substation 551,Circuit 1461,In service,9/26/2022,Permission to Operate,1/5/2023 AE-16109,Solar PV,5.8,,Category 1,"Deforest, Dane County, WI",Substation 335,Circuit 790,In service,9/26/2022,Permission to Operate,12/6/2022 AE-16178,Solar PV,6,,Category 1,"Argyle, Lafayette County, WI",,Circuit 930,In service,9/26/2022,Permission to Operate,1/5/2023 AE-15773,"Solar PV, Battery/Storage",9.54,,Category 1,"Horicon, Dodge County, WI",,Circuit 809,In service,9/26/2022,Permission to Operate,3/6/2023 AE-16199,Solar PV,7.6,,Category 1,"Hazel Green, Grant County, WI",Substation 67,Circuit 165,In service,9/23/2022,Permission to Operate,12/19/2022 AE-16173,Solar PV,5.1,,Category 1,"Barneveld, Iowa County, WI",Substation 280,Circuit 671,In service,9/23/2022,Permission to Operate,1/17/2023 AE-16111,Solar PV,9.8,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1925,In service,9/23/2022,Permission to Operate,1/5/2023 AE-16392,Solar PV,4.5,,Category 1,"Kendall, Monroe County, WI",Substation 217,Circuit 515,In service,9/23/2022,Permission to Operate,9/27/2022 AE-16196,Solar PV,10.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,9/22/2022,Permission to Operate,1/25/2023 AE-16198,Solar PV,5.1,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,9/22/2022,Permission to Operate,6/27/2023 AE-16176,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,9/22/2022,Permission to Operate,5/31/2023 AE-16185,Solar PV,7.6,,Category 1,"Hatley, Marathon County, WI",Substation 74,Circuit 179,In service,9/22/2022,Permission to Operate,12/30/2022 AE-16147,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 905,In service,9/21/2022,Permission to Operate,1/5/2023 AE-16089,Solar PV,8.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,9/21/2022,Permission to Operate,1/20/2023 AE-16189,Solar PV,4.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,9/21/2022,Permission to Operate,1/13/2023 AE-16159,Solar PV,10,,Category 1,"Rio, Columbia County, WI",Substation 335,Circuit 790,In service,9/21/2022,Permission to Operate,12/6/2022 AE-16123,Solar PV,7.6,,Category 1,"Montfort, Iowa County, WI",Substation 241,Circuit 583,In service,9/20/2022,Permission to Operate,11/22/2022 AE-16118,Solar PV,11.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,9/20/2022,Permission to Operate,12/14/2022 AE-16077,Solar PV,6.1,,Category 1,"Montfort, Grant County, WI",Substation 241,Circuit 582,In service,9/20/2022,Permission to Operate,4/19/2023 AE-16165,"Solar PV, Battery/Storage",13.4,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,In service,9/20/2022,Permission to Operate,5/22/2023 AE-16065,Solar PV,5.8,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1685,In service,9/20/2022,Permission to Operate,2/23/2023 AE-16283,Solar PV,10,,Category 1,"Arpin, Wood County, WI",Substation 573,Circuit 1507,In service,9/20/2022,Permission to Operate,12/19/2022 AE-16150,Solar PV,5.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/20/2022,Permission to Operate,12/29/2022 AE-16112,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/19/2022,Permission to Operate,2/1/2023 AE-16114,Solar PV,11.6,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,9/19/2022,Permission to Operate,12/28/2022 AE-16134,Solar PV,5.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/19/2022,Permission to Operate,12/1/2022 AE-16108,Solar PV,3,,Category 1,"Mineral Point, Iowa County, WI",Substation 601,Circuit 1622,In service,9/19/2022,Permission to Operate,12/6/2022 AE-16033,Solar PV,12,,Category 1,"Spring Green, Sauk County, WI",Substation 722,Circuit 1971,In service,9/19/2022,Permission to Operate,6/23/2023 AE-16099,Solar PV,5.1,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/16/2022,Permission to Operate,12/6/2022 AE-16098,Solar PV,5.4,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 338,Circuit 804,In service,9/16/2022,Permission to Operate,8/3/2023 AE-16070,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/15/2022,Permission to Operate,1/9/2023 AE-16067,Solar PV,7.6,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 584,Circuit 1533,In service,9/15/2022,Permission to Operate,11/16/2022 AE-16054,Solar PV,6.6,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 96,In service,9/15/2022,Permission to Operate,1/3/2023 AE-16044,"Solar PV, Battery/Storage",15.2,,Category 1,"Verona, Dane County, WI",Substation 666,Circuit 1831,In service,9/15/2022,Permission to Operate,7/21/2023 AE-16047,Solar PV,3.9,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,9/15/2022,Permission to Operate,11/11/2022 AE-16052,Solar PV,5.9,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/15/2022,Permission to Operate,12/14/2022 AE-15547,Solar PV,5.1,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,9/15/2022,Permission to Operate,11/30/2022 AE-16031,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/15/2022,Permission to Operate,10/28/2022 AE-16043,Solar PV,13.8,,Category 1,"Dane, Dane County, WI",Substation 201,Circuit 458,In service,9/15/2022,Permission to Operate,5/26/2023 AE-15832,Solar PV,7.6,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,9/15/2022,Permission to Operate,10/27/2022 AE-16056,"Solar PV, Battery/Storage",17.48,,Category 1,"Marshfield, Wood County, WI",Substation 573,Circuit 1508,In service,9/15/2022,Permission to Operate,6/9/2023 AE-15776,Solar PV,5.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,9/15/2022,Permission to Operate,11/15/2022 AE-16061,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/15/2022,Permission to Operate,1/9/2023 AE-16046,Solar PV,3.9,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,9/15/2022,Permission to Operate,11/11/2022 AE-16071,Solar PV,3.9,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/15/2022,Permission to Operate,12/28/2022 AE-16074,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/15/2022,Permission to Operate,1/23/2023 AE-16066,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,9/15/2022,Permission to Operate,2/1/2023 AE-16042,Solar PV,5.9,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/15/2022,Permission to Operate,11/11/2022 AE-16076,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 357,Circuit 860,In service,9/15/2022,Permission to Operate,1/3/2023 AE-16051,Solar PV,9.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,9/15/2022,Permission to Operate,12/29/2022 AE-16014,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,9/14/2022,Permission to Operate,12/6/2022 AE-16019,Solar PV,8.5,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 779,In service,9/14/2022,Permission to Operate,12/8/2022 AE-16045,Solar PV,9.1,,Category 1,"Markesan, Green Lake County, WI",,Circuit 767,In service,9/14/2022,Permission to Operate,2/6/2023 AE-16022,Solar PV,16.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1267,In service,9/14/2022,Permission to Operate,12/2/2022 AE-16008,Solar PV,14.3,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,9/13/2022,Permission to Operate,10/28/2022 AE-15986,Solar PV,15.2,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,9/13/2022,Permission to Operate,12/16/2022 AE-16005,Solar PV,3.8,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1732,In service,9/13/2022,Permission to Operate,10/11/2022 AE-16028,Solar PV,9.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,9/13/2022,Permission to Operate,1/20/2023 AE-15967,Solar PV,8.9,,Category 1,"Livingston, Grant County, WI",Substation 241,Circuit 582,In service,9/12/2022,Permission to Operate,2/2/2023 AE-15845,Solar PV,7.9,,Category 1,"Bellville, Green County, WI",Substation 57,Circuit 151,In service,9/12/2022,Permission to Operate,1/27/2023 AE-15895,Solar PV,9,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1185,In service,9/12/2022,Permission to Operate,12/7/2022 AE-15656,Solar PV,7.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 624,In service,9/12/2022,Permission to Operate,12/7/2023 AE-15992,Solar PV,3.6,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 61,In service,9/9/2022,Permission to Operate,6/13/2023 AE-15957,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,9/9/2022,Permission to Operate,10/27/2022 AE-15976,"Solar PV, Battery/Storage",7.6,,Category 1,"Burlington, Kenosha County, WI",Substation 714,Circuit 1954,In service,9/9/2022,Permission to Operate,12/8/2022 AE-15929,Solar PV,16.4,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/9/2022,Permission to Operate,12/28/2022 AE-15780,Solar PV,5.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,9/9/2022,Permission to Operate,12/1/2022 AE-15505,Solar PV,10,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 461,In service,9/8/2022,Permission to Operate,12/13/2022 AE-15866,Solar PV,11.4,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,9/7/2022,Permission to Operate,11/11/2022 AE-15896,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,9/7/2022,Permission to Operate,12/14/2022 AE-15913,Solar PV,7.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,9/7/2022,Permission to Operate,1/17/2024 AE-15910,Solar PV,10,,Category 1,"Dalton, Green Lake County, WI",Substation 436,Circuit 1105,In service,9/7/2022,Permission to Operate,1/31/2023 AE-15885,Solar PV,8.2,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 670,In service,9/7/2022,Permission to Operate,12/29/2022 AE-15858,Solar PV,7.6,,Category 1,"Juda, Green County, WI",Substation 647,Circuit 1774,In service,9/6/2022,Permission to Operate,12/13/2022 AE-15880,Solar PV,8.5,,Category 1,"Sauk City, Dane County, WI",Substation 461,Circuit 1130,In service,9/6/2022,Permission to Operate,12/29/2022 AE-15865,Solar PV,6.1,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,In service,9/6/2022,Permission to Operate,10/18/2022 AE-15887,Solar PV,7,,Category 1,"Wisconsin Dells, Columbia County, WI",,Circuit 1083,In service,9/6/2022,Permission to Operate,6/9/2023 AE-15839,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,9/2/2022,Permission to Operate,11/7/2022 AE-15706,Solar PV,7.6,,Category 1,"Vesper, Wood County, WI",Substation 723,Circuit 1974,In service,9/1/2022,Permission to Operate,10/11/2022 AE-15812,Solar PV,5,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 197,In service,9/1/2022,Permission to Operate,12/12/2022 AE-15807,Solar PV,7.5,,Category 1,"Merrimac, Sauk County, WI",,Circuit 494,In service,8/31/2022,Permission to Operate,12/29/2022 AE-15650,Solar PV,4.8,,Category 1,"Wisconsin Dells, Columbia County, WI",Substation 387,Circuit 957,In service,8/31/2022,Permission to Operate,2/8/2023 AE-15805,Solar PV,10.5,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,8/31/2022,Permission to Operate,1/5/2023 AE-15699,Solar PV,3.7,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,8/30/2022,Permission to Operate,12/1/2022 AE-15614,Solar PV,3.9,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,8/30/2022,Permission to Operate,12/1/2022 AE-15808,Solar PV,9.4,,Category 1,"Clindonville, Shawano County, WI",Substation 69,Circuit 169,In service,8/30/2022,Permission to Operate,1/9/2023 AE-15538,"Solar PV, Battery/Storage",15.19,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,8/29/2022,Permission to Operate,11/8/2022 AE-15710,Solar PV,4.9,,Category 1,"Hollandale, Iowa County, WI",Substation 525,Circuit 1342,In service,8/29/2022,Permission to Operate,6/27/2023 AE-15537,Solar PV,64.2,,Category 2,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,8/29/2022,Permission to Operate,5/23/2023 AE-15729,Solar PV,11.4,,Category 1,"Hancock, Waushara County, WI",Substation 327,Circuit 785,In service,8/29/2022,Permission to Operate,2/23/2023 AE-15717,Solar PV,6,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 420,In service,8/29/2022,Permission to Operate,11/29/2022 AE-15739,Solar PV,19,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,8/27/2022,Permission to Operate,10/18/2022 AE-15718,Solar PV,7.7,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,8/26/2022,Permission to Operate,10/11/2022 AE-15679,Solar PV,8.4,,Category 1,"Hately, Marathon County, WI",Substation 74,Circuit 179,In service,8/26/2022,Permission to Operate,2/1/2023 AE-15670,Solar PV,4.3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1521,In service,8/26/2022,Permission to Operate,12/5/2023 AE-15576,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,8/25/2022,Permission to Operate,11/8/2022 AE-15430,Solar PV,7.7,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,8/25/2022,Permission to Operate,11/11/2022 AE-15694,Solar PV,9,,Category 1,"Hillpoint, Sauk County, WI",Substation 421,Circuit 1051,In service,8/25/2022,Permission to Operate,11/15/2022 AE-15645,Solar PV,9.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,8/25/2022,Permission to Operate,10/28/2022 AE-15701,Solar PV,4.1,,Category 1,"Beloit, Rock County, WI",,Circuit 154,In service,8/25/2022,Permission to Operate,4/27/2023 AE-15686,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,8/24/2022,Permission to Operate,1/5/2023 AE-15677,Solar PV,15.8,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2138,In service,8/24/2022,Permission to Operate,11/2/2022 AE-15678,Solar PV,19.2,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,8/24/2022,Permission to Operate,12/1/2022 AE-15663,Solar PV,5.1,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,8/24/2022,Permission to Operate,10/27/2022 AE-15669,Solar PV,7.6,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 360,In service,8/24/2022,Permission to Operate,2/8/2023 AE-15680,Solar PV,7.2,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,8/24/2022,Permission to Operate,11/1/2022 AE-14885,Solar PV,15.2,,Category 1,"Cuba City, Lafayette County, WI",Substation 248,Circuit 595,In service,8/24/2022,Permission to Operate,4/3/2023 AE-15625,Solar PV,20,,Category 1,"Loganville, Sauk County, WI",Substation 421,Circuit 1052,In service,8/23/2022,Permission to Operate,11/30/2022 AE-15652,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,8/23/2022,Permission to Operate,11/15/2022 AE-15555,Solar PV,5.1,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 418,In service,8/23/2022,Permission to Operate,8/2/2023 AE-15655,Solar PV,8.7,,Category 1,"Lake Geneva, Walworth County, WI",Substation 660,Circuit 1810,In service,8/23/2022,Permission to Operate,3/22/2023 AE-15660,Solar PV,5.9,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2132,In service,8/23/2022,Permission to Operate,1/25/2023 AE-15662,Solar PV,7.8,,Category 1,"Browntown, Green County, WI",Substation 95,Circuit 2164,In service,8/23/2022,Permission to Operate,1/20/2023 AE-15535,Solar PV,10,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,8/22/2022,Permission to Operate,9/22/2022 AE-15697,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,8/22/2022,Permission to Operate,12/20/2022 AE-15345,Solar PV,150,,Category 2,"Richland Center, Richland County, WI",Substation 572,Circuit 1504,In service,8/22/2022,Permission to Operate,9/12/2023 AE-15622,Solar PV,6.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,8/22/2022,Permission to Operate,12/6/2022 AE-15632,"Solar PV, Battery/Storage",8.5,,Category 1,"Verona, Dane County, WI",Substation 280,Circuit 670,In service,8/22/2022,Permission to Operate,2/6/2023 AE-15575,Solar PV,5.4,,Category 1,"Tomah, Monroe County, WI",,Circuit 2113,In service,8/19/2022,Permission to Operate,9/27/2022 AE-15616,"Solar PV, Battery/Storage",13.24,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 109,In service,8/19/2022,Permission to Operate,4/7/2023 AE-15603,Solar PV,7.7,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,8/19/2022,Permission to Operate,11/30/2022 AE-15435,Solar PV,4.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,8/18/2022,Permission to Operate,1/11/2023 AE-15586,Solar PV,5.1,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,8/18/2022,Permission to Operate,12/19/2022 AE-15637,Solar PV,3.6,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1184,In service,8/18/2022,Permission to Operate,11/30/2022 AE-15569,Solar PV,9.8,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,8/17/2022,Permission to Operate,11/7/2022 AE-15536,Solar PV,6.6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,8/16/2022,Permission to Operate,10/14/2022 AE-15544,Solar PV,4.8,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 268,In service,8/16/2022,Permission to Operate,1/11/2023 AE-15545,Solar PV,5.2,,Category 1,"Sauk City, Sauk County, WI",Substation 710,Circuit 1947,In service,8/16/2022,Permission to Operate,11/8/2022 AE-15525,Solar PV,5.4,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,8/16/2022,Permission to Operate,10/14/2022 AE-15549,Solar PV,14.3,,Category 1,"Ontario, Monroe County, WI",Substation 217,Circuit 514,In service,8/16/2022,Permission to Operate,12/6/2022 AE-15518,Solar PV,20,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 670,In service,8/15/2022,Permission to Operate,11/7/2022 AE-15516,Solar PV,16,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,8/15/2022,Permission to Operate,11/11/2022 AE-14747,Solar PV,15.4,,Category 1,"Auburndale, Wood County, WI",Substation 43,Circuit 120,In service,8/15/2022,Permission to Operate,12/3/2024 AE-15534,Solar PV,7.5,,Category 1,"Mt Calvary, Fond du Lac County, WI",Substation 411,Circuit 1026,In service,8/15/2022,Permission to Operate,12/2/2022 AE-15503,Solar PV,11.2,,Category 1,"Brodhead, Green County, WI",Substation 96,Circuit 259,In service,8/12/2022,Permission to Operate,11/1/2022 AE-15479,Solar PV,7.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,8/11/2022,Permission to Operate,12/15/2022 AE-15498,Solar PV,6.4,,Category 1,"Gays Mills, Crawford County, WI",Substation 645,Circuit 1763,In service,8/11/2022,Permission to Operate,11/30/2022 AE-15490,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1140,In service,8/11/2022,Permission to Operate,10/17/2022 AE-15484,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,8/11/2022,Permission to Operate,10/17/2022 AE-15112,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,8/11/2022,Permission to Operate,1/4/2023 AE-15454,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/11/2022,Permission to Operate,1/3/2023 AE-15468,Solar PV,4.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,8/10/2022,Permission to Operate,10/14/2022 AE-15473,Solar PV,6.1,,Category 1,"Sauk City, Dane County, WI",,Circuit 496,In service,8/10/2022,Permission to Operate,12/21/2022 AE-15470,Solar PV,19.5,,Category 1,"Brownsville, Dodge County, WI",Substation 456,Circuit 1120,In service,8/10/2022,Permission to Operate,10/20/2022 AE-15475,Solar PV,7.7,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,8/10/2022,Permission to Operate,10/26/2022 AE-15453,Solar PV,5.1,,Category 1,"Fond Du, Fond du Lac County, WI",Substation 514,Circuit 1289,In service,8/9/2022,Permission to Operate,4/29/2024 AE-15461,Solar PV,7.9,,Category 1,"North Fond du Lac, Fond du Lac County, WI",,Circuit 2160,In service,8/9/2022,Permission to Operate,12/2/2022 AE-15434,Solar PV,14.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,8/9/2022,Permission to Operate,11/15/2022 AE-15388,Solar PV,7.9,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,8/9/2022,Permission to Operate,12/27/2022 AE-15431,Solar PV,5.2,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,8/9/2022,Permission to Operate,11/23/2022 AE-15411,Solar PV,4.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,8/9/2022,Permission to Operate,11/15/2022 AE-15456,Solar PV,7,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 1999,In service,8/9/2022,Permission to Operate,9/30/2022 AE-15259,Solar PV,5.6,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1664,In service,8/9/2022,Permission to Operate,11/10/2022 AE-15437,Solar PV,6.1,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,8/9/2022,Permission to Operate,10/28/2022 AE-15382,Solar PV,4.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,8/9/2022,Permission to Operate,11/17/2022 AE-15227,Solar PV,6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,8/9/2022,Permission to Operate,10/14/2022 AE-15313,Solar PV,20,,Category 1,"Hillpoint, Sauk County, WI",Substation 710,Circuit 1946,In service,8/8/2022,Permission to Operate,2/28/2023 AE-15410,Solar PV,5.1,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 17,In service,8/8/2022,Permission to Operate,6/21/2023 AE-15299,Solar PV,12.1,,Category 1,"Blanchardville, Green County, WI",Substation 77,Circuit 192,In service,8/8/2022,Permission to Operate,3/14/2023 AE-15439,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,8/8/2022,Permission to Operate,12/16/2022 AE-15174,Solar PV,12.1,,Category 1,"Amherst, Portage County, WI",Substation 651,Circuit 1787,In service,8/5/2022,Permission to Operate,11/30/2022 AE-15395,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,8/5/2022,Permission to Operate,11/15/2022 AE-15390,Solar PV,5.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,8/5/2022,Permission to Operate,10/7/2022 AE-15400,Solar PV,4.9,,Category 1,"Edgerton, Dane County, WI",,Circuit 569,In service,8/5/2022,Permission to Operate,9/21/2023 AE-15389,Solar PV,4.6,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 96,In service,8/5/2022,Permission to Operate,12/19/2022 AE-15309,Solar PV,8,,Category 1,"Montfort, Iowa County, WI",Substation 241,Circuit 582,In service,8/5/2022,Permission to Operate,9/28/2022 AE-15365,Solar PV,17.9,,Category 1,"Baraboo, Sauk County, WI",Substation 412,Circuit 1029,In service,8/4/2022,Permission to Operate,11/2/2022 AE-15350,Solar PV,7.7,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 1999,In service,8/4/2022,Permission to Operate,8/2/2023 AE-15378,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 378,Circuit 932,In service,8/4/2022,Permission to Operate,11/15/2022 AE-15371,Solar PV,6,,Category 1,"Markesan, Green Lake County, WI",,Circuit 767,In service,8/4/2022,Permission to Operate,9/26/2023 AE-15344,Solar PV,3.7,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,8/4/2022,Permission to Operate,11/16/2022 AE-15200,Solar PV,5.2,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,8/3/2022,Permission to Operate,5/3/2023 AE-15189,"Solar PV, Battery/Storage",20.02,,Category 2,"Albany, Green County, WI",Substation 15,Circuit 61,In service,8/3/2022,Permission to Operate,12/14/2023 AE-15363,Solar PV,4.6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,8/3/2022,Permission to Operate,1/30/2023 AE-15353,Solar PV,6.6,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1432,In service,8/2/2022,Permission to Operate,11/30/2022 AE-15342,Solar PV,11.4,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,8/2/2022,Permission to Operate,12/6/2022 AE-15346,Solar PV,4.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,8/2/2022,Permission to Operate,12/28/2022 AE-15308,Solar PV,7.6,,Category 1,"Mcfarland Wi, Dane County, WI",Substation 146,Circuit 389,In service,8/2/2022,Permission to Operate,11/17/2022 AE-15347,Solar PV,5.2,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,8/2/2022,Permission to Operate,9/30/2022 AE-14667,Solar PV,3.7,,Category 1,"Cassville, Grant County, WI",Substation 517,Circuit 1325,In service,8/2/2022,Permission to Operate,5/22/2023 AE-15295,Solar PV,5.9,,Category 1,"Fitchburg, Dane County, WI",,Circuit 1880,In service,8/1/2022,Permission to Operate,9/16/2022 AE-15269,Solar PV,13.3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,8/1/2022,Permission to Operate,10/3/2022 AE-15111,Solar PV,10,,Category 1,"Blanchardville, Lafayette County, WI",Substation 77,Circuit 192,In service,8/1/2022,Permission to Operate,6/23/2023 AE-15333,Solar PV,7.6,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1306,In service,8/1/2022,Permission to Operate,2/22/2023 AE-15302,Solar PV,11.6,,Category 1,"Omro, Winnebago County, WI",Substation 766,Circuit 2077,In service,7/29/2022,Permission to Operate,10/25/2022 AE-15306,Solar PV,11.2,,Category 1,"Monticello, Green County, WI",Substation 360,Circuit 886,In service,7/29/2022,Permission to Operate,5/16/2023 AE-15267,Solar PV,8.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/28/2022,Permission to Operate,10/18/2022 AE-15268,Solar PV,4.6,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,7/28/2022,Permission to Operate,12/15/2022 AE-15281,Solar PV,5.2,,Category 1,"Baraboo, Sauk County, WI",Substation 623,Circuit 1687,In service,7/28/2022,Permission to Operate,10/11/2022 AE-15279,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,7/28/2022,Permission to Operate,10/3/2022 AE-15282,Solar PV,3.7,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 23,In service,7/28/2022,Permission to Operate,8/23/2022 AE-15237,Solar PV,7.9,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,7/27/2022,Permission to Operate,12/9/2022 AE-15197,Solar PV,11.4,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,7/27/2022,Permission to Operate,10/14/2022 AE-15260,Solar PV,7.6,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,7/27/2022,Permission to Operate,12/6/2022 AE-15206,Solar PV,7.6,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,7/27/2022,Permission to Operate,12/6/2022 AE-15218,Solar PV,2.8,,Category 1,"Highland, Iowa County, WI",Substation 406,Circuit 1007,In service,7/27/2022,Permission to Operate,11/23/2022 AE-15263,Solar PV,3.9,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,7/27/2022,Permission to Operate,9/30/2022 AE-15241,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,7/27/2022,Permission to Operate,11/1/2022 AE-14989,Solar PV,4.8,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 862,In service,7/27/2022,Permission to Operate,2/1/2023 AE-15253,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/27/2022,Permission to Operate,11/15/2022 AE-15196,Solar PV,3.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,7/26/2022,Permission to Operate,9/16/2022 AE-15234,Solar PV,9.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,7/26/2022,Permission to Operate,10/27/2022 AE-15208,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,7/26/2022,Permission to Operate,9/30/2022 AE-15209,Solar PV,7.2,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,7/26/2022,Permission to Operate,12/1/2022 AE-15204,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,7/26/2022,Permission to Operate,9/9/2022 AE-15219,Solar PV,6.4,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,7/26/2022,Permission to Operate,4/3/2023 AE-15221,Solar PV,5.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,7/26/2022,Permission to Operate,8/30/2022 AE-15205,Solar PV,5.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,7/26/2022,Permission to Operate,9/16/2022 AE-15235,Solar PV,5.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,7/26/2022,Permission to Operate,9/9/2022 AE-14844,Solar PV,19.8,,Category 1,"Warrens, Monroe County, WI",,Circuit 2113,In service,7/26/2022,Permission to Operate,11/30/2022 AE-15198,Solar PV,7.6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,7/25/2022,Permission to Operate,9/19/2022 AE-15183,Solar PV,12.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,7/22/2022,Permission to Operate,11/15/2022 AE-15159,Solar PV,5,,Category 1,"Lone Rock, Richland County, WI",Substation 606,Circuit 1636,In service,7/22/2022,Permission to Operate,11/15/2022 AE-15187,Solar PV,5,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1267,In service,7/22/2022,Permission to Operate,8/29/2022 AE-15190,Solar PV,4.6,,Category 1,"Omro, Winnebago County, WI",Substation 549,Circuit 1446,In service,7/22/2022,Permission to Operate,1/20/2023 AE-14998,Solar PV,10.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,7/21/2022,Permission to Operate,10/3/2022 AE-15168,Solar PV,6.6,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,7/21/2022,Permission to Operate,10/7/2022 AE-15153,Solar PV,20,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,7/21/2022,Permission to Operate,9/28/2022 AE-15158,Solar PV,9.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,7/21/2022,Permission to Operate,11/15/2022 AE-15160,Solar PV,8.3,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 270,In service,7/21/2022,Permission to Operate,1/11/2023 AE-15156,Solar PV,7.9,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,7/20/2022,Permission to Operate,10/14/2022 AE-15151,Solar PV,7.6,,Category 1,"Monticello, Green County, WI",Substation 360,Circuit 886,In service,7/20/2022,Permission to Operate,12/7/2022 AE-14794,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 201,Circuit 458,In service,7/20/2022,Permission to Operate,10/17/2022 AE-15041,Solar PV,1600,,Category 4,"Fairwater, Fond du Lac County, WI",,Circuit 684,In service,7/19/2022,Permission to Operate,8/7/2025 AE-15072,Solar PV,6.6,,Category 1,"Middleton, Dane County, WI",Substation 686,Circuit 1894,In service,7/19/2022,Permission to Operate,8/24/2022 AE-15113,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,7/19/2022,Permission to Operate,1/30/2023 AE-15127,"Solar PV, Battery/Storage",7.8,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,7/19/2022,Permission to Operate,11/28/2022 AE-15042,Solar PV,10,,Category 1,"Browntown, Green County, WI",Substation 95,Circuit 2164,In service,7/19/2022,Permission to Operate,11/23/2022 AE-15131,Solar PV,7.9,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1044,In service,7/19/2022,Permission to Operate,11/1/2022 AE-15142,Solar PV,13.9,,Category 1,"Shawano, Shawano County, WI",Substation 111,Circuit 310,In service,7/19/2022,Permission to Operate,12/19/2022 AE-15123,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,7/19/2022,Permission to Operate,8/19/2022 AE-15099,Solar PV,7.1,,Category 1,"Pardeeville, Columbia County, WI",Substation 448,Circuit 1115,In service,7/18/2022,Permission to Operate,10/11/2022 AE-15098,Solar PV,7.6,,Category 1,"Wisconsin Dells, Adams County, WI",Substation 387,Circuit 957,In service,7/18/2022,Permission to Operate,10/27/2022 AE-15110,Solar PV,5.1,,Category 1,"Delavan, Walworth County, WI",Substation 207,Circuit 480,In service,7/18/2022,Permission to Operate,9/28/2022 AE-15117,Solar PV,4.2,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/18/2022,Permission to Operate,12/15/2022 AE-15063,Solar PV,3.7,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/18/2022,Permission to Operate,10/6/2022 AE-15045,Solar PV,5.9,,Category 1,"Edgerton, Rock County, WI",,Circuit 570,In service,7/15/2022,Permission to Operate,8/19/2022 AE-15064,Solar PV,8.2,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,7/15/2022,Permission to Operate,10/11/2022 AE-15019,Solar PV,8.2,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 96,In service,7/15/2022,Permission to Operate,10/14/2022 AE-15066,"Solar PV, Battery/Storage",11.54,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,7/15/2022,Permission to Operate,8/30/2022 AE-15028,Solar PV,11.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,7/15/2022,Permission to Operate,9/30/2022 AE-15089,Solar PV,10.2,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,7/15/2022,Permission to Operate,5/3/2023 AE-14181,"Solar PV, Battery/Storage",8.04,,Category 1,"Mt. Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,7/15/2022,Permission to Operate,6/1/2023 AE-15071,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,7/15/2022,Permission to Operate,1/5/2023 AE-14990,Solar PV,4.2,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,7/15/2022,Permission to Operate,12/6/2022 AE-15075,Solar PV,14,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2138,In service,7/15/2022,Permission to Operate,10/17/2022 AE-15059,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,7/14/2022,Permission to Operate,11/15/2022 AE-15060,Solar PV,3.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,7/14/2022,Permission to Operate,8/19/2022 AE-15054,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,7/14/2022,Permission to Operate,10/13/2022 AE-15051,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,7/14/2022,Permission to Operate,8/22/2022 AE-15040,Solar PV,9.8,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,7/13/2022,Permission to Operate,10/14/2022 AE-15022,Solar PV,7.8,,Category 1,"Wisconsin Dells, Columbia County, WI",Substation 387,Circuit 957,In service,7/13/2022,Permission to Operate,9/28/2022 AE-15018,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,7/13/2022,Permission to Operate,11/15/2022 AE-15020,Solar PV,8.5,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1585,In service,7/13/2022,Permission to Operate,10/14/2022 AE-15017,Solar PV,20,,Category 1,"Hillpoint, Sauk County, WI",Substation 421,Circuit 1051,In service,7/12/2022,Permission to Operate,9/29/2022 AE-15016,Solar PV,7.2,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 778,In service,7/12/2022,Permission to Operate,11/11/2022 AE-14978,Solar PV,3.9,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/11/2022,Permission to Operate,10/14/2022 AE-14797,Solar PV,8.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,7/11/2022,Permission to Operate,10/14/2022 AE-14976,Solar PV,9,,Category 1,"Waupun, Fond du Lac County, WI",Substation 22,Circuit 69,In service,7/11/2022,Permission to Operate,8/25/2022 AE-14967,Solar PV,15,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1306,In service,7/8/2022,Permission to Operate,12/29/2022 AE-14833,Solar PV,20,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,7/8/2022,Permission to Operate,10/14/2022 AE-14960,Solar PV,7.8,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,7/8/2022,Permission to Operate,8/19/2022 AE-14575,Solar PV,15.9,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,7/8/2022,Permission to Operate,7/21/2023 AE-14952,Solar PV,6,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 61,In service,7/8/2022,Permission to Operate,1/5/2023 AE-14970,Solar PV,13.7,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 462,In service,7/8/2022,Permission to Operate,9/13/2023 AE-14920,Solar PV,4.2,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1118,In service,7/8/2022,Permission to Operate,8/8/2022 AE-14973,Solar PV,10.4,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 301,In service,7/8/2022,Permission to Operate,10/27/2022 AE-14958,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,7/8/2022,Permission to Operate,9/14/2022 AE-14799,Solar PV,87.1,,Category 2,"Mayville, Dodge County, WI",Substation 664,Circuit 1828,In service,7/8/2022,Permission to Operate,5/11/2023 AE-14937,Solar PV,10.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1288,In service,7/7/2022,Permission to Operate,12/30/2022 AE-14956,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/7/2022,Permission to Operate,9/14/2022 AE-14913,Solar PV,7.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,7/6/2022,Permission to Operate,8/19/2022 AE-14903,Solar PV,7.6,,Category 1,"Stoughton, Dane County, WI",Substation 108,Circuit 302,In service,7/6/2022,Permission to Operate,10/20/2022 AE-14905,Solar PV,15.2,,Category 1,"Cleveland, Sheboygan County, WI",Substation 346,Circuit 832,In service,7/6/2022,Permission to Operate,10/24/2022 AE-14889,Solar PV,19.5,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,7/6/2022,Permission to Operate,10/17/2022 AE-14914,Solar PV,15,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1357,In service,7/6/2022,Permission to Operate,1/11/2023 AE-14926,Solar PV,6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 151,In service,7/6/2022,Permission to Operate,8/19/2022 AE-14902,Solar PV,7.6,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,7/5/2022,Permission to Operate,7/18/2022 AE-14815,Solar PV,87.1,,Category 2,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,7/5/2022,Permission to Operate,1/13/2023 AE-14868,Solar PV,6,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 23,In service,7/5/2022,Permission to Operate,7/17/2023 AE-14816,Solar PV,87.1,,Category 2,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,7/5/2022,Permission to Operate,1/13/2023 AE-14891,Solar PV,12.6,,Category 1,"New Glarus, Green County, WI",,Circuit 1327,In service,7/5/2022,Permission to Operate,12/21/2022 AE-14900,Solar PV,7.2,,Category 1,"Merrimac, Columbia County, WI",Substation 466,Circuit 1157,In service,7/5/2022,Permission to Operate,8/5/2022 AE-14871,Solar PV,20.3,,Category 1,"Pittsville, Brown County, WI",Substation 573,Circuit 1506,In service,7/1/2022,Permission to Operate,11/10/2022 AE-14834,Solar PV,8,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,7/1/2022,Permission to Operate,8/3/2022 AE-14699,Solar PV,5.1,,Category 1,"Monroe, Monroe County, WI",Substation 661,Circuit 1815,In service,6/30/2022,Permission to Operate,1/5/2023 AE-14856,Solar PV,5.1,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 420,In service,6/30/2022,Permission to Operate,1/20/2023 AE-14854,Solar PV,6.6,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,6/30/2022,Permission to Operate,8/23/2022 AE-14840,Solar PV,11.2,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1813,In service,6/29/2022,Permission to Operate,11/16/2022 AE-14806,Solar PV,5,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,6/29/2022,Permission to Operate,9/1/2022 AE-14847,Solar PV,4.9,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,6/29/2022,Permission to Operate,5/26/2023 AE-14846,Solar PV,3.9,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,6/29/2022,Permission to Operate,5/31/2023 AE-14835,Solar PV,4.2,,Category 1,"Genoa City, Walworth County, WI",,Circuit 1666,In service,6/28/2022,Permission to Operate,10/11/2022 AE-14831,Solar PV,13.4,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1230,In service,6/28/2022,Permission to Operate,3/8/2023 AE-14819,Solar PV,5.1,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1285,In service,6/27/2022,Permission to Operate,5/23/2023 AE-14804,Solar PV,5.2,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,6/27/2022,Permission to Operate,8/3/2022 AE-14820,Solar PV,7.6,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1638,In service,6/27/2022,Permission to Operate,9/28/2022 AE-14817,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",,Circuit 1872,In service,6/27/2022,Permission to Operate,9/14/2022 AE-14800,Solar PV,5.1,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,6/27/2022,Permission to Operate,10/5/2022 AE-14790,Solar PV,3.8,,Category 1,"Barneveld, Iowa County, WI",Substation 280,Circuit 671,In service,6/27/2022,Permission to Operate,12/14/2022 AE-14767,Solar PV,5,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,6/24/2022,Permission to Operate,9/9/2022 AE-14772,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2126,In service,6/24/2022,Permission to Operate,9/16/2022 AE-14755,Solar PV,7.1,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 694,In service,6/24/2022,Permission to Operate,1/13/2023 AE-14751,Solar PV,3.3,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,6/24/2022,Permission to Operate,7/28/2022 AE-14766,Solar PV,3.3,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,6/24/2022,Permission to Operate,7/29/2022 AE-14765,Solar PV,12.6,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,6/24/2022,Permission to Operate,8/31/2022 AE-14756,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/23/2022,Permission to Operate,8/9/2022 AE-14757,Solar PV,7.6,,Category 1,"Monroe, Green County, WI",,Circuit 930,In service,6/23/2022,Permission to Operate,10/26/2022 AE-14720,Solar PV,5,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/23/2022,Permission to Operate,8/9/2022 AE-14702,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1199,In service,6/22/2022,Permission to Operate,9/22/2022 AE-14729,Solar PV,17.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,6/22/2022,Permission to Operate,10/3/2022 AE-14436,Solar PV,7.1,,Category 1,"Stratford, Marathon County, WI",Substation 626,Circuit 1690,In service,6/22/2022,Permission to Operate,11/28/2022 AE-14719,Solar PV,6.7,,Category 1,"Freedom, Sauk County, WI",Substation 623,Circuit 1685,In service,6/22/2022,Permission to Operate,1/9/2023 AE-14524,"Solar PV, Battery/Storage",15.6,,Category 1,"Brooklyn, Adams County, WI",Substation 108,Circuit 303,In service,6/22/2022,Permission to Operate,3/1/2023 AE-14597,Solar PV,10.4,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 106,Circuit 294,In service,6/22/2022,Permission to Operate,9/26/2022 AE-14733,Solar PV,7.2,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 778,In service,6/22/2022,Permission to Operate,8/5/2022 AE-14568,Solar PV,5.1,,Category 1,"Waupaca, Waupaca County, WI",Substation 651,Circuit 1787,In service,6/22/2022,Permission to Operate,9/28/2022 AE-14712,"Solar PV, Battery/Storage",10.9,,Category 1,"Madison, Dane County, WI",Substation 698,Circuit 1922,In service,6/21/2022,Permission to Operate,10/17/2022 AE-14673,Solar PV,10.6,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 694,In service,6/21/2022,Permission to Operate,1/6/2023 AE-14595,Solar PV,9.1,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,6/20/2022,Permission to Operate,9/19/2022 AE-14656,Solar PV,7.6,,Category 1,"J, Rock County, WI",Substation 704,Circuit 1925,In service,6/20/2022,Permission to Operate,1/12/2023 AE-14522,Solar PV,120.8,,Category 2,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,6/17/2022,Permission to Operate,2/1/2023 AE-14474,"Solar PV, Battery/Storage",15.2,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 886,In service,6/17/2022,Permission to Operate,12/7/2022 AE-14604,Solar PV,4.8,,Category 1,"New Glarus, Green County, WI",,Circuit 1327,In service,6/17/2022,Permission to Operate,12/7/2022 AE-14649,Solar PV,7.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,6/17/2022,Permission to Operate,7/18/2022 AE-14308,Solar PV,5.4,,Category 1,"Amherst, Marquette County, WI",Substation 30,Circuit 80,In service,6/17/2022,Permission to Operate,3/15/2023 AE-14584,Solar PV,7.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 323,In service,6/17/2022,Permission to Operate,10/14/2022 AE-14521,Solar PV,161,,Category 2,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,6/17/2022,Permission to Operate,3/21/2023 AE-14578,Solar PV,3.1,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,6/17/2022,Permission to Operate,10/11/2022 AE-14618,Solar PV,5.6,,Category 1,"Pardeeville, Columbia County, WI",Substation 448,Circuit 1115,In service,6/17/2022,Permission to Operate,11/11/2022 AE-14650,Solar PV,10,,Category 1,"Brooklyn, Rock County, WI",Substation 108,Circuit 303,In service,6/17/2022,Permission to Operate,10/14/2022 AE-14602,Solar PV,8.9,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 199,In service,6/17/2022,Permission to Operate,12/27/2022 AE-14536,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,6/17/2022,Permission to Operate,8/8/2022 AE-14645,"Solar PV, Battery/Storage",8,,Category 1,"La Valle, Sauk County, WI",Substation 421,Circuit 1051,In service,6/17/2022,Permission to Operate,8/22/2022 AE-14634,Solar PV,4.7,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,6/17/2022,Permission to Operate,8/9/2022 AE-14638,Solar PV,10,,Category 1,"La Valle, Sauk County, WI",,Circuit 110,In service,6/17/2022,Permission to Operate,7/21/2022 AE-14626,Solar PV,9.4,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,6/16/2022,Permission to Operate,1/11/2023 AE-14619,Solar PV,10.7,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 687,In service,6/16/2022,Permission to Operate,11/21/2022 AE-14600,Solar PV,8.8,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,6/16/2022,Permission to Operate,5/27/2025 AE-14596,Solar PV,7,,Category 1,"Monroe, Green County, WI",Substation 481,Circuit 1191,In service,6/15/2022,Permission to Operate,7/22/2022 AE-14407,"Solar PV, Battery/Storage",23.48,,Category 2,"Barneveld, Iowa County, WI",Substation 357,Circuit 860,In service,6/15/2022,Permission to Operate,3/10/2023 AE-14588,Solar PV,6.6,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,6/15/2022,Permission to Operate,7/28/2022 AE-14573,Solar PV,5,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/15/2022,Permission to Operate,7/28/2022 AE-14587,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1926,In service,6/15/2022,Permission to Operate,12/27/2022 AE-14577,Solar PV,7.6,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,6/15/2022,Permission to Operate,12/2/2022 AE-14565,Solar PV,3.7,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 4,Circuit 4,In service,6/14/2022,Permission to Operate,2/1/2023 AE-14563,Solar PV,5,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,6/14/2022,Permission to Operate,7/29/2022 AE-14513,Solar PV,7.7,,Category 1,"Blanchardville, Lafayette County, WI",Substation 280,Circuit 672,In service,6/14/2022,Permission to Operate,10/28/2022 AE-14520,Solar PV,3.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,6/14/2022,Permission to Operate,7/20/2022 AE-14532,Solar PV,10,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 316,In service,6/13/2022,Permission to Operate,8/16/2022 AE-14151,Solar PV,7.1,,Category 1,"Portage, Portage County, WI",Substation 585,Circuit 1541,In service,6/13/2022,Permission to Operate,10/14/2022 AE-14561,Solar PV,6.4,,Category 1,"Warrens, Monroe County, WI",,Circuit 2113,In service,6/13/2022,Permission to Operate,9/14/2022 AE-14531,Solar PV,5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,6/13/2022,Permission to Operate,8/8/2022 AE-14523,Solar PV,7.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,6/11/2022,Permission to Operate,9/16/2022 AE-14340,Solar PV,7.7,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,6/11/2022,Permission to Operate,7/20/2022 AE-14525,Solar PV,7.6,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 670,In service,6/11/2022,Permission to Operate,8/31/2022 AE-14454,Solar PV,5.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,6/9/2022,Permission to Operate,7/27/2022 AE-14413,Solar PV,7.9,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,6/9/2022,Permission to Operate,1/9/2023 AE-14490,Solar PV,11.7,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1584,In service,6/9/2022,Permission to Operate,9/14/2022 AE-14469,Solar PV,6.6,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,6/9/2022,Permission to Operate,7/20/2022 AE-14504,Solar PV,7.2,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 898,In service,6/9/2022,Permission to Operate,7/28/2022 AE-14468,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1925,In service,6/9/2022,Permission to Operate,12/13/2022 AE-14475,Solar PV,5.5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,6/8/2022,Permission to Operate,7/18/2022 AE-14476,Solar PV,6.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,6/8/2022,Permission to Operate,7/18/2022 AE-14466,Solar PV,11.4,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,6/8/2022,Permission to Operate,10/14/2022 AE-14464,Solar PV,5.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,6/7/2022,Permission to Operate,7/29/2022 AE-14438,Solar PV,11.4,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,6/6/2022,Permission to Operate,9/26/2022 AE-14435,Solar PV,11.8,,Category 1,"Gratiot, Lafayette County, WI",Substation 770,Circuit 2082,In service,6/6/2022,Permission to Operate,10/31/2022 AE-14430,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,6/6/2022,Permission to Operate,7/18/2022 AE-14281,Solar PV,9.6,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,6/6/2022,Permission to Operate,10/27/2022 AE-14443,Solar PV,5.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,6/6/2022,Permission to Operate,10/11/2022 AE-14423,Solar PV,3.3,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,6/3/2022,Permission to Operate,7/21/2022 AE-14411,Solar PV,3.3,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,6/3/2022,Permission to Operate,7/18/2022 AE-14422,Solar PV,5.5,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,6/3/2022,Permission to Operate,8/31/2022 AE-14427,"Solar PV, Battery/Storage",17.6,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2148,In service,6/3/2022,Permission to Operate,12/13/2022 AE-14397,Solar PV,18.3,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,6/2/2022,Permission to Operate,9/16/2022 AE-14396,Solar PV,8.9,,Category 1,"Necedah, Juneau County, WI",Substation 516,Circuit 1323,In service,6/2/2022,Permission to Operate,12/14/2022 AE-14406,Solar PV,7.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,6/2/2022,Permission to Operate,7/18/2022 AE-14428,Solar PV,10,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,6/2/2022,Permission to Operate,9/27/2022 AE-14385,Solar PV,5.4,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 898,In service,6/1/2022,Permission to Operate,8/5/2022 AE-14361,Solar PV,12,,Category 1,"Boscobel, Grant County, WI",Substation 86,Circuit 231,In service,6/1/2022,Permission to Operate,9/28/2022 AE-14355,Solar PV,16,,Category 1,"Black Earth, Dane County, WI",Substation 483,Circuit 1209,In service,6/1/2022,Permission to Operate,10/3/2022 AE-14392,Solar PV,3.7,,Category 1,"Ripon, Fond du Lac County, WI",Substation 537,Circuit 1403,In service,6/1/2022,Permission to Operate,1/6/2023 AE-14190,Solar PV,3.8,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 462,In service,5/31/2022,Permission to Operate,3/17/2023 AE-14305,Solar PV,20,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1184,In service,5/31/2022,Permission to Operate,7/26/2022 AE-14354,Solar PV,3.7,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1184,In service,5/31/2022,Permission to Operate,11/1/2022 AE-14356,Solar PV,5.1,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2134,In service,5/31/2022,Permission to Operate,3/14/2023 AE-14240,Solar PV,4.3,,Category 1,"Platteville, Grant County, WI",Substation 343,Circuit 821,In service,5/31/2022,Permission to Operate,8/25/2022 AE-13892,Solar PV,10.5,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1119,In service,5/27/2022,Permission to Operate,2/13/2023 AE-14346,Solar PV,8.4,,Category 1,"Wisconsin Dells, Columbia County, WI",Substation 216,Circuit 508,In service,5/27/2022,Permission to Operate,10/12/2022 AE-14351,Solar PV,4.4,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 109,In service,5/27/2022,Permission to Operate,2/1/2023 AE-14339,"Solar PV, Battery/Storage",12.2,,Category 1,"Evansville, Rock County, WI",Substation 108,Circuit 302,In service,5/27/2022,Permission to Operate,11/17/2022 AE-14206,Solar PV,6,,Category 1,"Orfordville, Rock County, WI",Substation 551,Circuit 1461,In service,5/26/2022,Permission to Operate,7/7/2022 AE-13965,Solar PV,18.8,,Category 1,"Prairie Du Chein, Crawford County, WI",Substation 91,Circuit 250,In service,5/26/2022,Permission to Operate,11/7/2022 AE-14263,Solar PV,5.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,5/26/2022,Permission to Operate,9/9/2022 AE-14309,Solar PV,5.1,,Category 1,"Prairie Du Sac, Sauk County, WI",,Circuit 494,In service,5/26/2022,Permission to Operate,12/14/2022 AE-14299,Solar PV,5,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,5/25/2022,Permission to Operate,7/12/2022 AE-14274,Solar PV,8.2,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,5/24/2022,Permission to Operate,8/16/2022 AE-14245,Solar PV,3.7,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 23,In service,5/24/2022,Permission to Operate,4/26/2023 AE-14264,Solar PV,5.2,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,5/24/2022,Permission to Operate,8/12/2022 AE-14270,Solar PV,6.4,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,5/24/2022,Permission to Operate,7/5/2022 AE-14289,Solar PV,5.9,,Category 1,"Princeton, Green Lake County, WI",Substation 596,Circuit 1609,In service,5/24/2022,Permission to Operate,9/21/2022 AE-14253,Solar PV,6,,Category 1,"Edgerton, Jefferson County, WI",Substation 676,Circuit 1870,In service,5/24/2022,Permission to Operate,7/1/2022 AE-14265,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,5/24/2022,Permission to Operate,7/29/2022 AE-13951,Solar PV,50.6,,Category 2,"Janesville, Rock County, WI",Substation 369,Circuit 906,In service,5/24/2022,Permission to Operate,10/27/2022 AE-14284,Solar PV,7.2,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,5/24/2022,Permission to Operate,1/9/2023 AE-14251,Solar PV,3.6,,Category 1,"Edgerton, Green County, WI",,Circuit 569,In service,5/23/2022,Permission to Operate,12/8/2022 AE-14273,Solar PV,13.2,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,5/23/2022,Permission to Operate,7/20/2022 AE-14247,Solar PV,6,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1230,In service,5/20/2022,Permission to Operate,10/11/2022 AE-14204,Solar PV,3.5,,Category 1,"Oshkosh, Winnebago County, WI",Substation 549,Circuit 1449,In service,5/20/2022,Permission to Operate,8/11/2022 AE-14239,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,5/20/2022,Permission to Operate,8/30/2022 AE-14100,"Solar PV, Battery/Storage",12.74,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,5/20/2022,Permission to Operate,7/21/2022 AE-14207,Solar PV,7,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 580,In service,5/19/2022,Permission to Operate,7/19/2022 AE-14214,"Solar PV, Battery/Storage",12.6,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,5/19/2022,Permission to Operate,9/15/2022 AE-14189,Solar PV,12.5,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,5/18/2022,Permission to Operate,9/28/2022 AE-14147,Solar PV,7.6,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1433,In service,5/18/2022,Permission to Operate,7/19/2022 AE-14185,Solar PV,9.9,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 1999,In service,5/18/2022,Permission to Operate,8/16/2022 AE-14173,Solar PV,4.9,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1653,In service,5/18/2022,Permission to Operate,8/29/2022 AE-14141,Solar PV,11.4,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1305,In service,5/18/2022,Permission to Operate,2/13/2023 AE-14193,Solar PV,16.6,,Category 1,"Janesville, Rock County, WI",,Circuit 1872,In service,5/18/2022,Permission to Operate,12/8/2022 AE-14160,Solar PV,8.8,,Category 1,"Fox Lake, Dodge County, WI",Substation 278,Circuit 663,In service,5/17/2022,Permission to Operate,7/27/2022 AE-14164,Solar PV,5,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 22,In service,5/17/2022,Permission to Operate,11/16/2022 AE-14174,"Solar PV, Battery/Storage",11,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,5/17/2022,Permission to Operate,12/2/2022 AE-14165,Solar PV,7,,Category 1,"Tomah, Monroe County, WI",,Circuit 2113,In service,5/17/2022,Permission to Operate,7/26/2022 AE-14154,Solar PV,11.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,5/16/2022,Permission to Operate,8/31/2022 AE-14060,Solar PV,10.7,,Category 1,"Sauk City, Sauk County, WI",Substation 710,Circuit 1947,In service,5/16/2022,Permission to Operate,8/23/2022 AE-14148,Solar PV,3.8,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,5/16/2022,Permission to Operate,7/11/2022 AE-14143,Solar PV,5.4,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 625,In service,5/16/2022,Permission to Operate,9/14/2022 AE-14136,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1521,In service,5/16/2022,Permission to Operate,7/8/2022 AE-13957,"Solar PV, Battery/Storage",12.74,,Category 1,"Ferryville, Crawford County, WI",Substation 645,Circuit 1763,In service,5/16/2022,Permission to Operate,10/6/2022 AE-14133,Solar PV,5.5,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,5/13/2022,Permission to Operate,6/23/2022 AE-14128,Solar PV,9.9,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,5/13/2022,Permission to Operate,8/19/2022 AE-14110,Solar PV,3.8,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,5/13/2022,Permission to Operate,7/11/2022 AE-14135,Solar PV,9.4,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,5/13/2022,Permission to Operate,7/29/2022 AE-14051,Solar PV,10,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,5/12/2022,Permission to Operate,7/20/2022 AE-14061,Solar PV,2250,,Category 4,"Stoughton, Dane County, WI",Substation 146,Circuit 390,In service,5/12/2022,Permission to Operate,5/22/2025 AE-14104,Solar PV,5.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,5/12/2022,Permission to Operate,7/11/2022 AE-14090,"Solar PV, Battery/Storage",12.6,,Category 1,"Plain, Sauk County, WI",Substation 710,Circuit 1946,In service,5/11/2022,Permission to Operate,6/28/2022 AE-14076,Solar PV,9.8,,Category 1,"Fon Du Lac, Fond du Lac County, WI",Substation 411,Circuit 1027,In service,5/10/2022,Permission to Operate,7/12/2022 AE-14075,Solar PV,4.4,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,5/10/2022,Permission to Operate,6/14/2022 AE-14079,Solar PV,5,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 925,In service,5/10/2022,Permission to Operate,6/30/2022 AE-14078,"Solar PV, Battery/Storage",9.54,,Category 1,"Genoa City, Walworth County, WI",,Circuit 1666,In service,5/10/2022,Permission to Operate,10/11/2022 AE-14069,Solar PV,7.2,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,5/9/2022,Permission to Operate,6/23/2022 AE-14055,Solar PV,5.4,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 888,In service,5/9/2022,Permission to Operate,12/15/2022 AE-14068,Solar PV,13.3,,Category 1,"Tomah, Monroe County, WI",,Circuit 385,In service,5/9/2022,Permission to Operate,10/3/2022 AE-14066,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,5/9/2022,Permission to Operate,8/19/2022 AE-14050,Solar PV,4.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,5/9/2022,Permission to Operate,7/21/2022 AE-13985,Solar PV,5.8,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,5/6/2022,Permission to Operate,6/22/2022 AE-14033,Solar PV,8.4,,Category 1,"Twin Lakes, Kenosha County, WI",Substation 714,Circuit 1956,In service,5/5/2022,Permission to Operate,7/20/2022 AE-13986,Solar PV,7,,Category 1,"Wautoma, Waushara County, WI",Substation 742,Circuit 2036,In service,5/5/2022,Permission to Operate,8/2/2022 AE-14029,Solar PV,7.7,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,5/5/2022,Permission to Operate,7/11/2022 AE-13999,Solar PV,8.7,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1191,In service,5/4/2022,Permission to Operate,10/5/2022 AE-14016,Solar PV,19.5,,Category 1,"Elroy, Juneau County, WI",,Circuit 1959,In service,5/4/2022,Permission to Operate,8/23/2022 AE-14017,Solar PV,5.2,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,5/4/2022,Permission to Operate,6/3/2022 AE-13631,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1926,In service,5/2/2022,Permission to Operate,6/2/2025 AE-13964,Solar PV,7.2,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,4/29/2022,Permission to Operate,6/23/2022 AE-13955,Solar PV,7.8,,Category 1,"Ripon, Winnebago County, WI",,Circuit 170,In service,4/29/2022,Permission to Operate,7/26/2022 AE-13959,Solar PV,7.8,,Category 1,"Ripon, Winnebago County, WI",Substation 627,Circuit 1693,In service,4/29/2022,Permission to Operate,7/22/2022 AE-13944,Solar PV,4.6,,Category 1,"Monroe, Monroe County, WI",Substation 360,Circuit 888,In service,4/29/2022,Permission to Operate,9/16/2022 AE-13929,Solar PV,19.9,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,4/29/2022,Permission to Operate,8/23/2022 AE-13707,Solar PV,6.631,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 91,Circuit 247,In service,4/28/2022,Permission to Operate,7/26/2022 AE-13884,Solar PV,6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,4/28/2022,Permission to Operate,6/3/2022 AE-13939,Solar PV,11.8,,Category 1,"Genoa Cityt, Kenosha County, WI",,Circuit 1667,In service,4/28/2022,Permission to Operate,10/27/2022 AE-13925,Solar PV,7.6,,Category 1,"Mineral Point, Dane County, WI",Substation 601,Circuit 1621,In service,4/27/2022,Permission to Operate,6/30/2022 AE-13938,Solar PV,12.1,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,4/27/2022,Permission to Operate,6/9/2022 AE-13941,Solar PV,4.9,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,4/27/2022,Permission to Operate,8/8/2022 AE-13748,Solar PV,8.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,4/26/2022,Permission to Operate,6/22/2022 AE-13910,Solar PV,11.5,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,4/26/2022,Permission to Operate,1/19/2023 AE-13919,Solar PV,5.1,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,4/26/2022,Permission to Operate,7/5/2022 AE-13920,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,4/26/2022,Permission to Operate,7/13/2022 AE-13921,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,4/26/2022,Permission to Operate,6/2/2022 AE-13760,Solar PV,3.7,,Category 1,"Beaver Dam, Dodge County, WI",Substation 124,Circuit 337,In service,4/25/2022,Permission to Operate,8/11/2022 AE-13874,Solar PV,7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,4/22/2022,Permission to Operate,6/9/2022 AE-13791,Solar PV,6,,Category 1,"Almond, Portage County, WI",Substation 575,Circuit 1511,In service,4/21/2022,Permission to Operate,9/2/2022 AE-13837,Solar PV,8.2,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,4/21/2022,Permission to Operate,7/11/2022 AE-13825,Solar PV,7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 836,In service,4/21/2022,Permission to Operate,6/24/2022 AE-13866,Solar PV,5.1,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,4/21/2022,Permission to Operate,7/29/2022 AE-13830,Solar PV,15,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 583,In service,4/21/2022,Permission to Operate,11/4/2022 AE-11600,Solar PV,33.3,,Category 2,"Sheboygan, Sheboygan County, WI",Substation 355,Circuit 854,In service,4/21/2022,Permission to Operate,11/29/2022 AE-13838,Solar PV,6.6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,4/21/2022,Permission to Operate,5/24/2022 AE-13867,Solar PV,7.6,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 996,In service,4/21/2022,Permission to Operate,7/28/2022 AE-13869,Solar PV,7.8,,Category 1,"Waupaca, Portage County, WI",Substation 651,Circuit 1787,In service,4/21/2022,Permission to Operate,5/25/2022 AE-13572,Solar PV,5.1,,Category 1,"Marion, Shawano County, WI",Substation 494,Circuit 1236,In service,4/20/2022,Permission to Operate,12/20/2022 AE-13800,Solar PV,9.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,4/19/2022,Permission to Operate,8/25/2022 AE-13794,Solar PV,7.8,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,4/19/2022,Permission to Operate,7/21/2022 AE-13675,Solar PV,1400,,Category 4,"Janesville, Rock County, WI",Substation 378,Circuit 2177,In service,4/18/2022,Permission to Operate,4/29/2025 AE-13749,Solar PV,5.5,,Category 1,"Belleville, Dane County, WI",Substation 280,Circuit 670,In service,4/18/2022,Permission to Operate,7/11/2022 AE-13771,"Solar PV, Battery/Storage",9.16,,Category 1,"Tomah, Monroe County, WI",,Circuit 387,In service,4/15/2022,Permission to Operate,9/7/2022 AE-13736,Solar PV,6.7,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,4/15/2022,Permission to Operate,7/11/2022 AE-13777,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,4/15/2022,Permission to Operate,8/17/2022 AE-13610,Solar PV,20,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1215,In service,4/15/2022,Permission to Operate,9/28/2022 AE-13750,Solar PV,30,,Category 2,"Baraboo, Sauk County, WI",Substation 495,Circuit 1242,In service,4/15/2022,Permission to Operate,6/24/2022 AE-13776,Solar PV,7,,Category 1,"Ferryville, Crawford County, WI",Substation 645,Circuit 1763,In service,4/15/2022,Permission to Operate,6/30/2022 AE-13738,Solar PV,10.4,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,4/14/2022,Permission to Operate,5/27/2022 AE-13741,Solar PV,10.8,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,4/14/2022,Permission to Operate,10/27/2022 AE-13752,Solar PV,5,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,4/14/2022,Permission to Operate,10/27/2022 AE-13753,Solar PV,15.4,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,4/14/2022,Permission to Operate,6/29/2022 AE-13762,Solar PV,9.8,,Category 1,"Sun Prairie, Dane County, WI",Substation 76,Circuit 186,In service,4/14/2022,Permission to Operate,5/12/2022 AE-13734,Solar PV,8.2,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,4/13/2022,Permission to Operate,6/2/2022 AE-13168,Solar PV,9.1,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1209,In service,4/13/2022,Permission to Operate,4/16/2024 AE-13735,Solar PV,5.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,4/13/2022,Permission to Operate,7/11/2022 AE-13702,Solar PV,8.8,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,4/11/2022,Permission to Operate,6/13/2022 AE-13638,Solar PV,7.5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,4/11/2022,Permission to Operate,6/24/2022 AE-13693,Solar PV,8,,Category 1,"Portage, Portage County, WI",,Circuit 1551,In service,4/11/2022,Permission to Operate,9/29/2022 AE-13639,Solar PV,1.4,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,4/11/2022,Permission to Operate,7/21/2022 AE-13553,Solar PV,3.7,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 20,In service,4/11/2022,Permission to Operate,11/1/2022 AE-13554,Solar PV,3.7,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 16,In service,4/11/2022,Permission to Operate,11/11/2022 AE-13399,"Solar PV, Wind, Battery/Storage",9,,Category 1,"Hillpoint, Sauk County, WI",Substation 710,Circuit 1946,In service,4/11/2022,Permission to Operate,1/13/2023 AE-13679,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,4/11/2022,Permission to Operate,6/11/2022 AE-13692,Solar PV,12.1,,Category 1,"Brodhead, Green County, WI",Substation 96,Circuit 260,In service,4/11/2022,Permission to Operate,10/5/2022 AE-13665,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,4/7/2022,Permission to Operate,8/8/2022 AE-13660,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,4/7/2022,Permission to Operate,6/17/2022 AE-13657,Solar PV,4.5,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 95,In service,4/7/2022,Permission to Operate,8/29/2022 AE-13644,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,4/6/2022,Permission to Operate,7/26/2022 AE-13634,"Solar PV, Battery/Storage",12.3,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1216,In service,4/6/2022,Permission to Operate,8/30/2022 AE-13630,Solar PV,7.6,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,4/6/2022,Permission to Operate,7/26/2022 AE-13637,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,4/6/2022,Permission to Operate,6/2/2022 AE-13646,"Solar PV, Battery/Storage",15.499,,Category 1,"Shawano, Shawano County, WI",Substation 652,Circuit 1789,In service,4/6/2022,Permission to Operate,11/15/2022 AE-13632,Solar PV,6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,4/6/2022,Permission to Operate,5/18/2022 AE-13649,Solar PV,3.8,,Category 1,"Sauk City, Dane County, WI",Substation 461,Circuit 1130,In service,4/6/2022,Permission to Operate,5/5/2022 AE-13622,Solar PV,9.57,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,4/5/2022,Permission to Operate,8/9/2022 AE-13621,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,4/5/2022,Permission to Operate,7/11/2022 AE-13605,Solar PV,8.8,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,4/4/2022,Permission to Operate,5/23/2022 AE-13602,Solar PV,3.3,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,4/4/2022,Permission to Operate,6/30/2022 AE-13599,Solar PV,16.4,,Category 1,"Van Dyne, Fond du Lac County, WI",Substation 524,Circuit 2201,In service,4/1/2022,Permission to Operate,7/27/2022 AE-13607,Solar PV,3.3,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,4/1/2022,Permission to Operate,5/24/2022 AE-13595,Solar PV,4.4,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,4/1/2022,Permission to Operate,4/26/2022 AE-13596,Solar PV,7.2,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,4/1/2022,Permission to Operate,4/29/2022 AE-13579,Solar PV,5.5,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1699,In service,4/1/2022,Permission to Operate,5/23/2022 AE-13536,Solar PV,5.2,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1732,In service,4/1/2022,Permission to Operate,7/15/2022 AE-13603,Solar PV,5,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,4/1/2022,Permission to Operate,6/3/2022 AE-13584,Solar PV,5.5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,4/1/2022,Permission to Operate,7/18/2022 AE-13571,Solar PV,7.7,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,4/1/2022,Permission to Operate,7/20/2022 AE-13590,Solar PV,14.3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1518,In service,4/1/2022,Permission to Operate,8/15/2022 AE-13578,Solar PV,3.8,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,3/31/2022,Permission to Operate,4/26/2022 AE-13555,Solar PV,13.5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,3/30/2022,Permission to Operate,6/22/2022 AE-13559,Solar PV,6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/30/2022,Permission to Operate,6/22/2022 AE-13564,Solar PV,9.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,3/30/2022,Permission to Operate,5/4/2022 AE-13558,Solar PV,6.6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,3/30/2022,Permission to Operate,5/23/2022 AE-13437,Solar PV,8.3,,Category 1,"Belleville, Dane County, WI",Substation 280,Circuit 670,In service,3/30/2022,Permission to Operate,4/27/2022 AE-13500,Solar PV,5.5,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1736,In service,3/30/2022,Permission to Operate,7/11/2022 AE-13556,Solar PV,8.2,,Category 1,"Sun Prairie, Dane County, WI",Substation 698,Circuit 1920,In service,3/29/2022,Permission to Operate,6/14/2022 AE-13546,Solar PV,4.6,,Category 1,"Lone Rock, Richland County, WI",Substation 606,Circuit 1636,In service,3/29/2022,Permission to Operate,7/26/2022 AE-13483,Solar PV,3.5,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1746,In service,3/29/2022,Permission to Operate,11/15/2022 AE-13545,Solar PV,3.5,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,3/29/2022,Permission to Operate,10/4/2022 AE-13525,Solar PV,6.6,,Category 1,"Howards Grove, Sheboygan County, WI",Substation 346,Circuit 833,In service,3/29/2022,Permission to Operate,7/5/2022 AE-13540,Solar PV,8.2,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 889,In service,3/29/2022,Permission to Operate,7/22/2022 AE-13432,Solar PV,4.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,3/28/2022,Permission to Operate,8/8/2022 AE-13426,Solar PV,43.5,,Category 2,"Fox Lake, Dodge County, WI",Substation 278,Circuit 662,In service,3/28/2022,Permission to Operate,9/9/2022 AE-13528,Solar PV,6.3,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,3/28/2022,Permission to Operate,4/27/2022 AE-13283,Solar PV,4.8,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1209,In service,3/28/2022,Permission to Operate,12/29/2022 AE-13505,Solar PV,5.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1455,In service,3/25/2022,Permission to Operate,6/7/2022 AE-13524,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,3/25/2022,Permission to Operate,7/18/2022 AE-13529,Solar PV,7.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 926,In service,3/25/2022,Permission to Operate,8/25/2022 AE-13214,Solar PV,51.4,,Category 2,"Loganville, Sauk County, WI",Substation 421,Circuit 1052,In service,3/25/2022,Permission to Operate,9/21/2023 AE-13522,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,3/25/2022,Permission to Operate,7/21/2022 AE-13520,Solar PV,3.9,,Category 1,"Berlin, Green Lake County, WI",,Circuit 172,In service,3/24/2022,Permission to Operate,4/26/2022 AE-13515,Solar PV,7,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,3/23/2022,Permission to Operate,10/7/2022 AE-13363,Solar PV,9.4,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1198,In service,3/23/2022,Permission to Operate,7/17/2023 AE-13514,Solar PV,13.3,,Category 1,"Marion, Waupaca County, WI",Substation 494,Circuit 1237,In service,3/23/2022,Permission to Operate,5/20/2022 AE-13511,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,3/23/2022,Permission to Operate,6/2/2022 AE-13504,Solar PV,3.8,,Category 1,"Plainfield, Waushara County, WI",Substation 575,Circuit 1512,In service,3/22/2022,Permission to Operate,6/27/2022 AE-13503,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,3/22/2022,Permission to Operate,5/18/2022 AE-13336,Solar PV,7.5,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 404,Circuit 1000,In service,3/22/2022,Permission to Operate,4/22/2022 AE-13411,"Solar PV, Battery/Storage",26.9,,Category 2,"Black Earth, Dane County, WI",Substation 483,Circuit 1209,In service,3/22/2022,Permission to Operate,7/19/2022 AE-13478,Solar PV,9.3,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,3/21/2022,Permission to Operate,11/16/2022 AE-13481,Solar PV,7.6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,3/21/2022,Permission to Operate,6/23/2022 AE-13468,Solar PV,7.6,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1118,In service,3/21/2022,Permission to Operate,5/9/2022 AE-13479,Solar PV,7,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,3/21/2022,Permission to Operate,4/12/2022 AE-13470,Solar PV,6.3,,Category 1,"Poy Sippi, Waushara County, WI",Substation 281,Circuit 675,In service,3/21/2022,Permission to Operate,5/13/2022 AE-13098,Solar PV,5,,Category 1,"Clinton, Rock County, WI",,Circuit 364,In service,3/21/2022,Permission to Operate,5/12/2022 AE-13474,Solar PV,3.5,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,3/18/2022,Permission to Operate,5/16/2022 AE-13472,Solar PV,10,,Category 1,"Columbus, Dane County, WI",,Circuit 2000,In service,3/18/2022,Permission to Operate,7/28/2022 AE-13458,Solar PV,6.6,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1357,In service,3/17/2022,Permission to Operate,8/19/2022 AE-13375,Solar PV,7.5,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,3/17/2022,Permission to Operate,8/12/2022 AE-13461,Solar PV,5.1,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,3/17/2022,Permission to Operate,4/8/2022 AE-13452,Solar PV,8.1,,Category 1,"Stoughton, Dane County, WI",,Circuit 972,In service,3/17/2022,Permission to Operate,9/9/2022 AE-13358,Solar PV,8.7,,Category 1,"Wisconsin Dells, Columbia County, WI",Substation 387,Circuit 957,In service,3/16/2022,Permission to Operate,9/28/2022 AE-13442,Solar PV,8.2,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1227,In service,3/16/2022,Permission to Operate,5/13/2022 AE-13104,Solar PV,347.8,,Category 3,"Mcfarland, Dane County, WI",,Circuit 1143,In service,3/16/2022,Permission to Operate,6/19/2023 AE-13433,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,3/16/2022,Permission to Operate,7/5/2022 AE-13412,Solar PV,9.5,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 535,Circuit 1381,In service,3/15/2022,Permission to Operate,5/10/2022 AE-13413,Solar PV,6.7,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 2069,In service,3/15/2022,Permission to Operate,8/19/2022 AE-13410,Solar PV,8.5,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1919,In service,3/15/2022,Permission to Operate,6/24/2022 AE-13420,Solar PV,7.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1697,In service,3/15/2022,Permission to Operate,8/19/2022 AE-13194,Solar PV,6.4,,Category 1,"Delevan, Walworth County, WI",,Circuit 2068,In service,3/15/2022,Permission to Operate,7/8/2022 AE-13416,Solar PV,5.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,3/15/2022,Permission to Operate,8/31/2022 AE-13380,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,3/14/2022,Permission to Operate,5/25/2022 AE-13255,Solar PV,133.2,,Category 2,"Mcfarland, Dane County, WI",Substation 146,Circuit 389,In service,3/14/2022,Permission to Operate,4/14/2023 AE-13396,Solar PV,11.4,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,3/14/2022,Permission to Operate,7/28/2022 AE-13379,Solar PV,8.2,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 861,In service,3/11/2022,Permission to Operate,4/20/2022 AE-13372,"Solar PV, Battery/Storage",6.64,,Category 1,"Green Lake, Green Lake County, WI",,Circuit 453,In service,3/11/2022,Permission to Operate,9/21/2022 AE-13228,Solar PV,7.6,,Category 1,"Sauk City, Sauk County, WI",Substation 461,Circuit 1130,In service,3/10/2022,Permission to Operate,10/6/2022 AE-13371,Solar PV,5.1,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,3/10/2022,Permission to Operate,6/14/2022 AE-13349,Solar PV,3.5,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,3/9/2022,Permission to Operate,4/15/2022 AE-13338,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",,Circuit 1183,In service,3/8/2022,Permission to Operate,6/2/2022 AE-13334,Solar PV,11.4,,Category 1,"Mineral Point, Lafayette County, WI",Substation 59,Circuit 161,In service,3/8/2022,Permission to Operate,7/26/2022 AE-13337,Solar PV,7.6,,Category 1,"Marshfield, Wood County, WI",Substation 573,Circuit 1508,In service,3/8/2022,Permission to Operate,1/30/2023 AE-13324,Solar PV,7.7,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 1999,In service,3/7/2022,Permission to Operate,5/16/2022 AE-13311,Solar PV,10,,Category 1,"Browntown, Green County, WI",Substation 95,Circuit 2164,In service,3/7/2022,Permission to Operate,6/2/2022 AE-13162,"Solar PV, Battery/Storage",17,,Category 1,"Omro, Winnebago County, WI",Substation 549,Circuit 1449,In service,3/4/2022,Permission to Operate,6/9/2022 AE-13265,Solar PV,10.4,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,3/2/2022,Permission to Operate,5/5/2022 AE-13266,Solar PV,11.4,,Category 1,"Pardeeville, Dane County, WI",Substation 448,Circuit 1112,In service,3/2/2022,Permission to Operate,6/3/2022 AE-13281,Solar PV,11.5,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 315,In service,3/2/2022,Permission to Operate,8/29/2022 AE-13263,Solar PV,15.2,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,3/2/2022,Permission to Operate,8/19/2022 AE-13249,Solar PV,7.6,,Category 1,"Marion, Waupaca County, WI",Substation 494,Circuit 1235,In service,3/1/2022,Permission to Operate,7/7/2022 AE-13260,Solar PV,7.7,,Category 1,"Princeton, Green Lake County, WI",Substation 596,Circuit 1609,In service,3/1/2022,Permission to Operate,7/27/2022 AE-12875,Solar PV,13.7,,Category 1,"Avoca, Iowa County, WI",Substation 45,Circuit 128,In service,2/28/2022,Permission to Operate,5/27/2022 AE-13236,Solar PV,7,,Category 1,"Dodgeville, Iowa County, WI",Substation 783,Circuit 2137,In service,2/28/2022,Permission to Operate,9/14/2023 AE-13173,Solar PV,11.2,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,2/25/2022,Permission to Operate,3/28/2022 AE-13160,Solar PV,4.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,2/25/2022,Permission to Operate,4/12/2022 AE-13226,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,2/25/2022,Permission to Operate,4/12/2022 AE-13209,Solar PV,5.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,2/24/2022,Permission to Operate,4/26/2022 AE-13197,Solar PV,6,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,2/24/2022,Permission to Operate,4/12/2022 AE-13204,"Solar PV, Battery/Storage",11.74,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1230,In service,2/24/2022,Permission to Operate,4/4/2022 AE-13208,Solar PV,6.6,,Category 1,"Fontana, Walworth County, WI",,Circuit 2018,In service,2/24/2022,Permission to Operate,4/21/2022 AE-13189,"Solar PV, Battery/Storage",18.18,,Category 1,"Barneveld, Iowa County, WI",,Circuit 222,In service,2/23/2022,Permission to Operate,7/26/2022 AE-13170,Solar PV,7.6,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1191,In service,2/23/2022,Permission to Operate,11/1/2022 AE-13180,"Solar PV, Battery/Storage",17.6,,Category 1,"Genoa City, Kenosha County, WI",,Circuit 1667,In service,2/23/2022,Permission to Operate,3/21/2022 AE-13190,Solar PV,7.5,,Category 1,"Middleton, Dane County, WI",Substation 686,Circuit 1895,In service,2/23/2022,Permission to Operate,4/12/2022 AE-13161,Solar PV,9.4,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,2/22/2022,Permission to Operate,4/29/2022 AE-13165,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,2/22/2022,Permission to Operate,6/7/2022 AE-13166,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,2/22/2022,Permission to Operate,6/7/2022 AE-13177,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,2/22/2022,Permission to Operate,3/29/2022 AE-13167,Solar PV,17.6,,Category 1,"Cross Plains, Dane County, WI",Substation 686,Circuit 1895,In service,2/22/2022,Permission to Operate,5/27/2022 AE-13156,Solar PV,11.4,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,2/21/2022,Permission to Operate,5/6/2022 AE-13154,Solar PV,14.7,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,2/21/2022,Permission to Operate,4/15/2022 AE-13127,"Solar PV, Battery/Storage",12.8,,Category 1,"Amherst Junction, Portage County, WI",Substation 624,Circuit 1689,In service,2/18/2022,Permission to Operate,5/18/2022 AE-13155,Solar PV,7.6,,Category 1,"Beloit, Rock County, WI",Substation 529,Circuit 1352,In service,2/18/2022,Permission to Operate,9/28/2022 AE-13121,Solar PV,10.1,,Category 1,"Wisconsin Dells, Columbia County, WI",Substation 387,Circuit 957,In service,2/17/2022,Permission to Operate,9/21/2022 AE-13119,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,2/17/2022,Permission to Operate,6/2/2022 AE-13114,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/17/2022,Permission to Operate,4/20/2022 AE-13101,Solar PV,9.9,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,2/16/2022,Permission to Operate,4/29/2022 AE-13108,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1518,In service,2/16/2022,Permission to Operate,4/19/2022 AE-13107,"Solar PV, Battery/Storage",35.4,,Category 2,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,2/16/2022,Permission to Operate,7/25/2024 AE-12986,"Solar PV, Battery/Storage",15.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 783,Circuit 2137,In service,2/16/2022,Permission to Operate,4/15/2022 AE-13090,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,2/15/2022,Permission to Operate,4/13/2022 AE-13037,Solar PV,7,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 672,In service,2/15/2022,Permission to Operate,6/30/2022 AE-13096,Solar PV,10,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1665,In service,2/15/2022,Permission to Operate,11/10/2022 AE-13095,Solar PV,15.2,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,2/15/2022,Permission to Operate,4/12/2022 AE-13091,Solar PV,3.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,2/15/2022,Permission to Operate,4/12/2022 AE-13057,Solar PV,10.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,2/15/2022,Permission to Operate,3/22/2022 AE-13080,Solar PV,10.5,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 420,In service,2/14/2022,Permission to Operate,7/12/2022 AE-13075,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,2/14/2022,Permission to Operate,6/14/2022 AE-13061,Solar PV,5.8,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 433,Circuit 1100,In service,2/11/2022,Permission to Operate,4/20/2022 AE-13067,Solar PV,5.9,,Category 1,"Howards Grove, Sheboygan County, WI",Substation 346,Circuit 833,In service,2/11/2022,Permission to Operate,4/13/2022 AE-13069,Solar PV,10,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 1999,In service,2/11/2022,Permission to Operate,5/19/2022 AE-12963,Solar PV,22.8,,Category 2,"Morrisonville, Dane County, WI",,Circuit 472,In service,2/10/2022,Permission to Operate,9/19/2022 AE-13038,Solar PV,7,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,2/9/2022,Permission to Operate,5/24/2022 AE-13016,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,2/8/2022,Permission to Operate,7/18/2022 AE-13026,Solar PV,4.8,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,2/8/2022,Permission to Operate,6/7/2022 AE-13014,Solar PV,7.6,,Category 1,"Richland Center, Richland County, WI",Substation 572,Circuit 1505,In service,2/7/2022,Permission to Operate,4/26/2022 AE-13005,Solar PV,4.4,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,2/4/2022,Permission to Operate,4/20/2022 AE-12983,Solar PV,8.4,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1877,In service,2/3/2022,Permission to Operate,4/26/2022 AE-12979,Solar PV,5.1,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1185,In service,2/3/2022,Permission to Operate,5/16/2023 AE-12984,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2126,In service,2/2/2022,Permission to Operate,4/26/2022 AE-12967,Solar PV,6,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,2/1/2022,Permission to Operate,6/17/2022 AE-12656,Solar PV,5,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,2/1/2022,Permission to Operate,3/17/2022 AE-12966,Solar PV,16.6,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 583,In service,2/1/2022,Permission to Operate,7/18/2022 AE-12925,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,2/1/2022,Permission to Operate,3/28/2022 AE-12935,Solar PV,7.6,,Category 1,"Blanchardville, Lafayette County, WI",Substation 77,Circuit 192,In service,1/28/2022,Permission to Operate,7/19/2022 AE-12944,Solar PV,13.7,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 302,In service,1/28/2022,Permission to Operate,4/13/2022 AE-12937,Solar PV,7.2,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1218,In service,1/28/2022,Permission to Operate,3/9/2022 AE-12932,Solar PV,7.6,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,1/27/2022,Permission to Operate,4/12/2022 AE-12919,Solar PV,12.7,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,1/27/2022,Permission to Operate,2/28/2022 AE-12910,Solar PV,10,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,1/26/2022,Permission to Operate,4/12/2022 AE-12912,Solar PV,7.2,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 317,In service,1/26/2022,Permission to Operate,3/28/2022 AE-12917,Solar PV,15.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,1/26/2022,Permission to Operate,5/27/2022 AE-12892,Solar PV,7.6,,Category 1,"Sauk City, Sauk County, WI",Substation 710,Circuit 1947,In service,1/25/2022,Permission to Operate,2/25/2022 AE-12904,Solar PV,15.2,,Category 1,"Hill Point, Sauk County, WI",Substation 710,Circuit 1946,In service,1/25/2022,Permission to Operate,8/29/2022 AE-12907,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,1/25/2022,Permission to Operate,2/24/2022 AE-12900,Solar PV,7.6,,Category 1,"Hill Point, Sauk County, WI",Substation 710,Circuit 1946,In service,1/25/2022,Permission to Operate,8/29/2022 AE-12905,Solar PV,3.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,1/25/2022,Permission to Operate,4/19/2022 AE-12877,Solar PV,7.8,,Category 1,"Beloit, Rock County, WI",Substation 529,Circuit 1352,In service,1/24/2022,Permission to Operate,2/17/2022 AE-12891,Solar PV,8.8,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1006,In service,1/24/2022,Permission to Operate,6/6/2022 AE-12878,Solar PV,3.9,,Category 1,"Beloit, Rock County, WI",Substation 529,Circuit 1352,In service,1/24/2022,Permission to Operate,2/17/2022 AE-12876,Solar PV,7.2,,Category 1,"Delavan, Walworth County, WI",Substation 81,Circuit 226,In service,1/21/2022,Permission to Operate,8/19/2022 AE-12791,Solar PV,20,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 519,In service,1/20/2022,Permission to Operate,6/22/2022 AE-12745,Solar PV,6,,Category 1,"Blue Mounds, Iowa County, WI",Substation 483,Circuit 1211,In service,1/20/2022,Permission to Operate,12/6/2022 AE-12862,Solar PV,8.8,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,1/20/2022,Permission to Operate,3/1/2022 AE-12838,Solar PV,6.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,1/20/2022,Permission to Operate,3/14/2022 AE-12865,Solar PV,5.1,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 20,In service,1/20/2022,Permission to Operate,7/29/2022 AE-12858,Solar PV,10,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 614,In service,1/20/2022,Permission to Operate,2/15/2023 AE-12849,Solar PV,7.5,,Category 1,"Cross Plains, Dane County, WI",Substation 686,Circuit 1895,In service,1/19/2022,Permission to Operate,2/18/2022 AE-12841,Solar PV,6,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,1/18/2022,Permission to Operate,3/15/2022 AE-12842,Solar PV,3.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,1/18/2022,Permission to Operate,7/28/2022 AE-12828,Solar PV,4.1,,Category 1,"Montello, Marquette County, WI",Substation 515,Circuit 1312,In service,1/17/2022,Permission to Operate,4/29/2022 AE-12638,Solar PV,3,,Category 1,"Pell Lake, Walworth County, WI",Substation 660,Circuit 1810,In service,1/14/2022,Permission to Operate,7/20/2022 AE-12819,Solar PV,5.1,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,1/14/2022,Permission to Operate,4/25/2022 AE-12837,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 135,In service,1/14/2022,Permission to Operate,2/15/2022 AE-12808,Solar PV,3.8,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,1/13/2022,Permission to Operate,3/10/2022 AE-12812,Solar PV,5.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,1/13/2022,Permission to Operate,2/21/2022 AE-12817,Solar PV,5.1,,Category 1,"Linden, Iowa County, WI",,Circuit 1184,In service,1/13/2022,Permission to Operate,7/18/2022 AE-12807,Solar PV,14.8,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,1/13/2022,Permission to Operate,3/2/2022 AE-12798,Solar PV,16,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,1/12/2022,Permission to Operate,6/20/2022 AE-12739,Solar PV,15.2,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,1/12/2022,Permission to Operate,8/9/2022 AE-12698,Solar PV,12257.8,,Category 4,"Portage, Portage County, WI",,,In service,1/11/2022,Permission to Operate,5/8/2023 AE-12787,Solar PV,3.7,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,1/11/2022,Permission to Operate,9/21/2022 AE-12785,Solar PV,6,,Category 1,"Fennimore, Grant County, WI",Substation 398,Circuit 989,In service,1/11/2022,Permission to Operate,6/3/2022 AE-11610,"Solar PV, Battery/Storage",18.98,,Category 1,"Baraboo, Sauk County, WI",Substation 466,Circuit 1155,In service,1/11/2022,Permission to Operate,10/28/2022 AE-12685,Solar PV,3.7,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1987,In service,1/11/2022,Permission to Operate,6/2/2022 AE-12526,Solar PV,17.6,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,1/10/2022,Permission to Operate,7/13/2022 AE-12772,Solar PV,20,,Category 1,"Cuba City, Grant County, WI",Substation 386,Circuit 2179,In service,1/10/2022,Permission to Operate,4/12/2022 AE-12755,Solar PV,7.5,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2146,In service,1/10/2022,Permission to Operate,4/19/2022 AE-12748,"Solar PV, Battery/Storage",9.34,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 199,In service,1/6/2022,Permission to Operate,6/24/2022 AE-12740,Solar PV,10,,Category 1,"Marion, Waushara County, WI",Substation 494,Circuit 1234,In service,1/5/2022,Permission to Operate,2/7/2023 AE-12626,Solar PV,10,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,1/3/2022,Permission to Operate,5/10/2022 AE-12669,Solar PV,7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,1/3/2022,Permission to Operate,4/28/2022 AE-12689,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1927,In service,12/30/2021,Permission to Operate,2/9/2022 AE-12684,Solar PV,5.1,,Category 1,"Sauk City, Sauk County, WI",Substation 461,Circuit 1130,In service,12/30/2021,Permission to Operate,5/17/2022 AE-12654,Solar PV,7.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/29/2021,Permission to Operate,8/31/2022 AE-12675,Solar PV,13.6,,Category 1,"Warrens, Monroe County, WI",,Circuit 2113,In service,12/29/2021,Permission to Operate,6/16/2022 AE-12664,Solar PV,7.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 355,Circuit 855,In service,12/29/2021,Permission to Operate,4/19/2022 AE-12665,Solar PV,7.7,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,12/29/2021,Permission to Operate,2/16/2022 AE-12662,"Solar PV, Battery/Storage",16.8,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 270,In service,12/29/2021,Permission to Operate,7/27/2022 AE-12660,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,12/28/2021,Permission to Operate,6/24/2022 AE-12667,Solar PV,7.6,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 61,In service,12/28/2021,Permission to Operate,7/7/2022 AE-12643,Solar PV,3.3,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/27/2021,Permission to Operate,4/20/2022 AE-12639,Solar PV,17.6,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,12/27/2021,Permission to Operate,4/28/2022 AE-12653,Solar PV,9.4,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1435,In service,12/27/2021,Permission to Operate,7/13/2022 AE-12630,Solar PV,7.9,,Category 1,"Prairie Du Sac, Sauk County, WI",Substation 710,Circuit 1948,In service,12/27/2021,Permission to Operate,4/28/2022 AE-12635,Solar PV,6,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,12/23/2021,Permission to Operate,5/18/2022 AE-12374,Solar PV,5.1,,Category 1,"Ferryville, Crawford County, WI",Substation 645,Circuit 1763,In service,12/23/2021,Permission to Operate,12/8/2022 AE-12579,Solar PV,5.1,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1009,In service,12/22/2021,Permission to Operate,9/9/2022 AE-12633,Solar PV,7.7,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,12/22/2021,Permission to Operate,2/9/2022 AE-12582,"Solar PV, Battery/Storage",10.6,,Category 1,"Delavan, Walworth County, WI",Substation 207,Circuit 480,In service,12/21/2021,Permission to Operate,5/4/2022 AE-12594,Solar PV,7.7,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,12/21/2021,Permission to Operate,2/18/2022 AE-12587,Solar PV,3.8,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/20/2021,Permission to Operate,2/15/2022 AE-12580,Solar PV,5.2,,Category 1,"Ripon, Fond du Lac County, WI",Substation 610,Circuit 1643,In service,12/20/2021,Permission to Operate,2/2/2022 AE-12589,Solar PV,4.4,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/20/2021,Permission to Operate,2/14/2022 AE-12581,Solar PV,4.2,,Category 1,"Delavan, Walworth County, WI",,Circuit 2065,In service,12/20/2021,Permission to Operate,2/1/2022 AE-12380,Solar PV,16.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1653,In service,12/17/2021,Permission to Operate,4/12/2022 AE-12687,Solar PV,11.4,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,12/16/2021,Permission to Operate,3/9/2022 AE-12567,Solar PV,7,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 135,In service,12/16/2021,Permission to Operate,2/8/2022 AE-12449,Solar PV,7.7,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,12/15/2021,Permission to Operate,2/14/2022 AE-12457,Solar PV,20,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,12/15/2021,Permission to Operate,4/12/2022 AE-12423,Solar PV,5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/15/2021,Permission to Operate,2/8/2022 AE-12428,Solar PV,5.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/15/2021,Permission to Operate,3/2/2022 AE-12548,Solar PV,12.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 623,In service,12/15/2021,Permission to Operate,3/15/2022 AE-12560,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,12/15/2021,Permission to Operate,2/14/2022 AE-12540,Solar PV,9.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,12/15/2021,Permission to Operate,2/8/2022 AE-12456,Solar PV,11.4,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,12/15/2021,Permission to Operate,4/12/2022 AE-12531,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,12/14/2021,Permission to Operate,1/24/2022 AE-12527,Solar PV,11.4,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 623,In service,12/14/2021,Permission to Operate,10/26/2022 AE-12536,Solar PV,7.2,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/14/2021,Permission to Operate,3/9/2022 AE-12512,"Solar PV, Battery/Storage",8.74,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 839,In service,12/13/2021,Permission to Operate,8/23/2022 AE-12513,Solar PV,3.8,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/13/2021,Permission to Operate,2/14/2022 AE-12509,Solar PV,6.6,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,12/13/2021,Permission to Operate,1/21/2022 AE-12503,Solar PV,3.8,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/13/2021,Permission to Operate,3/2/2022 AE-12524,Solar PV,6,,Category 1,"Omro, Winnebago County, WI",Substation 766,Circuit 2077,In service,12/13/2021,Permission to Operate,2/8/2022 AE-12520,Solar PV,5.5,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,12/13/2021,Permission to Operate,3/3/2022 AE-12497,Solar PV,7.7,,Category 1,"Deforest, Dane County, WI",,Circuit 475,In service,12/10/2021,Permission to Operate,1/31/2022 AE-12498,Solar PV,5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/10/2021,Permission to Operate,2/8/2022 AE-12495,Solar PV,11,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,12/10/2021,Permission to Operate,2/3/2022 AE-12369,Solar PV,15,,Category 1,"Cross Plains, Dane County, WI",Substation 686,Circuit 1894,In service,12/10/2021,Permission to Operate,2/14/2022 AE-12435,Solar PV,3.3,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,12/10/2021,Permission to Operate,2/8/2022 AE-12505,Solar PV,4.4,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/10/2021,Permission to Operate,2/14/2022 AE-12488,Solar PV,7.5,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1227,In service,12/9/2021,Permission to Operate,3/9/2022 AE-12480,Solar PV,6,,Category 1,"W7475 Aspen Trl, Columbia County, WI",Substation 781,Circuit 2132,In service,12/9/2021,Permission to Operate,2/10/2022 AE-12491,Solar PV,5.5,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,12/9/2021,Permission to Operate,1/27/2022 AE-12485,Solar PV,10,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,12/9/2021,Permission to Operate,4/12/2022 AE-12478,Solar PV,8.2,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/9/2021,Permission to Operate,2/25/2022 AE-12463,Solar PV,6.7,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,12/8/2021,Permission to Operate,2/28/2022 AE-12466,Solar PV,5.1,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 18,In service,12/8/2021,Permission to Operate,2/15/2022 AE-12473,Solar PV,6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/8/2021,Permission to Operate,2/24/2022 AE-12440,Solar PV,7.7,,Category 1,"Springdale, Dane County, WI",Substation 722,Circuit 1973,In service,12/7/2021,Permission to Operate,2/14/2022 AE-12452,Solar PV,3.7,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,12/7/2021,Permission to Operate,1/11/2023 AE-12445,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1711,In service,12/7/2021,Permission to Operate,2/1/2022 AE-12393,Solar PV,4.4,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,12/7/2021,Permission to Operate,4/21/2022 AE-12201,Solar PV,7.6,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1354,In service,12/7/2021,Permission to Operate,7/20/2022 AE-12414,Solar PV,7.7,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/6/2021,Permission to Operate,2/3/2022 AE-12413,Solar PV,5.5,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,12/3/2021,Permission to Operate,2/24/2022 AE-12415,Solar PV,5,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,12/3/2021,Permission to Operate,1/31/2022 AE-12416,Solar PV,5.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/3/2021,Permission to Operate,2/3/2022 AE-12419,Solar PV,5.5,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,12/3/2021,Permission to Operate,6/14/2022 AE-12410,Solar PV,12.8,,Category 1,"Sauk City, Dane County, WI",,,In service,12/3/2021,Permission to Operate,12/23/2021 AE-12394,Solar PV,7.6,,Category 1,"Prairie Du Sac, Sauk County, WI",Substation 710,Circuit 1948,In service,12/2/2021,Permission to Operate,4/12/2022 AE-12389,Solar PV,4.4,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1745,In service,12/2/2021,Permission to Operate,2/15/2022 AE-12376,"Solar PV, Battery/Storage",14,,Category 1,"Baraboo, Sauk County, WI",Substation 418,Circuit 1039,In service,12/2/2021,Permission to Operate,1/6/2022 AE-12397,Solar PV,11.4,,Category 1,"Argyle, Lafayette County, WI",Substation 77,Circuit 192,In service,12/2/2021,Permission to Operate,2/11/2022 AE-12396,Solar PV,3.8,,Category 1,"Argyle, Lafayette County, WI",Substation 77,Circuit 192,In service,12/2/2021,Permission to Operate,1/28/2022 AE-12405,Solar PV,18,,Category 1,"Mount Calvary, Fond du Lac County, WI",Substation 391,Circuit 976,In service,12/2/2021,Permission to Operate,1/21/2022 AE-12378,Solar PV,4.4,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,12/1/2021,Permission to Operate,4/25/2022 AE-12366,Solar PV,5,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,12/1/2021,Permission to Operate,2/14/2022 AE-12362,Solar PV,7.6,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,11/30/2021,Permission to Operate,12/7/2022 AE-12234,Solar PV,7.7,,Category 1,"Green Lake, Green Lake County, WI",,Circuit 457,In service,11/30/2021,Permission to Operate,2/17/2022 AE-12514,Solar PV,15,,Category 1,"Darlington, Lafayette County, WI",,Circuit 1606,In service,11/29/2021,Permission to Operate,12/23/2021 AE-12352,Solar PV,7.6,,Category 1,"Manawa, Waupaca County, WI",Substation 433,Circuit 1098,In service,11/29/2021,Permission to Operate,2/1/2023 AE-12291,Solar PV,7.6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,11/29/2021,Permission to Operate,3/9/2022 AE-12344,Solar PV,10,,Category 1,"La Valle, Sauk County, WI",,Circuit 110,In service,11/29/2021,Permission to Operate,2/1/2022 AE-12341,Solar PV,12,,Category 1,"Blanchardville, Lafayette County, WI",Substation 525,Circuit 1344,In service,11/24/2021,Permission to Operate,4/26/2022 AE-12342,Solar PV,5.1,,Category 1,"Iola, Waupaca County, WI",Substation 364,Circuit 895,In service,11/24/2021,Permission to Operate,2/22/2022 AE-12333,Solar PV,2.9,,Category 1,"Lake Geneva, Walworth County, WI",Substation 393,Circuit 982,In service,11/24/2021,Permission to Operate,12/22/2021 AE-12273,Solar PV,10,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,11/23/2021,Permission to Operate,11/10/2022 AE-12314,Solar PV,11.4,,Category 1,"Woodford, Green County, WI",,Circuit 930,In service,11/23/2021,Permission to Operate,12/17/2021 AE-12325,Solar PV,7.6,,Category 1,"Highland, Iowa County, WI",Substation 45,Circuit 129,In service,11/23/2021,Permission to Operate,4/27/2022 AE-12304,Solar PV,8.1,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2132,In service,11/23/2021,Permission to Operate,3/28/2022 AE-12281,Solar PV,7,,Category 1,"Amherst, Portage County, WI",Substation 41,Circuit 2242,In service,11/23/2021,Permission to Operate,12/23/2021 AE-12301,Solar PV,5.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,11/23/2021,Permission to Operate,2/3/2022 AE-12305,Solar PV,7.2,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,11/22/2021,Permission to Operate,2/24/2022 AE-12300,Solar PV,7.2,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,11/19/2021,Permission to Operate,5/24/2022 AE-12284,Solar PV,5,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,11/19/2021,Permission to Operate,1/26/2022 AE-12287,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1925,In service,11/19/2021,Permission to Operate,2/15/2022 AE-12282,Solar PV,3.3,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1745,In service,11/19/2021,Permission to Operate,2/3/2022 AE-12309,Solar PV,7.2,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,11/19/2021,Permission to Operate,1/31/2022 AE-12235,Solar PV,3.7,,Category 1,"Montfort, Grant County, WI",Substation 241,Circuit 582,In service,11/19/2021,Permission to Operate,2/3/2022 AE-12263,Solar PV,11.4,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 316,In service,11/18/2021,Permission to Operate,12/15/2021 AE-12073,Solar PV,5,,Category 1,"Lavalle, Sauk County, WI",,Circuit 110,In service,11/18/2021,Permission to Operate,6/22/2022 AE-12267,Solar PV,11.4,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,11/18/2021,Permission to Operate,12/23/2021 AE-12268,Solar PV,7.6,,Category 1,"Sauk City, Sauk County, WI",Substation 710,Circuit 1947,In service,11/18/2021,Permission to Operate,3/17/2022 AE-12257,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,11/17/2021,Permission to Operate,1/31/2022 AE-12254,Solar PV,14.3,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,11/17/2021,Permission to Operate,8/8/2022 AE-11923,Solar PV,15.4,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1435,In service,11/16/2021,Permission to Operate,12/27/2023 AE-12174,"Solar PV, Battery/Storage",12.24,,Category 1,"Dodgeville, Iowa County, WI",Substation 783,Circuit 2138,In service,11/16/2021,Permission to Operate,5/24/2022 AE-12173,Solar PV,13,,Category 1,"Marion, Waupaca County, WI",Substation 494,Circuit 1234,In service,11/16/2021,Permission to Operate,1/14/2022 AE-12199,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,11/15/2021,Permission to Operate,5/27/2022 AE-12237,Solar PV,15,,Category 1,"Clinton, Rock County, WI",,Circuit 365,In service,11/15/2021,Permission to Operate,1/13/2022 AE-12227,Solar PV,10,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,In service,11/15/2021,Permission to Operate,2/17/2022 AE-12217,Solar PV,7.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,11/15/2021,Permission to Operate,1/12/2022 AE-12222,Solar PV,3.8,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1745,In service,11/15/2021,Permission to Operate,2/15/2022 AE-12225,Solar PV,16.1,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,11/15/2021,Permission to Operate,4/19/2022 AE-12189,Solar PV,4.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,11/11/2021,Permission to Operate,2/14/2022 AE-12184,Solar PV,5.5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,11/11/2021,Permission to Operate,12/27/2021 AE-12067,Solar PV,12.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,11/10/2021,Permission to Operate,4/18/2022 AE-12080,Solar PV,10,,Category 1,"Portage, Portage County, WI",Substation 252,Circuit 606,In service,11/10/2021,Permission to Operate,5/10/2022 AE-12011,"Solar PV, Battery/Storage",10,,Category 1,"Almond, Portage County, WI",Substation 651,Circuit 1787,In service,11/10/2021,Permission to Operate,12/22/2021 AE-12171,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,11/10/2021,Permission to Operate,3/8/2022 AE-12169,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,11/10/2021,Permission to Operate,2/1/2022 AE-12172,Solar PV,5.5,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,11/10/2021,Permission to Operate,12/22/2021 AE-12152,Solar PV,6,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,11/9/2021,Permission to Operate,3/10/2022 AE-12138,Solar PV,6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,11/9/2021,Permission to Operate,1/17/2022 AE-12161,"Solar PV, Battery/Storage",7.6,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1814,In service,11/9/2021,Permission to Operate,3/28/2022 AE-12089,Solar PV,10,,Category 1,"Mt Horeb, Dane County, WI",Substation 280,Circuit 671,In service,11/8/2021,Permission to Operate,6/13/2022 AE-12125,Solar PV,23.6,,Category 2,"Oregon, Dane County, WI",,Circuit 1881,In service,11/8/2021,Permission to Operate,7/6/2023 AE-12091,"Solar PV, Battery/Storage",17.6,,Category 1,"Birnamwood, Marathon County, WI",Substation 74,Circuit 181,In service,11/4/2021,Permission to Operate,3/23/2022 AE-12102,Solar PV,5.8,,Category 1,"Manwa, Waupaca County, WI",Substation 494,Circuit 1234,In service,11/4/2021,Permission to Operate,6/24/2022 AE-11758,Solar PV,333,,Category 3,"Deforest, Dane County, WI",Substation 726,Circuit 1985,In service,11/3/2021,Permission to Operate,3/10/2022 AE-11759,Solar PV,133.2,,Category 2,"Deforest, Dane County, WI",,Circuit 474,In service,11/3/2021,Permission to Operate,3/2/2022 AE-12082,Solar PV,10,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1737,In service,11/3/2021,Permission to Operate,9/9/2022 AE-11510,Solar PV,16.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,11/3/2021,Permission to Operate,1/4/2022 AE-12085,Solar PV,4.9,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 318,In service,11/3/2021,Permission to Operate,12/15/2021 AE-11951,"Solar PV, Battery/Storage",9,,Category 1,"Sauk City, Dane County, WI",,Circuit 496,In service,11/3/2021,Permission to Operate,12/2/2021 AE-11687,"Solar PV, Battery/Storage",22.4,,Category 2,"Williams Bay, Walworth County, WI",,Circuit 2067,In service,11/2/2021,Permission to Operate,7/5/2022 AE-12072,Solar PV,10,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,11/2/2021,Permission to Operate,2/11/2022 AE-11995,Solar PV,7,,Category 1,"Brandon, Fond du Lac County, WI",,Circuit 682,In service,11/1/2021,Permission to Operate,2/1/2022 AE-12049,Solar PV,4.4,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,11/1/2021,Permission to Operate,2/15/2022 AE-12053,Solar PV,10,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,11/1/2021,Permission to Operate,6/7/2023 AE-12047,Solar PV,10.1,,Category 1,"Port Edwards, Wood County, WI",Substation 584,Circuit 1536,In service,11/1/2021,Permission to Operate,4/20/2022 AE-12043,Solar PV,11.4,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,11/1/2021,Permission to Operate,3/9/2022 AE-12048,Solar PV,16.8,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2242,In service,11/1/2021,Permission to Operate,3/7/2022 AE-12045,Solar PV,7.5,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 338,Circuit 804,In service,11/1/2021,Permission to Operate,12/22/2021 AE-12046,Solar PV,3.7,,Category 1,"Delavan, Walworth County, WI",Substation 207,Circuit 483,In service,11/1/2021,Permission to Operate,4/15/2022 AE-12015,Solar PV,4.1,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,10/29/2021,Permission to Operate,10/6/2022 AE-12032,Solar PV,9,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2000,In service,10/29/2021,Permission to Operate,12/30/2021 AE-12029,Solar PV,8.1,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,10/29/2021,Permission to Operate,5/12/2022 AE-12027,"Solar PV, Battery/Storage",14.4,,Category 1,"Omro, Winnebago County, WI",Substation 550,Circuit 1452,In service,10/29/2021,Permission to Operate,8/2/2022 AE-12196,Solar PV,10,,Category 1,"Harvard, McHenry County, IL",,,In service,10/29/2021,Permission to Operate,2/8/2022 AE-12006,Solar PV,6.4,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,10/28/2021,Permission to Operate,1/7/2022 AE-11999,Solar PV,10.4,,Category 1,"Blanchardville, Green County, WI",Substation 77,Circuit 192,In service,10/27/2021,Permission to Operate,12/22/2021 AE-11991,Solar PV,6,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 862,In service,10/27/2021,Permission to Operate,4/12/2022 AE-12000,Solar PV,9.6,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1210,In service,10/27/2021,Permission to Operate,12/23/2021 AE-11982,Solar PV,10,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 360,In service,10/27/2021,Permission to Operate,7/21/2022 AE-11980,Solar PV,5,,Category 1,"Barneveld, Iowa County, WI",,Circuit 222,In service,10/26/2021,Permission to Operate,6/17/2022 AE-11969,Solar PV,11,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,10/26/2021,Permission to Operate,1/26/2022 AE-11960,Solar PV,7.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 496,Circuit 1255,In service,10/25/2021,Permission to Operate,12/17/2021 AE-11952,Solar PV,7.8,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,10/25/2021,Permission to Operate,1/6/2022 AE-11950,Solar PV,10,,Category 1,"Sharon, Walworth County, WI",Substation 648,Circuit 1783,In service,10/25/2021,Permission to Operate,9/2/2022 AE-11940,Solar PV,10.8,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 614,In service,10/22/2021,Permission to Operate,3/25/2022 AE-11942,Solar PV,5.2,,Category 1,"White Lake, Langlade County, WI",Substation 578,Circuit 1516,In service,10/22/2021,Permission to Operate,12/2/2021 AE-11947,Solar PV,19.7,,Category 1,"Eden, Fond du Lac County, WI",,Circuit 1399,In service,10/22/2021,Permission to Operate,12/2/2021 AE-11932,Solar PV,4.8,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/22/2021,Permission to Operate,1/4/2022 AE-11853,Solar PV,5,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1269,In service,10/22/2021,Permission to Operate,12/29/2021 AE-11939,Solar PV,13.2,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,10/22/2021,Permission to Operate,2/2/2022 AE-11928,Solar PV,7.8,,Category 1,"Merrimac, Sauk County, WI",,Circuit 494,In service,10/21/2021,Permission to Operate,12/16/2021 AE-11927,Solar PV,11.4,,Category 1,"Darien, Walworth County, WI",Substation 662,Circuit 1820,In service,10/21/2021,Permission to Operate,6/30/2022 AE-11842,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 623,Circuit 1687,In service,10/21/2021,Permission to Operate,1/18/2022 AE-11852,Solar PV,17.4,,Category 1,"Eden, Fond du Lac County, WI",,Circuit 1399,In service,10/21/2021,Permission to Operate,1/24/2022 AE-11737,Solar PV,8.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1269,In service,10/21/2021,Permission to Operate,1/27/2022 AE-11789,Solar PV,6.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/21/2021,Permission to Operate,1/28/2022 AE-11576,Solar PV,6,,Category 1,"Delavan, Walworth County, WI",Substation 207,Circuit 483,In service,10/21/2021,Permission to Operate,7/20/2022 AE-11915,Solar PV,6.1,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,10/20/2021,Permission to Operate,1/21/2022 AE-11913,Solar PV,7.6,,Category 1,"Juda, Green County, WI",Substation 101,Circuit 270,In service,10/20/2021,Permission to Operate,6/13/2022 AE-11901,Solar PV,8.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1269,In service,10/20/2021,Permission to Operate,1/27/2022 AE-11813,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,10/20/2021,Permission to Operate,2/4/2022 AE-11917,Solar PV,5.8,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,10/20/2021,Permission to Operate,12/23/2021 AE-11877,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2126,In service,10/19/2021,Permission to Operate,1/4/2022 AE-11891,Solar PV,13.2,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 22,In service,10/19/2021,Permission to Operate,1/18/2022 AE-11897,Solar PV,4.9,,Category 1,"Union Center, Juneau County, WI",,Circuit 1959,In service,10/19/2021,Permission to Operate,4/27/2022 AE-11863,Solar PV,6.7,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,10/18/2021,Permission to Operate,12/15/2021 AE-11836,Solar PV,7.8,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2139,In service,10/18/2021,Permission to Operate,12/15/2021 AE-11866,Solar PV,8.1,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,10/18/2021,Permission to Operate,1/25/2022 AE-11872,Solar PV,5.8,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,10/18/2021,Permission to Operate,12/23/2021 AE-11874,Solar PV,10.8,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 723,Circuit 1975,In service,10/18/2021,Permission to Operate,12/27/2021 AE-11843,"Solar PV, Battery/Storage",9.04,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1184,In service,10/15/2021,Permission to Operate,11/3/2022 AE-11855,Solar PV,4.4,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 774,Circuit 2097,In service,10/15/2021,Permission to Operate,12/29/2021 AE-11825,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,10/13/2021,Permission to Operate,12/23/2021 AE-11793,Solar PV,17.6,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,10/13/2021,Permission to Operate,12/29/2021 AE-11795,Solar PV,3.7,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1198,In service,10/12/2021,Permission to Operate,4/19/2022 AE-11782,Solar PV,3.8,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1184,In service,10/11/2021,Permission to Operate,6/17/2022 AE-11786,Solar PV,10.2,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,10/11/2021,Permission to Operate,11/19/2021 AE-11781,Solar PV,3.8,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2138,In service,10/11/2021,Permission to Operate,4/26/2022 AE-11760,Solar PV,5.6,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 723,Circuit 1975,In service,10/11/2021,Permission to Operate,2/17/2022 AE-11754,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,10/11/2021,Permission to Operate,11/23/2021 AE-11769,Solar PV,14.5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,10/8/2021,Permission to Operate,12/22/2021 AE-11726,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,10/8/2021,Permission to Operate,12/13/2021 AE-11764,Solar PV,5.8,,Category 1,"Howards Grove, Sheboygan County, WI",Substation 346,Circuit 833,In service,10/8/2021,Permission to Operate,12/16/2021 AE-11779,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/8/2021,Permission to Operate,1/6/2022 AE-11753,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/7/2021,Permission to Operate,11/23/2021 AE-11745,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,10/7/2021,Permission to Operate,12/16/2021 AE-11761,Solar PV,10,,Category 1,"Sigel, Wood County, WI",Substation 723,Circuit 1977,In service,10/7/2021,Permission to Operate,12/9/2021 AE-11622,Solar PV,7.6,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,10/7/2021,Permission to Operate,12/15/2021 AE-11744,Solar PV,11.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,10/7/2021,Permission to Operate,12/2/2021 AE-11763,Solar PV,5.1,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1043,In service,10/7/2021,Permission to Operate,12/6/2021 AE-11756,Solar PV,6,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,10/7/2021,Permission to Operate,12/17/2021 AE-11730,Solar PV,4.4,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,10/6/2021,Permission to Operate,11/30/2021 AE-11440,Solar PV,3,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 694,In service,10/6/2021,Permission to Operate,11/17/2022 AE-11715,Solar PV,6.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,10/6/2021,Permission to Operate,5/6/2022 AE-11742,Solar PV,6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1268,In service,10/6/2021,Permission to Operate,1/24/2022 AE-11515,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,10/6/2021,Permission to Operate,11/24/2021 AE-11727,Solar PV,15.4,,Category 1,"Neshkoro, Marquette County, WI",Substation 656,Circuit 1792,In service,10/6/2021,Permission to Operate,11/9/2021 AE-11731,Solar PV,10.6,,Category 1,"Belleville, Dane County, WI",Substation 722,Circuit 1971,In service,10/6/2021,Permission to Operate,12/22/2021 AE-11736,Solar PV,6.1,,Category 1,"Bloomington, Grant County, WI",Substation 80,Circuit 209,In service,10/6/2021,Permission to Operate,1/4/2022 AE-11735,Solar PV,8.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 774,Circuit 2097,In service,10/6/2021,Permission to Operate,1/24/2022 AE-11708,Solar PV,11.3,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,10/5/2021,Permission to Operate,12/29/2021 AE-11707,Solar PV,4.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,10/5/2021,Permission to Operate,11/23/2021 AE-11725,Solar PV,7.6,,Category 1,"South Wayne, Lafayette County, WI",Substation 770,Circuit 2082,In service,10/5/2021,Permission to Operate,5/10/2022 AE-11716,Solar PV,4.4,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1696,In service,10/5/2021,Permission to Operate,12/30/2021 AE-11717,"Solar PV, Battery/Storage",16.98,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,10/5/2021,Permission to Operate,12/6/2021 AE-11706,Solar PV,4.4,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1696,In service,10/5/2021,Permission to Operate,12/29/2021 AE-11695,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,10/4/2021,Permission to Operate,12/6/2021 AE-11699,Solar PV,9.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1697,In service,10/4/2021,Permission to Operate,1/24/2022 AE-11459,Solar PV,15.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,10/4/2021,Permission to Operate,11/30/2021 AE-11666,Solar PV,7.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1700,In service,10/4/2021,Permission to Operate,1/27/2022 AE-11696,Solar PV,4.9,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/4/2021,Permission to Operate,12/17/2021 AE-11701,Solar PV,4.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,10/4/2021,Permission to Operate,2/8/2022 AE-11677,Solar PV,21,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,10/4/2021,Permission to Operate,6/2/2022 AE-11676,Solar PV,7.7,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,10/1/2021,Permission to Operate,11/13/2021 AE-11663,Solar PV,4.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/30/2021,Permission to Operate,2/4/2022 AE-11661,Solar PV,3.7,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 421,In service,9/30/2021,Permission to Operate,11/15/2022 AE-11664,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,9/30/2021,Permission to Operate,11/30/2021 AE-11657,Solar PV,7.6,,Category 1,"Richland Center, Richland County, WI",Substation 100,Circuit 261,In service,9/30/2021,Permission to Operate,1/3/2022 AE-11501,Solar PV,5,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,9/30/2021,Permission to Operate,12/15/2021 AE-11247,Solar PV,16150.4,,Category 4,"Cottage Grove, Dane County, WI",,,In service,9/30/2021,Permission to Operate,6/23/2023 AE-11632,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,9/29/2021,Permission to Operate,12/16/2021 AE-11650,Solar PV,4.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,9/29/2021,Permission to Operate,1/25/2022 AE-11558,Solar PV,7.7,,Category 1,"Oostburg, Sheboygan County, WI",Substation 355,Circuit 850,In service,9/29/2021,Permission to Operate,11/24/2021 AE-11625,Solar PV,4.9,,Category 1,"Wautoma, Waushara County, WI",Substation 599,Circuit 1614,In service,9/29/2021,Permission to Operate,12/21/2021 AE-11636,Solar PV,5.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,9/29/2021,Permission to Operate,12/6/2021 AE-11648,Solar PV,8.8,,Category 1,"Sun Prairie, Dane County, WI",Substation 698,Circuit 1920,In service,9/29/2021,Permission to Operate,1/31/2022 AE-11640,Solar PV,5.1,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,9/29/2021,Permission to Operate,12/23/2021 AE-11621,Solar PV,8.4,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 360,In service,9/28/2021,Permission to Operate,12/21/2021 AE-11624,Solar PV,6.1,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/28/2021,Permission to Operate,11/29/2021 AE-11618,Solar PV,10,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 1999,In service,9/27/2021,Permission to Operate,10/29/2021 AE-11612,Solar PV,5.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/27/2021,Permission to Operate,11/11/2021 AE-11607,Solar PV,22,,Category 2,"Fitchburg, Dane County, WI",Substation 119,Circuit 324,In service,9/27/2021,Permission to Operate,7/14/2022 AE-11602,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/27/2021,Permission to Operate,10/27/2021 AE-11589,Solar PV,14.3,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,9/24/2021,Permission to Operate,2/11/2022 AE-11599,Solar PV,3.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,9/24/2021,Permission to Operate,11/24/2021 AE-11591,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 466,Circuit 1155,In service,9/24/2021,Permission to Operate,1/6/2022 AE-11580,Solar PV,7.5,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 433,Circuit 1100,In service,9/23/2021,Permission to Operate,12/2/2021 AE-11581,Solar PV,8.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/23/2021,Permission to Operate,1/24/2022 AE-11586,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,9/23/2021,Permission to Operate,11/23/2021 AE-11561,Solar PV,10,,Category 1,"Brodhead, Green County, WI",Substation 15,Circuit 61,In service,9/22/2021,Permission to Operate,12/7/2021 AE-11569,Solar PV,13.9,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/22/2021,Permission to Operate,12/6/2021 AE-11388,"Solar PV, Battery/Storage",13.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1009,In service,9/22/2021,Permission to Operate,11/22/2021 AE-11563,Solar PV,5.8,,Category 1,"Mount Calvary, Fond du Lac County, WI",Substation 391,Circuit 976,In service,9/22/2021,Permission to Operate,11/1/2021 AE-11560,Solar PV,7.6,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1218,In service,9/22/2021,Permission to Operate,11/18/2021 AE-11543,Solar PV,6.3,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,9/22/2021,Permission to Operate,4/20/2022 AE-11562,Solar PV,6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,9/22/2021,Permission to Operate,11/30/2021 AE-11546,Solar PV,4.1,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2132,In service,9/22/2021,Permission to Operate,10/27/2021 AE-11537,Solar PV,6,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1357,In service,9/21/2021,Permission to Operate,9/2/2022 AE-11530,Solar PV,4.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,9/21/2021,Permission to Operate,11/9/2021 AE-11524,Solar PV,3.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,9/21/2021,Permission to Operate,11/5/2021 AE-11514,Solar PV,7.2,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,9/21/2021,Permission to Operate,12/23/2021 AE-11485,Solar PV,5,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1354,In service,9/21/2021,Permission to Operate,10/6/2022 AE-11541,Solar PV,11.4,,Category 1,"Beloit, Rock County, WI",,Circuit 1680,In service,9/21/2021,Permission to Operate,2/17/2022 AE-11538,Solar PV,4.4,,Category 1,"Red Granite, Waushara County, WI",Substation 599,Circuit 1614,In service,9/21/2021,Permission to Operate,10/28/2021 AE-11491,Solar PV,3.3,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,9/21/2021,Permission to Operate,11/24/2021 AE-11528,Solar PV,5,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 317,In service,9/21/2021,Permission to Operate,12/23/2021 AE-11413,Solar PV,7.6,,Category 1,"Livingston, Grant County, WI",Substation 241,Circuit 582,In service,9/20/2021,Permission to Operate,11/30/2021 AE-11372,Solar PV,6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,9/20/2021,Permission to Operate,11/30/2021 AE-11512,Solar PV,3.4,,Category 1,"Neshkoro, Marquette County, WI",Substation 656,Circuit 1792,In service,9/20/2021,Permission to Operate,11/11/2021 AE-11281,Solar PV,10,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1043,In service,9/17/2021,Permission to Operate,3/23/2022 AE-11493,Solar PV,11.4,,Category 1,"Pardeeville, Columbia County, WI",Substation 609,Circuit 1637,In service,9/17/2021,Permission to Operate,12/2/2021 AE-11377,Solar PV,6.4,,Category 1,"Birnamwood, Shawano County, WI",Substation 74,Circuit 181,In service,9/17/2021,Permission to Operate,11/10/2021 AE-11496,Solar PV,6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 134,In service,9/17/2021,Permission to Operate,12/2/2021 AE-11466,Solar PV,7.6,,Category 1,"Nekoosa, Wood County, WI",Substation 345,Circuit 826,In service,9/16/2021,Permission to Operate,8/31/2022 AE-11472,Solar PV,5,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 317,In service,9/16/2021,Permission to Operate,12/15/2021 AE-11484,Solar PV,3.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,9/16/2021,Permission to Operate,3/17/2022 AE-11422,Solar PV,5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,9/16/2021,Permission to Operate,11/9/2021 AE-11470,Solar PV,3.7,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1935,In service,9/16/2021,Permission to Operate,8/23/2022 AE-11490,Solar PV,7.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/16/2021,Permission to Operate,10/13/2021 AE-11479,Solar PV,5.6,,Category 1,"Ripon, Fond du Lac County, WI",Substation 610,Circuit 1643,In service,9/16/2021,Permission to Operate,2/2/2022 AE-11465,Solar PV,10,,Category 1,"N Fond du Lac, Fond du Lac County, WI",,Circuit 2160,In service,9/15/2021,Permission to Operate,11/1/2021 AE-11464,Solar PV,3.8,,Category 1,"Edgerton, Dane County, WI",,Circuit 569,In service,9/15/2021,Permission to Operate,12/23/2021 AE-11396,Solar PV,15.4,,Category 1,"Sharon, Walworth County, WI",Substation 662,Circuit 1820,In service,9/15/2021,Permission to Operate,11/17/2021 AE-11453,Solar PV,9,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,9/15/2021,Permission to Operate,12/28/2021 AE-11430,Solar PV,8.2,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,9/14/2021,Permission to Operate,2/8/2022 AE-11443,Solar PV,4.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,9/14/2021,Permission to Operate,12/10/2021 AE-11433,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,9/14/2021,Permission to Operate,12/2/2021 AE-11445,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,9/14/2021,Permission to Operate,12/16/2021 AE-11432,Solar PV,3.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,9/14/2021,Permission to Operate,12/15/2021 AE-11442,Solar PV,7.7,,Category 1,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1685,In service,9/14/2021,Permission to Operate,12/16/2021 AE-11431,Solar PV,7.6,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2138,In service,9/14/2021,Permission to Operate,1/11/2022 AE-11425,Solar PV,10,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,9/13/2021,Permission to Operate,10/20/2021 AE-11407,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/10/2021,Permission to Operate,11/30/2021 AE-11408,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,9/10/2021,Permission to Operate,11/19/2021 AE-11403,Solar PV,5.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/10/2021,Permission to Operate,3/10/2022 AE-11398,Solar PV,6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,9/10/2021,Permission to Operate,7/6/2022 AE-11382,Solar PV,3.3,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,9/9/2021,Permission to Operate,11/12/2021 AE-11340,Solar PV,8.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,9/9/2021,Permission to Operate,12/13/2021 AE-11337,Solar PV,62.5,,Category 2,"Avalon, Rock County, WI",,Circuit 1873,In service,9/9/2021,Permission to Operate,5/6/2022 AE-11319,Solar PV,16.8,,Category 1,"Clinton, Rock County, WI",,Circuit 365,In service,9/9/2021,Permission to Operate,12/9/2021 AE-11386,Solar PV,5.2,,Category 1,"Beloit, Rock County, WI",,Circuit 1680,In service,9/9/2021,Permission to Operate,1/13/2022 AE-11313,Solar PV,125,,Category 2,"Clinton, Rock County, WI",,Circuit 364,In service,9/9/2021,Permission to Operate,3/14/2022 AE-11379,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/9/2021,Permission to Operate,10/19/2021 AE-11380,Solar PV,5,,Category 1,"Mount Horeb, Dane County, WI",Substation 686,Circuit 1895,In service,9/9/2021,Permission to Operate,9/23/2021 AE-11338,Solar PV,62.5,,Category 2,"Sharon, Walworth County, WI",,Circuit 1889,In service,9/9/2021,Permission to Operate,3/30/2022 AE-11383,Solar PV,3.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,9/9/2021,Permission to Operate,11/19/2021 AE-11374,Solar PV,5.9,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1518,In service,9/8/2021,Permission to Operate,11/15/2021 AE-11334,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/8/2021,Permission to Operate,1/4/2022 AE-11370,Solar PV,8.8,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,9/8/2021,Permission to Operate,1/4/2022 AE-11361,Solar PV,5.9,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,9/8/2021,Permission to Operate,1/26/2022 AE-11364,Solar PV,4.4,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,9/8/2021,Permission to Operate,11/8/2021 AE-11362,Solar PV,11,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 318,In service,9/8/2021,Permission to Operate,12/30/2021 AE-11373,Solar PV,7.8,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,9/8/2021,Permission to Operate,10/20/2021 AE-11355,Solar PV,8.2,,Category 1,"Omro, Winnebago County, WI",Substation 550,Circuit 1452,In service,9/7/2021,Permission to Operate,1/31/2022 AE-11348,Solar PV,13.6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,9/7/2021,Permission to Operate,7/29/2022 AE-11353,Solar PV,15.2,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,9/7/2021,Permission to Operate,12/2/2021 AE-11349,Solar PV,9.3,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1435,In service,9/7/2021,Permission to Operate,7/6/2022 AE-11336,Solar PV,5.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,9/3/2021,Permission to Operate,11/13/2021 AE-11339,Solar PV,11.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,9/3/2021,Permission to Operate,10/12/2021 AE-11329,Solar PV,7.7,,Category 1,"Sauk City, Dane County, WI",Substation 461,Circuit 1130,In service,9/3/2021,Permission to Operate,2/10/2022 AE-11341,Solar PV,6,,Category 1,"Blue Mounds, Dane County, WI",,Circuit 222,In service,9/3/2021,Permission to Operate,9/23/2021 AE-11331,Solar PV,10.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,9/3/2021,Permission to Operate,10/27/2021 AE-11330,Solar PV,4.4,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 317,In service,9/3/2021,Permission to Operate,12/23/2021 AE-11328,Solar PV,7.5,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 583,In service,9/3/2021,Permission to Operate,11/18/2021 AE-11323,Solar PV,10,,Category 1,"Scandinavia, Waupaca County, WI",Substation 364,Circuit 892,In service,9/2/2021,Permission to Operate,4/17/2025 AE-11317,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/2/2021,Permission to Operate,10/15/2021 AE-11257,Solar PV,6.6,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,9/2/2021,Permission to Operate,12/15/2021 AE-11324,Solar PV,16,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2173,In service,9/2/2021,Permission to Operate,11/10/2021 AE-11250,Solar PV,7.6,,Category 1,"Stoughton, Dane County, WI",Substation 108,Circuit 302,In service,9/2/2021,Permission to Operate,10/4/2021 AE-11320,Solar PV,7.2,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,9/2/2021,Permission to Operate,11/24/2021 AE-11284,Solar PV,18.2,,Category 1,"Shullsburg, Lafayette County, WI",,Circuit 1606,In service,9/1/2021,Permission to Operate,12/23/2021 AE-11312,Solar PV,12,,Category 1,"Juda, Green County, WI",Substation 101,Circuit 268,In service,9/1/2021,Permission to Operate,12/16/2021 AE-11295,Solar PV,5.5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,8/31/2021,Permission to Operate,9/28/2021 AE-11297,Solar PV,7.7,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 134,In service,8/31/2021,Permission to Operate,2/3/2022 AE-11258,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 135,In service,8/31/2021,Permission to Operate,2/11/2022 AE-11291,Solar PV,9.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,8/31/2021,Permission to Operate,11/19/2021 AE-11286,Solar PV,3.3,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,8/31/2021,Permission to Operate,11/2/2021 AE-11259,Solar PV,9.9,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,8/30/2021,Permission to Operate,12/29/2021 AE-11406,Solar PV,7.6,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 61,In service,8/30/2021,Permission to Operate,9/24/2021 AE-11243,Solar PV,3.8,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 136,In service,8/30/2021,Permission to Operate,11/4/2021 AE-11261,Solar PV,4.1,,Category 1,"Janesville, Rock County, WI",,Circuit 1872,In service,8/30/2021,Permission to Operate,11/24/2021 AE-11275,Solar PV,7.6,,Category 1,"Milladore, Wood County, WI",Substation 43,Circuit 120,In service,8/30/2021,Permission to Operate,12/27/2023 AE-11271,Solar PV,7.6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,8/30/2021,Permission to Operate,10/4/2021 AE-11263,Solar PV,7.8,,Category 1,"Manawa, Waupaca County, WI",Substation 433,Circuit 1098,In service,8/30/2021,Permission to Operate,10/5/2021 AE-11244,Solar PV,3.3,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,8/27/2021,Permission to Operate,12/29/2021 AE-11216,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,8/27/2021,Permission to Operate,11/8/2021 AE-11249,Solar PV,5.5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,8/27/2021,Permission to Operate,1/4/2022 AE-11234,Solar PV,5.8,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 199,In service,8/26/2021,Permission to Operate,11/8/2021 AE-11167,Solar PV,19.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,8/26/2021,Permission to Operate,2/14/2022 AE-11239,Solar PV,7.7,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 898,In service,8/26/2021,Permission to Operate,11/30/2021 AE-11233,Solar PV,7.8,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2132,In service,8/26/2021,Permission to Operate,10/12/2021 AE-11229,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,8/25/2021,Permission to Operate,11/30/2021 AE-11224,Solar PV,6,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,8/25/2021,Permission to Operate,10/27/2021 AE-11217,Solar PV,9.1,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1210,In service,8/25/2021,Permission to Operate,12/22/2021 AE-11207,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,8/24/2021,Permission to Operate,11/8/2021 AE-11205,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 908,In service,8/24/2021,Permission to Operate,12/22/2021 AE-11170,Solar PV,8.5,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 723,Circuit 1977,In service,8/24/2021,Permission to Operate,9/27/2021 AE-11206,Solar PV,3.3,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,8/24/2021,Permission to Operate,12/27/2021 AE-11204,Solar PV,4.1,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1696,In service,8/24/2021,Permission to Operate,11/4/2021 AE-11214,Solar PV,7.2,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 135,In service,8/24/2021,Permission to Operate,1/25/2022 AE-11109,Solar PV,3.3,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,8/24/2021,Permission to Operate,11/22/2021 AE-11210,Solar PV,6,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,8/24/2021,Permission to Operate,12/17/2021 AE-11211,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,8/24/2021,Permission to Operate,3/8/2022 AE-11202,Solar PV,3.8,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 134,In service,8/24/2021,Permission to Operate,11/2/2021 AE-11194,Solar PV,4.4,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 898,In service,8/23/2021,Permission to Operate,11/2/2021 AE-10954,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 730,Circuit 2005,In service,8/23/2021,Permission to Operate,2/1/2022 AE-11199,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/23/2021,Permission to Operate,12/23/2021 AE-11195,Solar PV,6.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,8/23/2021,Permission to Operate,1/28/2022 AE-11185,Solar PV,3.84,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,8/23/2021,Permission to Operate,10/12/2021 AE-11197,Solar PV,3.8,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,8/23/2021,Permission to Operate,11/2/2021 AE-11192,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/23/2021,Permission to Operate,10/8/2021 AE-11131,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,8/19/2021,Permission to Operate,10/4/2021 AE-11171,Solar PV,4.4,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,8/19/2021,Permission to Operate,12/7/2021 AE-11169,Solar PV,5.5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,8/19/2021,Permission to Operate,11/2/2021 AE-11168,Solar PV,6.6,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 778,In service,8/19/2021,Permission to Operate,12/3/2021 AE-11173,Solar PV,5.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,8/19/2021,Permission to Operate,10/13/2021 AE-11159,Solar PV,18.8,,Category 1,"Stoughton, Dane County, WI",,Circuit 1140,In service,8/18/2021,Permission to Operate,10/20/2021 AE-11147,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/18/2021,Permission to Operate,9/29/2021 AE-11128,"Solar PV, Battery/Storage",15.2,,Category 2,"Randolph, Columbia County, WI",Substation 284,Circuit 685,In service,8/18/2021,Permission to Operate,2/14/2022 AE-11104,Solar PV,5.5,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,8/18/2021,Permission to Operate,11/8/2021 AE-11079,Solar PV,11.2,,Category 1,"Necedah, Juneau County, WI",Substation 516,Circuit 1321,In service,8/18/2021,Permission to Operate,11/8/2021 AE-11146,Solar PV,7.7,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,8/18/2021,Permission to Operate,11/18/2021 AE-11151,Solar PV,7.7,,Category 1,"Edgerton, Dane County, WI",,Circuit 569,In service,8/18/2021,Permission to Operate,11/23/2021 AE-11125,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,8/17/2021,Permission to Operate,11/8/2021 AE-11132,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1925,In service,8/17/2021,Permission to Operate,10/29/2021 AE-11127,Solar PV,11.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,8/17/2021,Permission to Operate,1/20/2022 AE-11136,Solar PV,7.2,,Category 1,"Belleville, Dane County, WI",Substation 280,Circuit 670,In service,8/17/2021,Permission to Operate,12/2/2021 AE-11138,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,8/17/2021,Permission to Operate,10/4/2021 AE-10971,Solar PV,6.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,8/17/2021,Permission to Operate,11/3/2021 AE-11130,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/17/2021,Permission to Operate,9/22/2021 AE-11122,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,8/16/2021,Permission to Operate,10/8/2021 AE-11124,Solar PV,5,,Category 1,"Spring Green, Iowa County, WI",Substation 406,Circuit 1007,In service,8/16/2021,Permission to Operate,11/19/2021 AE-11011,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/16/2021,Permission to Operate,9/22/2021 AE-11059,Solar PV,4.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/16/2021,Permission to Operate,10/6/2021 AE-10967,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,8/16/2021,Permission to Operate,12/22/2021 AE-11119,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,8/16/2021,Permission to Operate,2/14/2022 AE-11121,Solar PV,9.9,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,8/16/2021,Permission to Operate,12/27/2021 AE-11074,Solar PV,3.7,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1651,In service,8/13/2021,Permission to Operate,5/17/2022 AE-11098,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,8/13/2021,Permission to Operate,2/24/2022 AE-11093,Solar PV,4.2,,Category 1,"Spring Green, Iowa County, WI",Substation 666,Circuit 1833,In service,8/13/2021,Permission to Operate,10/6/2021 AE-11099,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1456,In service,8/13/2021,Permission to Operate,9/29/2021 AE-11003,Solar PV,7.2,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,8/13/2021,Permission to Operate,10/20/2021 AE-11097,Solar PV,8.2,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1584,In service,8/13/2021,Permission to Operate,12/23/2021 AE-11083,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,8/12/2021,Permission to Operate,10/4/2021 AE-11085,Solar PV,10,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1357,In service,8/12/2021,Permission to Operate,3/24/2022 AE-11061,Solar PV,11.4,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,8/11/2021,Permission to Operate,10/4/2021 AE-11062,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,8/11/2021,Permission to Operate,9/21/2021 AE-10879,Solar PV,5,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,8/11/2021,Permission to Operate,9/24/2021 AE-11072,Solar PV,18.8,,Category 1,"Spring Green, Iowa County, WI",Substation 406,Circuit 1007,In service,8/11/2021,Permission to Operate,12/14/2021 AE-11069,Solar PV,3.3,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,8/11/2021,Permission to Operate,1/25/2022 AE-11055,Solar PV,11.4,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 302,In service,8/10/2021,Permission to Operate,9/22/2021 AE-11060,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,8/10/2021,Permission to Operate,9/24/2021 AE-11030,Solar PV,5.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,8/10/2021,Permission to Operate,10/13/2021 AE-10379,Solar PV,6.1,,Category 1,"Winneconne, Winnebago County, WI",Substation 766,Circuit 2076,In service,8/9/2021,Permission to Operate,11/24/2021 AE-10937,"Solar PV, Battery/Storage",12.6,,Category 1,"Pine River, Waushara County, WI",Substation 281,Circuit 675,In service,8/9/2021,Permission to Operate,1/7/2022 AE-11026,Solar PV,5.6,,Category 1,"Blue Mounds, Dane County, WI",Substation 37,Circuit 96,In service,8/9/2021,Permission to Operate,12/22/2021 AE-10817,Solar PV,10,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,8/9/2021,Permission to Operate,11/18/2021 AE-11037,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/9/2021,Permission to Operate,12/22/2021 AE-11020,Solar PV,6.6,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,8/6/2021,Permission to Operate,10/27/2021 AE-11025,Solar PV,9.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,8/6/2021,Permission to Operate,1/10/2022 AE-11031,Solar PV,7.2,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,8/6/2021,Permission to Operate,11/30/2021 AE-11017,Solar PV,3.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,8/6/2021,Permission to Operate,9/29/2021 AE-11036,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/6/2021,Permission to Operate,9/22/2021 AE-11027,Solar PV,3.3,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,8/6/2021,Permission to Operate,9/20/2021 AE-11008,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,8/5/2021,Permission to Operate,9/21/2021 AE-11007,Solar PV,2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,8/5/2021,Permission to Operate,10/12/2021 AE-11013,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,8/5/2021,Permission to Operate,1/3/2022 AE-11006,Solar PV,11.4,,Category 1,"Richland Center, Richland County, WI",Substation 606,Circuit 1636,In service,8/5/2021,Permission to Operate,4/26/2022 AE-11010,Solar PV,5.5,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,8/5/2021,Permission to Operate,11/30/2021 AE-11009,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,8/5/2021,Permission to Operate,2/4/2022 AE-10987,Solar PV,5.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,8/4/2021,Permission to Operate,1/18/2022 AE-10977,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,8/4/2021,Permission to Operate,12/2/2021 AE-10998,Solar PV,7.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,8/4/2021,Permission to Operate,9/3/2021 AE-10976,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,8/4/2021,Permission to Operate,10/12/2021 AE-10985,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/4/2021,Permission to Operate,10/18/2021 AE-11002,Solar PV,3.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,8/4/2021,Permission to Operate,9/3/2021 AE-10979,Solar PV,2.8,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,8/4/2021,Permission to Operate,12/27/2021 AE-10988,Solar PV,9.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,8/4/2021,Permission to Operate,12/22/2021 AE-10955,Solar PV,10.4,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,8/3/2021,Permission to Operate,9/20/2021 AE-10639,Solar PV,2.9,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,8/3/2021,Permission to Operate,12/6/2021 AE-11004,Solar PV,5.4,,Category 1,"Van Dyne, Fond du Lac County, WI",,Circuit 2158,In service,8/3/2021,Permission to Operate,12/22/2021 AE-10978,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,8/3/2021,Permission to Operate,10/29/2021 AE-10953,Solar PV,5,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,8/3/2021,Permission to Operate,9/24/2021 AE-11001,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1932,In service,8/3/2021,Permission to Operate,12/22/2021 AE-10966,Solar PV,10,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,8/3/2021,Permission to Operate,8/25/2021 AE-10968,Solar PV,8.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,8/3/2021,Permission to Operate,12/23/2021 AE-10952,Solar PV,5,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,8/3/2021,Permission to Operate,10/4/2021 AE-10992,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",,Circuit 1872,In service,8/3/2021,Permission to Operate,12/14/2021 AE-10969,Solar PV,11.4,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,8/3/2021,Permission to Operate,11/12/2021 AE-10887,Solar PV,5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,8/3/2021,Permission to Operate,9/20/2021 AE-10975,Solar PV,6.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,8/3/2021,Permission to Operate,9/24/2021 AE-10945,Solar PV,5.5,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,8/2/2021,Permission to Operate,10/27/2021 AE-10943,Solar PV,3.8,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,8/2/2021,Permission to Operate,9/22/2021 AE-10942,Solar PV,10.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,8/2/2021,Permission to Operate,12/2/2021 AE-10944,Solar PV,8.2,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1927,In service,8/2/2021,Permission to Operate,2/11/2022 AE-10941,Solar PV,6,,Category 1,"Pardeeville, Columbia County, WI",Substation 448,Circuit 1115,In service,8/2/2021,Permission to Operate,1/21/2022 AE-10935,Solar PV,3.7,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,7/30/2021,Permission to Operate,1/4/2022 AE-10930,Solar PV,3.8,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/30/2021,Permission to Operate,10/13/2021 AE-10926,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,7/30/2021,Permission to Operate,9/1/2021 AE-10884,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1583,In service,7/30/2021,Permission to Operate,12/14/2021 AE-10936,Solar PV,3.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 134,In service,7/30/2021,Permission to Operate,9/21/2021 AE-10933,Solar PV,6,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,7/30/2021,Permission to Operate,10/12/2021 AE-10931,Solar PV,7.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,7/30/2021,Permission to Operate,12/22/2021 AE-10857,Solar PV,4.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,7/30/2021,Permission to Operate,1/13/2022 AE-10934,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,7/30/2021,Permission to Operate,9/21/2021 AE-10928,Solar PV,5.1,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,7/30/2021,Permission to Operate,9/20/2021 AE-10927,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,7/30/2021,Permission to Operate,9/1/2021 AE-10929,Solar PV,7.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,7/30/2021,Permission to Operate,9/1/2021 AE-10398,Solar PV,29.2,,Category 2,"Bellville, Dane County, WI",,Circuit 1881,In service,7/29/2021,Permission to Operate,12/10/2021 AE-10915,Solar PV,9.4,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,7/29/2021,Permission to Operate,2/24/2022 AE-10914,Solar PV,8.8,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,7/29/2021,Permission to Operate,12/30/2021 AE-10913,Solar PV,10,,Category 1,"Poynette, Columbia County, WI",Substation 547,Circuit 1432,In service,7/29/2021,Permission to Operate,9/17/2021 AE-10482,Solar PV,17,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,7/29/2021,Permission to Operate,12/30/2021 AE-10864,Solar PV,299.7,,Category 3,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,7/29/2021,Permission to Operate,4/19/2022 AE-10904,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,7/29/2021,Permission to Operate,9/16/2021 AE-10901,Solar PV,6.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,7/28/2021,Permission to Operate,9/3/2021 AE-10903,Solar PV,6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/28/2021,Permission to Operate,12/23/2021 AE-10911,Solar PV,7.6,,Category 1,"Prairie Du Sac, Sauk County, WI",,Circuit 495,In service,7/28/2021,Permission to Operate,12/2/2021 AE-10906,Solar PV,3.8,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,7/28/2021,Permission to Operate,9/22/2021 AE-10907,Solar PV,10.4,,Category 1,"Poyette, Columbia County, WI",Substation 591,Circuit 1575,In service,7/28/2021,Permission to Operate,4/13/2022 AE-10756,Solar PV,7.6,,Category 1,"Ridgeway, Iowa County, WI",Substation 37,Circuit 94,In service,7/28/2021,Permission to Operate,1/6/2022 AE-10909,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,7/28/2021,Permission to Operate,9/8/2021 AE-10912,Solar PV,5.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,7/28/2021,Permission to Operate,9/3/2021 AE-10902,Solar PV,3.8,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/28/2021,Permission to Operate,10/27/2021 AE-10882,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1583,In service,7/27/2021,Permission to Operate,12/6/2021 AE-10883,Solar PV,4.4,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1047,In service,7/27/2021,Permission to Operate,9/14/2021 AE-10881,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,7/27/2021,Permission to Operate,2/1/2022 AE-10890,Solar PV,5.1,,Category 1,"Richland Center, Richland County, WI",Substation 572,Circuit 1504,In service,7/27/2021,Permission to Operate,9/23/2021 AE-10614,"Solar PV, Battery/Storage",10.4,,Category 1,"Sauk City, Dane County, WI",Substation 461,Circuit 1130,In service,7/26/2021,Permission to Operate,10/11/2022 AE-10874,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 906,In service,7/26/2021,Permission to Operate,4/26/2022 AE-10826,Solar PV,3.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,7/26/2021,Permission to Operate,10/12/2021 AE-10872,Solar PV,4.4,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,7/26/2021,Permission to Operate,9/2/2021 AE-10873,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,7/26/2021,Permission to Operate,1/11/2022 AE-10867,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 730,Circuit 2005,In service,7/26/2021,Permission to Operate,12/15/2021 AE-10869,Solar PV,9.4,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,7/26/2021,Permission to Operate,10/29/2021 AE-10866,Solar PV,3.8,,Category 1,"Cambria, Columbia County, WI",,Circuit 2168,In service,7/26/2021,Permission to Operate,2/16/2022 AE-10880,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,7/26/2021,Permission to Operate,12/28/2021 AE-10851,Solar PV,3.5,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 535,Circuit 1375,In service,7/23/2021,Permission to Operate,8/31/2021 AE-10855,Solar PV,12.6,,Category 1,"Janesville, Rock County, WI",,Circuit 1872,In service,7/23/2021,Permission to Operate,11/5/2021 AE-10858,Solar PV,5,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,7/23/2021,Permission to Operate,8/19/2021 AE-10853,Solar PV,4.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,7/23/2021,Permission to Operate,9/10/2021 AE-10863,Solar PV,13.8,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1584,In service,7/23/2021,Permission to Operate,1/18/2022 AE-10849,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,7/23/2021,Permission to Operate,12/23/2021 AE-10861,Solar PV,5.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,7/23/2021,Permission to Operate,9/2/2021 AE-10856,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,7/23/2021,Permission to Operate,11/5/2021 AE-10859,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,7/23/2021,Permission to Operate,12/6/2021 AE-10832,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,7/22/2021,Permission to Operate,9/2/2021 AE-10839,Solar PV,5.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,7/22/2021,Permission to Operate,8/17/2021 AE-10844,Solar PV,14.8,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1925,In service,7/22/2021,Permission to Operate,11/2/2021 AE-10830,Solar PV,4.9,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,7/21/2021,Permission to Operate,12/15/2021 AE-10825,Solar PV,6,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,7/21/2021,Permission to Operate,10/13/2021 AE-10818,Solar PV,4.6,,Category 1,"Shawano, Shawano County, WI",Substation 652,Circuit 1788,In service,7/21/2021,Permission to Operate,9/17/2021 AE-10824,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,7/21/2021,Permission to Operate,10/26/2021 AE-10823,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,7/21/2021,Permission to Operate,1/10/2022 AE-10812,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,7/20/2021,Permission to Operate,11/23/2021 AE-10808,Solar PV,5,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1047,In service,7/20/2021,Permission to Operate,9/14/2021 AE-10814,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,7/20/2021,Permission to Operate,12/15/2021 AE-10807,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,7/20/2021,Permission to Operate,11/13/2021 AE-10805,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/20/2021,Permission to Operate,9/14/2021 AE-10794,Solar PV,13.3,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1267,In service,7/20/2021,Permission to Operate,9/8/2021 AE-10810,Solar PV,8.2,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,7/20/2021,Permission to Operate,9/22/2021 AE-10809,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1927,In service,7/20/2021,Permission to Operate,10/20/2021 AE-10811,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,7/20/2021,Permission to Operate,12/27/2021 AE-10793,Solar PV,11.9,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1210,In service,7/20/2021,Permission to Operate,12/29/2021 AE-10772,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1584,In service,7/19/2021,Permission to Operate,9/21/2021 AE-10783,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 908,In service,7/19/2021,Permission to Operate,11/2/2021 AE-10721,Solar PV,7.6,,Category 1,"Clintonville, Waupaca County, WI",Substation 494,Circuit 1234,In service,7/19/2021,Permission to Operate,8/20/2021 AE-10705,Solar PV,4.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,7/19/2021,Permission to Operate,9/29/2021 AE-10773,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 378,Circuit 932,In service,7/19/2021,Permission to Operate,11/2/2021 AE-10755,Solar PV,8.6,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,7/19/2021,Permission to Operate,10/20/2021 AE-10785,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,7/19/2021,Permission to Operate,9/14/2021 AE-10769,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1932,In service,7/19/2021,Permission to Operate,10/20/2021 AE-10745,Solar PV,5.2,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1577,In service,7/19/2021,Permission to Operate,8/27/2021 AE-10774,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,7/19/2021,Permission to Operate,9/21/2021 AE-10775,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,7/19/2021,Permission to Operate,9/20/2021 AE-10664,Solar PV,16.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1650,In service,7/19/2021,Permission to Operate,9/30/2021 AE-10771,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,7/19/2021,Permission to Operate,12/28/2021 AE-10762,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1199,In service,7/16/2021,Permission to Operate,2/17/2022 AE-10767,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,7/16/2021,Permission to Operate,12/22/2021 AE-10761,Solar PV,3.3,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,7/16/2021,Permission to Operate,11/24/2021 AE-10768,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1925,In service,7/16/2021,Permission to Operate,12/6/2021 AE-10759,Solar PV,5.1,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/16/2021,Permission to Operate,10/18/2021 AE-10749,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1932,In service,7/15/2021,Permission to Operate,10/26/2021 AE-10753,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,7/15/2021,Permission to Operate,11/23/2021 AE-10718,"Solar PV, Battery/Storage",9,,Category 1,"Endeavor, Marquette County, WI",Substation 252,Circuit 607,In service,7/15/2021,Permission to Operate,9/21/2021 AE-10754,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1933,In service,7/15/2021,Permission to Operate,11/5/2021 AE-10751,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,7/15/2021,Permission to Operate,8/12/2021 AE-10752,Solar PV,3.7,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,7/15/2021,Permission to Operate,11/1/2021 AE-10741,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 903,In service,7/14/2021,Permission to Operate,12/1/2021 AE-10726,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,7/14/2021,Permission to Operate,11/5/2021 AE-10723,Solar PV,3.5,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1921,In service,7/14/2021,Permission to Operate,2/24/2022 AE-10725,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2103,In service,7/14/2021,Permission to Operate,11/24/2021 AE-10734,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,7/14/2021,Permission to Operate,8/5/2021 AE-10738,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,7/14/2021,Permission to Operate,10/29/2021 AE-10719,Solar PV,6,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,7/14/2021,Permission to Operate,8/27/2021 AE-10727,Solar PV,4.9,,Category 1,"Barnevald, Iowa County, WI",Substation 525,Circuit 1342,In service,7/14/2021,Permission to Operate,10/28/2021 AE-10746,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,7/14/2021,Permission to Operate,9/21/2021 AE-10650,Solar PV,16.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,7/14/2021,Permission to Operate,10/6/2021 AE-10742,Solar PV,9.3,,Category 1,"Ripon, Winnebago County, WI",,Circuit 170,In service,7/14/2021,Permission to Operate,10/20/2021 AE-10711,Solar PV,3.5,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1654,In service,7/13/2021,Permission to Operate,12/6/2021 AE-10687,Solar PV,5.1,,Category 1,"Brodhead, Green County, WI",Substation 96,Circuit 259,In service,7/13/2021,Permission to Operate,11/18/2021 AE-10704,Solar PV,14.7,,Category 1,"Rio, Columbia County, WI",Substation 335,Circuit 790,In service,7/12/2021,Permission to Operate,1/5/2022 AE-10717,Solar PV,5.5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 134,In service,7/12/2021,Permission to Operate,8/5/2021 AE-10715,Solar PV,5.1,,Category 1,"Baraboo, Sauk County, WI",Substation 216,Circuit 507,In service,7/12/2021,Permission to Operate,8/31/2021 AE-10694,Solar PV,4,,Category 1,"Hollandale, Iowa County, WI",Substation 525,Circuit 1343,In service,7/12/2021,Permission to Operate,8/25/2021 AE-10710,Solar PV,15.2,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,7/12/2021,Permission to Operate,1/27/2022 AE-10697,Solar PV,10.4,,Category 1,"Marshfield, Wood County, WI",Substation 573,Circuit 1508,In service,7/12/2021,Permission to Operate,12/27/2021 AE-10706,Solar PV,7.8,,Category 1,"La Valle, Sauk County, WI",,Circuit 110,In service,7/12/2021,Permission to Operate,9/13/2021 AE-10709,Solar PV,18.8,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1926,In service,7/12/2021,Permission to Operate,8/4/2021 AE-10690,Solar PV,11.1,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,7/9/2021,Permission to Operate,9/16/2021 AE-10692,Solar PV,7.3,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,7/9/2021,Permission to Operate,9/28/2021 AE-10701,Solar PV,10.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,7/8/2021,Permission to Operate,11/3/2021 AE-10673,Solar PV,3.1,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1003,In service,7/8/2021,Permission to Operate,10/25/2021 AE-10672,Solar PV,5.9,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 355,Circuit 855,In service,7/8/2021,Permission to Operate,4/27/2022 AE-10652,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,7/7/2021,Permission to Operate,8/11/2021 AE-10533,Solar PV,13,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,7/7/2021,Permission to Operate,10/20/2021 AE-10655,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,7/7/2021,Permission to Operate,8/12/2021 AE-10661,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,7/7/2021,Permission to Operate,8/18/2021 AE-10448,Solar PV,10.5,,Category 1,"Hollandale, Iowa County, WI",Substation 525,Circuit 1342,In service,7/7/2021,Permission to Operate,11/2/2021 AE-10656,Solar PV,7.7,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,7/7/2021,Permission to Operate,10/28/2021 AE-10635,Solar PV,14.7,,Category 1,"Ripon, Fond du Lac County, WI",Substation 610,Circuit 1643,In service,7/6/2021,Permission to Operate,10/7/2021 AE-10654,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,7/6/2021,Permission to Operate,12/30/2021 AE-10642,Solar PV,3.8,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,7/6/2021,Permission to Operate,12/23/2021 AE-10636,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,7/6/2021,Permission to Operate,12/20/2021 AE-10659,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,7/6/2021,Permission to Operate,11/2/2021 AE-10433,Solar PV,5.8,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,7/6/2021,Permission to Operate,8/11/2021 AE-10626,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,7/2/2021,Permission to Operate,9/28/2021 AE-10632,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,7/2/2021,Permission to Operate,8/24/2021 AE-10634,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1926,In service,7/2/2021,Permission to Operate,11/11/2021 AE-10631,Solar PV,5.5,,Category 1,"Delavan, Walworth County, WI",,Circuit 2065,In service,7/2/2021,Permission to Operate,10/27/2021 AE-10622,Solar PV,8.2,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,7/1/2021,Permission to Operate,9/1/2021 AE-10619,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/1/2021,Permission to Operate,1/13/2022 AE-10620,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/1/2021,Permission to Operate,11/2/2021 AE-10618,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,7/1/2021,Permission to Operate,8/11/2021 AE-10617,Solar PV,9.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,7/1/2021,Permission to Operate,9/1/2021 AE-10616,Solar PV,3.3,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,7/1/2021,Permission to Operate,8/3/2021 AE-10604,Solar PV,7.6,,Category 1,"Livingston, Grant County, WI",Substation 241,Circuit 582,In service,6/30/2021,Permission to Operate,2/24/2022 AE-10545,Solar PV,11.4,,Category 1,"Van Dyne, Fond du Lac County, WI",,Circuit 2158,In service,6/30/2021,Permission to Operate,8/19/2021 AE-10611,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 378,Circuit 932,In service,6/30/2021,Permission to Operate,9/14/2021 AE-10364,Solar PV,7.6,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,6/30/2021,Permission to Operate,9/20/2021 AE-10580,Solar PV,10,,Category 1,"Columbus, Columbia County, WI",,Circuit 669,In service,6/30/2021,Permission to Operate,5/5/2022 AE-10608,Solar PV,6.6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,6/30/2021,Permission to Operate,8/13/2021 AE-10605,Solar PV,8.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,6/30/2021,Permission to Operate,8/3/2021 AE-10599,Solar PV,4.4,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,6/30/2021,Permission to Operate,8/27/2021 AE-10602,Solar PV,7.6,,Category 1,"Rewey, Iowa County, WI",Substation 601,Circuit 1620,In service,6/29/2021,Permission to Operate,12/8/2021 AE-10597,Solar PV,5.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,6/29/2021,Permission to Operate,8/11/2021 AE-10594,"Solar PV, Battery/Storage",7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,6/29/2021,Permission to Operate,8/11/2021 AE-10593,Solar PV,5.5,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,6/29/2021,Permission to Operate,8/27/2021 AE-10569,Solar PV,4.9,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,6/28/2021,Permission to Operate,10/7/2021 AE-10577,Solar PV,3.3,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 779,In service,6/28/2021,Permission to Operate,8/18/2021 AE-10578,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,6/28/2021,Permission to Operate,7/28/2021 AE-10542,Solar PV,9,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 2159,In service,6/28/2021,Permission to Operate,8/13/2021 AE-10570,Solar PV,11.4,,Category 1,"Ripon, Fond du Lac County, WI",Substation 615,Circuit 1658,In service,6/28/2021,Permission to Operate,8/19/2021 AE-10573,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,6/28/2021,Permission to Operate,8/18/2021 AE-10574,Solar PV,3.8,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,6/28/2021,Permission to Operate,8/13/2021 AE-10585,Solar PV,5,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 888,In service,6/28/2021,Permission to Operate,8/26/2021 AE-10567,Solar PV,11.6,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,6/25/2021,Permission to Operate,8/11/2021 AE-10547,"Solar PV, Battery/Storage",17.48,,Category 1,"Juda, Green County, WI",Substation 647,Circuit 1774,In service,6/24/2021,Permission to Operate,4/22/2022 AE-10550,Solar PV,7.8,,Category 1,"Rudolph, Wood County, WI",Substation 630,Circuit 1714,In service,6/24/2021,Permission to Operate,7/21/2021 AE-10240,Solar PV,299.7,,Category 3,"Portage, Columbia County, WI",Substation 326,Circuit 781,In service,6/24/2021,Permission to Operate,11/3/2021 AE-10530,Solar PV,4.5,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,6/24/2021,Permission to Operate,10/13/2021 AE-10540,"Solar PV, Battery/Storage",12.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,6/24/2021,Permission to Operate,8/23/2021 AE-10525,Solar PV,5,,Category 1,"Janesville, Rock County, WI",,Circuit 1872,In service,6/24/2021,Permission to Operate,9/21/2021 AE-10532,Solar PV,6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,6/23/2021,Permission to Operate,9/1/2021 AE-10523,Solar PV,7.6,,Category 1,"New Glarus, Green County, WI",,Circuit 1327,In service,6/23/2021,Permission to Operate,8/25/2021 AE-10526,Solar PV,10.9,,Category 1,"Hazel Green, Grant County, WI",Substation 386,Circuit 2181,In service,6/23/2021,Permission to Operate,11/24/2021 AE-10524,Solar PV,6,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 389,In service,6/22/2021,Permission to Operate,8/23/2021 AE-10487,Solar PV,16.5,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 996,In service,6/22/2021,Permission to Operate,12/23/2021 AE-10501,Solar PV,3.8,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,6/22/2021,Permission to Operate,8/9/2021 AE-10522,Solar PV,6.6,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,6/22/2021,Permission to Operate,8/9/2021 AE-10520,Solar PV,3.7,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 199,In service,6/22/2021,Permission to Operate,10/18/2021 AE-10517,Solar PV,10,,Category 1,"Horicon, Dodge County, WI",,Circuit 808,In service,6/22/2021,Permission to Operate,11/9/2021 AE-10507,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 698,Circuit 1922,In service,6/21/2021,Permission to Operate,10/4/2021 AE-10512,"Solar PV, Battery/Storage",19.9,,Category 1,"Avoca, Iowa County, WI",Substation 783,Circuit 2137,In service,6/21/2021,Permission to Operate,11/16/2021 AE-10514,Solar PV,21,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 925,In service,6/21/2021,Permission to Operate,9/14/2021 AE-10495,Solar PV,4.4,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,6/18/2021,Permission to Operate,8/13/2021 AE-10488,Solar PV,5,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,6/18/2021,Permission to Operate,8/30/2021 AE-10489,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,6/18/2021,Permission to Operate,8/17/2021 AE-10498,Solar PV,5.1,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,6/18/2021,Permission to Operate,10/29/2021 AE-10490,Solar PV,7.2,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,6/18/2021,Permission to Operate,8/10/2021 AE-10492,Solar PV,7.6,,Category 1,"Ordfordville, Rock County, WI",Substation 551,Circuit 1461,In service,6/18/2021,Permission to Operate,8/31/2021 AE-10493,Solar PV,6,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,6/18/2021,Permission to Operate,8/10/2021 AE-10475,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,6/17/2021,Permission to Operate,7/22/2021 AE-10476,Solar PV,4.4,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,6/17/2021,Permission to Operate,8/10/2021 AE-10474,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,6/17/2021,Permission to Operate,10/5/2021 AE-10485,Solar PV,6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/17/2021,Permission to Operate,8/3/2021 AE-10443,Solar PV,5.5,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,6/17/2021,Permission to Operate,8/25/2021 AE-10447,Solar PV,11.4,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,6/16/2021,Permission to Operate,10/18/2021 AE-10471,Solar PV,7.6,,Category 1,"Clinton, Rock County, WI",,Circuit 364,In service,6/16/2021,Permission to Operate,9/23/2021 AE-10473,Solar PV,7.6,,Category 1,"Cobb, Iowa County, WI",Substation 241,Circuit 584,In service,6/16/2021,Permission to Operate,8/17/2021 AE-10469,Solar PV,4.4,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,6/16/2021,Permission to Operate,8/3/2021 AE-10464,Solar PV,4.4,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/15/2021,Permission to Operate,8/5/2021 AE-10413,Solar PV,11.4,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 106,Circuit 294,In service,6/15/2021,Permission to Operate,8/6/2021 AE-10456,Solar PV,7.6,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,6/15/2021,Permission to Operate,7/14/2021 AE-10459,Solar PV,13.1,,Category 1,"Green Lake, Green Lake County, WI",,Circuit 457,In service,6/15/2021,Permission to Operate,9/17/2021 AE-10467,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/15/2021,Permission to Operate,8/4/2021 AE-10460,Solar PV,6,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1228,In service,6/15/2021,Permission to Operate,11/19/2021 AE-10445,Solar PV,6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,6/11/2021,Permission to Operate,7/28/2021 AE-10431,Solar PV,199.8,60,Category 2,"Rio, Columbia County, WI",Substation 335,Circuit 790,In service,6/11/2021,Permission to Operate,5/4/2023 AE-10434,Solar PV,3.8,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,6/11/2021,Permission to Operate,7/27/2021 AE-10442,Solar PV,3.3,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,6/11/2021,Permission to Operate,8/9/2021 AE-10444,Solar PV,4.4,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,6/11/2021,Permission to Operate,8/10/2021 AE-10432,Solar PV,133.2,60,Category 2,"Rio, Columbia County, WI",Substation 335,Circuit 790,In service,6/11/2021,Permission to Operate,5/3/2023 AE-10446,Solar PV,5.5,,Category 1,"Deforest, Dane County, WI",,Circuit 475,In service,6/11/2021,Permission to Operate,8/3/2021 AE-10425,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,6/10/2021,Permission to Operate,7/15/2021 AE-10427,Solar PV,3.8,,Category 1,"Deforest, Dane County, WI",,Circuit 475,In service,6/10/2021,Permission to Operate,7/19/2021 AE-10426,Solar PV,5.5,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,6/10/2021,Permission to Operate,8/3/2021 AE-10421,Solar PV,9.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,6/9/2021,Permission to Operate,7/19/2021 AE-10422,Solar PV,6.1,,Category 1,"Tomah, Monroe County, WI",,Circuit 2113,In service,6/9/2021,Permission to Operate,6/30/2021 AE-10401,Solar PV,3.8,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,6/8/2021,Permission to Operate,7/22/2021 AE-10390,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,6/7/2021,Permission to Operate,7/14/2021 AE-10393,Solar PV,7.6,,Category 1,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1687,In service,6/7/2021,Permission to Operate,9/8/2021 AE-10400,"Solar PV, Battery/Storage",9.6,,Category 1,"Wautoma, Waushara County, WI",Substation 656,Circuit 1794,In service,6/7/2021,Permission to Operate,8/30/2021 AE-10389,Solar PV,9.4,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,6/7/2021,Permission to Operate,7/23/2021 AE-10391,Solar PV,3.3,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/7/2021,Permission to Operate,7/20/2021 AE-10342,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,6/7/2021,Permission to Operate,7/8/2021 AE-10396,Solar PV,10,,Category 1,"Shawano, Shawano County, WI",Substation 69,Circuit 167,In service,6/7/2021,Permission to Operate,8/19/2021 AE-10372,Solar PV,12.2,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 151,In service,6/4/2021,Permission to Operate,8/25/2021 AE-10367,"Solar PV, Battery/Storage",7.6,,Category 1,"Mt Horeb, Dane County, WI",Substation 483,Circuit 1209,In service,6/4/2021,Permission to Operate,7/8/2021 AE-10383,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,6/4/2021,Permission to Operate,7/1/2021 AE-10380,Solar PV,7.5,,Category 1,"Rosendale, Fond du Lac County, WI",Substation 615,Circuit 1658,In service,6/4/2021,Permission to Operate,7/22/2021 AE-10388,Solar PV,5,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 706,In service,6/4/2021,Permission to Operate,7/19/2021 AE-10382,Solar PV,10,,Category 1,"Delavan, Walworth County, WI",Substation 662,Circuit 1823,In service,6/4/2021,Permission to Operate,10/18/2022 AE-10369,Solar PV,3.3,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,6/3/2021,Permission to Operate,9/20/2021 AE-10366,Solar PV,2.2,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,6/3/2021,Permission to Operate,7/1/2021 AE-10370,Solar PV,8.2,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,6/3/2021,Permission to Operate,7/15/2021 AE-10178,Solar PV,6.1,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,6/3/2021,Permission to Operate,9/28/2021 AE-10368,Solar PV,18.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 686,In service,6/3/2021,Permission to Operate,1/28/2022 AE-10354,Solar PV,8.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,6/3/2021,Permission to Operate,6/24/2021 AE-10365,Solar PV,7.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 687,In service,6/3/2021,Permission to Operate,10/12/2021 AE-10362,Solar PV,4.8,,Category 1,"Berlin, Winnebago County, WI",,Circuit 170,In service,6/3/2021,Permission to Operate,7/12/2021 AE-10357,Solar PV,5.8,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,6/2/2021,Permission to Operate,10/6/2021 AE-10341,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,6/1/2021,Permission to Operate,7/8/2021 AE-10340,Solar PV,6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/1/2021,Permission to Operate,7/23/2021 AE-10346,Solar PV,4.4,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,6/1/2021,Permission to Operate,7/8/2021 AE-10328,Solar PV,4.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/1/2021,Permission to Operate,8/19/2021 AE-10339,Solar PV,7.7,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2173,In service,6/1/2021,Permission to Operate,8/19/2021 AE-10344,Solar PV,7.7,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,6/1/2021,Permission to Operate,7/2/2021 AE-10326,Solar PV,5,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,5/28/2021,Permission to Operate,9/27/2021 AE-10230,Solar PV,20,,Category 1,"Sheboygan Falls, Sheboygan County, WI",Substation 650,Circuit 1785,In service,5/28/2021,Permission to Operate,8/19/2021 AE-10334,Solar PV,15,,Category 1,"Fon Du Lac, Fond du Lac County, WI",Substation 774,Circuit 2097,In service,5/28/2021,Permission to Operate,10/22/2021 AE-10348,Solar PV,9.4,,Category 1,"Monroe, Green County, WI",,Circuit 930,In service,5/28/2021,Permission to Operate,12/30/2021 AE-10317,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,5/27/2021,Permission to Operate,7/14/2021 AE-10338,Solar PV,6,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1185,In service,5/27/2021,Permission to Operate,6/17/2021 AE-10315,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,5/27/2021,Permission to Operate,7/19/2021 AE-10314,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,5/27/2021,Permission to Operate,7/6/2021 AE-10157,Battery/Storage,2400,,Category 4,"Muscoda, Richland County, WI",,,In service,5/27/2021,Permission to Operate,7/21/2023 AE-10309,Solar PV,7,,Category 1,"Norwalk, Monroe County, WI",Substation 217,Circuit 514,In service,5/26/2021,Permission to Operate,8/24/2021 AE-10296,Solar PV,6,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,5/25/2021,Permission to Operate,7/28/2021 AE-10293,Solar PV,7.2,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,5/25/2021,Permission to Operate,8/30/2021 AE-10192,Solar PV,6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1734,In service,5/24/2021,Permission to Operate,9/21/2021 AE-10299,Solar PV,7.8,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 723,Circuit 1975,In service,5/24/2021,Permission to Operate,6/22/2021 AE-10283,"Solar PV, Battery/Storage",12.54,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,5/24/2021,Permission to Operate,7/9/2021 AE-10301,Solar PV,7.6,,Category 1,"Omro, Winnebago County, WI",Substation 281,Circuit 674,In service,5/24/2021,Permission to Operate,10/7/2021 AE-10270,Solar PV,7,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 96,In service,5/21/2021,Permission to Operate,7/29/2021 AE-10275,Solar PV,5.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,5/21/2021,Permission to Operate,6/24/2021 AE-10268,Solar PV,6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,5/20/2021,Permission to Operate,6/30/2021 AE-10193,Solar PV,20,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,5/20/2021,Permission to Operate,2/16/2022 AE-10245,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,5/19/2021,Permission to Operate,6/24/2021 AE-10251,Solar PV,19,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 302,In service,5/19/2021,Permission to Operate,7/8/2021 AE-10244,Solar PV,6.4,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1922,In service,5/18/2021,Permission to Operate,10/6/2021 AE-10248,Solar PV,6,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1664,In service,5/18/2021,Permission to Operate,7/29/2021 AE-10235,Solar PV,5.1,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,5/18/2021,Permission to Operate,8/5/2021 AE-10243,Solar PV,4.9,,Category 1,"Ontario, Vernon County, WI",Substation 217,Circuit 514,In service,5/18/2021,Permission to Operate,7/26/2022 AE-10242,Solar PV,7,,Category 1,"Janesville, Rock County, WI",Substation 730,Circuit 2005,In service,5/18/2021,Permission to Operate,10/20/2021 AE-10225,Solar PV,7.6,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,5/17/2021,Permission to Operate,7/13/2021 AE-10232,Solar PV,14.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,5/17/2021,Permission to Operate,7/21/2021 AE-10239,Solar PV,6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,5/17/2021,Permission to Operate,7/13/2021 AE-10220,Solar PV,5,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,5/14/2021,Permission to Operate,7/2/2021 AE-10215,Solar PV,5.5,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,5/14/2021,Permission to Operate,7/7/2021 AE-10207,Solar PV,10,,Category 1,"Spring Green, Sauk County, WI",Substation 710,Circuit 1946,In service,5/14/2021,Permission to Operate,9/20/2021 AE-10203,Solar PV,7,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,5/14/2021,Permission to Operate,6/22/2021 AE-10205,Solar PV,5.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,5/14/2021,Permission to Operate,7/19/2021 AE-10216,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1198,In service,5/14/2021,Permission to Operate,10/21/2021 AE-10200,Solar PV,11.6,,Category 1,"New Glarus, Green County, WI",,Circuit 1327,In service,5/13/2021,Permission to Operate,7/7/2021 AE-10201,Solar PV,12.1,,Category 1,"Janesville, Rock County, WI",Substation 730,Circuit 2005,In service,5/13/2021,Permission to Operate,7/15/2021 AE-10209,Solar PV,7.5,,Category 1,"Tomah, Monroe County, WI",,Circuit 388,In service,5/13/2021,Permission to Operate,7/14/2021 AE-10084,Solar PV,15,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,5/12/2021,Permission to Operate,8/3/2021 AE-10181,Solar PV,5.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,5/12/2021,Permission to Operate,8/11/2021 AE-10190,Solar PV,9.4,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,In service,5/12/2021,Permission to Operate,11/9/2021 AE-10182,Solar PV,11.2,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2134,In service,5/10/2021,Permission to Operate,9/30/2021 AE-10076,Solar PV,3.8,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 780,In service,5/10/2021,Permission to Operate,8/9/2021 AE-10179,Solar PV,11.4,,Category 1,"Waupun, Dodge County, WI",,Circuit 1279,In service,5/10/2021,Permission to Operate,9/13/2021 AE-10146,Solar PV,12,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1189,In service,5/10/2021,Permission to Operate,8/11/2021 AE-10171,Solar PV,7,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,5/10/2021,Permission to Operate,6/29/2021 AE-10169,Solar PV,5.1,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 462,In service,5/7/2021,Permission to Operate,12/9/2021 AE-10180,Solar PV,2.9,,Category 1,"Walworth, Walworth County, WI",,Circuit 2015,In service,5/7/2021,Permission to Operate,9/10/2021 AE-10172,Solar PV,7.6,,Category 1,"Beloit, Rock County, WI",,Circuit 1682,In service,5/7/2021,Permission to Operate,7/16/2021 AE-10173,"Solar PV, Battery/Storage",7.6,,Category 1,"Milladore, Portage County, WI",Substation 630,Circuit 1713,In service,5/7/2021,Permission to Operate,6/24/2021 AE-10156,Solar PV,3.8,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,5/6/2021,Permission to Operate,9/10/2021 AE-10137,Solar PV,5.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,5/5/2021,Permission to Operate,7/14/2021 AE-10143,Solar PV,7.7,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,5/5/2021,Permission to Operate,8/4/2021 AE-10119,Solar PV,8.8,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,5/5/2021,Permission to Operate,6/17/2021 AE-10150,"Solar PV, Battery/Storage",7.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,5/5/2021,Permission to Operate,11/9/2021 AE-10154,Solar PV,11.4,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,5/5/2021,Permission to Operate,7/21/2021 AE-10132,Solar PV,16.4,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1711,In service,5/4/2021,Permission to Operate,9/14/2021 AE-10141,Solar PV,3.7,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1003,In service,5/4/2021,Permission to Operate,7/1/2021 AE-10134,Solar PV,4.9,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,5/4/2021,Permission to Operate,6/22/2021 AE-10140,Solar PV,5.1,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1171,In service,5/4/2021,Permission to Operate,8/17/2021 AE-10126,Solar PV,3.8,,Category 1,"Arlington, Columbia County, WI",Substation 13,Circuit 52,In service,5/3/2021,Permission to Operate,7/2/2021 AE-10131,Solar PV,12.9,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 151,In service,5/3/2021,Permission to Operate,9/20/2021 AE-10098,Solar PV,16,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,5/3/2021,Permission to Operate,7/6/2021 AE-10115,Solar PV,9.9,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,5/3/2021,Permission to Operate,5/24/2021 AE-10127,Solar PV,7.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,5/3/2021,Permission to Operate,6/30/2021 AE-10112,Solar PV,3.8,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,5/3/2021,Permission to Operate,6/3/2021 AE-10102,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,4/30/2021,Permission to Operate,10/13/2021 AE-10094,Solar PV,3.7,,Category 1,"Omro, Winnebago County, WI",Substation 550,Circuit 1452,In service,4/29/2021,Permission to Operate,7/14/2021 AE-10037,Solar PV,6.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,4/28/2021,Permission to Operate,6/9/2021 AE-10092,Solar PV,7.6,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2000,In service,4/28/2021,Permission to Operate,7/2/2021 AE-10083,Solar PV,5.1,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,4/27/2021,Permission to Operate,7/14/2021 AE-10078,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,4/27/2021,Permission to Operate,7/22/2021 AE-10077,Solar PV,3.8,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,4/27/2021,Permission to Operate,6/24/2021 AE-10085,Solar PV,3,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 418,In service,4/27/2021,Permission to Operate,8/3/2021 AE-10082,Solar PV,8.2,,Category 1,"Hollandalef, Iowa County, WI",Substation 525,Circuit 1342,In service,4/27/2021,Permission to Operate,7/1/2021 AE-10068,Solar PV,7.7,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,4/26/2021,Permission to Operate,5/24/2021 AE-10064,Solar PV,6.96,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,4/23/2021,Permission to Operate,7/21/2022 AE-10063,Solar PV,3.5,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1168,In service,4/23/2021,Permission to Operate,9/2/2021 AE-10075,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1935,In service,4/23/2021,Permission to Operate,6/22/2021 AE-10145,Solar PV,12.1,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,4/23/2021,Permission to Operate,5/14/2021 AE-10059,Solar PV,5.1,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1433,In service,4/23/2021,Permission to Operate,7/28/2021 AE-09987,Solar PV,3.3,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,4/22/2021,Permission to Operate,6/10/2021 AE-10055,Solar PV,3.5,,Category 1,"West Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,4/22/2021,Permission to Operate,7/21/2021 AE-10047,Solar PV,6,,Category 1,"Sauk, Dane County, WI",,Circuit 496,In service,4/22/2021,Permission to Operate,7/2/2021 AE-10042,Solar PV,5.9,,Category 1,"Lynxville, Crawford County, WI",Substation 645,Circuit 1762,In service,4/21/2021,Permission to Operate,7/30/2021 AE-10041,Solar PV,5.2,,Category 1,"Eden, Fond du Lac County, WI",,Circuit 1398,In service,4/19/2021,Permission to Operate,5/28/2021 AE-09924,Solar PV,9.8,,Category 1,"Belleville, Dane County, WI",Substation 722,Circuit 1971,In service,4/19/2021,Permission to Operate,7/30/2021 AE-09870,Solar PV,99.9,,Category 2,"Madison, Dane County, WI",Substation 579,Circuit 1519,In service,4/19/2021,Permission to Operate,8/27/2021 AE-10028,Solar PV,7.6,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 450,In service,4/19/2021,Permission to Operate,12/6/2021 AE-10032,Solar PV,3.8,,Category 1,"Aniwa, Shawano County, WI",Substation 74,Circuit 180,In service,4/19/2021,Permission to Operate,8/26/2021 AE-10027,Solar PV,6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,4/19/2021,Permission to Operate,6/30/2021 AE-10022,Solar PV,7.6,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,4/16/2021,Permission to Operate,5/24/2021 AE-10023,Solar PV,20,,Category 1,"Stratford, Marathon County, WI",Substation 626,Circuit 1690,In service,4/16/2021,Permission to Operate,9/30/2021 AE-09832,Solar PV,4.4,,Category 1,"Monticello, Dane County, WI",Substation 57,Circuit 151,In service,4/15/2021,Permission to Operate,5/18/2021 AE-09999,Solar PV,15.4,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2148,In service,4/15/2021,Permission to Operate,10/11/2021 AE-09974,Solar PV,9.4,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,4/13/2021,Permission to Operate,5/24/2021 AE-10009,Solar PV,12.6,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 301,In service,4/13/2021,Permission to Operate,8/5/2021 AE-10001,Solar PV,7.8,,Category 1,"Wilton, Monroe County, WI",Substation 217,Circuit 515,In service,4/12/2021,Permission to Operate,6/23/2021 AE-09992,Solar PV,4.4,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 450,In service,4/9/2021,Permission to Operate,5/11/2021 AE-09991,Solar PV,5,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,4/9/2021,Permission to Operate,5/18/2021 AE-09959,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,4/9/2021,Permission to Operate,5/11/2021 AE-09988,Solar PV,9.4,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,4/9/2021,Permission to Operate,5/4/2021 AE-09989,Solar PV,3.3,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,4/9/2021,Permission to Operate,5/18/2021 AE-09986,Solar PV,2.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,4/9/2021,Permission to Operate,5/28/2021 AE-09971,Solar PV,4.4,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,4/8/2021,Permission to Operate,5/11/2021 AE-09232,Solar PV,10,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1737,In service,4/8/2021,Permission to Operate,7/29/2021 AE-09973,Solar PV,6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,4/8/2021,Permission to Operate,5/11/2021 AE-09972,Solar PV,8.8,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,4/8/2021,Permission to Operate,5/18/2021 AE-09755,Solar PV,20,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,4/8/2021,Permission to Operate,11/1/2021 AE-09754,Solar PV,20,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,4/8/2021,Permission to Operate,10/11/2021 AE-09985,Solar PV,7.7,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,4/8/2021,Permission to Operate,5/20/2021 AE-09957,Solar PV,6.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,4/7/2021,Permission to Operate,5/5/2021 AE-09960,Solar PV,6,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,4/7/2021,Permission to Operate,5/11/2021 AE-09934,"Solar PV, Battery/Storage",12,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,4/7/2021,Permission to Operate,11/8/2021 AE-09958,Solar PV,7.7,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,4/7/2021,Permission to Operate,5/4/2021 AE-09963,Solar PV,5.1,,Category 1,"Brodhead, Green County, WI",Substation 647,Circuit 1774,In service,4/7/2021,Permission to Operate,6/30/2021 AE-09968,Solar PV,15.1,,Category 1,"Springdale, Dane County, WI",Substation 483,Circuit 1209,In service,4/7/2021,Permission to Operate,5/11/2021 AE-09962,Solar PV,6,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,4/7/2021,Permission to Operate,5/4/2021 AE-09890,Solar PV,6.6,,Category 1,"Merrimac, Sauk County, WI",Substation 466,Circuit 1156,In service,4/7/2021,Permission to Operate,6/9/2021 AE-09969,Solar PV,6,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,4/7/2021,Permission to Operate,5/11/2021 AE-09970,Solar PV,3.8,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,4/7/2021,Permission to Operate,5/5/2021 AE-09961,Solar PV,5.5,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,4/7/2021,Permission to Operate,5/11/2021 AE-09951,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09947,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09939,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09938,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09954,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09950,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09937,Solar PV,21,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09941,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09945,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09948,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09940,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09953,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09944,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09952,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09942,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09675,Solar PV,3.3,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,4/6/2021,Permission to Operate,5/21/2021 AE-09949,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09946,Solar PV,20.8,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 928,In service,4/6/2021,Permission to Operate,6/2/2022 AE-09932,Solar PV,2.9,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,4/5/2021,Permission to Operate,5/28/2021 AE-09920,Solar PV,7.7,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,4/5/2021,Permission to Operate,6/10/2021 AE-09923,Solar PV,10,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,4/5/2021,Permission to Operate,6/4/2021 AE-09918,"Solar PV, Battery/Storage",16.4,,Category 1,"Green Lake, Green Lake County, WI",,Circuit 456,In service,4/5/2021,Permission to Operate,7/9/2021 AE-09931,Solar PV,11.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1455,In service,4/5/2021,Permission to Operate,5/28/2021 AE-09930,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1455,In service,4/5/2021,Permission to Operate,5/28/2021 AE-09921,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,4/5/2021,Permission to Operate,6/3/2021 AE-09926,Solar PV,6.1,,Category 1,"Wilton, Monroe County, WI",Substation 217,Circuit 514,In service,4/2/2021,Permission to Operate,6/3/2021 AE-09788,"Solar PV, Battery/Storage",82.6,,Category 2,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,4/1/2021,Permission to Operate,2/23/2023 AE-09906,Solar PV,1113,,Category 4,"Sheboygan, Sheboygan County, WI",Substation 355,Circuit 852,In service,4/1/2021,Permission to Operate,4/26/2022 AE-09902,Solar PV,7.6,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1745,In service,3/31/2021,Permission to Operate,5/5/2021 AE-09922,Solar PV,19,,Category 1,"Stoughton, Dane County, WI",Substation 676,Circuit 1871,In service,3/31/2021,Permission to Operate,5/11/2021 AE-09892,Solar PV,7.7,,Category 1,"Beloit, Rock County, WI",Substation 529,Circuit 1352,In service,3/30/2021,Permission to Operate,5/13/2021 AE-09883,Solar PV,9.4,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,3/29/2021,Permission to Operate,4/26/2021 AE-09882,Solar PV,7.2,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,3/29/2021,Permission to Operate,4/28/2021 AE-09872,Solar PV,10,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/26/2021,Permission to Operate,10/20/2021 AE-09878,Solar PV,6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,3/26/2021,Permission to Operate,4/26/2021 AE-09873,Solar PV,7.6,,Category 1,"Sauk City, Dane County, WI",Substation 461,Circuit 1130,In service,3/26/2021,Permission to Operate,5/13/2021 AE-09875,Solar PV,8.1,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,3/26/2021,Permission to Operate,9/22/2021 AE-09879,Solar PV,6,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,3/26/2021,Permission to Operate,4/23/2021 AE-09869,Solar PV,10,,Category 1,"Merrimac, Columbia County, WI",Substation 466,Circuit 1157,In service,3/25/2021,Permission to Operate,6/18/2021 AE-09866,Solar PV,7.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,3/25/2021,Permission to Operate,5/25/2021 AE-09852,Solar PV,3.7,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,3/24/2021,Permission to Operate,4/29/2021 AE-09818,Solar PV,7.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,3/24/2021,Permission to Operate,4/21/2021 AE-09856,Solar PV,6.4,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,3/24/2021,Permission to Operate,4/28/2021 AE-09862,Solar PV,9.8,,Category 1,"Poynette, Columbia County, WI",Substation 335,Circuit 790,In service,3/24/2021,Permission to Operate,10/15/2021 AE-09758,Solar PV,14.4,,Category 1,"Cuba City, Wi, Lafayette County, WI",Substation 248,Circuit 595,In service,3/24/2021,Permission to Operate,9/20/2021 AE-09846,Solar PV,7.6,,Category 1,"Livingston, Iowa County, WI",Substation 601,Circuit 1620,In service,3/23/2021,Permission to Operate,5/20/2021 AE-09845,Solar PV,8.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/23/2021,Permission to Operate,4/21/2021 AE-09863,Solar PV,17.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1269,In service,3/23/2021,Permission to Operate,8/26/2021 AE-09849,Solar PV,15.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,3/23/2021,Permission to Operate,10/20/2021 AE-09840,Solar PV,2.2,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,3/23/2021,Permission to Operate,4/27/2021 AE-09833,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/22/2021,Permission to Operate,4/21/2021 AE-09838,Solar PV,18.7,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1433,In service,3/22/2021,Permission to Operate,5/25/2021 AE-09836,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,3/22/2021,Permission to Operate,5/17/2021 AE-09685,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/22/2021,Permission to Operate,6/17/2021 AE-09842,Solar PV,7.7,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,3/22/2021,Permission to Operate,5/28/2021 AE-09843,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,3/22/2021,Permission to Operate,6/17/2021 AE-09860,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,3/22/2021,Permission to Operate,4/28/2021 AE-09742,Solar PV,86,,Category 2,"Hillsboro, Vernon County, WI",Substation 340,Circuit 805,In service,3/19/2021,Permission to Operate,6/3/2021 AE-09830,Solar PV,7.7,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1585,In service,3/19/2021,Permission to Operate,5/28/2021 AE-09831,Solar PV,7.7,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,3/19/2021,Permission to Operate,4/26/2021 AE-09817,Solar PV,6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/19/2021,Permission to Operate,4/21/2021 AE-09791,Solar PV,15.2,,Category 1,"Darien, Walworth County, WI",Substation 746,Circuit 2053,In service,3/19/2021,Permission to Operate,10/14/2021 AE-09827,Solar PV,7.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,3/19/2021,Permission to Operate,4/27/2021 AE-09829,Solar PV,10.4,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,3/19/2021,Permission to Operate,5/28/2021 AE-09812,Solar PV,8.8,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,3/18/2021,Permission to Operate,5/4/2021 AE-09726,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,3/18/2021,Permission to Operate,6/9/2021 AE-09810,Solar PV,3.3,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,3/18/2021,Permission to Operate,4/15/2021 AE-09814,Solar PV,11.4,,Category 1,"Dane, Dane County, WI",Substation 201,Circuit 459,In service,3/17/2021,Permission to Operate,6/3/2021 AE-09790,Solar PV,7.6,,Category 1,"Tomah, Monroe County, WI",,Circuit 387,In service,3/17/2021,Permission to Operate,6/30/2021 AE-09807,Solar PV,12.6,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,3/17/2021,Permission to Operate,6/4/2021 AE-09808,Solar PV,4.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,3/17/2021,Permission to Operate,4/27/2021 AE-09809,Solar PV,3.3,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,3/17/2021,Permission to Operate,3/30/2021 AE-09752,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1927,In service,3/16/2021,Permission to Operate,7/7/2021 AE-09712,Solar PV,11.1,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,3/16/2021,Permission to Operate,6/15/2021 AE-09794,Solar PV,5.1,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,3/16/2021,Permission to Operate,5/24/2021 AE-09806,Solar PV,8.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,3/16/2021,Permission to Operate,6/3/2021 AE-09792,Solar PV,5.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/16/2021,Permission to Operate,4/9/2021 AE-09795,Solar PV,7.7,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,3/16/2021,Permission to Operate,1/10/2023 AE-09783,Solar PV,10,,Category 1,"Stratford, Marathon County, WI",Substation 626,Circuit 1690,In service,3/15/2021,Permission to Operate,7/15/2021 AE-09789,Solar PV,9.9,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1927,In service,3/12/2021,Permission to Operate,5/18/2021 AE-09779,Solar PV,7.6,,Category 1,"Mineral Point, Lafayette County, WI",,Circuit 1186,In service,3/12/2021,Permission to Operate,12/16/2021 AE-09778,Solar PV,3.7,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1745,In service,3/12/2021,Permission to Operate,6/22/2021 AE-09777,Solar PV,10,,Category 1,"Janesville, Rock County, WI",,Circuit 1875,In service,3/12/2021,Permission to Operate,8/25/2021 AE-09770,Solar PV,7.7,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2132,In service,3/11/2021,Permission to Operate,6/9/2021 AE-09771,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,3/11/2021,Permission to Operate,6/22/2021 AE-09769,Solar PV,6.7,,Category 1,"Berlin, Green Lake County, WI",,Circuit 172,In service,3/11/2021,Permission to Operate,7/27/2021 AE-09775,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/10/2021,Permission to Operate,4/26/2021 AE-09766,Solar PV,8.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,3/10/2021,Permission to Operate,6/18/2021 AE-09776,Solar PV,3.8,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,3/10/2021,Permission to Operate,3/30/2021 AE-09767,Solar PV,6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,3/10/2021,Permission to Operate,3/30/2021 AE-09772,Solar PV,7.7,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,3/10/2021,Permission to Operate,3/30/2021 AE-09676,Solar PV,5,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,3/10/2021,Permission to Operate,6/10/2021 AE-09686,Solar PV,10.1,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,3/10/2021,Permission to Operate,7/1/2021 AE-09763,Solar PV,11.9,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,3/10/2021,Permission to Operate,5/20/2021 AE-09782,Solar PV,5,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,3/10/2021,Permission to Operate,6/4/2021 AE-09538,Solar PV,5.1,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,3/9/2021,Permission to Operate,4/27/2021 AE-09750,Solar PV,16.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,3/9/2021,Permission to Operate,3/29/2021 AE-09751,Solar PV,9.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,3/9/2021,Permission to Operate,4/15/2021 AE-09733,Solar PV,4.7,,Category 1,"Markesan, Green Lake County, WI",Substation 436,Circuit 1105,In service,3/8/2021,Permission to Operate,9/2/2021 AE-09625,Solar PV,22,,Category 2,"Portage, Columbia County, WI",Substation 46,Circuit 137,In service,3/8/2021,Permission to Operate,12/3/2021 AE-09745,Solar PV,6.2,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1006,In service,3/8/2021,Permission to Operate,7/1/2021 AE-09747,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/8/2021,Permission to Operate,4/21/2021 AE-09748,Solar PV,8.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/8/2021,Permission to Operate,4/21/2021 AE-09749,Solar PV,5,,Category 1,"Monroe, Green County, WI",Substation 481,Circuit 1190,In service,3/8/2021,Permission to Operate,4/27/2021 AE-09656,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,3/8/2021,Permission to Operate,4/26/2021 AE-09743,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1925,In service,3/8/2021,Permission to Operate,5/4/2021 AE-09573,Solar PV,7.8,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,3/8/2021,Permission to Operate,4/21/2021 AE-09746,Solar PV,3.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,3/8/2021,Permission to Operate,4/26/2021 AE-09736,Solar PV,3,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 202,In service,3/5/2021,Permission to Operate,4/15/2021 AE-09711,Solar PV,5.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,3/5/2021,Permission to Operate,5/24/2021 AE-09732,Solar PV,3.5,,Category 1,"Poynette, Columbia County, WI",Substation 335,Circuit 790,In service,3/5/2021,Permission to Operate,5/28/2021 AE-09737,Solar PV,6.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,3/5/2021,Permission to Operate,5/28/2021 AE-09644,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,3/4/2021,Permission to Operate,5/4/2021 AE-09729,Solar PV,3.8,,Category 1,"Beloit, Rock County, WI",,Circuit 1682,In service,3/4/2021,Permission to Operate,4/26/2021 AE-09660,Solar PV,7.6,,Category 1,"Lodi, Columbia County, WI",Substation 201,Circuit 458,In service,3/4/2021,Permission to Operate,12/19/2022 AE-09719,Solar PV,5.1,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1189,In service,3/3/2021,Permission to Operate,7/1/2021 AE-09716,Solar PV,7.6,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2132,In service,3/2/2021,Permission to Operate,4/29/2021 AE-09697,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,3/1/2021,Permission to Operate,5/4/2021 AE-09698,Solar PV,8.2,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,3/1/2021,Permission to Operate,3/29/2021 AE-09689,Solar PV,7.8,,Category 1,"Baraboo, Sauk County, WI",Substation 623,Circuit 1687,In service,3/1/2021,Permission to Operate,7/22/2021 AE-09702,Solar PV,8.8,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,3/1/2021,Permission to Operate,5/18/2021 AE-09706,Solar PV,8.8,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,3/1/2021,Permission to Operate,4/1/2021 AE-09701,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,3/1/2021,Permission to Operate,3/31/2021 AE-09704,Solar PV,6.7,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,3/1/2021,Permission to Operate,5/17/2021 AE-09703,Solar PV,7.2,,Category 1,"Deforest, Dane County, WI",,Circuit 474,In service,3/1/2021,Permission to Operate,4/20/2021 AE-09691,Solar PV,10,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,2/25/2021,Permission to Operate,5/13/2021 AE-09696,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,2/25/2021,Permission to Operate,4/28/2021 AE-09688,Solar PV,7,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,2/25/2021,Permission to Operate,4/28/2021 AE-09699,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1927,In service,2/25/2021,Permission to Operate,7/29/2021 AE-09684,Solar PV,20,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,2/25/2021,Permission to Operate,6/30/2021 AE-09681,Solar PV,4.5,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 270,In service,2/23/2021,Permission to Operate,4/2/2021 AE-09679,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,2/23/2021,Permission to Operate,3/29/2021 AE-09680,Solar PV,5,,Category 1,"Tigerton, Shawano County, WI",Substation 494,Circuit 1237,In service,2/23/2021,Permission to Operate,5/18/2021 AE-09682,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,2/23/2021,Permission to Operate,5/4/2021 AE-09673,Solar PV,5.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,2/23/2021,Permission to Operate,5/14/2021 AE-09652,Solar PV,7.6,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 316,In service,2/19/2021,Permission to Operate,6/4/2021 AE-09653,Solar PV,10.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,2/19/2021,Permission to Operate,3/29/2021 AE-09658,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1522,In service,2/19/2021,Permission to Operate,3/29/2021 AE-09661,Solar PV,7.2,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,2/19/2021,Permission to Operate,3/18/2021 AE-09665,Solar PV,9.4,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,2/18/2021,Permission to Operate,4/23/2021 AE-09664,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,2/18/2021,Permission to Operate,5/4/2021 AE-09657,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,2/18/2021,Permission to Operate,5/4/2021 AE-09667,Solar PV,8.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,2/18/2021,Permission to Operate,6/3/2021 AE-09659,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,2/18/2021,Permission to Operate,4/28/2021 AE-09642,Solar PV,10,,Category 1,"Juda, Green County, WI",Substation 647,Circuit 1774,In service,2/17/2021,Permission to Operate,7/7/2021 AE-09565,Solar PV,4.4,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,2/17/2021,Permission to Operate,4/20/2021 AE-09619,Solar PV,10,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,2/17/2021,Permission to Operate,3/11/2021 AE-09635,Solar PV,7.6,,Category 1,"N Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2197,In service,2/17/2021,Permission to Operate,5/26/2021 AE-09604,Solar PV,10,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,2/17/2021,Permission to Operate,4/26/2021 AE-09638,Solar PV,4.4,,Category 1,"De Forest, Dane County, WI",Substation 726,Circuit 1984,In service,2/17/2021,Permission to Operate,3/30/2021 AE-09639,Solar PV,6.4,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,2/17/2021,Permission to Operate,5/13/2021 AE-09502,Solar PV,132,,Category 2,"Cambridge, Dane County, WI",Substation 115,Circuit 318,In service,2/17/2021,Permission to Operate,10/13/2021 AE-09634,Solar PV,20,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,2/17/2021,Permission to Operate,7/23/2021 AE-09629,Solar PV,5.2,,Category 1,"Black Earth, Dane County, WI",Substation 483,Circuit 1209,In service,2/15/2021,Permission to Operate,3/23/2021 AE-09627,Solar PV,7.6,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1044,In service,2/15/2021,Permission to Operate,4/29/2021 AE-09621,Solar PV,5.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,2/15/2021,Permission to Operate,3/31/2021 AE-09493,Solar PV,4.2,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,2/15/2021,Permission to Operate,6/15/2021 AE-09626,Solar PV,6,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,2/15/2021,Permission to Operate,3/18/2021 AE-09612,Solar PV,4.1,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1171,In service,2/12/2021,Permission to Operate,8/17/2021 AE-09602,Solar PV,7.6,,Category 1,"Gratiot, Lafayette County, WI",Substation 770,Circuit 2083,In service,2/10/2021,Permission to Operate,9/2/2021 AE-09596,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,2/10/2021,Permission to Operate,3/25/2021 AE-09598,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,2/10/2021,Permission to Operate,3/29/2021 AE-09606,Solar PV,3.8,,Category 1,"Belleville, Dane County, WI",Substation 280,Circuit 670,In service,2/10/2021,Permission to Operate,3/25/2021 AE-09607,Solar PV,7.6,,Category 1,"Spring Green, Sauk County, WI",Substation 710,Circuit 1946,In service,2/10/2021,Permission to Operate,10/6/2021 AE-09605,Solar PV,3.3,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,2/10/2021,Permission to Operate,3/18/2021 AE-09494,Solar PV,11,,Category 1,"Dane, Dane County, WI",Substation 201,Circuit 458,In service,2/9/2021,Permission to Operate,6/24/2021 AE-09594,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,2/9/2021,Permission to Operate,3/22/2021 AE-09595,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,2/9/2021,Permission to Operate,3/22/2021 AE-09591,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1522,In service,2/9/2021,Permission to Operate,3/19/2021 AE-09574,Solar PV,2000,,Category 4,"Platteville, Grant County, WI",,,In service,2/5/2021,Permission to Operate,7/22/2022 AE-09566,Solar PV,9.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,2/4/2021,Permission to Operate,8/4/2021 AE-09571,Solar PV,7.5,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 346,Circuit 831,In service,2/4/2021,Permission to Operate,2/10/2022 AE-09554,Solar PV,6,,Category 1,"Leopolis, Shawano County, WI",Substation 111,Circuit 310,In service,2/4/2021,Permission to Operate,5/21/2021 AE-09564,Solar PV,3.9,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,2/4/2021,Permission to Operate,3/23/2021 AE-09563,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,2/3/2021,Permission to Operate,3/18/2021 AE-09559,Solar PV,3.9,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 862,In service,2/2/2021,Permission to Operate,3/23/2021 AE-09561,Solar PV,5,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,2/2/2021,Permission to Operate,4/28/2021 AE-09553,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,2/2/2021,Permission to Operate,3/18/2021 AE-09548,Solar PV,11.3,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1653,In service,1/29/2021,Permission to Operate,3/30/2021 AE-09535,Solar PV,5,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,1/29/2021,Permission to Operate,3/22/2021 AE-09536,"Solar PV, Battery/Storage",34.1,,Category 2,"Scandinavia, Waupaca County, WI",Substation 651,Circuit 1786,In service,1/29/2021,Permission to Operate,5/27/2021 AE-09544,Solar PV,3.3,,Category 1,"Gotham, Richland County, WI",,Circuit 1055,In service,1/29/2021,Permission to Operate,3/23/2021 AE-09526,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,1/27/2021,Permission to Operate,3/29/2021 AE-09525,Solar PV,6,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,1/27/2021,Permission to Operate,3/22/2021 AE-09530,Solar PV,10.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,1/27/2021,Permission to Operate,8/9/2021 AE-09523,Solar PV,7.6,,Category 1,"Woodford, Lafayette County, WI",,Circuit 930,In service,1/26/2021,Permission to Operate,7/29/2022 AE-09518,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,1/26/2021,Permission to Operate,4/30/2021 AE-09519,Solar PV,5.5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,1/26/2021,Permission to Operate,3/18/2021 AE-09521,"Solar PV, Battery/Storage",520.1,,Category 3,"Tomah, Monroe County, WI",,Circuit 388,In service,1/26/2021,Permission to Operate,10/1/2021 AE-09512,Solar PV,3.8,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,1/26/2021,Permission to Operate,6/22/2021 AE-09520,Solar PV,5.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,1/26/2021,Permission to Operate,3/18/2021 AE-09532,Solar PV,10.5,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 926,In service,1/26/2021,Permission to Operate,5/11/2021 AE-09517,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,1/26/2021,Permission to Operate,3/18/2021 AE-09500,Solar PV,10,,Category 1,"Fon Du Lac, Fond du Lac County, WI",Substation 513,Circuit 1267,In service,1/25/2021,Permission to Operate,6/9/2021 AE-09510,Solar PV,5.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,1/25/2021,Permission to Operate,3/23/2021 AE-09501,Solar PV,4.1,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1501,In service,1/25/2021,Permission to Operate,5/14/2021 AE-09506,Solar PV,5,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,1/25/2021,Permission to Operate,3/18/2021 AE-09509,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,1/25/2021,Permission to Operate,3/16/2021 AE-09504,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,1/25/2021,Permission to Operate,3/22/2021 AE-09508,Solar PV,3,,Category 1,"Blue Mounds, Iowa County, WI",,Circuit 220,In service,1/25/2021,Permission to Operate,6/10/2021 AE-09477,"Solar PV, Battery/Storage",10.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,1/20/2021,Permission to Operate,4/29/2021 AE-09490,Solar PV,9.3,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,1/20/2021,Permission to Operate,3/31/2021 AE-09486,Solar PV,5.2,,Category 1,"Deforest, Dane County, WI",,Circuit 474,In service,1/20/2021,Permission to Operate,2/19/2021 AE-09492,Solar PV,5.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,1/20/2021,Permission to Operate,7/13/2021 AE-09498,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,1/20/2021,Permission to Operate,2/18/2021 AE-09495,Solar PV,3.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,1/20/2021,Permission to Operate,4/21/2021 AE-09468,Solar PV,4.6,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,1/15/2021,Permission to Operate,4/26/2021 AE-09467,Solar PV,16.5,,Category 1,"Lone Rock, Richland County, WI",,Circuit 1055,In service,1/15/2021,Permission to Operate,7/29/2021 AE-09469,Solar PV,3,,Category 1,"Clinton, Rock County, WI",Substation 493,Circuit 1227,In service,1/15/2021,Permission to Operate,8/17/2021 AE-09465,Solar PV,5.5,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,1/14/2021,Permission to Operate,3/12/2021 AE-09458,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,1/13/2021,Permission to Operate,3/8/2021 AE-09421,Solar PV,3.6,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1815,In service,1/7/2021,Permission to Operate,9/24/2021 AE-09460,Solar PV,7.7,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,1/6/2021,Permission to Operate,3/3/2021 AE-09457,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1518,In service,1/6/2021,Permission to Operate,3/18/2021 AE-09466,Solar PV,5.1,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1925,In service,1/6/2021,Permission to Operate,5/4/2021 AE-09459,Solar PV,3.5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,1/6/2021,Permission to Operate,3/30/2021 AE-09427,Solar PV,5.1,,Category 1,"Columbus, Columbia County, WI",Substation 335,Circuit 791,In service,1/5/2021,Permission to Operate,7/28/2021 AE-09428,Solar PV,5.1,,Category 1,"Wonewoc, Juneau County, WI",,Circuit 1958,In service,1/5/2021,Permission to Operate,2/9/2021 AE-09418,Solar PV,11,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,1/4/2021,Permission to Operate,5/11/2021 AE-09419,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,1/4/2021,Permission to Operate,2/26/2021 AE-09372,Solar PV,65.5,,Category 2,"Fond du Lac, Fond du Lac County, WI",,,In service,1/4/2021,Permission to Operate,1/28/2021 AE-09400,Solar PV,3.8,,Category 1,"De Forest, Dane County, WI",Substation 726,Circuit 1984,In service,12/30/2020,Permission to Operate,3/15/2021 AE-09410,Solar PV,6,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,12/30/2020,Permission to Operate,3/12/2021 AE-09401,Solar PV,3.8,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,12/30/2020,Permission to Operate,3/15/2021 AE-09385,Solar PV,4.4,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/30/2020,Permission to Operate,4/5/2021 AE-09395,Solar PV,3.8,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/29/2020,Permission to Operate,6/22/2021 AE-09412,Solar PV,7.7,,Category 1,"Albany, Green County, WI",Substation 481,Circuit 1189,In service,12/29/2020,Permission to Operate,4/27/2021 AE-09396,Solar PV,10,,Category 1,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1685,In service,12/29/2020,Permission to Operate,8/23/2022 AE-09381,Solar PV,5.1,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,12/29/2020,Permission to Operate,1/28/2021 AE-09378,Solar PV,3.8,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,12/29/2020,Permission to Operate,3/3/2021 AE-09388,Solar PV,6.4,,Category 1,"Stoughton, Dane County, WI",,Circuit 1140,In service,12/29/2020,Permission to Operate,2/8/2021 AE-09380,"Solar PV, Battery/Storage",16,,Category 1,"Avoca, Iowa County, WI",Substation 45,Circuit 128,In service,12/28/2020,Permission to Operate,5/25/2021 AE-09389,Solar PV,7.2,,Category 1,"Belmont, Lafayette County, WI",Substation 59,Circuit 162,In service,12/28/2020,Permission to Operate,5/14/2021 AE-09386,Solar PV,5,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,12/28/2020,Permission to Operate,3/12/2021 AE-09359,Solar PV,3.7,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,12/28/2020,Permission to Operate,6/21/2021 AE-09375,Solar PV,5,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,12/22/2020,Permission to Operate,3/12/2021 AE-09367,Solar PV,7.7,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,12/22/2020,Permission to Operate,3/22/2021 AE-09366,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,12/22/2020,Permission to Operate,3/3/2021 AE-09376,Solar PV,6.6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,12/22/2020,Permission to Operate,3/25/2021 AE-09382,Solar PV,8.7,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,12/22/2020,Permission to Operate,4/28/2021 AE-09434,Solar PV,10.8,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1006,In service,12/22/2020,Permission to Operate,6/3/2021 AE-09369,Solar PV,6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/22/2020,Permission to Operate,2/12/2021 AE-09377,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,12/22/2020,Permission to Operate,3/3/2021 AE-09362,Solar PV,5,,Category 1,"Pardeeville, Columbia County, WI",Substation 448,Circuit 1115,In service,12/21/2020,Permission to Operate,3/18/2021 AE-09364,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,12/21/2020,Permission to Operate,2/26/2021 AE-09358,Solar PV,9.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1697,In service,12/21/2020,Permission to Operate,2/5/2021 AE-09361,Solar PV,16.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/21/2020,Permission to Operate,4/28/2021 AE-09265,Solar PV,3.8,,Category 1,"De Forest, Dane County, WI",,Circuit 477,In service,12/21/2020,Permission to Operate,3/18/2021 AE-09357,Solar PV,3.7,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1584,In service,12/21/2020,Permission to Operate,3/10/2021 AE-09271,Solar PV,16,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,12/21/2020,Permission to Operate,3/18/2021 AE-09363,Solar PV,3.3,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,12/21/2020,Permission to Operate,3/3/2021 AE-09056,"Solar PV, Battery/Storage",7.6,,Category 1,"Genoa City, Kenosha County, WI",,Circuit 1666,In service,12/18/2020,Permission to Operate,4/28/2021 AE-09323,Solar PV,3.8,,Category 1,"Arlington, Columbia County, WI",Substation 13,Circuit 52,In service,12/18/2020,Permission to Operate,4/13/2021 AE-09308,Solar PV,9,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,12/18/2020,Permission to Operate,2/5/2021 AE-09255,Solar PV,3.4,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 584,In service,12/17/2020,Permission to Operate,3/18/2021 AE-09346,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,12/17/2020,Permission to Operate,6/3/2021 AE-09259,Solar PV,10.7,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,12/16/2020,Permission to Operate,7/21/2021 AE-08578,Solar PV,33.3,20,Category 2,"Poynette, Dane County, WI",Substation 591,Circuit 1576,In service,12/16/2020,Permission to Operate,1/4/2022 AE-09299,Solar PV,9.9,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,12/15/2020,Permission to Operate,3/24/2021 AE-09324,Solar PV,8.2,,Category 1,"De Forest, Dane County, WI",,Circuit 477,In service,12/15/2020,Permission to Operate,3/18/2021 AE-09320,Solar PV,6.6,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,12/14/2020,Permission to Operate,2/8/2021 AE-09315,Solar PV,5.5,,Category 1,"De Forest, Dane County, WI",Substation 726,Circuit 1984,In service,12/14/2020,Permission to Operate,3/10/2021 AE-09319,Solar PV,9.9,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,12/14/2020,Permission to Operate,4/27/2021 AE-09314,Solar PV,3.3,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,12/14/2020,Permission to Operate,2/17/2021 AE-09311,Solar PV,5.2,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,12/14/2020,Permission to Operate,3/11/2021 AE-09316,Solar PV,5.5,,Category 1,"De Forest, Dane County, WI",Substation 726,Circuit 1984,In service,12/14/2020,Permission to Operate,3/18/2021 AE-09310,Solar PV,5.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,12/14/2020,Permission to Operate,4/15/2021 AE-09318,Solar PV,6,,Category 1,"Ridgeway, Iowa County, WI",Substation 37,Circuit 94,In service,12/14/2020,Permission to Operate,3/3/2021 AE-09317,Solar PV,7.7,,Category 1,"De Forest, Dane County, WI",Substation 726,Circuit 1984,In service,12/14/2020,Permission to Operate,2/12/2021 AE-09298,Solar PV,5,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1228,In service,12/11/2020,Permission to Operate,3/5/2021 AE-09262,Solar PV,3.8,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,12/8/2020,Permission to Operate,12/30/2020 AE-09275,Solar PV,7.7,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,12/7/2020,Permission to Operate,3/3/2021 AE-09283,Solar PV,3.8,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 535,Circuit 1380,In service,12/7/2020,Permission to Operate,8/13/2021 AE-09277,Solar PV,4.9,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,12/7/2020,Permission to Operate,6/18/2021 AE-09145,Solar PV,5.8,,Category 1,"Mt Sterling, Crawford County, WI",Substation 645,Circuit 1763,In service,12/7/2020,Permission to Operate,12/22/2020 AE-09272,Solar PV,14.5,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,12/7/2020,Permission to Operate,9/7/2021 AE-09264,Solar PV,3.7,,Category 1,"Walworth, Walworth County, WI",,Circuit 2017,In service,12/4/2020,Permission to Operate,4/15/2021 AE-09270,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 378,Circuit 932,In service,12/4/2020,Permission to Operate,3/18/2021 AE-09268,Solar PV,6,,Category 1,"Mineral Point, Iowa County, WI",Substation 525,Circuit 1344,In service,12/4/2020,Permission to Operate,3/31/2021 AE-09345,Solar PV,11.4,,Category 1,"Hollandale, Iowa County, WI",Substation 525,Circuit 1343,In service,12/3/2020,Permission to Operate,12/14/2020 AE-09260,Solar PV,3.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,12/3/2020,Permission to Operate,6/3/2021 AE-09196,Solar PV,5000,,Category 4,"Fond du Lac, Fond du Lac County, WI",Substation 411,Circuit 1026,In service,12/2/2020,Permission to Operate,6/28/2024 AE-09254,Solar PV,9.3,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,12/2/2020,Permission to Operate,5/11/2021 AE-09236,Solar PV,7.2,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,12/2/2020,Permission to Operate,2/19/2021 AE-09251,Solar PV,5,,Category 1,"Evansville, Rock County, WI",Substation 279,Circuit 666,In service,12/2/2020,Permission to Operate,6/30/2021 AE-09247,Solar PV,5.1,,Category 1,"Waupaca, Waupaca County, WI",Substation 651,Circuit 1787,In service,12/1/2020,Permission to Operate,6/16/2021 AE-09234,Solar PV,8.2,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,11/30/2020,Permission to Operate,2/2/2021 AE-09231,Solar PV,5.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,11/30/2020,Permission to Operate,1/21/2021 AE-09231,Solar PV,5.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,11/30/2020,Permission to Operate,1/21/2021 AE-09252,Solar PV,17.6,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/30/2020,Permission to Operate,12/21/2020 AE-09243,Solar PV,5.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,11/30/2020,Permission to Operate,5/25/2021 AE-09238,Solar PV,6,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,11/30/2020,Permission to Operate,3/10/2021 AE-09212,Solar PV,7.7,,Category 1,"Manawa, Waupaca County, WI",Substation 494,Circuit 1234,In service,11/25/2020,Permission to Operate,12/23/2020 AE-09226,Solar PV,5.5,,Category 1,"Black Earth, Dane County, WI",Substation 483,Circuit 1209,In service,11/25/2020,Permission to Operate,3/5/2021 AE-09227,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,11/24/2020,Permission to Operate,2/5/2021 AE-09216,Solar PV,3.8,,Category 1,"Stoughton, Rock County, WI",Substation 108,Circuit 302,In service,11/23/2020,Permission to Operate,7/2/2021 AE-09184,Solar PV,3.8,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,11/20/2020,Permission to Operate,12/23/2020 AE-09204,Solar PV,13,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,11/20/2020,Permission to Operate,3/16/2021 AE-09123,Solar PV,5,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,11/20/2020,Permission to Operate,3/8/2021 AE-09186,Solar PV,3.8,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,11/19/2020,Permission to Operate,3/4/2021 AE-09090,Solar PV,11,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,11/19/2020,Permission to Operate,5/25/2021 AE-09095,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,11/19/2020,Permission to Operate,7/8/2021 AE-09188,Solar PV,5.1,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1357,In service,11/19/2020,Permission to Operate,12/22/2020 AE-09213,Solar PV,10.1,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,11/19/2020,Permission to Operate,2/2/2021 AE-09176,Solar PV,10.4,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,11/17/2020,Permission to Operate,2/11/2021 AE-09160,Solar PV,7.8,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2132,In service,11/16/2020,Permission to Operate,12/21/2020 AE-09172,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,11/16/2020,Permission to Operate,4/16/2021 AE-09125,Solar PV,7.8,,Category 1,"Avoca, Iowa County, WI",Substation 45,Circuit 128,In service,11/13/2020,Permission to Operate,12/21/2020 AE-09127,Solar PV,3.7,,Category 1,"Walworth, Walworth County, WI",,Circuit 2015,In service,11/13/2020,Permission to Operate,3/12/2021 AE-09102,Solar PV,15.1,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,11/12/2020,Permission to Operate,1/7/2021 AE-09119,Solar PV,10,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,11/12/2020,Permission to Operate,4/28/2021 AE-09117,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09131,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09150,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09147,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09154,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,11/11/2020,Permission to Operate,2/11/2021 AE-09149,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09142,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09151,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09137,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09136,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09132,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09148,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09130,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09129,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09138,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09152,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09134,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09153,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,11/11/2020,Permission to Operate,2/26/2021 AE-09139,Solar PV,3.8,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09133,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09146,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09135,Solar PV,3.7,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,11/11/2020,Permission to Operate,12/18/2020 AE-09097,Solar PV,3,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 904,In service,11/10/2020,Permission to Operate,2/24/2021 AE-08981,Solar PV,15.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,11/10/2020,Permission to Operate,6/3/2021 AE-09116,Solar PV,5.1,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1199,In service,11/10/2020,Permission to Operate,5/12/2021 AE-09087,Solar PV,3.7,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,11/9/2020,Permission to Operate,4/30/2021 AE-09024,Solar PV,5.6,,Category 1,"Monroe, Green County, WI",,Circuit 930,In service,11/9/2020,Permission to Operate,2/8/2021 AE-08777,Solar PV,3.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,11/6/2020,Permission to Operate,4/20/2021 AE-09094,Solar PV,9.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,11/5/2020,Permission to Operate,2/8/2021 AE-09085,Solar PV,3.7,,Category 1,"Pell Lake, Walworth County, WI",Substation 660,Circuit 1810,In service,11/5/2020,Permission to Operate,3/23/2021 AE-09073,Solar PV,14.8,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,11/5/2020,Permission to Operate,5/18/2021 AE-09074,Solar PV,16,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,11/5/2020,Permission to Operate,3/11/2021 AE-09050,Solar PV,7.7,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,11/5/2020,Permission to Operate,12/10/2020 AE-08894,Solar PV,5.1,,Category 1,"Sauk City, Dane County, WI",Substation 461,Circuit 1130,In service,11/4/2020,Permission to Operate,3/17/2021 AE-09054,Solar PV,11,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 395,In service,11/4/2020,Permission to Operate,2/9/2021 AE-09046,Solar PV,3.3,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,11/4/2020,Permission to Operate,12/30/2020 AE-08899,Solar PV,4.1,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,11/3/2020,Permission to Operate,6/24/2021 AE-09034,Solar PV,2.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,11/2/2020,Permission to Operate,1/4/2021 AE-09035,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,11/2/2020,Permission to Operate,12/30/2020 AE-09036,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,11/2/2020,Permission to Operate,5/11/2021 AE-09038,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,11/2/2020,Permission to Operate,12/30/2020 AE-08762,Solar PV,3.7,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,10/29/2020,Permission to Operate,12/16/2020 AE-08967,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/29/2020,Permission to Operate,3/9/2021 AE-09017,Solar PV,11.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,10/29/2020,Permission to Operate,12/30/2020 AE-09011,Solar PV,5,,Category 1,"De Forest, Dane County, WI",,Circuit 474,In service,10/29/2020,Permission to Operate,2/12/2021 AE-08765,Solar PV,16,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,10/29/2020,Permission to Operate,12/11/2020 AE-09018,Solar PV,17.6,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,10/29/2020,Permission to Operate,5/6/2021 AE-09010,Solar PV,7.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,10/29/2020,Permission to Operate,3/2/2021 AE-09031,Solar PV,8.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,10/29/2020,Permission to Operate,4/28/2021 AE-09014,Solar PV,5.1,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1129,In service,10/29/2020,Permission to Operate,12/4/2020 AE-08999,Solar PV,7.7,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,10/28/2020,Permission to Operate,6/4/2021 AE-09001,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/28/2020,Permission to Operate,1/21/2021 AE-08994,Solar PV,18.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,10/28/2020,Permission to Operate,12/16/2020 AE-08986,Solar PV,8.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,10/27/2020,Permission to Operate,12/11/2020 AE-08989,Solar PV,10,,Category 1,"Avoca, Iowa County, WI",Substation 783,Circuit 2137,In service,10/27/2020,Permission to Operate,6/3/2021 AE-08987,Solar PV,7.6,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,10/27/2020,Permission to Operate,4/27/2021 AE-09096,Solar PV,199.8,,Category 2,"Poynette, Dane County, WI",Substation 591,Circuit 1576,In service,10/27/2020,Permission to Operate,1/4/2022 AE-08568,Solar PV,99.9,46,Category 2,"Poynette, Dane County, WI",Substation 591,Circuit 1576,In service,10/27/2020,Permission to Operate,1/4/2022 AE-08966,Solar PV,7.2,,Category 1,"New Glarus, Green County, WI",,Circuit 1328,In service,10/23/2020,Permission to Operate,2/5/2021 AE-09071,Solar PV,40,,Category 2,"Fond du Lac, Fond du Lac County, WI",Substation 411,Circuit 1024,In service,10/22/2020,Permission to Operate,12/29/2020 AE-08950,Solar PV,4.4,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1519,In service,10/21/2020,Permission to Operate,12/22/2020 AE-08948,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,10/21/2020,Permission to Operate,12/21/2020 AE-09002,Solar PV,3.7,,Category 1,"Pell Lake, Walworth County, WI",Substation 375,Circuit 926,In service,10/20/2020,Permission to Operate,5/13/2021 AE-08831,"Solar PV, Battery/Storage",8,,Category 1,"Oregon, Dane County, WI",,Circuit 1455,In service,10/19/2020,Permission to Operate,11/18/2020 AE-08964,Solar PV,6.4,,Category 1,"Edgerton, Rock County, WI",,Circuit 570,In service,10/16/2020,Permission to Operate,3/5/2021 AE-08931,Solar PV,7.6,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 202,In service,10/16/2020,Permission to Operate,4/6/2021 AE-08928,Solar PV,7.6,,Category 1,"Pell Lake, Walworth County, WI",Substation 660,Circuit 1810,In service,10/16/2020,Permission to Operate,2/18/2021 AE-08955,Solar PV,3.9,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,10/16/2020,Permission to Operate,12/1/2020 AE-08938,Solar PV,3.4,,Category 1,"Brooklyn, Dane County, WI",,Circuit 1881,In service,10/15/2020,Permission to Operate,1/8/2021 AE-08910,Solar PV,5.1,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,10/15/2020,Permission to Operate,12/17/2020 AE-08751,Solar PV,5.8,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1003,In service,10/15/2020,Permission to Operate,12/22/2020 AE-08888,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,10/14/2020,Permission to Operate,12/2/2020 AE-08887,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/14/2020,Permission to Operate,12/2/2020 AE-08883,Solar PV,14.3,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 301,In service,10/14/2020,Permission to Operate,1/13/2021 AE-08889,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/14/2020,Permission to Operate,12/30/2020 AE-08873,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/13/2020,Permission to Operate,12/2/2020 AE-07862,Solar PV,7,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2000,In service,10/13/2020,Permission to Operate,8/11/2021 AE-08872,Solar PV,5.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,10/13/2020,Permission to Operate,12/21/2020 AE-08875,Solar PV,7.2,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1877,In service,10/13/2020,Permission to Operate,12/11/2020 AE-08868,Solar PV,2.8,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,10/13/2020,Permission to Operate,12/1/2020 AE-08857,Solar PV,6,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,10/12/2020,Permission to Operate,12/10/2020 AE-08642,Solar PV,18.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,10/12/2020,Permission to Operate,12/14/2020 AE-08839,Solar PV,2.8,,Category 1,"Belleville, Dane County, WI",Substation 280,Circuit 670,In service,10/12/2020,Permission to Operate,12/17/2020 AE-08840,Solar PV,7.7,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,10/12/2020,Permission to Operate,12/7/2020 AE-08852,Solar PV,5.5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 151,In service,10/12/2020,Permission to Operate,1/21/2021 AE-08841,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/12/2020,Permission to Operate,12/2/2020 AE-08842,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,10/12/2020,Permission to Operate,11/25/2020 AE-08847,Solar PV,9.9,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,10/12/2020,Permission to Operate,12/2/2020 AE-08844,Solar PV,2.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,10/12/2020,Permission to Operate,11/25/2020 AE-08850,Solar PV,4.4,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 151,In service,10/12/2020,Permission to Operate,12/10/2020 AE-08862,Solar PV,5,,Category 1,"Richland Center, Richland County, WI",Substation 572,Circuit 1505,In service,10/9/2020,Permission to Operate,12/17/2020 AE-08849,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/9/2020,Permission to Operate,11/25/2020 AE-08838,Solar PV,8.7,,Category 1,"Deforest, Dane County, WI",,Circuit 474,In service,10/9/2020,Permission to Operate,1/28/2021 AE-08843,Solar PV,8.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/9/2020,Permission to Operate,11/25/2020 AE-08867,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/9/2020,Permission to Operate,1/13/2021 AE-08864,Solar PV,6,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,10/9/2020,Permission to Operate,11/18/2020 AE-08853,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/9/2020,Permission to Operate,12/2/2020 AE-08891,Solar PV,15.4,,Category 1,"Marshfield, Marathon County, WI",Substation 626,Circuit 1690,In service,10/8/2020,Permission to Operate,11/18/2020 AE-08692,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,10/8/2020,Permission to Operate,12/23/2020 AE-08256,Solar PV,5,,Category 1,"Amherst, Portage County, WI",Substation 651,Circuit 1787,In service,10/8/2020,Permission to Operate,4/12/2021 AE-08846,Solar PV,10,,Category 1,"Pine River, Waushara County, WI",Substation 281,Circuit 675,In service,10/8/2020,Permission to Operate,5/26/2021 AE-08845,Solar PV,6.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/8/2020,Permission to Operate,12/1/2020 AE-08890,Solar PV,6,,Category 1,"Pardeeville, Columbia County, WI",Substation 448,Circuit 1113,In service,10/8/2020,Permission to Operate,12/2/2020 AE-08824,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,10/8/2020,Permission to Operate,12/8/2020 AE-08816,Solar PV,7.6,,Category 1,"Delavan, Walworth County, WI",Substation 52,Circuit 146,In service,10/7/2020,Permission to Operate,12/1/2020 AE-08807,Solar PV,4.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1012,In service,10/7/2020,Permission to Operate,12/17/2020 AE-08825,Solar PV,9.9,,Category 1,"Marshfield, Wood County, WI",Substation 573,Circuit 1508,In service,10/7/2020,Permission to Operate,12/17/2020 AE-08827,Solar PV,7.7,,Category 1,"Ontario, Monroe County, WI",Substation 217,Circuit 514,In service,10/7/2020,Permission to Operate,11/9/2020 AE-08811,Solar PV,4.1,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/6/2020,Permission to Operate,1/22/2021 AE-08786,Solar PV,7.4,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2147,In service,10/2/2020,Permission to Operate,11/4/2020 AE-08621,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,10/2/2020,Permission to Operate,11/18/2020 AE-08691,Solar PV,2.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 578,In service,10/2/2020,Permission to Operate,10/29/2020 AE-08640,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,10/2/2020,Permission to Operate,11/10/2020 AE-08224,Solar PV,66.6,,Category 2,"Madison, Dane County, WI",Substation 31,Circuit 84,In service,10/2/2020,Permission to Operate,11/16/2020 AE-08780,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,10/2/2020,Permission to Operate,11/10/2020 AE-08628,Solar PV,7.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,10/2/2020,Permission to Operate,11/10/2020 AE-08572,Solar PV,17.6,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 860,In service,10/1/2020,Permission to Operate,11/24/2020 AE-08769,Solar PV,8.8,,Category 1,"Sheboygan Falls, Sheboygan County, WI",Substation 346,Circuit 833,In service,10/1/2020,Permission to Operate,12/9/2020 AE-08775,"Solar PV, Battery/Storage",6,,Category 1,"Rio, Columbia County, WI",Substation 591,Circuit 1577,In service,10/1/2020,Permission to Operate,11/12/2020 AE-08716,Solar PV,7,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,9/30/2020,Permission to Operate,11/11/2020 AE-08771,Solar PV,4.9,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,9/30/2020,Permission to Operate,11/19/2020 AE-08650,Solar PV,17.9,,Category 1,"Madison, Dane County, WI",Substation 76,Circuit 186,In service,9/30/2020,Permission to Operate,2/17/2021 AE-08766,Solar PV,4.9,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,9/30/2020,Permission to Operate,12/1/2020 AE-08551,Solar PV,23.5,,Category 2,"Mcfarland, Dane County, WI",,Circuit 1141,In service,9/29/2020,Permission to Operate,3/8/2021 AE-08763,"Solar PV, Battery/Storage",9.6,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1666,In service,9/29/2020,Permission to Operate,12/1/2020 AE-08749,Solar PV,8.8,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,9/28/2020,Permission to Operate,12/16/2020 AE-08739,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,9/28/2020,Permission to Operate,12/1/2020 AE-08747,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/28/2020,Permission to Operate,12/4/2020 AE-08746,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/28/2020,Permission to Operate,11/18/2020 AE-08754,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/28/2020,Permission to Operate,11/20/2020 AE-08738,Solar PV,7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/28/2020,Permission to Operate,11/18/2020 AE-08737,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/28/2020,Permission to Operate,12/1/2020 AE-08721,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,9/25/2020,Permission to Operate,11/11/2020 AE-08724,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1519,In service,9/25/2020,Permission to Operate,11/20/2020 AE-08693,Solar PV,9.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/25/2020,Permission to Operate,11/20/2020 AE-08627,Solar PV,6.6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,9/24/2020,Permission to Operate,12/1/2020 AE-08711,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1518,In service,9/24/2020,Permission to Operate,11/11/2020 AE-08718,Solar PV,3.5,,Category 1,"Omro, Winnebago County, WI",Substation 550,Circuit 1452,In service,9/24/2020,Permission to Operate,5/12/2021 AE-08708,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/24/2020,Permission to Operate,11/20/2020 AE-08712,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,9/24/2020,Permission to Operate,12/4/2020 AE-08710,Solar PV,3.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/24/2020,Permission to Operate,11/10/2020 AE-08581,Solar PV,42.1,,Category 2,"Monroe, Green County, WI",Substation 360,Circuit 886,In service,9/24/2020,Permission to Operate,5/3/2021 AE-08700,Solar PV,3.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,9/23/2020,Permission to Operate,11/20/2020 AE-08695,Solar PV,2.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/22/2020,Permission to Operate,10/26/2020 AE-08699,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/22/2020,Permission to Operate,11/10/2020 AE-08674,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/21/2020,Permission to Operate,11/11/2020 AE-08684,Solar PV,3.7,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 420,In service,9/21/2020,Permission to Operate,3/5/2021 AE-08701,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,9/21/2020,Permission to Operate,11/11/2020 AE-08682,Solar PV,6,,Category 1,"Livingston, Grant County, WI",Substation 241,Circuit 582,In service,9/21/2020,Permission to Operate,1/7/2021 AE-08698,Solar PV,8.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,9/21/2020,Permission to Operate,11/20/2020 AE-08683,Solar PV,10,,Category 1,"Neshkoro, Marquette County, WI",Substation 656,Circuit 1792,In service,9/21/2020,Permission to Operate,10/21/2020 AE-08673,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/21/2020,Permission to Operate,11/25/2020 AE-08609,Solar PV,2.8,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,9/21/2020,Permission to Operate,11/12/2020 AE-08702,Solar PV,7.7,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,9/21/2020,Permission to Operate,12/2/2020 AE-08660,Solar PV,4.9,,Category 1,"Keshena, Outagamie County, WI",Substation 384,Circuit 944,In service,9/18/2020,Permission to Operate,11/19/2020 AE-08656,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/18/2020,Permission to Operate,10/14/2020 AE-08661,Solar PV,5.8,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2102,In service,9/18/2020,Permission to Operate,11/23/2020 AE-08680,Solar PV,5.1,,Category 1,"Kendall, Monroe County, WI",Substation 217,Circuit 515,In service,9/18/2020,Permission to Operate,11/5/2020 AE-08532,Solar PV,3.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,9/18/2020,Permission to Operate,3/16/2021 AE-08657,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/18/2020,Permission to Operate,11/18/2020 AE-08668,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/18/2020,Permission to Operate,11/11/2020 AE-08667,Solar PV,5.5,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,9/18/2020,Permission to Operate,12/2/2020 AE-08610,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/18/2020,Permission to Operate,12/8/2020 AE-08672,Solar PV,4.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,9/18/2020,Permission to Operate,11/25/2020 AE-08555,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,9/17/2020,Permission to Operate,11/11/2020 AE-08630,Solar PV,7.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,9/16/2020,Permission to Operate,11/18/2020 AE-08653,Solar PV,2.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/16/2020,Permission to Operate,10/28/2020 AE-08632,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/16/2020,Permission to Operate,10/13/2020 AE-08633,Solar PV,4.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,9/16/2020,Permission to Operate,10/26/2020 AE-08643,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/16/2020,Permission to Operate,11/20/2020 AE-08631,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/16/2020,Permission to Operate,10/16/2020 AE-08545,Solar PV,11,,Category 1,"Richland Center, Richland County, WI",Substation 606,Circuit 1636,In service,9/16/2020,Permission to Operate,11/12/2020 AE-08638,Solar PV,9.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/16/2020,Permission to Operate,12/8/2020 AE-08544,Solar PV,3.8,,Category 1,"Blanchardville, Lafayette County, WI",Substation 525,Circuit 1344,In service,9/16/2020,Permission to Operate,2/3/2021 AE-08533,Solar PV,7.7,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2126,In service,9/15/2020,Permission to Operate,10/13/2020 AE-08623,Solar PV,2.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/15/2020,Permission to Operate,10/28/2020 AE-08639,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1522,In service,9/15/2020,Permission to Operate,12/8/2020 AE-08611,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/15/2020,Permission to Operate,11/25/2020 AE-08612,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,9/15/2020,Permission to Operate,11/10/2020 AE-08614,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/15/2020,Permission to Operate,10/14/2020 AE-08616,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,9/15/2020,Permission to Operate,12/30/2020 AE-08629,Solar PV,10.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/15/2020,Permission to Operate,10/28/2020 AE-08606,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,9/15/2020,Permission to Operate,10/26/2020 AE-08644,Solar PV,5.8,,Category 1,"Neshkoro, Marquette County, WI",Substation 656,Circuit 1792,In service,9/15/2020,Permission to Operate,12/29/2020 AE-08641,Solar PV,20,,Category 1,"Beliot, Rock County, WI",Substation 493,Circuit 1228,In service,9/15/2020,Permission to Operate,11/24/2020 AE-08620,Solar PV,3.8,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,9/14/2020,Permission to Operate,12/21/2020 AE-08601,Solar PV,7.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,9/14/2020,Permission to Operate,12/8/2020 AE-08605,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,9/14/2020,Permission to Operate,10/13/2020 AE-08602,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/14/2020,Permission to Operate,10/14/2020 AE-08604,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,9/14/2020,Permission to Operate,10/22/2020 AE-08607,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,9/14/2020,Permission to Operate,10/13/2020 AE-08615,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/14/2020,Permission to Operate,11/25/2020 AE-08603,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/14/2020,Permission to Operate,10/14/2020 AE-08622,Solar PV,6.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,9/14/2020,Permission to Operate,10/27/2020 AE-08613,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,9/14/2020,Permission to Operate,10/13/2020 AE-08594,Solar PV,3.7,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 201,In service,9/11/2020,Permission to Operate,12/21/2020 AE-08586,Solar PV,10,,Category 1,"Merrimac, Sauk County, WI",Substation 466,Circuit 1156,In service,9/11/2020,Permission to Operate,10/23/2020 AE-08598,Solar PV,4.6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1575,In service,9/11/2020,Permission to Operate,11/5/2020 AE-08577,Solar PV,137,40,Category 2,"Poynette, Dane County, WI",Substation 591,Circuit 1576,In service,9/10/2020,Permission to Operate,1/4/2022 AE-08576,Solar PV,99.9,50,Category 2,"Poynette, Dane County, WI",Substation 591,Circuit 1576,In service,9/10/2020,Permission to Operate,1/4/2022 AE-08575,Solar PV,17.9,10,Category 1,"Poynette, Dane County, WI",Substation 591,Circuit 1576,In service,9/10/2020,Permission to Operate,1/4/2022 AE-08571,Solar PV,30.2,13,Category 2,"Poynette, Dane County, WI",Substation 591,Circuit 1576,In service,9/10/2020,Permission to Operate,1/4/2022 AE-08506,Solar PV,7.6,,Category 1,"Berlin, Green Lake County, WI",Substation 550,Circuit 1450,In service,9/9/2020,Permission to Operate,1/28/2021 AE-08369,Solar PV,4.4,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 461,In service,9/9/2020,Permission to Operate,3/8/2021 AE-08563,Solar PV,3.5,,Category 1,"Friendship, Adams County, WI",Substation 283,Circuit 677,In service,9/9/2020,Permission to Operate,10/12/2020 AE-08565,Solar PV,3.7,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,9/9/2020,Permission to Operate,1/13/2021 AE-08560,Solar PV,4.4,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 461,In service,9/9/2020,Permission to Operate,3/8/2021 AE-08552,Solar PV,5,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,9/9/2020,Permission to Operate,10/16/2020 AE-08521,Solar PV,6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,9/8/2020,Permission to Operate,10/5/2020 AE-08510,Solar PV,3.7,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,9/8/2020,Permission to Operate,11/19/2020 AE-08549,Solar PV,6.1,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 342,Circuit 817,In service,9/8/2020,Permission to Operate,12/2/2020 AE-08466,Solar PV,7.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1650,In service,9/8/2020,Permission to Operate,9/13/2021 AE-08547,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,9/4/2020,Permission to Operate,10/14/2020 AE-08542,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,9/2/2020,Permission to Operate,10/6/2020 AE-08543,Solar PV,7.2,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/2/2020,Permission to Operate,10/26/2020 AE-08514,Solar PV,11,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1433,In service,9/2/2020,Permission to Operate,11/4/2020 AE-08531,Solar PV,2.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,9/1/2020,Permission to Operate,10/14/2020 AE-08540,Solar PV,8.4,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,9/1/2020,Permission to Operate,11/6/2020 AE-08534,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/1/2020,Permission to Operate,10/13/2020 AE-08489,Solar PV,5,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,8/31/2020,Permission to Operate,12/1/2020 AE-08477,Solar PV,10.4,,Category 1,"Juneau, Dodge County, WI",Substation 351,Circuit 836,In service,8/28/2020,Permission to Operate,11/5/2020 AE-08527,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,8/28/2020,Permission to Operate,10/6/2020 AE-08467,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,8/28/2020,Permission to Operate,10/13/2020 AE-08526,Solar PV,12.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,8/28/2020,Permission to Operate,10/14/2020 AE-08515,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,8/28/2020,Permission to Operate,10/14/2020 AE-08516,Solar PV,4.4,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 706,In service,8/27/2020,Permission to Operate,11/11/2020 AE-08448,Solar PV,15.2,,Category 1,"Markesan, Green Lake County, WI",Substation 474,Circuit 1163,In service,8/27/2020,Permission to Operate,12/10/2020 AE-08522,Solar PV,9.8,,Category 1,"Deerfield, Dane County, WI",Substation 147,Circuit 394,In service,8/27/2020,Permission to Operate,12/29/2020 AE-08498,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,8/27/2020,Permission to Operate,9/22/2020 AE-08492,Solar PV,5.5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,8/26/2020,Permission to Operate,12/10/2020 AE-08500,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,8/25/2020,Permission to Operate,10/6/2020 AE-08426,Solar PV,3.3,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,8/25/2020,Permission to Operate,10/14/2020 AE-08493,Solar PV,6,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,8/25/2020,Permission to Operate,10/15/2020 AE-08434,Solar PV,2.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/24/2020,Permission to Operate,11/25/2020 AE-08435,Solar PV,2.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,8/24/2020,Permission to Operate,9/24/2020 AE-08480,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,8/21/2020,Permission to Operate,9/24/2020 AE-08454,Solar PV,3.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,8/21/2020,Permission to Operate,9/10/2020 AE-08481,Solar PV,3.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,8/21/2020,Permission to Operate,9/24/2020 AE-08447,Solar PV,4.9,,Category 1,"Wautoma, Waushara County, WI",Substation 742,Circuit 2036,In service,8/21/2020,Permission to Operate,10/15/2020 AE-08482,Solar PV,3.8,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,8/21/2020,Permission to Operate,9/30/2020 AE-08483,Solar PV,11.6,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 270,In service,8/21/2020,Permission to Operate,10/22/2020 AE-08491,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,8/21/2020,Permission to Operate,11/25/2020 AE-08490,Solar PV,6.6,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,8/21/2020,Permission to Operate,10/6/2020 AE-08471,Solar PV,5.5,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,8/20/2020,Permission to Operate,9/28/2020 AE-08473,Solar PV,15.7,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 1306,In service,8/20/2020,Permission to Operate,3/25/2021 AE-08472,Solar PV,8.8,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1519,In service,8/20/2020,Permission to Operate,10/6/2020 AE-08470,Solar PV,3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,8/19/2020,Permission to Operate,10/9/2020 AE-08456,Solar PV,12.1,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,8/18/2020,Permission to Operate,10/21/2020 AE-08462,Solar PV,5.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/18/2020,Permission to Operate,11/20/2020 AE-08365,Solar PV,3.9,,Category 1,"Custer, Portage County, WI",Substation 41,Circuit 2243,In service,8/18/2020,Permission to Operate,9/30/2020 AE-08253,Solar PV,2.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/18/2020,Permission to Operate,10/20/2020 AE-08445,Solar PV,6.7,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,8/18/2020,Permission to Operate,11/23/2020 AE-08452,Solar PV,9.9,,Category 1,"Walworth, Walworth County, WI",,Circuit 2067,In service,8/18/2020,Permission to Operate,9/14/2020 AE-08450,Solar PV,4.9,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,8/18/2020,Permission to Operate,11/4/2020 AE-08436,Solar PV,6,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,8/17/2020,Permission to Operate,9/22/2020 AE-08427,Solar PV,4.4,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,8/17/2020,Permission to Operate,11/6/2020 AE-08444,Solar PV,7.7,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 996,In service,8/17/2020,Permission to Operate,12/1/2020 AE-08439,Solar PV,5.5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,8/17/2020,Permission to Operate,10/23/2020 AE-08422,Solar PV,5,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1745,In service,8/12/2020,Permission to Operate,9/11/2020 AE-08327,Solar PV,3.7,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,8/6/2020,Permission to Operate,9/10/2020 AE-08403,Solar PV,15.2,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 886,In service,8/6/2020,Permission to Operate,3/30/2021 AE-08410,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2103,In service,8/5/2020,Permission to Operate,9/24/2020 AE-08408,Solar PV,4.4,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,8/4/2020,Permission to Operate,9/28/2020 AE-08397,Solar PV,11.4,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,8/4/2020,Permission to Operate,10/6/2020 AE-08354,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,8/3/2020,Permission to Operate,10/7/2020 AE-08381,Solar PV,10.1,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1189,In service,8/3/2020,Permission to Operate,10/13/2020 AE-08377,Solar PV,12.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,7/31/2020,Permission to Operate,9/23/2020 AE-08380,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,7/31/2020,Permission to Operate,10/6/2020 AE-08374,Solar PV,5.1,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 687,In service,7/31/2020,Permission to Operate,1/7/2021 AE-08350,Solar PV,5.5,,Category 1,"Belleville, Dane County, WI",Substation 280,Circuit 670,In service,7/31/2020,Permission to Operate,9/15/2020 AE-08349,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,7/31/2020,Permission to Operate,9/2/2020 AE-08385,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1210,In service,7/31/2020,Permission to Operate,9/25/2020 AE-08339,Solar PV,11.4,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,7/31/2020,Permission to Operate,9/2/2020 AE-08340,Solar PV,5.2,,Category 1,"Sun Prairie, Dane County, WI",Substation 76,Circuit 186,In service,7/31/2020,Permission to Operate,10/1/2020 AE-08378,Solar PV,4.6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1519,In service,7/31/2020,Permission to Operate,9/23/2020 AE-08348,Solar PV,6,,Category 1,"Edgerton, Dane County, WI",,Circuit 569,In service,7/30/2020,Permission to Operate,9/11/2020 AE-08193,Solar PV,5.5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,7/30/2020,Permission to Operate,9/4/2020 AE-08338,Solar PV,2.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,7/30/2020,Permission to Operate,9/16/2020 AE-08358,Solar PV,4.4,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,7/30/2020,Permission to Operate,9/4/2020 AE-08342,Solar PV,3.7,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 581,In service,7/30/2020,Permission to Operate,10/29/2020 AE-08347,Solar PV,9.4,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/30/2020,Permission to Operate,10/1/2020 AE-08288,Solar PV,3.8,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,7/30/2020,Permission to Operate,8/20/2020 AE-08355,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/30/2020,Permission to Operate,9/24/2020 AE-08317,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,7/30/2020,Permission to Operate,8/20/2020 AE-08329,Solar PV,5.2,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/30/2020,Permission to Operate,9/10/2020 AE-08345,Solar PV,10.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,7/30/2020,Permission to Operate,9/16/2020 AE-08332,Solar PV,3.3,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,7/30/2020,Permission to Operate,9/15/2020 AE-08319,Solar PV,3.8,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1170,In service,7/29/2020,Permission to Operate,10/16/2020 AE-08303,Solar PV,7.7,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,7/29/2020,Permission to Operate,9/10/2020 AE-08337,Solar PV,18,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,7/29/2020,Permission to Operate,9/10/2020 AE-08295,Solar PV,3.8,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,7/28/2020,Permission to Operate,9/16/2020 AE-08214,Solar PV,10.1,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,7/28/2020,Permission to Operate,8/18/2020 AE-08318,Solar PV,7.7,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,7/28/2020,Permission to Operate,10/9/2020 AE-08307,Solar PV,4.4,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,7/27/2020,Permission to Operate,9/9/2020 AE-08304,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,7/27/2020,Permission to Operate,9/10/2020 AE-08305,Solar PV,7.2,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,7/27/2020,Permission to Operate,8/18/2020 AE-08181,Solar PV,5.1,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,7/24/2020,Permission to Operate,10/1/2020 AE-08298,Solar PV,4.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,7/23/2020,Permission to Operate,10/20/2020 AE-08311,Solar PV,7.2,,Category 1,"Beloit, Rock County, WI",Substation 214,Circuit 504,In service,7/23/2020,Permission to Operate,10/22/2020 AE-08287,Solar PV,4.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,7/23/2020,Permission to Operate,9/4/2020 AE-08292,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,7/23/2020,Permission to Operate,9/10/2020 AE-08314,Solar PV,14.5,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,7/23/2020,Permission to Operate,10/7/2020 AE-08346,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1988,In service,7/23/2020,Permission to Operate,10/23/2020 AE-08290,Solar PV,5.6,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,7/23/2020,Permission to Operate,10/7/2020 AE-08309,Solar PV,7.7,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,7/22/2020,Permission to Operate,9/23/2020 AE-08194,Solar PV,2.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,7/22/2020,Permission to Operate,9/9/2020 AE-08308,Solar PV,4.4,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,7/22/2020,Permission to Operate,9/1/2020 AE-08192,Solar PV,7.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,7/22/2020,Permission to Operate,9/24/2020 AE-08289,Solar PV,7,,Category 1,"Loganville, Sauk County, WI",Substation 421,Circuit 1052,In service,7/21/2020,Permission to Operate,9/24/2020 AE-08216,Solar PV,7.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 519,In service,7/21/2020,Permission to Operate,9/10/2020 AE-08252,Solar PV,2.8,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 898,In service,7/21/2020,Permission to Operate,9/4/2020 AE-08302,Solar PV,3.3,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,7/21/2020,Permission to Operate,9/4/2020 AE-08251,Solar PV,3.3,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,7/21/2020,Permission to Operate,9/23/2020 AE-08285,Solar PV,3.7,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1968,In service,7/20/2020,Permission to Operate,9/10/2020 AE-08188,Solar PV,7.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 516,In service,7/20/2020,Permission to Operate,8/18/2020 AE-08269,Solar PV,3.7,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 535,Circuit 1379,In service,7/20/2020,Permission to Operate,10/29/2020 AE-08132,Solar PV,7.8,,Category 1,"Junction City, Portage County, WI",Substation 630,Circuit 1712,In service,7/17/2020,Permission to Operate,5/22/2025 AE-08231,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,7/16/2020,Permission to Operate,9/23/2020 AE-08242,Solar PV,5.5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,7/16/2020,Permission to Operate,10/20/2020 AE-08233,Solar PV,2.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,7/16/2020,Permission to Operate,10/20/2020 AE-08215,Solar PV,5.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,7/13/2020,Permission to Operate,9/10/2020 AE-08218,Solar PV,2.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 518,In service,7/13/2020,Permission to Operate,9/9/2020 AE-08274,Solar PV,6,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,7/13/2020,Permission to Operate,8/18/2020 AE-08273,Solar PV,7.6,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,7/13/2020,Permission to Operate,9/1/2020 AE-08241,Solar PV,4.4,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,7/10/2020,Permission to Operate,8/18/2020 AE-08191,Solar PV,6.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 518,In service,7/10/2020,Permission to Operate,8/31/2020 AE-08238,Solar PV,5.5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,7/10/2020,Permission to Operate,11/10/2020 AE-08234,Solar PV,2.8,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/10/2020,Permission to Operate,8/17/2020 AE-08211,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,7/10/2020,Permission to Operate,9/16/2020 AE-08235,Solar PV,2.8,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1047,In service,7/10/2020,Permission to Operate,8/20/2020 AE-08240,Solar PV,7.2,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,7/9/2020,Permission to Operate,9/28/2020 AE-08257,Solar PV,5.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,7/9/2020,Permission to Operate,8/20/2020 AE-08232,Solar PV,3.8,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1818,In service,7/9/2020,Permission to Operate,8/18/2020 AE-08239,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,7/9/2020,Permission to Operate,8/19/2020 AE-08207,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,7/8/2020,Permission to Operate,8/17/2020 AE-08210,Solar PV,3.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,7/8/2020,Permission to Operate,8/7/2020 AE-08236,Solar PV,7.7,,Category 1,"Bellevillle, Green County, WI",Substation 57,Circuit 151,In service,7/8/2020,Permission to Operate,9/23/2020 AE-08250,Solar PV,5.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,7/8/2020,Permission to Operate,8/18/2020 AE-08223,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,7/7/2020,Permission to Operate,9/17/2020 AE-08219,Solar PV,2.8,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,7/7/2020,Permission to Operate,8/20/2020 AE-08200,Solar PV,8.7,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 418,In service,7/7/2020,Permission to Operate,10/15/2020 AE-08158,Solar PV,3.7,,Category 1,"Winneconne, Winnebago County, WI",Substation 766,Circuit 2078,In service,7/7/2020,Permission to Operate,10/23/2020 AE-08195,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,7/7/2020,Permission to Operate,8/20/2020 AE-08186,Solar PV,5.2,,Category 1,"Beloit, Rock County, WI",Substation 214,Circuit 504,In service,7/6/2020,Permission to Operate,8/28/2020 AE-07994,Solar PV,7.6,,Category 1,"Sheboygan Falls, Sheboygan County, WI",Substation 650,Circuit 1785,In service,7/6/2020,Permission to Operate,7/2/2021 AE-08176,Solar PV,9.4,,Category 1,"Stoughton, Dane County, WI",,Circuit 971,In service,7/3/2020,Permission to Operate,9/2/2020 AE-08189,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,7/3/2020,Permission to Operate,9/25/2020 AE-08197,Solar PV,3,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,7/3/2020,Permission to Operate,10/16/2020 AE-08187,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1455,In service,7/3/2020,Permission to Operate,7/29/2020 AE-08159,Solar PV,7.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,7/3/2020,Permission to Operate,10/2/2020 AE-08179,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,7/2/2020,Permission to Operate,9/17/2020 AE-08048,Solar PV,15,,Category 1,"Winneconne, Winnebago County, WI",Substation 766,Circuit 2078,In service,7/2/2020,Permission to Operate,9/15/2020 AE-08040,"Solar PV, Battery/Storage",8.8,,Category 1,"Stratford, Marathon County, WI",Substation 626,Circuit 1690,In service,7/1/2020,Permission to Operate,9/21/2020 AE-08177,Solar PV,5.8,,Category 1,"Brandon, Fond du Lac County, WI",Substation 89,Circuit 245,In service,7/1/2020,Permission to Operate,10/23/2020 AE-08152,Solar PV,4.1,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 524,Circuit 2201,In service,6/26/2020,Permission to Operate,8/24/2020 AE-08155,Solar PV,8.3,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 686,In service,6/26/2020,Permission to Operate,10/29/2020 AE-08016,Solar PV,5,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1004,In service,6/24/2020,Permission to Operate,9/23/2020 AE-08111,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,6/24/2020,Permission to Operate,8/20/2020 AE-08149,Solar PV,15.5,,Category 1,"Bryant, Langlade County, WI",Substation 578,Circuit 1516,In service,6/24/2020,Permission to Operate,9/25/2020 AE-08119,Solar PV,3.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,6/24/2020,Permission to Operate,7/21/2020 AE-08122,Solar PV,5.1,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,6/24/2020,Permission to Operate,8/13/2020 AE-08133,Solar PV,3.8,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,6/23/2020,Permission to Operate,8/7/2020 AE-08081,"Solar PV, Battery/Storage",22,,Category 2,"Arlington, Columbia County, WI",Substation 13,Circuit 52,In service,6/22/2020,Permission to Operate,8/27/2020 AE-08124,Solar PV,5.5,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1229,In service,6/22/2020,Permission to Operate,8/26/2020 AE-08114,Solar PV,9.9,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1434,In service,6/19/2020,Permission to Operate,8/18/2020 AE-08128,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,6/17/2020,Permission to Operate,9/10/2020 AE-08123,Solar PV,2.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,6/17/2020,Permission to Operate,8/13/2020 AE-08097,Solar PV,6.6,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,6/17/2020,Permission to Operate,7/23/2020 AE-08125,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,6/17/2020,Permission to Operate,7/23/2020 AE-08098,Solar PV,4.4,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 898,In service,6/16/2020,Permission to Operate,8/19/2020 AE-08094,Solar PV,2.8,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,6/16/2020,Permission to Operate,8/20/2020 AE-08058,Solar PV,15.7,,Category 1,"Zenda, Walworth County, WI",Substation 784,Circuit 2146,In service,6/16/2020,Permission to Operate,8/3/2020 AE-08070,Solar PV,1.9,,Category 1,"Monroe, Monroe County, WI",Substation 484,Circuit 1218,In service,6/16/2020,Permission to Operate,9/21/2020 AE-08079,Solar PV,7.6,,Category 1,"Omro, Winnebago County, WI",Substation 281,Circuit 674,In service,6/16/2020,Permission to Operate,9/16/2020 AE-08057,Solar PV,2250.3,,Category 4,"Kohler, Sheboygan County, WI",Substation 404,Circuit 2188,In service,6/16/2020,Permission to Operate,6/7/2022 AE-08090,Solar PV,5.5,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,6/15/2020,Permission to Operate,8/20/2020 AE-08001,"Solar PV, Battery/Storage",9.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 783,Circuit 2138,In service,6/15/2020,Permission to Operate,8/6/2020 AE-08080,Solar PV,7.7,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,6/15/2020,Permission to Operate,9/25/2020 AE-08095,Solar PV,5.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,6/15/2020,Permission to Operate,8/20/2020 AE-08061,Solar PV,5.5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,6/11/2020,Permission to Operate,10/21/2020 AE-07420,Solar PV,11.4,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1711,In service,6/11/2020,Permission to Operate,8/4/2020 AE-08049,Solar PV,86.5,,Category 2,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,6/11/2020,Permission to Operate,10/2/2020 AE-08068,Solar PV,6.9,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1639,In service,6/11/2020,Permission to Operate,8/20/2020 AE-07981,Solar PV,20,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,6/10/2020,Permission to Operate,11/9/2020 AE-08050,Solar PV,11.4,,Category 1,"Barneveld, Iowa County, WI",Substation 37,Circuit 96,In service,6/9/2020,Permission to Operate,9/10/2020 AE-08025,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,6/5/2020,Permission to Operate,7/23/2020 AE-08011,Solar PV,6.1,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1664,In service,6/5/2020,Permission to Operate,7/10/2020 AE-07995,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,6/4/2020,Permission to Operate,8/6/2020 AE-08019,Solar PV,1.1,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,6/3/2020,Permission to Operate,8/13/2020 AE-07929,Solar PV,3.7,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,6/3/2020,Permission to Operate,2/17/2021 AE-08009,Solar PV,2.8,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,6/3/2020,Permission to Operate,7/21/2020 AE-08014,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,6/3/2020,Permission to Operate,7/21/2020 AE-07992,Solar PV,6.6,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,In service,6/3/2020,Permission to Operate,8/18/2020 AE-08010,Solar PV,10,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 270,In service,6/3/2020,Permission to Operate,8/28/2020 AE-08015,Solar PV,4.4,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,6/3/2020,Permission to Operate,7/21/2020 AE-08013,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,6/3/2020,Permission to Operate,8/6/2020 AE-08008,Solar PV,9.4,,Category 1,"New Glarus, Green County, WI",,Circuit 1328,In service,6/3/2020,Permission to Operate,8/18/2020 AE-08005,Solar PV,5,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,6/2/2020,Permission to Operate,7/23/2020 AE-08006,Solar PV,5.5,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,6/2/2020,Permission to Operate,6/18/2020 AE-08004,Solar PV,8.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,6/2/2020,Permission to Operate,8/20/2020 AE-07972,Solar PV,15,,Category 1,"Lancaster, Grant County, WI",Substation 398,Circuit 989,In service,6/1/2020,Permission to Operate,6/15/2020 AE-07996,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,6/1/2020,Permission to Operate,9/10/2020 AE-07998,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,6/1/2020,Permission to Operate,7/10/2020 AE-07997,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,6/1/2020,Permission to Operate,7/10/2020 AE-07993,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,5/29/2020,Permission to Operate,6/22/2020 AE-07976,Solar PV,5.1,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 109,In service,5/28/2020,Permission to Operate,8/26/2020 AE-07970,"Solar PV, Battery/Storage",10,,Category 1,"Amherst Junction, Portage County, WI",Substation 624,Circuit 1689,In service,5/27/2020,Permission to Operate,8/20/2020 AE-07947,Solar PV,4.4,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,5/27/2020,Permission to Operate,11/11/2020 AE-07974,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,5/27/2020,Permission to Operate,7/21/2020 AE-07928,Solar PV,15.2,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,5/21/2020,Permission to Operate,7/9/2020 AE-07856,Solar PV,5.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 13,In service,5/21/2020,Permission to Operate,7/9/2020 AE-07948,Solar PV,3.8,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,5/20/2020,Permission to Operate,8/7/2020 AE-07754,Solar PV,7.2,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,5/19/2020,Permission to Operate,6/4/2020 AE-07945,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,5/19/2020,Permission to Operate,7/17/2020 AE-07946,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,5/19/2020,Permission to Operate,7/21/2020 AE-07923,Solar PV,8.2,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,5/19/2020,Permission to Operate,8/17/2020 AE-07847,Solar PV,7.5,,Category 1,"Ripon, Fond du Lac County, WI",,Circuit 453,In service,5/18/2020,Permission to Operate,6/25/2020 AE-07932,Solar PV,6.6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,5/18/2020,Permission to Operate,7/10/2020 AE-07846,Solar PV,10,,Category 1,"Blanchardville, Lafayette County, WI",Substation 77,Circuit 191,In service,5/18/2020,Permission to Operate,10/29/2020 AE-07927,Solar PV,5.2,,Category 1,"Orfordville, Rock County, WI",Substation 551,Circuit 1462,In service,5/15/2020,Permission to Operate,8/7/2020 AE-07899,Solar PV,4.1,,Category 1,"Twin Lakes, Kenosha County, WI",Substation 714,Circuit 1954,In service,5/14/2020,Permission to Operate,10/14/2020 AE-07924,Solar PV,3.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,5/13/2020,Permission to Operate,7/21/2020 AE-07914,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,5/13/2020,Permission to Operate,12/11/2020 AE-07918,Solar PV,3.5,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,5/13/2020,Permission to Operate,6/18/2020 AE-07921,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,5/13/2020,Permission to Operate,5/27/2020 AE-07919,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,5/12/2020,Permission to Operate,6/22/2020 AE-07915,Solar PV,7.7,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,5/12/2020,Permission to Operate,10/1/2020 AE-07889,Solar PV,20,,Category 1,"Monroe, Green County, WI",Substation 481,Circuit 1190,In service,5/11/2020,Permission to Operate,8/18/2020 AE-07916,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,5/11/2020,Permission to Operate,5/15/2020 AE-07878,Solar PV,5,,Category 1,"Nekoosa, Wood County, WI",Substation 345,Circuit 826,In service,5/8/2020,Permission to Operate,8/17/2020 AE-07907,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,5/8/2020,Permission to Operate,6/8/2020 AE-07908,Solar PV,3.3,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1922,In service,5/8/2020,Permission to Operate,8/18/2020 AE-07884,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,5/7/2020,Permission to Operate,6/18/2020 AE-07739,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1519,In service,5/7/2020,Permission to Operate,7/14/2020 AE-07882,Solar PV,12.1,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1518,In service,5/7/2020,Permission to Operate,6/10/2020 AE-07896,Solar PV,3.7,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,5/7/2020,Permission to Operate,9/22/2020 AE-07861,Solar PV,20,,Category 1,"Bloomington, Grant County, WI",Substation 80,Circuit 209,In service,5/6/2020,Permission to Operate,10/7/2020 AE-07864,Solar PV,3.9,,Category 1,"Scandinavia, Waupaca County, WI",Substation 651,Circuit 1786,In service,5/6/2020,Permission to Operate,5/22/2020 AE-07883,Solar PV,14.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1518,In service,5/6/2020,Permission to Operate,6/10/2020 AE-07848,Solar PV,7.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,5/5/2020,Permission to Operate,6/24/2020 AE-07873,"Solar PV, Battery/Storage",21.2,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 302,In service,5/5/2020,Permission to Operate,10/22/2020 AE-07863,Solar PV,5.1,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,5/5/2020,Permission to Operate,6/9/2020 AE-07868,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,5/5/2020,Permission to Operate,7/10/2020 AE-07858,Solar PV,7.8,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 723,Circuit 1976,In service,5/5/2020,Permission to Operate,6/17/2020 AE-07880,Solar PV,20,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1191,In service,5/5/2020,Permission to Operate,6/22/2020 AE-07859,Solar PV,3,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1191,In service,5/5/2020,Permission to Operate,6/22/2020 AE-07849,Solar PV,5.1,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2243,In service,5/4/2020,Permission to Operate,6/4/2020 AE-07857,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1582,In service,5/4/2020,Permission to Operate,6/19/2020 AE-07854,Solar PV,2.4,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1935,In service,5/4/2020,Permission to Operate,10/7/2020 AE-07845,Solar PV,11.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,5/1/2020,Permission to Operate,7/17/2020 AE-07843,Solar PV,5,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,5/1/2020,Permission to Operate,6/18/2020 AE-07844,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,5/1/2020,Permission to Operate,6/22/2020 AE-07865,Solar PV,3,,Category 1,"Waupun, Fond du Lac County, WI",,Circuit 1280,In service,4/30/2020,Permission to Operate,6/2/2020 AE-07836,Solar PV,19.4,,Category 1,"Baraboo, Sauk County, WI",Substation 466,Circuit 1155,In service,4/28/2020,Permission to Operate,6/24/2020 AE-07820,Solar PV,9.4,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 346,Circuit 833,In service,4/28/2020,Permission to Operate,9/15/2020 AE-07834,Solar PV,5,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,4/27/2020,Permission to Operate,6/19/2020 AE-07808,Solar PV,11.4,,Category 1,"Blue Mounds, Iowa County, WI",Substation 483,Circuit 1211,In service,4/27/2020,Permission to Operate,10/2/2020 AE-07840,Solar PV,6,,Category 1,"Waunakee, Dane County, WI",,Circuit 2142,In service,4/27/2020,Permission to Operate,6/16/2020 AE-07812,Solar PV,17.4,,Category 1,"Evansville, Rock County, WI",Substation 108,Circuit 302,In service,4/24/2020,Permission to Operate,7/9/2020 AE-07818,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1927,In service,4/24/2020,Permission to Operate,7/21/2020 AE-07815,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,4/23/2020,Permission to Operate,6/22/2020 AE-07797,Solar PV,7.6,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,4/23/2020,Permission to Operate,6/4/2020 AE-07666,Solar PV,13.7,,Category 1,"Sheboygan Falls, Sheboygan County, WI",Substation 650,Circuit 1785,In service,4/22/2020,Permission to Operate,6/19/2020 AE-07801,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1525,In service,4/20/2020,Permission to Operate,5/7/2020 AE-07796,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",,Circuit 1872,In service,4/20/2020,Permission to Operate,6/12/2020 AE-07790,Solar PV,7.6,,Category 1,"Mount Horeb, Dane County, WI",Substation 686,Circuit 1895,In service,4/17/2020,Permission to Operate,8/4/2020 AE-07799,Solar PV,6,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,4/17/2020,Permission to Operate,6/22/2020 AE-07792,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,4/17/2020,Permission to Operate,5/14/2020 AE-07785,Solar PV,2.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,4/16/2020,Permission to Operate,6/16/2020 AE-07682,Solar PV,5,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 433,Circuit 1100,In service,4/16/2020,Permission to Operate,5/13/2020 AE-07781,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,4/16/2020,Permission to Operate,5/27/2020 AE-07783,Solar PV,9.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,4/16/2020,Permission to Operate,7/2/2020 AE-07791,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,4/16/2020,Permission to Operate,6/19/2020 AE-07768,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,4/15/2020,Permission to Operate,7/10/2020 AE-07767,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,4/15/2020,Permission to Operate,8/7/2020 AE-07770,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,4/14/2020,Permission to Operate,5/27/2020 AE-07753,Solar PV,11.4,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 153,In service,4/14/2020,Permission to Operate,6/11/2020 AE-07647,Solar PV,24,,Category 2,"Dickeyville, Grant County, WI",Substation 386,Circuit 2179,In service,4/13/2020,Permission to Operate,7/14/2020 AE-07760,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,4/13/2020,Permission to Operate,6/18/2020 AE-07723,"Solar PV, Battery/Storage",34.9,,Category 2,"Birnamwood, Marathon County, WI",Substation 74,Circuit 181,In service,4/13/2020,Permission to Operate,7/9/2020 AE-07740,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,4/10/2020,Permission to Operate,6/9/2020 AE-07750,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,4/9/2020,Permission to Operate,5/27/2020 AE-07727,Solar PV,7.6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,4/9/2020,Permission to Operate,7/21/2020 AE-07733,Solar PV,4.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,4/6/2020,Permission to Operate,7/21/2020 AE-07736,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,4/6/2020,Permission to Operate,4/15/2020 AE-07732,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 679,Circuit 1877,In service,4/6/2020,Permission to Operate,4/29/2020 AE-07717,Solar PV,3.7,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,4/6/2020,Permission to Operate,8/28/2020 AE-07721,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 903,In service,4/3/2020,Permission to Operate,7/17/2020 AE-07718,Solar PV,11,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1210,In service,4/3/2020,Permission to Operate,5/12/2020 AE-07719,Solar PV,9.9,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 889,In service,4/3/2020,Permission to Operate,7/14/2020 AE-07729,Solar PV,9.3,,Category 1,"Mt. Horeb, Dane County, WI",Substation 280,Circuit 672,In service,4/3/2020,Permission to Operate,7/22/2020 AE-07728,Solar PV,4.1,,Category 1,"Soldiers Grove, Crawford County, WI",Substation 288,Circuit 696,In service,4/3/2020,Permission to Operate,5/13/2020 AE-07713,Solar PV,6.4,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,4/2/2020,Permission to Operate,5/13/2020 AE-07724,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,4/2/2020,Permission to Operate,6/22/2020 AE-07711,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,4/2/2020,Permission to Operate,6/19/2020 AE-07673,Solar PV,7.6,,Category 1,"Lodi, Dane County, WI",Substation 547,Circuit 1434,In service,4/1/2020,Permission to Operate,4/24/2020 AE-07689,Solar PV,2.8,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1042,In service,4/1/2020,Permission to Operate,6/12/2020 AE-07712,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,3/31/2020,Permission to Operate,5/27/2020 AE-07687,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1927,In service,3/31/2020,Permission to Operate,6/12/2020 AE-07710,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1521,In service,3/31/2020,Permission to Operate,5/14/2020 AE-07683,Solar PV,2.8,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1047,In service,3/31/2020,Permission to Operate,5/22/2020 AE-07701,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,3/30/2020,Permission to Operate,6/12/2020 AE-07703,Solar PV,2.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/30/2020,Permission to Operate,6/16/2020 AE-07583,Solar PV,2.8,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1926,In service,3/27/2020,Permission to Operate,6/19/2020 AE-07685,Solar PV,2.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/25/2020,Permission to Operate,6/16/2020 AE-07684,Solar PV,8.2,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1984,In service,3/25/2020,Permission to Operate,4/22/2020 AE-07674,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 296,Circuit 707,In service,3/25/2020,Permission to Operate,5/13/2020 AE-07667,Solar PV,5.2,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,3/24/2020,Permission to Operate,4/28/2020 AE-07680,Solar PV,6.4,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,3/24/2020,Permission to Operate,6/10/2020 AE-07645,Solar PV,3.8,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,3/23/2020,Permission to Operate,5/13/2020 AE-07650,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,3/20/2020,Permission to Operate,6/19/2020 AE-07639,"Solar PV, Battery/Storage",17.6,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,3/20/2020,Permission to Operate,9/4/2020 AE-07665,Solar PV,2.9,,Category 1,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,3/20/2020,Permission to Operate,8/4/2020 AE-07637,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,3/18/2020,Permission to Operate,5/21/2020 AE-07636,Solar PV,9.4,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 342,Circuit 814,In service,3/17/2020,Permission to Operate,4/21/2020 AE-07632,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,3/16/2020,Permission to Operate,6/16/2020 AE-07633,Solar PV,2.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,3/16/2020,Permission to Operate,6/11/2020 AE-07631,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,3/16/2020,Permission to Operate,6/22/2020 AE-07634,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1991,In service,3/16/2020,Permission to Operate,6/4/2020 AE-07619,Solar PV,3.5,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1357,In service,3/13/2020,Permission to Operate,4/7/2020 AE-07628,Solar PV,7.6,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1043,In service,3/13/2020,Permission to Operate,5/14/2020 AE-07627,Solar PV,13,,Category 1,"Mount Calvary, Fond du Lac County, WI",Substation 411,Circuit 1026,In service,3/13/2020,Permission to Operate,6/3/2020 AE-07625,Solar PV,10,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2148,In service,3/13/2020,Permission to Operate,4/21/2020 AE-07575,Solar PV,2.8,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,3/12/2020,Permission to Operate,6/12/2020 AE-07617,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1199,In service,3/12/2020,Permission to Operate,9/11/2020 AE-07606,Solar PV,2.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,3/12/2020,Permission to Operate,4/22/2020 AE-07592,Solar PV,2.2,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,3/12/2020,Permission to Operate,7/10/2020 AE-07612,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,3/12/2020,Permission to Operate,5/15/2020 AE-07603,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1935,In service,3/11/2020,Permission to Operate,8/20/2020 AE-07578,Solar PV,7.8,,Category 1,"Marion, Waupaca County, WI",Substation 494,Circuit 1234,In service,3/11/2020,Permission to Operate,5/12/2020 AE-07608,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,3/10/2020,Permission to Operate,5/1/2020 AE-07431,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,3/9/2020,Permission to Operate,4/24/2020 AE-07604,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,3/9/2020,Permission to Operate,5/1/2020 AE-07599,"Solar PV, Battery/Storage",3.8,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,3/6/2020,Permission to Operate,6/22/2020 AE-07446,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,3/6/2020,Permission to Operate,5/22/2020 AE-07593,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,3/6/2020,Permission to Operate,4/22/2020 AE-07573,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2103,In service,3/6/2020,Permission to Operate,5/15/2020 AE-07567,Solar PV,7.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 624,In service,3/6/2020,Permission to Operate,5/12/2020 AE-07569,Solar PV,11.4,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2148,In service,3/6/2020,Permission to Operate,4/20/2020 AE-07597,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,3/6/2020,Permission to Operate,4/22/2020 AE-07601,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,3/5/2020,Permission to Operate,4/15/2020 AE-07172,Solar PV,10,,Category 1,"Necedah, Juneau County, WI",Substation 516,Circuit 1321,In service,3/5/2020,Permission to Operate,8/18/2020 AE-07584,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,3/5/2020,Permission to Operate,4/21/2020 AE-07591,Solar PV,7.6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,3/5/2020,Permission to Operate,4/7/2020 AE-07588,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,3/5/2020,Permission to Operate,4/14/2020 AE-07586,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,3/5/2020,Permission to Operate,4/7/2020 AE-07502,Solar PV,7.6,,Category 1,"Nelsonville, Portage County, WI",Substation 30,Circuit 79,In service,3/3/2020,Permission to Operate,10/2/2020 AE-07577,Solar PV,3.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,3/3/2020,Permission to Operate,5/8/2020 AE-07579,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,3/3/2020,Permission to Operate,5/14/2020 AE-07546,Solar PV,6,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,2/28/2020,Permission to Operate,3/16/2020 AE-07550,Solar PV,5.1,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,2/28/2020,Permission to Operate,5/15/2020 AE-07558,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1454,In service,2/28/2020,Permission to Operate,4/6/2020 AE-07557,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,2/28/2020,Permission to Operate,5/8/2020 AE-07503,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,2/28/2020,Permission to Operate,3/17/2020 AE-07551,Solar PV,11.4,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1878,In service,2/28/2020,Permission to Operate,4/21/2020 AE-07559,Solar PV,6.1,,Category 1,"Wisconsin Dells, Sauk County, WI",,Circuit 1083,In service,2/28/2020,Permission to Operate,7/14/2020 AE-07555,Solar PV,10,,Category 1,"Ripon, Winnebago County, WI",,Circuit 170,In service,2/28/2020,Permission to Operate,6/23/2020 AE-07560,Solar PV,7.7,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 778,In service,2/28/2020,Permission to Operate,4/15/2020 AE-07562,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1521,In service,2/28/2020,Permission to Operate,4/21/2020 AE-07530,Solar PV,5.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,2/26/2020,Permission to Operate,5/11/2020 AE-07552,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,2/26/2020,Permission to Operate,3/19/2020 AE-07545,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,2/25/2020,Permission to Operate,6/4/2020 AE-07544,Solar PV,2.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2103,In service,2/24/2020,Permission to Operate,4/24/2020 AE-07473,Solar PV,12.2,,Category 1,"Eldorado, Fond du Lac County, WI",Substation 615,Circuit 1659,In service,2/24/2020,Permission to Operate,4/9/2020 AE-07543,Solar PV,3.8,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,2/21/2020,Permission to Operate,6/9/2020 AE-07509,Solar PV,5,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,2/20/2020,Permission to Operate,3/12/2020 AE-07511,Solar PV,7,,Category 1,"Windsor, Dane County, WI",,Circuit 2140,In service,2/20/2020,Permission to Operate,7/7/2020 AE-07519,Solar PV,7.6,,Category 1,"Stoughton, Dane County, WI",,Circuit 972,In service,2/20/2020,Permission to Operate,3/11/2020 AE-07513,Solar PV,8.2,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,2/20/2020,Permission to Operate,6/12/2020 AE-07481,Solar PV,6,,Category 1,"Loganville, Sauk County, WI",Substation 710,Circuit 1946,In service,2/20/2020,Permission to Operate,4/17/2020 AE-07515,Solar PV,3.5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,2/20/2020,Permission to Operate,3/20/2020 AE-07512,Solar PV,3.7,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,2/20/2020,Permission to Operate,8/7/2020 AE-07514,Solar PV,7.2,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1047,In service,2/20/2020,Permission to Operate,5/15/2020 AE-07505,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,2/19/2020,Permission to Operate,4/15/2020 AE-07478,Solar PV,3.7,,Category 1,"Dane, Dane County, WI",Substation 201,Circuit 458,In service,2/19/2020,Permission to Operate,6/4/2020 AE-07500,Solar PV,5.5,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,2/19/2020,Permission to Operate,4/15/2020 AE-07494,Solar PV,2.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,2/17/2020,Permission to Operate,4/22/2020 AE-07406,Solar PV,1250,,Category 4,"Fond du Lac, Fond du Lac County, WI",Substation 774,Circuit 2098,In service,2/17/2020,Permission to Operate,12/14/2021 AE-07474,Solar PV,7.6,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 861,In service,2/17/2020,Permission to Operate,7/22/2020 AE-07504,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,2/17/2020,Permission to Operate,4/27/2020 AE-07427,Solar PV,7,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2138,In service,2/17/2020,Permission to Operate,12/4/2020 AE-07468,Solar PV,6.9,,Category 1,"Malone, Fond du Lac County, WI",Substation 411,Circuit 1024,In service,2/17/2020,Permission to Operate,3/18/2020 AE-07490,Solar PV,2.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,2/14/2020,Permission to Operate,5/14/2020 AE-07448,Solar PV,3.3,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1926,In service,2/14/2020,Permission to Operate,4/9/2020 AE-07493,Solar PV,7.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,2/14/2020,Permission to Operate,3/13/2020 AE-07472,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/14/2020,Permission to Operate,3/5/2020 AE-07458,Solar PV,3.7,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 889,In service,2/14/2020,Permission to Operate,3/12/2020 AE-07467,Solar PV,7.6,,Category 1,"Blue River, Richland County, WI",Substation 100,Circuit 261,In service,2/14/2020,Permission to Operate,5/8/2020 AE-07485,Solar PV,3.3,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,2/14/2020,Permission to Operate,4/28/2020 AE-07480,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,2/14/2020,Permission to Operate,4/16/2020 AE-07501,Solar PV,2.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2103,In service,2/14/2020,Permission to Operate,4/15/2020 AE-07484,Solar PV,7.2,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,2/14/2020,Permission to Operate,4/24/2020 AE-07482,Solar PV,5.1,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1210,In service,2/14/2020,Permission to Operate,4/27/2020 AE-07464,Solar PV,3.7,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,2/14/2020,Permission to Operate,3/10/2020 AE-07483,Solar PV,3.8,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,2/14/2020,Permission to Operate,4/24/2020 AE-07447,Solar PV,7.7,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1989,In service,2/14/2020,Permission to Operate,6/4/2020 AE-07450,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,2/13/2020,Permission to Operate,3/19/2020 AE-07479,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,2/13/2020,Permission to Operate,3/13/2020 AE-07471,Solar PV,4.4,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 908,In service,2/12/2020,Permission to Operate,4/9/2020 AE-07443,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1519,In service,2/11/2020,Permission to Operate,3/3/2020 AE-07459,Solar PV,10.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,2/10/2020,Permission to Operate,5/8/2020 AE-07460,Solar PV,3.7,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 615,In service,2/10/2020,Permission to Operate,8/4/2020 AE-07449,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,2/10/2020,Permission to Operate,3/10/2020 AE-07440,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/10/2020,Permission to Operate,3/5/2020 AE-07441,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,2/10/2020,Permission to Operate,5/27/2020 AE-07435,Solar PV,7,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,2/10/2020,Permission to Operate,3/3/2020 AE-07444,Solar PV,3.7,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,2/10/2020,Permission to Operate,7/3/2020 AE-07442,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,2/10/2020,Permission to Operate,5/15/2020 AE-07461,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,2/10/2020,Permission to Operate,3/10/2020 AE-07453,Solar PV,2.2,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,2/10/2020,Permission to Operate,4/15/2020 AE-07462,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,2/10/2020,Permission to Operate,3/17/2020 AE-07452,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,2/7/2020,Permission to Operate,3/10/2020 AE-07433,Solar PV,13,,Category 1,"Oakfield, Fond du Lac County, WI",Substation 538,Circuit 1419,In service,2/7/2020,Permission to Operate,7/21/2020 AE-07445,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,2/7/2020,Permission to Operate,4/15/2020 AE-07455,Solar PV,2.8,,Category 1,"Janesville, Rock County, WI",Substation 775,Circuit 2104,In service,2/7/2020,Permission to Operate,4/9/2020 AE-07456,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,2/7/2020,Permission to Operate,5/27/2020 AE-07463,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/6/2020,Permission to Operate,3/12/2020 AE-07457,Solar PV,4,,Category 1,"Merrimac, Sauk County, WI",Substation 466,Circuit 1156,In service,2/6/2020,Permission to Operate,3/6/2020 AE-07451,Solar PV,8.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/6/2020,Permission to Operate,4/7/2020 AE-07454,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/6/2020,Permission to Operate,5/11/2020 AE-07430,Solar PV,6,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,2/5/2020,Permission to Operate,3/10/2020 AE-07424,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/5/2020,Permission to Operate,5/11/2020 AE-07423,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/5/2020,Permission to Operate,3/17/2020 AE-07425,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,2/5/2020,Permission to Operate,3/4/2020 AE-07408,Solar PV,6,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 79,In service,2/4/2020,Permission to Operate,5/21/2025 AE-07390,Solar PV,3.8,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,1/29/2020,Permission to Operate,5/19/2020 AE-07402,Solar PV,4.4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,1/28/2020,Permission to Operate,3/3/2020 AE-07397,Solar PV,2.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,1/27/2020,Permission to Operate,3/12/2020 AE-07399,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,1/27/2020,Permission to Operate,3/4/2020 AE-07392,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,1/27/2020,Permission to Operate,3/10/2020 AE-07393,Solar PV,5.5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,1/27/2020,Permission to Operate,3/20/2020 AE-07239,Solar PV,10,,Category 1,"Burnett, Dodge County, WI",,Circuit 1279,In service,1/23/2020,Permission to Operate,3/24/2020 AE-07361,Solar PV,9.9,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,1/22/2020,Permission to Operate,4/24/2020 AE-07358,Solar PV,10,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,1/22/2020,Permission to Operate,4/20/2020 AE-07388,Solar PV,3.7,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,1/22/2020,Permission to Operate,4/16/2020 AE-07389,Solar PV,4.4,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,1/22/2020,Permission to Operate,3/17/2020 AE-07386,Solar PV,5,,Category 1,"Marshall, Dane County, WI",Substation 679,Circuit 1877,In service,1/21/2020,Permission to Operate,2/25/2020 AE-07384,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,1/21/2020,Permission to Operate,3/10/2020 AE-07383,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,1/21/2020,Permission to Operate,4/24/2020 AE-07376,Solar PV,12.1,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 323,In service,1/20/2020,Permission to Operate,9/23/2020 AE-07372,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,1/20/2020,Permission to Operate,3/16/2020 AE-07363,Solar PV,7.6,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 316,In service,1/20/2020,Permission to Operate,8/17/2020 AE-07371,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,1/17/2020,Permission to Operate,3/5/2020 AE-07364,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,1/16/2020,Permission to Operate,3/3/2020 AE-07374,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,1/16/2020,Permission to Operate,2/28/2020 AE-07375,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,1/16/2020,Permission to Operate,2/28/2020 AE-07373,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,1/16/2020,Permission to Operate,4/21/2020 AE-07357,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,1/15/2020,Permission to Operate,3/12/2020 AE-07359,Solar PV,19,,Category 1,"South Wayne, Lafayette County, WI",Substation 770,Circuit 2083,In service,1/15/2020,Permission to Operate,8/10/2020 AE-07350,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 325,In service,1/14/2020,Permission to Operate,3/20/2020 AE-07354,Solar PV,3.7,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,1/14/2020,Permission to Operate,2/26/2020 AE-07352,Solar PV,4.1,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,1/14/2020,Permission to Operate,2/24/2020 AE-07346,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,1/10/2020,Permission to Operate,3/4/2020 AE-07293,Solar PV,12,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 358,In service,1/8/2020,Permission to Operate,2/19/2020 AE-07341,Solar PV,13,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1432,In service,1/8/2020,Permission to Operate,2/20/2020 AE-07339,Solar PV,4.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,1/8/2020,Permission to Operate,5/27/2020 AE-07338,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1521,In service,1/8/2020,Permission to Operate,2/10/2020 AE-07286,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,1/7/2020,Permission to Operate,3/20/2020 AE-07337,Solar PV,4.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,1/7/2020,Permission to Operate,1/24/2020 AE-07303,Solar PV,7.6,,Category 1,"Winneconne, Winnebago County, WI",Substation 766,Circuit 2077,In service,1/7/2020,Permission to Operate,11/13/2020 AE-07302,Solar PV,20,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 17,In service,1/7/2020,Permission to Operate,6/18/2020 AE-07144,Solar PV,7.6,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1003,In service,1/6/2020,Permission to Operate,2/12/2020 AE-07289,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,1/2/2020,Permission to Operate,3/12/2020 AE-07306,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1519,In service,1/2/2020,Permission to Operate,2/17/2020 AE-07309,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,1/2/2020,Permission to Operate,2/17/2020 AE-07318,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,1/2/2020,Permission to Operate,2/24/2020 AE-07304,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,12/31/2019,Permission to Operate,2/10/2020 AE-07281,Solar PV,9.6,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1639,In service,12/31/2019,Permission to Operate,5/5/2020 AE-07295,Solar PV,15,,Category 1,"Stoughton, Dane County, WI",Substation 676,Circuit 1870,In service,12/20/2019,Permission to Operate,2/6/2020 AE-07298,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,12/20/2019,Permission to Operate,3/3/2020 AE-07299,Solar PV,2.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,12/20/2019,Permission to Operate,2/17/2020 AE-07139,Solar PV,30,,Category 2,"Janesville, Rock County, WI",,Circuit 1873,In service,12/19/2019,Permission to Operate,12/21/2020 AE-07287,Solar PV,2.2,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,12/18/2019,Permission to Operate,2/17/2020 AE-07279,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,12/17/2019,Permission to Operate,3/10/2020 AE-07243,Solar PV,15,,Category 1,"Burnett, Dodge County, WI",,Circuit 809,In service,12/17/2019,Permission to Operate,1/30/2020 AE-07269,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,12/13/2019,Permission to Operate,4/21/2020 AE-07227,Solar PV,2.2,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,12/11/2019,Permission to Operate,2/25/2020 AE-07268,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1522,In service,12/11/2019,Permission to Operate,3/5/2020 AE-07242,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,12/11/2019,Permission to Operate,2/10/2020 AE-07248,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,12/11/2019,Permission to Operate,2/6/2020 AE-07267,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,12/11/2019,Permission to Operate,2/6/2020 AE-07175,Solar PV,8.2,,Category 1,"Reedsburg, Sauk County, WI",Substation 216,Circuit 507,In service,12/10/2019,Permission to Operate,1/6/2020 AE-07212,Solar PV,6,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 153,In service,12/10/2019,Permission to Operate,6/18/2020 AE-07220,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,12/9/2019,Permission to Operate,2/10/2020 AE-07229,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,12/9/2019,Permission to Operate,2/10/2020 AE-07183,Solar PV,7.2,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 61,In service,12/9/2019,Permission to Operate,6/25/2020 AE-07153,Solar PV,15.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,12/6/2019,Permission to Operate,4/17/2020 AE-07135,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,12/5/2019,Permission to Operate,2/10/2020 AE-07148,Solar PV,3.8,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,12/3/2019,Permission to Operate,1/23/2020 AE-07150,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1521,In service,12/2/2019,Permission to Operate,2/24/2020 AE-07163,Solar PV,10,,Category 1,"Deerfield, Dane County, WI",Substation 147,Circuit 394,In service,12/2/2019,Permission to Operate,1/6/2020 AE-07147,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,11/26/2019,Permission to Operate,12/23/2019 AE-07099,"Solar PV, Battery/Storage",16,,Category 1,"Coloma, Waushara County, WI",Substation 143,Circuit 372,In service,11/26/2019,Permission to Operate,5/6/2020 AE-07137,Solar PV,5.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,11/26/2019,Permission to Operate,1/24/2020 AE-07149,Solar PV,4.4,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,11/26/2019,Permission to Operate,2/20/2020 AE-07045,Solar PV,5.2,,Category 1,"Brooklyn, Dane County, WI",,Circuit 1881,In service,11/26/2019,Permission to Operate,1/30/2020 AE-07133,Solar PV,7.7,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,11/25/2019,Permission to Operate,2/28/2020 AE-07134,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1521,In service,11/25/2019,Permission to Operate,3/26/2020 AE-07082,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,11/25/2019,Permission to Operate,2/7/2020 AE-07130,Solar PV,6.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,11/25/2019,Permission to Operate,3/12/2020 AE-07128,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 326,In service,11/22/2019,Permission to Operate,3/5/2020 AE-07123,Solar PV,7.6,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,11/21/2019,Permission to Operate,5/1/2020 AE-07122,Solar PV,3,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,11/21/2019,Permission to Operate,5/1/2020 AE-07120,Solar PV,3,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,11/21/2019,Permission to Operate,5/1/2020 AE-07121,Solar PV,3,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,11/21/2019,Permission to Operate,5/1/2020 AE-07124,Solar PV,3.8,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,11/21/2019,Permission to Operate,5/1/2020 AE-07080,Solar PV,5,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,11/21/2019,Permission to Operate,1/8/2020 AE-07125,Solar PV,3,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,11/21/2019,Permission to Operate,5/1/2020 AE-06902,Solar PV,14.5,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1172,In service,11/20/2019,Permission to Operate,3/10/2020 AE-07089,Solar PV,4.9,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,11/20/2019,Permission to Operate,2/26/2020 AE-07107,Solar PV,4.4,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,11/20/2019,Permission to Operate,3/10/2020 AE-07096,Solar PV,7.2,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,11/20/2019,Permission to Operate,1/16/2020 AE-07090,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1522,In service,11/19/2019,Permission to Operate,12/23/2019 AE-07088,Solar PV,3.3,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,11/19/2019,Permission to Operate,2/17/2020 AE-07064,Solar PV,6.6,,Category 1,"Mineral Point, Iowa County, WI",Substation 601,Circuit 1622,In service,11/18/2019,Permission to Operate,2/20/2020 AE-07087,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,11/18/2019,Permission to Operate,1/9/2020 AE-07086,Solar PV,4.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,11/18/2019,Permission to Operate,3/3/2020 AE-07078,Solar PV,6,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,11/15/2019,Permission to Operate,3/26/2020 AE-07077,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 326,In service,11/15/2019,Permission to Operate,2/24/2020 AE-06929,Solar PV,2.8,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,11/15/2019,Permission to Operate,1/8/2020 AE-07075,Solar PV,8.2,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,11/14/2019,Permission to Operate,3/10/2020 AE-06927,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1522,In service,11/14/2019,Permission to Operate,12/17/2019 AE-07065,Solar PV,3.3,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,11/14/2019,Permission to Operate,1/8/2020 AE-07010,Solar PV,2.8,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,11/13/2019,Permission to Operate,12/19/2019 AE-07055,Solar PV,7.6,,Category 1,"Platteville, Grant County, WI",Substation 601,Circuit 1621,In service,11/13/2019,Permission to Operate,1/17/2020 AE-07033,Solar PV,2.9,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,11/13/2019,Permission to Operate,4/24/2020 AE-07023,"Solar PV, Battery/Storage",24.8,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1210,In service,11/12/2019,Permission to Operate,7/23/2020 AE-07019,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,11/11/2019,Permission to Operate,2/17/2020 AE-07030,Solar PV,9.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,11/11/2019,Permission to Operate,2/6/2020 AE-07020,Solar PV,14.5,,Category 1,"Monroe, Green County, WI",Substation 484,Circuit 1215,In service,11/11/2019,Permission to Operate,12/23/2019 AE-06978,Solar PV,9.4,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 535,Circuit 1375,In service,11/11/2019,Permission to Operate,2/13/2020 AE-06980,Solar PV,2.8,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,11/7/2019,Permission to Operate,2/6/2020 AE-07001,Solar PV,5,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,11/7/2019,Permission to Operate,3/31/2020 AE-06958,Solar PV,7.2,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 4,Circuit 3,In service,11/7/2019,Permission to Operate,2/24/2020 AE-06995,Solar PV,4.4,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,11/7/2019,Permission to Operate,1/8/2020 AE-06999,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 706,In service,11/6/2019,Permission to Operate,1/28/2020 AE-06993,Solar PV,5,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,11/6/2019,Permission to Operate,1/3/2020 AE-06994,Solar PV,7.4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,11/5/2019,Permission to Operate,12/5/2019 AE-06977,Solar PV,10,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,11/4/2019,Permission to Operate,12/26/2019 AE-06896,Solar PV,7.6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 774,Circuit 2098,In service,11/4/2019,Permission to Operate,1/7/2020 AE-06921,Solar PV,7.6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1736,In service,11/1/2019,Permission to Operate,2/14/2020 AE-06952,Solar PV,3.3,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,11/1/2019,Permission to Operate,11/21/2019 AE-06934,Solar PV,7.6,,Category 1,"Deerfield, Dane County, WI",Substation 204,Circuit 469,In service,11/1/2019,Permission to Operate,7/8/2020 AE-07022,Solar PV,3.8,,Category 1,"Sun Prairie, Dane County, WI",Substation 698,Circuit 1920,In service,11/1/2019,Permission to Operate,1/28/2020 AE-06936,Solar PV,7.6,,Category 1,"Mt. Horeb, Dane County, WI",Substation 686,Circuit 1895,In service,11/1/2019,Permission to Operate,12/12/2019 AE-06926,Solar PV,6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,10/31/2019,Permission to Operate,12/17/2019 AE-06906,Solar PV,5,,Category 1,"Prairie Du Sac, Sauk County, WI",Substation 710,Circuit 1948,In service,10/31/2019,Permission to Operate,11/20/2019 AE-06856,Solar PV,7.7,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1732,In service,10/31/2019,Permission to Operate,11/13/2019 AE-06887,Solar PV,6,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1433,In service,10/31/2019,Permission to Operate,3/18/2020 AE-06907,Solar PV,7.6,,Category 1,"Dane, Dane County, WI",Substation 201,Circuit 459,In service,10/29/2019,Permission to Operate,1/23/2020 AE-06916,Solar PV,5.5,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1288,In service,10/29/2019,Permission to Operate,1/30/2020 AE-06905,Solar PV,3.6,,Category 1,"Windsor, Dane County, WI",,Circuit 2140,In service,10/28/2019,Permission to Operate,12/19/2019 AE-06868,Solar PV,7,,Category 1,"Delavan, Walworth County, WI",,Circuit 2065,In service,10/24/2019,Permission to Operate,11/18/2019 AE-06808,Solar PV,15,,Category 1,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1685,In service,10/24/2019,Permission to Operate,6/22/2020 AE-06876,Solar PV,3,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,10/24/2019,Permission to Operate,12/4/2019 AE-06899,Solar PV,5.5,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,10/24/2019,Permission to Operate,11/21/2019 AE-06889,Solar PV,3.7,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,10/23/2019,Permission to Operate,3/5/2020 AE-06881,Solar PV,3.8,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,10/23/2019,Permission to Operate,12/19/2019 AE-06877,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,10/23/2019,Permission to Operate,6/12/2020 AE-06888,Solar PV,5,,Category 1,"Deerfield, Dane County, WI",Substation 147,Circuit 394,In service,10/23/2019,Permission to Operate,1/13/2020 AE-06834,Solar PV,20,,Category 1,"Blue Mounds, Dane County, WI",,Circuit 220,In service,10/23/2019,Permission to Operate,2/26/2020 AE-06875,Solar PV,3.7,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,10/23/2019,Permission to Operate,1/9/2020 AE-06863,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",Substation 146,Circuit 390,In service,10/22/2019,Permission to Operate,12/10/2019 AE-06869,"Solar PV, Battery/Storage",7.6,,Category 1,"Stoughton, Dane County, WI",Substation 676,Circuit 1870,In service,10/22/2019,Permission to Operate,11/18/2019 AE-06855,Solar PV,3.3,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,10/22/2019,Permission to Operate,11/21/2019 AE-06870,Solar PV,3.3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1518,In service,10/22/2019,Permission to Operate,12/30/2019 AE-06727,Solar PV,6,,Category 1,"Coloma, Waushara County, WI",Substation 143,Circuit 372,In service,10/22/2019,Permission to Operate,3/6/2020 AE-06847,Solar PV,4.4,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,10/18/2019,Permission to Operate,2/21/2020 AE-06849,Solar PV,3.3,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,10/18/2019,Permission to Operate,1/15/2020 AE-06798,Solar PV,3.8,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 338,Circuit 804,In service,10/17/2019,Permission to Operate,12/30/2019 AE-06816,Solar PV,7.6,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,10/17/2019,Permission to Operate,12/6/2019 AE-06842,Solar PV,7.4,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,10/16/2019,Permission to Operate,11/18/2019 AE-06846,Solar PV,11.4,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1971,In service,10/16/2019,Permission to Operate,1/8/2020 AE-06805,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,10/16/2019,Permission to Operate,11/8/2019 AE-06788,Solar PV,7.6,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 358,In service,10/16/2019,Permission to Operate,11/15/2019 AE-06841,Solar PV,2.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,10/16/2019,Permission to Operate,12/5/2019 AE-06826,Solar PV,4.9,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,10/15/2019,Permission to Operate,11/21/2019 AE-06809,Solar PV,3.7,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,10/15/2019,Permission to Operate,12/30/2019 AE-06837,Solar PV,3.8,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,10/15/2019,Permission to Operate,11/21/2019 AE-06823,Solar PV,8.2,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,10/15/2019,Permission to Operate,11/21/2019 AE-06813,Solar PV,4.9,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,10/15/2019,Permission to Operate,12/5/2019 AE-06830,Solar PV,3.8,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,10/15/2019,Permission to Operate,1/8/2020 AE-06818,Solar PV,3.8,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1518,In service,10/15/2019,Permission to Operate,11/15/2019 AE-06794,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,10/14/2019,Permission to Operate,11/8/2019 AE-06799,Solar PV,3.8,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,10/14/2019,Permission to Operate,11/21/2019 AE-06780,Solar PV,2.8,,Category 1,"Lodi, Dane County, WI",Substation 547,Circuit 1433,In service,10/11/2019,Permission to Operate,12/5/2019 AE-06795,Solar PV,7.2,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,10/11/2019,Permission to Operate,11/21/2019 AE-06797,Solar PV,3.8,,Category 1,"Necedah, Juneau County, WI",Substation 516,Circuit 1323,In service,10/11/2019,Permission to Operate,11/11/2019 AE-06791,Solar PV,10,,Category 1,"Sharon, Rock County, WI",Substation 648,Circuit 1783,In service,10/11/2019,Permission to Operate,11/18/2019 AE-06729,Solar PV,3,,Category 1,"Scandinavia, Waupaca County, WI",Substation 364,Circuit 894,In service,10/7/2019,Permission to Operate,11/15/2019 AE-06751,Solar PV,5,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,10/7/2019,Permission to Operate,11/6/2019 AE-06631,"Solar PV, Battery/Storage",7.6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,10/7/2019,Permission to Operate,12/16/2019 AE-06774,Solar PV,7.7,,Category 1,"Reedsburg, Sauk County, WI",Substation 623,Circuit 1685,In service,10/7/2019,Permission to Operate,11/25/2019 AE-06755,Solar PV,233.1,,Category 3,"Fitchburg, Dane County, WI",Substation 119,Circuit 324,In service,10/4/2019,Permission to Operate,2/5/2020 AE-06752,Solar PV,299.7,,Category 3,"Oregon, Dane County, WI",,Circuit 1459,In service,10/4/2019,Permission to Operate,11/20/2020 AE-06725,Solar PV,8.4,,Category 1,"Deforest, Dane County, WI",,Circuit 474,In service,10/3/2019,Permission to Operate,11/8/2019 AE-06714,Solar PV,10,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 889,In service,10/2/2019,Permission to Operate,3/4/2020 AE-06718,Solar PV,17.9,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,10/2/2019,Permission to Operate,12/18/2019 AE-06719,Solar PV,17.9,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,10/1/2019,Permission to Operate,12/18/2019 AE-06611,Solar PV,22.8,,Category 2,"Oregon, Dane County, WI",Substation 108,Circuit 302,In service,10/1/2019,Permission to Operate,11/26/2019 AE-06734,Solar PV,5.53,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,9/27/2019,Permission to Operate,11/21/2019 AE-06723,Solar PV,6.1,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,9/27/2019,Permission to Operate,12/23/2019 AE-06706,Solar PV,3.8,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,9/24/2019,Permission to Operate,11/21/2019 AE-06676,Solar PV,8,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 535,Circuit 1377,In service,9/24/2019,Permission to Operate,11/13/2019 AE-06630,"Solar PV, Battery/Storage",19,,Category 1,"Marshfield, Marathon County, WI",Substation 626,Circuit 1690,In service,9/23/2019,Permission to Operate,12/20/2019 AE-06682,Solar PV,17.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 411,Circuit 1027,In service,9/19/2019,Permission to Operate,11/18/2019 AE-06633,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,9/18/2019,Permission to Operate,1/9/2020 AE-06664,Solar PV,7.6,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,9/18/2019,Permission to Operate,12/4/2019 AE-06614,Solar PV,6,,Category 1,"Hazel Green, Lafayette County, WI",Substation 67,Circuit 165,In service,9/17/2019,Permission to Operate,11/15/2019 AE-06616,Solar PV,15.2,,Category 1,"Highland, Iowa County, WI",Substation 45,Circuit 129,In service,9/17/2019,Permission to Operate,12/26/2019 AE-06542,Solar PV,10.8,,Category 1,"Juda, Green County, WI",Substation 101,Circuit 269,In service,9/16/2019,Permission to Operate,10/21/2019 AE-06636,Solar PV,3,,Category 1,"Blue Mounds, Iowa County, WI",Substation 483,Circuit 1211,In service,9/16/2019,Permission to Operate,2/10/2020 AE-06595,Solar PV,7.6,,Category 1,"Prairie Du Sac, Columbia County, WI",,Circuit 493,In service,9/13/2019,Permission to Operate,9/27/2019 AE-06629,Solar PV,10,,Category 1,"Sun Prairie, Dane County, WI",Substation 698,Circuit 1920,In service,9/13/2019,Permission to Operate,10/22/2019 AE-06572,Solar PV,6,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 862,In service,9/12/2019,Permission to Operate,11/22/2019 AE-06617,"Solar PV, Battery/Storage",7.6,,Category 1,"Evansville, Rock County, WI",Substation 108,Circuit 302,In service,9/12/2019,Permission to Operate,12/12/2019 AE-06602,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/10/2019,Permission to Operate,12/5/2019 AE-06534,Solar PV,15,,Category 1,"Rio, Columbia County, WI",Substation 335,Circuit 790,In service,9/10/2019,Permission to Operate,11/21/2019 AE-06577,Solar PV,11.4,,Category 1,"Fall River, Columbia County, WI",,Circuit 668,In service,9/10/2019,Permission to Operate,11/21/2019 AE-06576,Solar PV,3.48,,Category 1,"Delavan, Walworth County, WI",Substation 662,Circuit 1822,In service,9/9/2019,Permission to Operate,9/27/2019 AE-06539,Solar PV,2.8,,Category 1,"Waupaca, Waupaca County, WI",Substation 651,Circuit 1787,In service,9/6/2019,Permission to Operate,5/18/2020 AE-06591,Solar PV,4,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,9/6/2019,Permission to Operate,10/22/2019 AE-06565,Solar PV,6,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,9/5/2019,Permission to Operate,10/30/2019 AE-06545,Solar PV,5,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,9/5/2019,Permission to Operate,12/6/2019 AE-06471,Solar PV,9.3,,Category 1,"Lynxville, Crawford County, WI",Substation 645,Circuit 1762,In service,9/5/2019,Permission to Operate,10/25/2019 AE-06345,Solar PV,10,,Category 1,"Burnett, Dodge County, WI",,Circuit 1305,In service,9/4/2019,Permission to Operate,1/6/2020 AE-06544,Solar PV,5.5,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,9/4/2019,Permission to Operate,12/26/2019 AE-06548,"Solar PV, Battery/Storage",12.6,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,9/4/2019,Permission to Operate,10/16/2019 AE-06346,Solar PV,15,,Category 1,"Burnett, Dodge County, WI",,Circuit 1305,In service,9/4/2019,Permission to Operate,1/6/2020 AE-06566,Solar PV,5.4,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1525,In service,9/3/2019,Permission to Operate,10/31/2019 AE-06563,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,9/3/2019,Permission to Operate,10/31/2019 AE-06567,Solar PV,7.6,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2148,In service,9/3/2019,Permission to Operate,10/16/2019 AE-06570,Solar PV,6,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,9/3/2019,Permission to Operate,12/4/2019 AE-06530,Solar PV,5,,Category 1,"Dane, Dane County, WI",Substation 201,Circuit 459,In service,8/30/2019,Permission to Operate,10/22/2019 AE-06551,Solar PV,3.3,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1210,In service,8/30/2019,Permission to Operate,3/2/2020 AE-06549,Solar PV,1.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,8/30/2019,Permission to Operate,11/26/2019 AE-06550,Solar PV,7.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,8/30/2019,Permission to Operate,10/16/2019 AE-06556,Solar PV,3.6,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,8/30/2019,Permission to Operate,12/5/2019 AE-06528,Solar PV,6,,Category 1,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1685,In service,8/29/2019,Permission to Operate,12/11/2019 AE-06517,Solar PV,8.4,,Category 1,"Marshall, Dane County, WI",Substation 679,Circuit 1877,In service,8/28/2019,Permission to Operate,10/4/2019 AE-06536,Solar PV,6,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 433,Circuit 1100,In service,8/27/2019,Permission to Operate,10/11/2019 AE-06508,Solar PV,7.54,,Category 1,"Wild Rose, Fond du Lac County, WI",Substation 281,Circuit 675,In service,8/27/2019,Permission to Operate,3/4/2020 AE-06447,Solar PV,15,,Category 1,"Baraboo, Sauk County, WI",Substation 418,Circuit 1038,In service,8/23/2019,Permission to Operate,9/6/2019 AE-06490,Solar PV,6,,Category 1,"Darlington, Lafayette County, WI",Substation 59,Circuit 161,In service,8/22/2019,Permission to Operate,11/8/2019 AE-06489,Solar PV,3.6,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,8/19/2019,Permission to Operate,9/20/2019 AE-06487,Solar PV,3,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1522,In service,8/19/2019,Permission to Operate,9/12/2019 AE-06486,Solar PV,3,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,8/16/2019,Permission to Operate,11/20/2019 AE-06493,Solar PV,7,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,8/16/2019,Permission to Operate,9/3/2019 AE-06477,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,8/14/2019,Permission to Operate,9/30/2019 AE-06371,Solar PV,4,,Category 1,"Tomah, Monroe County, WI",,Circuit 385,In service,8/14/2019,Permission to Operate,5/23/2024 AE-06398,Solar PV,12,,Category 1,"North Freedom, Sauk County, WI",,Circuit 495,In service,8/14/2019,Permission to Operate,9/19/2019 AE-06147,Solar PV,4.2,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 433,Circuit 1100,In service,8/14/2019,Permission to Operate,12/5/2019 AE-06475,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 134,In service,8/14/2019,Permission to Operate,9/12/2019 AE-06392,Solar PV,5,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1170,In service,8/13/2019,Permission to Operate,9/9/2019 AE-06458,Solar PV,5.4,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,8/13/2019,Permission to Operate,10/31/2019 AE-06427,Solar PV,19,,Category 1,"Hollandale, Iowa County, WI",Substation 525,Circuit 1342,In service,8/12/2019,Permission to Operate,11/6/2019 AE-06460,Solar PV,8.5,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 79,In service,8/12/2019,Permission to Operate,12/26/2019 AE-06431,Solar PV,7.6,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 391,In service,8/6/2019,Permission to Operate,8/28/2019 AE-06430,Solar PV,20,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 355,Circuit 851,In service,8/6/2019,Permission to Operate,12/27/2019 AE-06426,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/5/2019,Permission to Operate,10/8/2019 AE-06414,Solar PV,6,,Category 1,"Sun Prairie, Dane County, WI",Substation 679,Circuit 1877,In service,8/5/2019,Permission to Operate,10/31/2019 AE-06372,Solar PV,4.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,8/2/2019,Permission to Operate,11/12/2019 AE-06407,Solar PV,5,,Category 1,"South Wayne, Lafayette County, WI",Substation 770,Circuit 2083,In service,8/2/2019,Permission to Operate,8/21/2020 AE-06203,Solar PV,14.4,,Category 1,"Orfordville, Rock County, WI",Substation 551,Circuit 1461,In service,8/2/2019,Permission to Operate,1/9/2020 AE-06395,Solar PV,3.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,7/30/2019,Permission to Operate,11/5/2019 AE-06403,Solar PV,5.4,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,7/30/2019,Permission to Operate,9/4/2019 AE-06399,Solar PV,3,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 2174,In service,7/30/2019,Permission to Operate,9/4/2019 AE-06402,Solar PV,4.8,,Category 1,"Mcfarlans, Dane County, WI",,Circuit 1143,In service,7/30/2019,Permission to Operate,12/26/2019 AE-06393,Solar PV,4.8,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,7/29/2019,Permission to Operate,9/4/2019 AE-06386,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,7/29/2019,Permission to Operate,8/20/2019 AE-06385,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,7/29/2019,Permission to Operate,9/3/2019 AE-06391,Solar PV,2.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,7/29/2019,Permission to Operate,10/17/2019 AE-06326,Solar PV,20,,Category 1,"Baraboo, Sauk County, WI",Substation 623,Circuit 1685,In service,7/29/2019,Permission to Operate,9/12/2019 AE-06384,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,7/26/2019,Permission to Operate,9/18/2019 AE-06325,Solar PV,15,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1685,In service,7/26/2019,Permission to Operate,9/12/2019 AE-06302,Solar PV,3.465,,Category 1,"Lake Geneva, Walworth County, WI",Substation 393,Circuit 983,In service,7/25/2019,Permission to Operate,9/10/2019 AE-06376,Solar PV,3.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,7/25/2019,Permission to Operate,9/19/2019 AE-06320,Solar PV,11.4,,Category 1,"Baraboo, Sauk County, WI",Substation 466,Circuit 1155,In service,7/24/2019,Permission to Operate,9/12/2019 AE-06375,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 280,Circuit 670,In service,7/24/2019,Permission to Operate,8/19/2019 AE-06377,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,7/24/2019,Permission to Operate,11/12/2019 AE-06352,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,7/24/2019,Permission to Operate,9/5/2019 AE-06366,Solar PV,4.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,7/23/2019,Permission to Operate,10/22/2019 AE-06363,Solar PV,7.2,,Category 1,"Sun Prairie, Dane County, WI",Substation 698,Circuit 1920,In service,7/23/2019,Permission to Operate,9/4/2019 AE-06367,Solar PV,3.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,7/23/2019,Permission to Operate,11/20/2019 AE-06364,Solar PV,2.4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 329,In service,7/23/2019,Permission to Operate,12/5/2019 AE-06337,Solar PV,7.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 581,In service,7/22/2019,Permission to Operate,8/26/2019 AE-06342,Solar PV,4.8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,7/19/2019,Permission to Operate,9/3/2019 AE-06343,Solar PV,12,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,7/19/2019,Permission to Operate,11/5/2019 AE-06212,Solar PV,3.48,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 315,In service,7/18/2019,Permission to Operate,10/4/2019 AE-06296,Solar PV,15.2,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,7/18/2019,Permission to Operate,11/25/2019 AE-06300,Solar PV,4.8,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,7/18/2019,Permission to Operate,8/28/2019 AE-06295,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,7/18/2019,Permission to Operate,8/20/2019 AE-06334,Solar PV,13.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 327,In service,7/17/2019,Permission to Operate,10/4/2019 AE-06277,Solar PV,7.2,,Category 1,"Pardeville, Columbia County, WI",Substation 781,Circuit 2132,In service,7/17/2019,Permission to Operate,10/23/2019 AE-06304,Solar PV,11.8,,Category 1,"Lake Geneva, Walworth County, WI",Substation 393,Circuit 981,In service,7/12/2019,Permission to Operate,9/3/2019 AE-06298,Solar PV,11.4,,Category 1,"Mt. Horeb, Dane County, WI",Substation 686,Circuit 1895,In service,7/12/2019,Permission to Operate,10/4/2019 AE-06181,Solar PV,10,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 887,In service,7/11/2019,Permission to Operate,11/15/2019 AE-06313,Solar PV,6,,Category 1,"Baraboo, Dane County, WI",Substation 46,Circuit 138,In service,7/11/2019,Permission to Operate,8/14/2019 AE-06294,Solar PV,2.4,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,7/11/2019,Permission to Operate,10/22/2019 AE-06305,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 418,Circuit 1039,In service,7/11/2019,Permission to Operate,8/27/2019 AE-06303,Solar PV,7.6,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,7/10/2019,Permission to Operate,8/2/2019 AE-06293,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,7/9/2019,Permission to Operate,10/11/2019 AE-06269,Solar PV,4.08,,Category 1,"Cottage Grove, Dane County, WI",,Circuit 973,In service,7/9/2019,Permission to Operate,8/30/2019 AE-06280,Solar PV,10,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 302,In service,7/9/2019,Permission to Operate,9/23/2019 AE-06254,Solar PV,6,,Category 1,"Beaver Dam, Dodge County, WI",Substation 637,Circuit 1736,In service,7/8/2019,Permission to Operate,8/21/2019 AE-06276,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,7/5/2019,Permission to Operate,9/26/2019 AE-06228,Solar PV,15.4,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,7/5/2019,Permission to Operate,9/11/2019 AE-06263,Solar PV,7.2,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,7/5/2019,Permission to Operate,9/9/2019 AE-06230,Solar PV,15.4,,Category 1,"Barneveld, Iowa County, WI",,Circuit 222,In service,7/3/2019,Permission to Operate,9/11/2019 AE-06261,Solar PV,8.7,,Category 1,"Oregon, Dane County, WI",,Circuit 1455,In service,7/2/2019,Permission to Operate,10/31/2019 AE-06171,Solar PV,2.655,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 514,Circuit 1288,In service,7/2/2019,Permission to Operate,5/5/2025 AE-06235,Solar PV,5.51,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,7/1/2019,Permission to Operate,9/28/2020 AE-06234,Solar PV,3.8,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1686,In service,7/1/2019,Permission to Operate,7/29/2019 AE-06236,Solar PV,7.6,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,7/1/2019,Permission to Operate,9/26/2019 AE-06222,Solar PV,7.6,,Category 1,"Brooklyn, Wi, Green County, WI",Substation 108,Circuit 303,In service,6/28/2019,Permission to Operate,8/20/2019 AE-06229,Solar PV,11.4,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,6/28/2019,Permission to Operate,8/20/2019 AE-06225,Solar PV,10,,Category 1,"Juneau, Dodge County, WI",Substation 637,Circuit 1736,In service,6/26/2019,Permission to Operate,8/20/2019 AE-06219,Solar PV,10,,Category 1,"Malone, Fond du Lac County, WI",Substation 256,Circuit 623,In service,6/25/2019,Permission to Operate,9/20/2019 AE-06211,Solar PV,7.6,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1685,In service,6/24/2019,Permission to Operate,7/9/2019 AE-06206,Solar PV,9.28,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,6/21/2019,Permission to Operate,9/25/2019 AE-06205,Solar PV,4.06,,Category 1,"Brooklyn, Green Lake County, WI",Substation 108,Circuit 303,In service,6/21/2019,Permission to Operate,9/11/2019 AE-06204,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 57,Circuit 152,In service,6/19/2019,Permission to Operate,8/29/2019 AE-06084,Solar PV,6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,6/19/2019,Permission to Operate,7/31/2019 AE-06161,Solar PV,5.22,,Category 1,"Vesper, Wood County, WI",Substation 723,Circuit 1976,In service,6/19/2019,Permission to Operate,7/16/2019 AE-06061,Solar PV,4,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1815,In service,6/18/2019,Permission to Operate,12/12/2019 AE-06134,Solar PV,6,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1731,In service,6/17/2019,Permission to Operate,10/24/2019 AE-06160,Solar PV,7.5,,Category 1,"Bloomington, Grant County, WI",Substation 80,Circuit 209,In service,6/11/2019,Permission to Operate,9/13/2019 AE-06154,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,6/11/2019,Permission to Operate,7/18/2019 AE-06152,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,6/7/2019,Permission to Operate,7/18/2019 AE-06132,Solar PV,6.96,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1184,In service,6/7/2019,Permission to Operate,9/11/2019 AE-06069,Solar PV,72,,Category 2,"Ripon, Winnebago County, WI",Substation 627,Circuit 1693,In service,6/6/2019,Permission to Operate,9/18/2019 AE-06090,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,6/5/2019,Permission to Operate,6/28/2019 AE-06148,Solar PV,10,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,6/5/2019,Permission to Operate,7/26/2019 AE-06089,Solar PV,11.4,,Category 1,"Mauston, Juneau County, WI",Substation 776,Circuit 2106,In service,6/4/2019,Permission to Operate,6/14/2019 AE-06099,Solar PV,7.6,,Category 1,"Platteville, Grant County, WI",Substation 601,Circuit 1622,In service,6/4/2019,Permission to Operate,7/24/2019 AE-06096,Solar PV,20,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 301,In service,6/3/2019,Permission to Operate,8/13/2019 AE-06053,Solar PV,3,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1581,In service,5/31/2019,Permission to Operate,7/22/2019 AE-06046,Solar PV,7.7,,Category 1,"Wautoma, Waushara County, WI",Substation 599,Circuit 1614,In service,5/28/2019,Permission to Operate,6/20/2019 AE-06068,Solar PV,11.4,,Category 1,"Blanchardville, Green County, WI",Substation 280,Circuit 672,In service,5/24/2019,Permission to Operate,7/16/2019 AE-06051,Solar PV,86.4,,Category 2,"Beaver Dam, Dodge County, WI",,Circuit 19,In service,5/24/2019,Permission to Operate,7/16/2019 AE-06066,"Solar PV, Battery/Storage",9.3,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,5/21/2019,Permission to Operate,11/21/2019 AE-06030,Solar PV,11.28,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,5/13/2019,Permission to Operate,8/15/2019 AE-06007,Solar PV,100,,Category 2,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,5/10/2019,Permission to Operate,11/1/2019 AE-06022,Solar PV,5,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,5/10/2019,Permission to Operate,6/25/2019 AE-06011,Solar PV,2.8,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,5/9/2019,Permission to Operate,7/11/2019 AE-06014,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 324,In service,5/9/2019,Permission to Operate,7/25/2019 AE-06018,Solar PV,5,,Category 1,"Endeavor, Marquette County, WI",Substation 252,Circuit 606,In service,5/9/2019,Permission to Operate,8/2/2019 AE-06015,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,5/9/2019,Permission to Operate,6/7/2019 AE-06020,Solar PV,20,,Category 1,"Hillsboro, Vernon County, WI",Substation 340,Circuit 806,In service,5/8/2019,Permission to Operate,7/30/2019 AE-05933,Solar PV,72,,Category 2,"Fond du Lac, Fond du Lac County, WI",Substation 513,Circuit 1270,In service,5/6/2019,Permission to Operate,7/30/2019 AE-06000,Solar PV,7.6,,Category 1,"Mt Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,5/6/2019,Permission to Operate,6/21/2019 AE-05994,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,5/3/2019,Permission to Operate,6/7/2019 AE-05960,Solar PV,10,,Category 1,"Oshkosh, Winnebago County, WI",Substation 550,Circuit 1452,In service,4/30/2019,Permission to Operate,7/30/2019 AE-05965,Solar PV,10,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1043,In service,4/30/2019,Permission to Operate,6/6/2019 AE-05881,Solar PV,72,,Category 2,"Windsor, Dane County, WI",,Circuit 2141,In service,4/29/2019,Permission to Operate,7/5/2019 AE-05938,Solar PV,7.6,,Category 1,"Auburndale, Wood County, WI",Substation 43,Circuit 118,In service,4/25/2019,Permission to Operate,6/4/2019 AE-05882,Solar PV,15,,Category 1,"Junction City, Portage County, WI",Substation 630,Circuit 1713,In service,4/24/2019,Permission to Operate,5/7/2019 AE-05906,Solar PV,86.4,,Category 2,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,4/23/2019,Permission to Operate,11/1/2019 AE-05929,Solar PV,5,,Category 1,"Manawa, Waupaca County, WI",Substation 433,Circuit 1099,In service,4/23/2019,Permission to Operate,6/12/2019 AE-05851,Solar PV,106.6,,Category 2,"Middleton, Dane County, WI",Substation 579,Circuit 1525,In service,4/23/2019,Permission to Operate,7/25/2019 AE-05905,Solar PV,34.2,,Category 2,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,4/23/2019,Permission to Operate,11/1/2019 AE-05845,Solar PV,66.6,,Category 2,"Madison, Dane County, WI",Substation 579,Circuit 1526,In service,4/19/2019,Permission to Operate,7/26/2019 AE-05927,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,4/19/2019,Permission to Operate,5/7/2019 AE-05921,Solar PV,16,,Category 1,"Necedah, Juneau County, WI",Substation 516,Circuit 1321,In service,4/18/2019,Permission to Operate,7/3/2019 AE-05902,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,4/18/2019,Permission to Operate,5/6/2019 AE-05886,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,4/17/2019,Permission to Operate,5/10/2019 AE-05892,Solar PV,5,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1003,In service,4/16/2019,Permission to Operate,6/19/2019 AE-05885,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,4/16/2019,Permission to Operate,5/20/2019 AE-05855,Solar PV,17,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,4/10/2019,Permission to Operate,5/6/2019 AE-05858,Solar PV,6,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,4/8/2019,Permission to Operate,5/1/2019 AE-05854,Solar PV,7.6,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1170,In service,4/8/2019,Permission to Operate,5/30/2019 AE-05833,Solar PV,7.6,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1731,In service,4/4/2019,Permission to Operate,5/30/2019 AE-05835,Solar PV,7.6,,Category 1,"Baraboo, Columbia County, WI",Substation 46,Circuit 137,In service,4/3/2019,Permission to Operate,4/23/2019 AE-05834,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,4/3/2019,Permission to Operate,5/6/2019 AE-05824,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/29/2019,Permission to Operate,5/20/2019 AE-05825,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/28/2019,Permission to Operate,5/10/2019 AE-05794,Solar PV,14,,Category 1,"Waunakee, Dane County, WI",,Circuit 2142,In service,3/18/2019,Permission to Operate,5/28/2019 AE-05774,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/18/2019,Permission to Operate,5/23/2019 AE-05771,Solar PV,12.65,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,3/18/2019,Permission to Operate,5/24/2019 AE-05791,Solar PV,7.6,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,3/15/2019,Permission to Operate,5/8/2019 AE-05776,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/13/2019,Permission to Operate,5/7/2019 AE-05777,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/13/2019,Permission to Operate,5/7/2019 AE-05759,Solar PV,14,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2138,In service,3/12/2019,Permission to Operate,5/20/2019 AE-05733,Solar PV,5.04,,Category 1,"Delavan, Walworth County, WI",Substation 662,Circuit 1822,In service,3/12/2019,Permission to Operate,6/11/2019 AE-05762,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/11/2019,Permission to Operate,3/19/2019 AE-05756,Solar PV,16.5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,3/7/2019,Permission to Operate,7/16/2019 AE-05757,Solar PV,4.35,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,3/7/2019,Permission to Operate,8/1/2019 AE-05704,Solar PV,5.04,,Category 1,"Mayville, Dodge County, WI",Substation 664,Circuit 1830,In service,3/4/2019,Permission to Operate,8/22/2019 AE-05735,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,3/1/2019,Permission to Operate,5/6/2019 AE-05734,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,2/28/2019,Permission to Operate,4/23/2019 AE-05721,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,2/27/2019,Permission to Operate,4/4/2019 AE-05725,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,2/27/2019,Permission to Operate,5/6/2019 AE-05722,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,2/27/2019,Permission to Operate,4/4/2019 AE-05726,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,2/27/2019,Permission to Operate,4/23/2019 AE-05718,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,2/21/2019,Permission to Operate,3/11/2019 AE-05716,Solar PV,3.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,2/21/2019,Permission to Operate,4/26/2019 AE-05711,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,2/20/2019,Permission to Operate,3/29/2019 AE-05717,Solar PV,10,,Category 1,"Genoa City, Walworth County, WI",,,In service,2/20/2019,Permission to Operate,5/6/2019 AE-05699,Solar PV,4.35,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,2/15/2019,Permission to Operate,6/25/2019 AE-05686,Solar PV,3,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,2/15/2019,Permission to Operate,4/11/2019 AE-05708,Solar PV,7.6,,Category 1,"Prairie Du Sac, Sauk County, WI",,Circuit 494,In service,2/15/2019,Permission to Operate,4/12/2019 AE-05700,"Solar PV, Battery/Storage",7.6,,Category 1,"Evansville, Rock County, WI",Substation 108,Circuit 302,In service,2/13/2019,Permission to Operate,3/29/2019 AE-05695,Solar PV,6.96,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,2/8/2019,Permission to Operate,6/14/2019 AE-05693,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,2/8/2019,Permission to Operate,4/17/2019 AE-05692,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,2/7/2019,Permission to Operate,5/23/2019 AE-05690,Solar PV,5.22,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,2/7/2019,Permission to Operate,7/25/2019 AE-05687,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,2/6/2019,Permission to Operate,7/12/2019 AE-05675,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,2/4/2019,Permission to Operate,4/24/2019 AE-05673,Solar PV,3,,Category 1,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1685,In service,1/29/2019,Permission to Operate,3/18/2019 AE-05677,Solar PV,5,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,1/29/2019,Permission to Operate,3/29/2019 AE-05655,Solar PV,5,,Category 1,"Sun Prairie, Dane County, WI",Substation 76,Circuit 186,In service,1/22/2019,Permission to Operate,3/8/2019 AE-05652,Solar PV,18,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1984,In service,1/18/2019,Permission to Operate,3/25/2019 AE-05636,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,1/14/2019,Permission to Operate,3/15/2019 AE-05642,Biomass,260,,Category 3,"Janesville, Rock County, WI",Substation 704,Circuit 1929,In service,1/14/2019,Permission to Operate,11/17/2020 AE-05637,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,1/14/2019,Permission to Operate,4/11/2019 AE-05631,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,1/11/2019,Permission to Operate,3/29/2019 AE-05639,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,1/11/2019,Permission to Operate,4/11/2019 AE-05634,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,1/11/2019,Permission to Operate,4/3/2019 AE-05632,Solar PV,5,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,1/10/2019,Permission to Operate,8/15/2019 AE-05638,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1524,In service,1/10/2019,Permission to Operate,3/19/2019 AE-05625,Solar PV,5,,Category 1,"Hazel Grenn, Grant County, WI",Substation 386,Circuit 2181,In service,1/8/2019,Permission to Operate,5/31/2019 AE-05622,Solar PV,7.6,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 316,In service,1/8/2019,Permission to Operate,4/17/2019 AE-05601,Solar PV,5,,Category 1,"Reedsburg, Sauk County, WI",Substation 421,Circuit 1050,In service,1/3/2019,Permission to Operate,1/24/2019 AE-05620,Solar PV,7.6,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2150,In service,1/2/2019,Permission to Operate,3/12/2019 AE-05605,Solar PV,6.96,,Category 1,"Shawano, Shawano County, WI",Substation 652,Circuit 1788,In service,12/28/2018,Permission to Operate,4/25/2019 AE-05612,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,12/28/2018,Permission to Operate,2/5/2019 AE-05599,Solar PV,6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,In service,12/17/2018,Permission to Operate,1/25/2019 AE-05596,Solar PV,15,,Category 1,"Blue Mounds, Iowa County, WI",,Circuit 220,In service,12/17/2018,Permission to Operate,1/7/2019 AE-05562,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,12/12/2018,Permission to Operate,3/8/2019 AE-05513,Solar PV,5,,Category 1,"Tomah, Monroe County, WI",,Circuit 388,In service,12/6/2018,Permission to Operate,2/4/2019 AE-05582,Solar PV,6,,Category 1,"Tomah, Monroe County, WI",Substation 277,Circuit 653,In service,12/5/2018,Permission to Operate,4/4/2019 AE-05575,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,12/5/2018,Permission to Operate,1/22/2019 AE-05560,Solar PV,5.5,,Category 1,"Dodgevelle, Iowa County, WI",Substation 406,Circuit 1009,In service,12/3/2018,Permission to Operate,1/24/2019 AE-05566,Solar PV,5,,Category 1,"Eland, Shawano County, WI",,Circuit 834,In service,12/3/2018,Permission to Operate,12/19/2018 AE-05563,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/29/2018,Permission to Operate,3/20/2019 AE-05537,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/21/2018,Permission to Operate,1/22/2019 AE-05543,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/21/2018,Permission to Operate,4/17/2019 AE-05541,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/21/2018,Permission to Operate,3/19/2019 AE-05540,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/21/2018,Permission to Operate,3/29/2019 AE-05550,Solar PV,7.6,,Category 1,"Hazel Green, Grant County, WI",Substation 386,Circuit 2180,In service,11/21/2018,Permission to Operate,1/7/2019 AE-05539,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/21/2018,Permission to Operate,3/20/2019 AE-05538,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/20/2018,Permission to Operate,2/22/2019 AE-05542,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,11/20/2018,Permission to Operate,3/19/2019 AE-05517,Solar PV,3,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,11/19/2018,Permission to Operate,12/11/2018 AE-05480,Solar PV,3.8,,Category 1,"Birnamwood, Marathon County, WI",Substation 74,Circuit 179,In service,11/16/2018,Permission to Operate,1/9/2019 AE-05516,Solar PV,11.4,,Category 1,"Windsor, Dane County, WI",,Circuit 2140,In service,11/14/2018,Permission to Operate,12/14/2018 AE-05504,Solar PV,10,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 580,In service,11/14/2018,Permission to Operate,1/24/2019 AE-05503,Solar PV,10,,Category 1,"Baraboo, Sauk County, WI",Substation 466,Circuit 1155,In service,11/13/2018,Permission to Operate,2/18/2019 AE-05454,Solar PV,6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,11/13/2018,Permission to Operate,12/20/2018 AE-05481,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 331,In service,11/12/2018,Permission to Operate,1/7/2019 AE-05492,Solar PV,10,,Category 1,"Tomah, Monroe County, WI",Substation 277,Circuit 654,In service,11/8/2018,Permission to Operate,1/29/2019 AE-05484,Solar PV,10,,Category 1,"Juda, Green County, WI",Substation 101,Circuit 268,In service,11/8/2018,Permission to Operate,1/7/2019 AE-05488,Solar PV,11.4,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,11/7/2018,Permission to Operate,12/19/2018 AE-05468,Solar PV,18,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,11/7/2018,Permission to Operate,2/12/2019 AE-05466,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,11/6/2018,Permission to Operate,12/21/2018 AE-05475,Solar PV,180,,Category 2,"Deerfield, Dane County, WI",Substation 204,Circuit 468,In service,11/6/2018,Permission to Operate,2/21/2019 AE-05477,Solar PV,3.8,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,11/6/2018,Permission to Operate,1/4/2019 AE-05478,Solar PV,3.8,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,11/6/2018,Permission to Operate,1/4/2019 AE-05479,Solar PV,3.8,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,11/6/2018,Permission to Operate,1/7/2019 AE-05482,Solar PV,5,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 109,In service,11/6/2018,Permission to Operate,2/4/2019 AE-05458,Solar PV,20,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,11/6/2018,Permission to Operate,3/29/2019 AE-05476,Solar PV,10,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 109,In service,11/5/2018,Permission to Operate,2/4/2019 AE-05483,Solar PV,6,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 774,Circuit 2099,In service,11/5/2018,Permission to Operate,3/28/2019 AE-05451,Solar PV,11.4,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1194,In service,11/2/2018,Permission to Operate,11/6/2018 AE-05473,Solar PV,17.6,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,11/2/2018,Permission to Operate,4/15/2019 AE-05469,Solar PV,7.6,,Category 1,"Richland Center, Richland County, WI",Substation 572,Circuit 1505,In service,11/2/2018,Permission to Operate,12/6/2018 AE-05471,Solar PV,5,,Category 1,"Merrimac, Columbia County, WI",Substation 466,Circuit 1157,In service,11/1/2018,Permission to Operate,12/11/2018 AE-05373,Solar PV,133.3,,Category 2,"Oregon, Dane County, WI",,Circuit 1456,In service,10/31/2018,Permission to Operate,1/10/2019 AE-05465,Solar PV,20,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 346,Circuit 833,In service,10/31/2018,Permission to Operate,2/28/2019 AE-05439,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,10/26/2018,Permission to Operate,11/26/2018 AE-05416,Solar PV,6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,10/22/2018,Permission to Operate,11/8/2018 AE-05412,Solar PV,360,,Category 3,"Deerfield, Dane County, WI",Substation 403,Circuit 997,In service,10/19/2018,Permission to Operate,2/21/2019 AE-05415,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,10/15/2018,Permission to Operate,11/8/2018 AE-05400,Solar PV,5,,Category 1,"Auburndale, Marathon County, WI",Substation 626,Circuit 1690,In service,10/12/2018,Permission to Operate,12/10/2018 AE-05397,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,10/11/2018,Permission to Operate,10/26/2018 AE-05398,Solar PV,2.5,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,10/11/2018,Permission to Operate,10/26/2018 AE-05367,Solar PV,105,,Category 2,"Beaver Dam, Dodge County, WI",,Circuit 21,In service,10/10/2018,Permission to Operate,11/20/2018 AE-05380,Solar PV,5,,Category 1,"Kohler, Sheboygan County, WI",Substation 404,Circuit 2187,In service,10/9/2018,Permission to Operate,1/2/2019 AE-05377,Solar PV,5,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,10/9/2018,Permission to Operate,11/13/2018 AE-05350,Solar PV,10,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1685,In service,10/9/2018,Permission to Operate,11/13/2018 AE-05339,Solar PV,1.5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/8/2018,Permission to Operate,11/13/2018 AE-05393,Solar PV,7.6,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2148,In service,10/8/2018,Permission to Operate,11/21/2018 AE-05384,Solar PV,4.72,,Category 1,"Platteville, Grant County, WI",Substation 601,Circuit 1622,In service,10/8/2018,Permission to Operate,1/7/2019 AE-05344,Solar PV,7.7,,Category 1,"Amherst, Portage County, WI",Substation 41,Circuit 2242,In service,10/5/2018,Permission to Operate,10/29/2018 AE-05365,Solar PV,7.6,,Category 1,"Plain, Sauk County, WI",Substation 710,Circuit 1946,In service,10/5/2018,Permission to Operate,11/1/2018 AE-05353,Solar PV,5,,Category 1,"Loganville, Sauk County, WI",Substation 421,Circuit 1052,In service,9/28/2018,Permission to Operate,11/14/2018 AE-05349,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,9/27/2018,Permission to Operate,11/13/2018 AE-05351,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 898,In service,9/27/2018,Permission to Operate,11/30/2018 AE-05342,Solar PV,3.8,,Category 1,"Lone Rock, Sauk County, WI",,Circuit 1056,In service,9/26/2018,Permission to Operate,3/29/2019 AE-05335,Solar PV,7.7,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,9/25/2018,Permission to Operate,10/24/2018 AE-05328,Solar PV,10,,Category 1,"Plain, Sauk County, WI",,Circuit 1057,In service,9/25/2018,Permission to Operate,11/26/2018 AE-05338,Solar PV,7.6,,Category 1,"Reedsburg, Sauk County, WI",Substation 421,Circuit 1050,In service,9/24/2018,Permission to Operate,11/30/2018 AE-05329,Solar PV,2,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,9/20/2018,Permission to Operate,10/26/2018 AE-05233,Solar PV,10,,Category 1,"Milton, Buffalo County, WI",Substation 419,Circuit 1046,In service,9/20/2018,Permission to Operate,10/31/2018 AE-05315,Solar PV,7.6,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,9/19/2018,Permission to Operate,11/5/2018 AE-05298,Solar PV,3.8,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 360,In service,9/19/2018,Permission to Operate,10/12/2018 AE-05316,Solar PV,5,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1209,In service,9/19/2018,Permission to Operate,10/16/2018 AE-05228,Solar PV,20,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,9/18/2018,Permission to Operate,11/27/2018 AE-05309,Solar PV,6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 614,In service,9/18/2018,Permission to Operate,11/9/2018 AE-05302,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,9/17/2018,Permission to Operate,11/6/2018 AE-05304,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 466,Circuit 1155,In service,9/17/2018,Permission to Operate,10/12/2018 AE-05261,Solar PV,3.8,,Category 1,"Cottage Grove, Dane County, WI",Substation 296,Circuit 707,In service,9/17/2018,Permission to Operate,10/30/2018 AE-05226,Solar PV,3.8,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 110,In service,9/12/2018,Permission to Operate,11/14/2018 AE-05293,Solar PV,6,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,9/12/2018,Permission to Operate,10/3/2018 AE-05300,Solar PV,7.7,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,9/11/2018,Permission to Operate,9/28/2018 AE-05234,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,9/11/2018,Permission to Operate,10/16/2018 AE-05255,Solar PV,3.8,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,9/11/2018,Permission to Operate,10/23/2018 AE-05259,Solar PV,7.6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,9/4/2018,Permission to Operate,10/3/2018 AE-05249,Solar PV,19.6,,Category 1,"Wittenberg, Marathon County, WI",Substation 624,Circuit 1688,In service,8/31/2018,Permission to Operate,10/19/2018 AE-05256,Solar PV,3.8,,Category 1,"Edgerton, Dane County, WI",Substation 579,Circuit 1521,In service,8/31/2018,Permission to Operate,10/18/2018 AE-05256,Solar PV,3.8,,Category 1,"Edgerton, Dane County, WI",,Circuit 569,In service,8/31/2018,Permission to Operate,10/18/2018 AE-05238,Solar PV,7.6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 355,Circuit 855,In service,8/30/2018,Permission to Operate,1/2/2019 AE-05216,Solar PV,10,,Category 1,"Ripon, Fond du Lac County, WI",Substation 627,Circuit 1693,In service,8/29/2018,Permission to Operate,11/13/2018 AE-05242,Solar PV,7.6,,Category 1,"Juda, Green County, WI",Substation 101,Circuit 268,In service,8/28/2018,Permission to Operate,9/25/2018 AE-05235,Solar PV,6,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,8/27/2018,Permission to Operate,10/10/2018 AE-05239,Solar PV,3.5,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2138,In service,8/24/2018,Permission to Operate,9/26/2018 AE-05225,Solar PV,6,,Category 1,"Lavalle, Sauk County, WI",,Circuit 1958,In service,8/24/2018,Permission to Operate,11/30/2018 AE-05222,Solar PV,7.7,,Category 1,"Deforest, Dane County, WI",,Circuit 479,In service,8/24/2018,Permission to Operate,10/12/2018 AE-05214,Solar PV,66.6,,Category 2,"Fond du Lac, Fond du Lac County, WI",,Circuit 689,In service,8/24/2018,Permission to Operate,10/22/2018 AE-05221,Solar PV,3,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,8/22/2018,Permission to Operate,10/10/2018 AE-05227,Solar PV,3,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,8/22/2018,Permission to Operate,1/4/2019 AE-05230,Solar PV,3.8,,Category 1,"Reedsburg, Sauk County, WI",Substation 421,Circuit 1050,In service,8/22/2018,Permission to Operate,11/14/2018 AE-05224,Solar PV,3.8,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1686,In service,8/22/2018,Permission to Operate,12/11/2018 AE-05210,Solar PV,5,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1992,In service,8/20/2018,Permission to Operate,9/17/2018 AE-05213,Solar PV,7.6,,Category 1,"Edgerton, Jefferson County, WI",,Circuit 569,In service,8/20/2018,Permission to Operate,9/28/2018 AE-05219,Solar PV,7.965,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,8/20/2018,Permission to Operate,12/14/2018 AE-05211,Solar PV,2.5,,Category 1,"Hill Point, Sauk County, WI",Substation 421,Circuit 1051,In service,8/17/2018,Permission to Operate,11/14/2018 AE-05202,Solar PV,3.8,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 900,In service,8/15/2018,Permission to Operate,10/25/2018 AE-05194,Solar PV,3.8,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,8/13/2018,Permission to Operate,10/3/2018 AE-05173,Solar PV,3,,Category 1,"Baraboo, Sauk County, WI",Substation 466,Circuit 1155,In service,8/9/2018,Permission to Operate,9/28/2018 AE-05191,Solar PV,3.8,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,8/8/2018,Permission to Operate,11/13/2018 AE-05187,Solar PV,15.2,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,8/7/2018,Permission to Operate,11/13/2018 AE-05159,Solar PV,3,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,8/6/2018,Permission to Operate,11/16/2018 AE-05186,Solar PV,5,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 110,In service,8/6/2018,Permission to Operate,11/14/2018 AE-05185,Solar PV,7.6,,Category 1,"Stevens Point, Portage County, WI",Substation 630,Circuit 1714,In service,8/6/2018,Permission to Operate,8/31/2018 AE-05170,Solar PV,5,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 109,In service,8/3/2018,Permission to Operate,10/16/2018 AE-05176,Solar PV,3.8,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1686,In service,8/2/2018,Permission to Operate,9/19/2018 AE-05178,Solar PV,6,,Category 1,"Auburndale, Wood County, WI",Substation 626,Circuit 1691,In service,8/2/2018,Permission to Operate,11/30/2018 AE-05146,Solar PV,3.2,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,8/2/2018,Permission to Operate,9/25/2018 AE-05172,Solar PV,3,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 109,In service,8/2/2018,Permission to Operate,9/19/2018 AE-05157,Solar PV,3,,Category 1,"Reedsburg, Sauk County, WI",Substation 216,Circuit 507,In service,8/1/2018,Permission to Operate,11/30/2018 AE-05141,Solar PV,43.2,,Category 2,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,8/1/2018,Permission to Operate,10/18/2018 AE-05065,Solar PV,45,,Category 2,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,8/1/2018,Permission to Operate,1/8/2019 AE-05156,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,8/1/2018,Permission to Operate,10/16/2018 AE-05151,Solar PV,6,,Category 1,"Reedsburg, Sauk County, WI",Substation 106,Circuit 294,In service,7/31/2018,Permission to Operate,10/25/2018 AE-05155,Solar PV,3,,Category 1,"North Freedom, Sauk County, WI",Substation 710,Circuit 1948,In service,7/31/2018,Permission to Operate,11/14/2018 AE-05150,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 900,In service,7/31/2018,Permission to Operate,10/12/2018 AE-05117,Solar PV,2,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,7/30/2018,Permission to Operate,10/15/2018 AE-05118,Solar PV,1,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,7/30/2018,Permission to Operate,10/4/2018 AE-05152,Solar PV,5,,Category 1,"Praire Dusac, Sauk County, WI",Substation 710,Circuit 1948,In service,7/30/2018,Permission to Operate,12/19/2018 AE-05149,Solar PV,19.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,7/27/2018,Permission to Operate,9/13/2018 AE-05148,Solar PV,19.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,7/27/2018,Permission to Operate,9/13/2018 AE-05124,Solar PV,7.6,,Category 1,"Genoa City, Kenosha County, WI",Substation 375,Circuit 926,In service,7/24/2018,Permission to Operate,10/2/2018 AE-05137,Solar PV,7.6,,Category 1,"Prairie Dusac, Sauk County, WI",,Circuit 493,In service,7/24/2018,Permission to Operate,9/4/2018 AE-05138,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1523,In service,7/23/2018,Permission to Operate,10/16/2018 AE-05136,Solar PV,6,,Category 1,"Prairie Dusac, Sauk County, WI",Substation 710,Circuit 1948,In service,7/23/2018,Permission to Operate,9/19/2018 AE-05135,Solar PV,7.6,,Category 1,"Hillpoint, Washington County, WI",Substation 421,Circuit 1051,In service,7/23/2018,Permission to Operate,9/12/2018 AE-05134,Solar PV,7.6,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 106,Circuit 292,In service,7/20/2018,Permission to Operate,9/5/2018 AE-05100,Solar PV,34.2,,Category 2,"Spring Green, Iowa County, WI",Substation 406,Circuit 1007,In service,7/19/2018,Permission to Operate,11/5/2018 AE-05116,Solar PV,5,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,7/17/2018,Permission to Operate,7/20/2018 AE-05122,Solar PV,7.86,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1129,In service,7/16/2018,Permission to Operate,8/9/2018 AE-05075,Solar PV,9.2,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,7/16/2018,Permission to Operate,8/13/2018 AE-05113,Solar PV,6,,Category 1,"Lone Rock, Sauk County, WI",Substation 710,Circuit 1946,In service,7/11/2018,Permission to Operate,9/18/2018 AE-05112,Solar PV,6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 152,In service,7/10/2018,Permission to Operate,7/26/2018 AE-05104,Solar PV,5,,Category 1,"Kohler, Sheboygan County, WI",Substation 650,Circuit 1784,In service,7/10/2018,Permission to Operate,9/7/2018 AE-05022,Solar PV,153.2,,Category 2,"Hazel Green, Grant County, WI",Substation 386,Circuit 2180,In service,7/9/2018,Permission to Operate,10/29/2018 AE-05033,Bio Digestor Farm,1062,,Category 4,"Juda, Green County, WI",Substation 15,Circuit 62,In service,7/6/2018,Permission to Operate,10/22/2018 AE-05105,Solar PV,7.6,,Category 1,"Pine River, Waushara County, WI",Substation 281,Circuit 675,In service,7/6/2018,Permission to Operate,10/9/2018 AE-05096,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,7/3/2018,Permission to Operate,8/1/2018 AE-05058,Solar PV,13.6,,Category 1,"Pine River, Waushara County, WI",Substation 281,Circuit 673,In service,7/3/2018,Permission to Operate,9/13/2018 AE-05095,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,7/3/2018,Permission to Operate,8/1/2018 AE-05099,Solar PV,7.6,,Category 1,"Spring Green, Iowa County, WI",Substation 406,Circuit 1007,In service,7/2/2018,Permission to Operate,10/8/2018 AE-05097,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,7/2/2018,Permission to Operate,8/1/2018 AE-05088,Solar PV,7.6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,7/2/2018,Permission to Operate,9/28/2018 AE-05072,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,6/29/2018,Permission to Operate,9/19/2018 AE-05073,Solar PV,3.8,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,6/29/2018,Permission to Operate,9/4/2018 AE-05069,Solar PV,11.4,,Category 1,"Richland Center, Richland County, WI",Substation 572,Circuit 1505,In service,6/28/2018,Permission to Operate,8/8/2018 AE-05064,Solar PV,7,,Category 1,"Blue Mounds, Iowa County, WI",Substation 483,Circuit 1211,In service,6/27/2018,Permission to Operate,9/28/2018 AE-05059,Solar PV,5,,Category 1,"Richland Center, Richland County, WI",Substation 572,Circuit 1505,In service,6/25/2018,Permission to Operate,7/17/2018 AE-05063,Solar PV,6,,Category 1,"Reedsburg, Sauk County, WI",Substation 216,Circuit 507,In service,6/25/2018,Permission to Operate,8/10/2018 AE-05068,Solar PV,6,,Category 1,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1685,In service,6/22/2018,Permission to Operate,9/19/2018 AE-05036,Solar PV,12,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 95,In service,6/22/2018,Permission to Operate,7/5/2018 AE-05071,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,6/21/2018,Permission to Operate,9/7/2018 AE-05045,Solar PV,11.4,,Category 1,"Baraboo, Sauk County, WI",Substation 216,Circuit 507,In service,6/21/2018,Permission to Operate,8/6/2018 AE-05050,Solar PV,6,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 61,In service,6/20/2018,Permission to Operate,3/14/2019 AE-05003,Solar PV,3.8,,Category 1,"New Lisbon, Juneau County, WI",Substation 344,Circuit 824,In service,6/15/2018,Permission to Operate,10/2/2018 AE-05039,Solar PV,3.8,,Category 1,"Arlington, Columbia County, WI",Substation 13,Circuit 52,In service,6/15/2018,Permission to Operate,10/16/2018 AE-05017,Solar PV,7.6,,Category 1,"Mazomanie, Dane County, WI",,Circuit 496,In service,6/14/2018,Permission to Operate,8/13/2018 AE-05028,Solar PV,10,,Category 1,"Browntown, Green County, WI",Substation 95,Circuit 2164,In service,6/14/2018,Permission to Operate,9/12/2018 AE-05024,Solar PV,20,,Category 1,"Hazel Green, Grant County, WI",Substation 386,Circuit 2180,In service,6/13/2018,Permission to Operate,9/10/2018 AE-05020,Solar PV,20,,Category 1,"Sinsinawa, Grant County, WI",Substation 386,Circuit 2180,In service,6/13/2018,Permission to Operate,9/27/2018 AE-04800,Solar PV,5.45,,Category 1,"Tomah, Monroe County, WI",,Circuit 2113,In service,6/12/2018,Permission to Operate,8/2/2018 AE-05015,Solar PV,7.6,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,6/11/2018,Permission to Operate,8/13/2018 AE-04910,Solar PV,90,,Category 2,"Gays Mills, Crawford County, WI",Substation 288,Circuit 696,In service,6/4/2018,Permission to Operate,8/27/2018 AE-04999,Solar PV,3.8,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,6/1/2018,Permission to Operate,7/18/2018 AE-04991,Solar PV,5,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1653,In service,5/31/2018,Permission to Operate,7/24/2018 AE-04863,Solar PV,399.6,233,Category 3,"Baraboo, Sauk County, WI",Substation 659,Circuit 1805,In service,5/31/2018,Permission to Operate,1/31/2019 AE-04948,Solar PV,7.7,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 135,In service,5/23/2018,Permission to Operate,5/6/2019 AE-04971,Solar PV,6,,Category 1,"Blue River, Richland County, WI",Substation 100,Circuit 261,In service,5/23/2018,Permission to Operate,6/22/2018 AE-04974,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,5/22/2018,Permission to Operate,8/1/2018 AE-04979,Solar PV,20,,Category 1,"Cuba City, Lafayette County, WI",Substation 248,Circuit 595,In service,5/22/2018,Permission to Operate,6/14/2018 AE-04975,Solar PV,7.6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,5/22/2018,Permission to Operate,6/21/2018 AE-04968,Solar PV,12,,Category 1,"Blanchardville, Lafayette County, WI",Substation 77,Circuit 192,In service,5/22/2018,Permission to Operate,8/2/2018 AE-04973,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,5/22/2018,Permission to Operate,8/1/2018 AE-04972,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,5/22/2018,Permission to Operate,8/1/2018 AE-04934,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,5/9/2018,Permission to Operate,5/31/2018 AE-04933,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,5/7/2018,Permission to Operate,9/19/2018 AE-04882,Solar PV,11.4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,5/1/2018,Permission to Operate,6/29/2018 AE-04890,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/26/2018,Permission to Operate,8/1/2018 AE-04875,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1459,In service,4/26/2018,Permission to Operate,5/23/2018 AE-04889,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/26/2018,Permission to Operate,8/1/2018 AE-04887,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/26/2018,Permission to Operate,8/1/2018 AE-04891,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/26/2018,Permission to Operate,8/1/2018 AE-04888,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/26/2018,Permission to Operate,8/1/2018 AE-04893,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/25/2018,Permission to Operate,8/1/2018 AE-04892,Solar PV,3.8,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/25/2018,Permission to Operate,8/1/2018 AE-04876,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 898,In service,4/18/2018,Permission to Operate,6/27/2018 AE-04860,Solar PV,2.5,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/16/2018,Permission to Operate,8/1/2018 AE-04859,Solar PV,2.5,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/16/2018,Permission to Operate,8/1/2018 AE-04858,Solar PV,2.5,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/13/2018,Permission to Operate,8/1/2018 AE-04853,Solar PV,2.5,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/13/2018,Permission to Operate,8/1/2018 AE-04854,Solar PV,2.5,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/13/2018,Permission to Operate,8/1/2018 AE-04852,Solar PV,2.5,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/13/2018,Permission to Operate,8/1/2018 AE-04856,Solar PV,2.5,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/13/2018,Permission to Operate,8/1/2018 AE-04855,Solar PV,2.5,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/13/2018,Permission to Operate,8/1/2018 AE-04857,Solar PV,2.5,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,4/13/2018,Permission to Operate,8/1/2018 AE-04834,Solar PV,366.3,133,Category 3,"Platteville, Grant County, WI",Substation 343,Circuit 819,In service,4/11/2018,Permission to Operate,1/31/2019 AE-04663,Solar PV,10,,Category 1,"Delevan, Walworth County, WI",,Circuit 2065,In service,4/11/2018,Permission to Operate,6/21/2018 AE-04826,Solar PV,73.3,,Category 2,"Middleton, Dane County, WI",Substation 579,Circuit 1525,In service,4/10/2018,Permission to Operate,6/4/2018 AE-04827,Solar PV,7.7,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,4/6/2018,Permission to Operate,1/8/2019 AE-04802,Solar PV,10,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,In service,4/6/2018,Permission to Operate,5/25/2018 AE-04830,Solar PV,6,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 581,In service,4/2/2018,Permission to Operate,9/4/2018 AE-04794,Solar PV,4.93,,Category 1,"Lancaster, Grant County, WI",Substation 398,Circuit 989,In service,3/28/2018,Permission to Operate,7/16/2018 AE-04798,Solar PV,9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 625,In service,3/22/2018,Permission to Operate,4/24/2018 AE-04793,Solar PV,5,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 433,Circuit 1100,In service,3/20/2018,Permission to Operate,4/3/2018 AE-04778,Solar PV,3,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 519,In service,3/12/2018,Permission to Operate,4/18/2018 AE-04777,Solar PV,7.6,,Category 1,"Janesville , Rock County, WI",Substation 593,Circuit 1582,In service,3/8/2018,Permission to Operate,5/17/2018 AE-04668,Solar PV,10,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1003,In service,2/27/2018,Permission to Operate,5/31/2018 AE-04722,Solar PV,3.8,,Category 1,"Custer, Portage County, WI",Substation 41,Circuit 2243,In service,2/22/2018,Permission to Operate,7/2/2018 AE-04750,Solar PV,20,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 696,In service,2/22/2018,Permission to Operate,5/31/2018 AE-04745,Solar PV,6,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 695,In service,2/20/2018,Permission to Operate,4/17/2018 AE-04734,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,2/13/2018,Permission to Operate,5/22/2018 AE-04716,Solar PV,10,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,2/13/2018,Permission to Operate,4/26/2018 AE-04733,Solar PV,7.7,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1006,In service,2/12/2018,Permission to Operate,4/5/2018 AE-04697,Solar PV,33.3,,Category 3,"Platteville, Grant County, WI",Substation 343,Circuit 819,In service,2/1/2018,Permission to Operate,1/28/2019 AE-04715,Solar PV,15.2,,Category 1,"Birnamwood, Shawano County, WI",Substation 74,Circuit 180,In service,2/1/2018,Permission to Operate,7/2/2018 AE-04714,Solar PV,5,,Category 1,"Birnamwood, Shawano County, WI",Substation 74,Circuit 180,In service,2/1/2018,Permission to Operate,6/6/2018 AE-04711,Solar PV,18.2,,Category 1,"Highland, Iowa County, WI",Substation 45,Circuit 129,In service,1/29/2018,Permission to Operate,6/28/2018 AE-04699,Solar PV,3.8,,Category 1,"Sharon, Walworth County, WI",Substation 648,Circuit 1781,In service,1/29/2018,Permission to Operate,3/14/2018 AE-04710,Solar PV,6,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,1/29/2018,Permission to Operate,2/8/2018 AE-04701,Solar PV,10,,Category 1,"Deforest, Dane County, WI",,Circuit 472,In service,1/26/2018,Permission to Operate,5/10/2018 AE-04706,Solar PV,7.7,,Category 1,"Cross Plains, Dane County, WI",Substation 686,Circuit 1895,In service,1/25/2018,Permission to Operate,4/27/2018 AE-04696,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1209,In service,1/19/2018,Permission to Operate,3/28/2018 AE-04679,Solar PV,15.2,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1009,In service,1/16/2018,Permission to Operate,5/9/2018 AE-04630,Solar PV,1,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 581,In service,1/16/2018,Permission to Operate,1/24/2019 AE-04684,Solar PV,7.6,,Category 1,"Stoughton, Dane County, WI",,Circuit 972,In service,1/15/2018,Permission to Operate,1/24/2018 AE-04650,Solar PV,15.2,,Category 1,"Reedsburg, Sauk County, WI",Substation 216,Circuit 507,In service,12/19/2017,Permission to Operate,3/6/2018 AE-04651,Solar PV,5.9,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 462,In service,12/18/2017,Permission to Operate,1/10/2018 AE-04648,Solar PV,6,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 429,Circuit 1065,In service,12/11/2017,Permission to Operate,3/5/2018 AE-04638,Solar PV,3.8,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,In service,12/7/2017,Permission to Operate,1/2/2018 AE-04646,Solar PV,5,,Category 1,"Livingston, Grant County, WI",Substation 241,Circuit 582,In service,12/7/2017,Permission to Operate,12/21/2017 AE-04616,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/4/2017,Permission to Operate,3/28/2018 AE-04628,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/4/2017,Permission to Operate,3/28/2018 AE-04615,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/4/2017,Permission to Operate,3/28/2018 AE-04632,Solar PV,2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/4/2017,Permission to Operate,3/28/2018 AE-04625,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/4/2017,Permission to Operate,3/28/2018 AE-04631,Solar PV,2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/4/2017,Permission to Operate,3/28/2018 AE-04627,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/4/2017,Permission to Operate,3/28/2018 AE-04633,Solar PV,3.1,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/4/2017,Permission to Operate,3/28/2018 AE-04617,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/4/2017,Permission to Operate,3/28/2018 AE-04619,Solar PV,6,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2243,In service,12/1/2017,Permission to Operate,2/16/2018 AE-04613,Solar PV,2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/1/2017,Permission to Operate,3/28/2018 AE-04611,Solar PV,2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/1/2017,Permission to Operate,3/28/2018 AE-04614,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/1/2017,Permission to Operate,3/28/2018 AE-04609,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/1/2017,Permission to Operate,3/28/2018 AE-04634,Solar PV,1.5,,Category 1,"Verona , Dane County, WI",Substation 722,Circuit 1970,In service,12/1/2017,Permission to Operate,3/28/2018 AE-04612,Solar PV,2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/1/2017,Permission to Operate,3/28/2018 AE-04610,Solar PV,2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/1/2017,Permission to Operate,3/28/2018 AE-04635,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,12/1/2017,Permission to Operate,3/28/2018 AE-04618,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,11/30/2017,Permission to Operate,3/28/2018 AE-04624,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,11/30/2017,Permission to Operate,3/28/2018 AE-04620,Solar PV,2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,11/30/2017,Permission to Operate,3/28/2018 AE-04623,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,11/30/2017,Permission to Operate,3/28/2018 AE-04621,Solar PV,2,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,11/30/2017,Permission to Operate,3/28/2018 AE-04622,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,11/30/2017,Permission to Operate,3/28/2018 AE-04626,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,11/30/2017,Permission to Operate,3/28/2018 AE-04629,Solar PV,1.5,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,11/30/2017,Permission to Operate,3/28/2018 AE-04607,Solar PV,2,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,11/28/2017,Permission to Operate,1/16/2018 AE-04604,Solar PV,7.68,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 623,In service,11/27/2017,Permission to Operate,1/10/2018 AE-04601,Solar PV,3,,Category 1,"Avoca, Iowa County, WI",Substation 45,Circuit 128,In service,11/27/2017,Permission to Operate,12/27/2017 AE-04602,Solar PV,1.5,,Category 1,"Dickeyville, Grant County, WI",Substation 386,Circuit 2179,In service,11/22/2017,Permission to Operate,1/10/2018 AE-04589,Solar PV,2,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,11/21/2017,Permission to Operate,1/16/2018 AE-04588,Solar PV,2,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,11/21/2017,Permission to Operate,1/16/2018 AE-04583,Solar PV,2,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,11/21/2017,Permission to Operate,1/16/2018 AE-04591,Solar PV,1.5,,Category 1,"Deforest , Dane County, WI",,Circuit 478,In service,11/21/2017,Permission to Operate,1/16/2018 AE-04592,Solar PV,2.5,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,11/21/2017,Permission to Operate,1/16/2018 AE-04590,Solar PV,1.5,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,11/21/2017,Permission to Operate,1/16/2018 AE-04593,Solar PV,1.5,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,11/21/2017,Permission to Operate,1/16/2018 AE-04600,Solar PV,10,,Category 1,"Marshfield, Marathon County, WI",Substation 626,Circuit 1690,In service,11/21/2017,Permission to Operate,12/22/2017 AE-04594,Solar PV,1.5,,Category 1,"Deforest, Dane County, WI",,Circuit 478,In service,11/21/2017,Permission to Operate,1/16/2018 AE-04564,Solar PV,133,,Category 2,"Oregon, Dane County, WI",,,In service,11/13/2017,Permission to Operate,12/19/2017 AE-04577,Solar PV,6,,Category 1,"Amherst Jct, Portage County, WI",Substation 30,Circuit 82,In service,11/10/2017,Permission to Operate,12/15/2017 AE-04114,Solar PV,2.85,,Category 1,"Almond, , Portage County, WI",Substation 575,Circuit 1511,In service,11/10/2017,Permission to Operate,5/16/2018 AE-04565,Solar PV,6,,Category 1,"Deerfield, Dane County, WI",Substation 147,Circuit 394,In service,11/9/2017,Permission to Operate,12/5/2017 AE-04559,Solar PV,14,,Category 1,"Brooklyn, Green County, WI",Substation 15,Circuit 61,In service,11/8/2017,Permission to Operate,12/12/2017 AE-04567,Solar PV,9,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 81,In service,11/8/2017,Permission to Operate,11/16/2017 AE-04555,Solar PV,7.7,,Category 1,"Genoa City, Walworth County, WI",Substation 375,Circuit 925,In service,11/6/2017,Permission to Operate,1/8/2018 AE-04409,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,11/3/2017,Permission to Operate,11/13/2017 AE-04550,Solar PV,7.6,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 79,In service,11/1/2017,Permission to Operate,12/21/2017 AE-04544,Solar PV,7.6,,Category 1,"Stoughton, Dane County, WI",,Circuit 972,In service,10/31/2017,Permission to Operate,1/24/2018 AE-04526,Solar PV,5,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,10/27/2017,Permission to Operate,12/7/2017 AE-04525,Solar PV,20,,Category 1,"Rewet, Iowa County, WI",Substation 601,Circuit 1620,In service,10/27/2017,Permission to Operate,12/21/2017 AE-04465,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 519,In service,10/26/2017,Permission to Operate,12/21/2017 AE-04532,Solar PV,8.2,,Category 1,"Lake Geneva, Walworth County, WI",Substation 660,Circuit 1809,In service,10/26/2017,Permission to Operate,5/7/2018 AE-04434,Solar PV,7.7,,Category 1,"Rudolph, Wood County, WI",Substation 630,Circuit 1714,In service,10/26/2017,Permission to Operate,12/22/2017 AE-04478,Solar PV,16,,Category 1,"Fitchburg, Dane County, WI",,Circuit 1881,In service,10/26/2017,Permission to Operate,12/8/2017 AE-04524,Solar PV,6,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 96,In service,10/25/2017,Permission to Operate,12/12/2017 AE-04523,Solar PV,4.4,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1815,In service,10/25/2017,Permission to Operate,1/18/2018 AE-04508,Solar PV,2.5,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 394,In service,10/24/2017,Permission to Operate,1/8/2018 AE-04503,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,10/20/2017,Permission to Operate,12/22/2017 AE-04481,Solar PV,3,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2138,In service,10/20/2017,Permission to Operate,4/13/2018 AE-04509,Solar PV,3,,Category 1,"Avoca, Iowa County, WI",Substation 45,Circuit 128,In service,10/20/2017,Permission to Operate,1/3/2018 AE-04484,Solar PV,10.6,,Category 1,"Spring Green, Iowa County, WI",Substation 783,Circuit 2138,In service,10/19/2017,Permission to Operate,12/1/2017 AE-04433,Solar PV,7.6,,Category 1,"Norwalk, Monroe County, WI",Substation 217,Circuit 514,In service,10/16/2017,Permission to Operate,12/12/2017 AE-04452,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1009,In service,10/13/2017,Permission to Operate,2/5/2018 AE-04425,Solar PV,6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,10/10/2017,Permission to Operate,10/27/2017 AE-04411,Solar PV,7.6,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,In service,10/6/2017,Permission to Operate,12/27/2017 AE-04365,Solar PV,18.48,,Category 1,"Lone Rock, Richland County, WI",,Circuit 1056,In service,10/5/2017,Permission to Operate,3/1/2018 AE-04398,Solar PV,3.8,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 862,In service,10/4/2017,Permission to Operate,12/12/2017 AE-04389,Solar PV,19,,Category 1,"Cuba City, Grant County, WI",Substation 248,Circuit 595,In service,10/3/2017,Permission to Operate,11/9/2017 AE-04368,Solar PV,3,,Category 1,"Dodgeville, Iowa County, WI",Substation 525,Circuit 1342,In service,10/2/2017,Permission to Operate,12/1/2017 AE-04370,Solar PV,5,,Category 1,"Rideway, Iowa County, WI",Substation 37,Circuit 94,In service,10/2/2017,Permission to Operate,12/14/2017 AE-04355,Solar PV,5.22,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1168,In service,9/29/2017,Permission to Operate,11/15/2017 AE-04356,Solar PV,7.6,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 584,In service,9/29/2017,Permission to Operate,12/5/2017 AE-04358,Solar PV,7.6,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1009,In service,9/29/2017,Permission to Operate,12/5/2017 AE-04362,Solar PV,6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,9/27/2017,Permission to Operate,12/15/2017 AE-04357,Solar PV,10,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,9/27/2017,Permission to Operate,11/16/2017 AE-04351,Solar PV,7.7,,Category 1,"Almond, Portage County, WI",Substation 771,Circuit 2085,In service,9/25/2017,Permission to Operate,1/15/2018 AE-04339,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",Substation 783,Circuit 2138,In service,9/22/2017,Permission to Operate,12/13/2017 AE-04331,Solar PV,6,,Category 1,"Rudolph, Wood County, WI",Substation 630,Circuit 1714,In service,9/22/2017,Permission to Operate,11/20/2017 AE-04345,Solar PV,3,,Category 1,"Wittenburg, Shawano County, WI",,Circuit 834,In service,9/21/2017,Permission to Operate,11/6/2017 AE-04346,"Solar PV, Battery/Storage",4,,Category 1,"Berlin, Green Lake County, WI",,Circuit 171,In service,9/21/2017,Permission to Operate,11/9/2017 AE-04329,Solar PV,7.6,,Category 1,"Evansville, Rock County, WI",Substation 629,Circuit 1710,In service,9/19/2017,Permission to Operate,10/3/2017 AE-04326,Solar PV,11.4,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,9/18/2017,Permission to Operate,12/19/2017 AE-04274,Solar PV,5,,Category 1,"Mount Horeb, Dane County, WI",Substation 483,Circuit 1210,In service,9/14/2017,Permission to Operate,10/20/2017 AE-04316,Solar PV,11.4,,Category 1,"Montfort, Iowa County, WI",Substation 241,Circuit 583,In service,9/14/2017,Permission to Operate,12/4/2017 AE-04315,Solar PV,3.8,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 862,In service,9/14/2017,Permission to Operate,10/19/2017 AE-04311,Solar PV,20,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,9/13/2017,Permission to Operate,12/13/2017 AE-04317,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 518,In service,9/13/2017,Permission to Operate,11/7/2017 AE-04211,Solar PV,11.4,,Category 1,"Cuba City, Lafayette County, WI",Substation 248,Circuit 595,In service,9/11/2017,Permission to Operate,12/13/2017 AE-04283,Solar PV,5,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 96,In service,9/1/2017,Permission to Operate,11/6/2017 AE-04272,Solar PV,14.4,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 861,In service,8/29/2017,Permission to Operate,11/1/2017 AE-04271,Solar PV,7,,Category 1,"Auburndale, Wood County, WI",Substation 43,Circuit 119,In service,8/24/2017,Permission to Operate,10/13/2017 AE-04233,Solar PV,12,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,In service,8/23/2017,Permission to Operate,9/27/2017 AE-04252,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,8/22/2017,Permission to Operate,9/6/2017 AE-04259,Solar PV,10.4,,Category 1,"Brooklyn, Rock County, WI",Substation 108,Circuit 302,In service,8/22/2017,Permission to Operate,11/20/2017 AE-04222,Solar PV,3,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 519,In service,8/21/2017,Permission to Operate,10/25/2017 AE-04264,Solar PV,7.6,,Category 1,"Ripon , Winnebago County, WI",,Circuit 170,In service,8/21/2017,Permission to Operate,9/27/2017 AE-04249,Solar PV,7.6,,Category 1,"Platteville, Grant County, WI",Substation 601,Circuit 1621,In service,8/16/2017,Permission to Operate,11/3/2017 AE-04250,Solar PV,5,,Category 1,"Cassville, Grant County, WI",Substation 517,Circuit 1324,In service,8/15/2017,Permission to Operate,10/18/2017 AE-04242,Solar PV,15,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 695,In service,8/15/2017,Permission to Operate,10/10/2017 AE-04214,Solar PV,15.2,,Category 1,"Cuba City, Lafayette County, WI",Substation 248,Circuit 595,In service,8/10/2017,Permission to Operate,12/21/2017 AE-04219,Solar PV,4.4,,Category 1,"Omro, Winnebago County, WI",Substation 550,Circuit 1450,In service,8/9/2017,Permission to Operate,8/31/2017 AE-04181,Solar PV,15,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,8/9/2017,Permission to Operate,10/5/2017 AE-04235,Solar PV,20,,Category 1,"Marshfield, Marathon County, WI",Substation 626,Circuit 1690,In service,8/9/2017,Permission to Operate,9/28/2017 AE-04207,Solar PV,7.7,,Category 1,"Amherst, Portage County, WI",Substation 651,Circuit 1787,In service,8/7/2017,Permission to Operate,9/13/2017 AE-04216,Solar PV,7.6,,Category 1,"Blue Mounds, Iowa County, WI",,Circuit 221,In service,8/7/2017,Permission to Operate,9/21/2017 AE-04221,Solar PV,5,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2242,In service,8/7/2017,Permission to Operate,11/3/2017 AE-04223,Solar PV,3.8,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 519,In service,8/7/2017,Permission to Operate,10/3/2017 AE-04171,Solar PV,16.4,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1521,In service,8/4/2017,Permission to Operate,12/13/2017 AE-04209,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,8/2/2017,Permission to Operate,9/20/2017 AE-04202,Solar PV,11.2,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,8/1/2017,Permission to Operate,8/31/2017 AE-04204,Solar PV,7.6,,Category 1,"Cross Plains, Dane County, WI",Substation 686,Circuit 1894,In service,8/1/2017,Permission to Operate,8/25/2017 AE-04197,Solar PV,120,,Category 2,"Delavan, Walworth County, WI",Substation 207,Circuit 485,In service,7/31/2017,Permission to Operate,10/30/2017 AE-04188,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,7/28/2017,Permission to Operate,8/21/2017 AE-04187,Solar PV,5,,Category 1,"Arena, Grant County, WI",Substation 37,Circuit 96,In service,7/26/2017,Permission to Operate,8/31/2017 AE-04198,Solar PV,3,,Category 1,"Avoca, Iowa County, WI",Substation 45,Circuit 128,In service,7/26/2017,Permission to Operate,9/12/2017 AE-04179,Solar PV,10,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 96,In service,7/25/2017,Permission to Operate,8/31/2017 AE-04186,Solar PV,3.8,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2173,In service,7/24/2017,Permission to Operate,8/25/2017 AE-04178,Solar PV,6,,Category 1,"Baraboo, Sauk County, WI",Substation 418,Circuit 1039,In service,7/24/2017,Permission to Operate,8/31/2017 AE-04176,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,7/18/2017,Permission to Operate,8/21/2017 AE-04170,Solar PV,3.8,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,7/17/2017,Permission to Operate,8/15/2017 AE-04174,Solar PV,7.68,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1973,In service,7/17/2017,Permission to Operate,8/16/2017 AE-04145,Solar PV,130,,Category 2,"Madison, Dane County, WI",Substation 31,Circuit 85,In service,7/11/2017,Permission to Operate,10/5/2017 AE-04165,Solar PV,4.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,7/11/2017,Permission to Operate,8/21/2017 AE-04106,Solar PV,86.4,,Category 2,"Necedah, Juneau County, WI",Substation 516,Circuit 1323,In service,7/10/2017,Permission to Operate,7/20/2017 AE-04153,Solar PV,7.6,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 584,In service,7/10/2017,Permission to Operate,8/2/2017 AE-04154,Solar PV,19.6,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1046,In service,7/7/2017,Permission to Operate,12/14/2017 AE-04156,Solar PV,12,,Category 1,"Custer, Portage County, WI",Substation 41,Circuit 2243,In service,6/30/2017,Permission to Operate,8/24/2017 AE-04150,Solar PV,7.6,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1184,In service,6/30/2017,Permission to Operate,9/19/2017 AE-04149,Solar PV,10,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,6/28/2017,Permission to Operate,8/23/2017 AE-04147,Solar PV,5,,Category 1,"Black Earth, Dane County, WI",Substation 483,Circuit 1209,In service,6/28/2017,Permission to Operate,7/28/2017 AE-04144,Solar PV,5.1,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,6/28/2017,Permission to Operate,8/1/2017 AE-04141,Solar PV,5,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 838,In service,6/22/2017,Permission to Operate,12/20/2017 AE-04139,Solar PV,7.7,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,6/21/2017,Permission to Operate,7/14/2017 AE-04131,Solar PV,3,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,6/13/2017,Permission to Operate,8/1/2017 AE-04128,Solar PV,10,,Category 1,"Deforest, Dane County, WI",,Circuit 2144,In service,6/6/2017,Permission to Operate,6/9/2017 AE-04122,Solar PV,14,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,6/1/2017,Permission to Operate,6/19/2017 AE-04093,Solar PV,6.72,,Category 1,"Spring Green, Iowa County, WI",Substation 218,Circuit 519,In service,6/1/2017,Permission to Operate,10/9/2017 AE-04081,Solar PV,10,,Category 1,"Lancaster, Grant County, WI",Substation 398,Circuit 989,In service,5/26/2017,Permission to Operate,6/12/2017 AE-04080,Solar PV,7.6,,Category 1,"Lancaster , Grant County, WI",Substation 398,Circuit 989,In service,5/26/2017,Permission to Operate,6/14/2017 AE-03982,Solar PV,192,,Category 2,"Edgerton, Dane County, WI",Substation 657,Circuit 1795,In service,5/22/2017,Permission to Operate,8/9/2017 AE-04087,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,5/22/2017,Permission to Operate,6/12/2017 AE-04099,Solar PV,7.6,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,5/19/2017,Permission to Operate,5/25/2017 AE-04098,Solar PV,6.75,,Category 1,"Dodgeville, Iowa County, WI",Substation 783,Circuit 2138,In service,5/19/2017,Permission to Operate,10/3/2017 AE-04097,Solar PV,7.6,,Category 1,"Gays Mills, Crawford County, WI",Substation 288,Circuit 694,In service,5/18/2017,Permission to Operate,7/11/2017 AE-04088,Solar PV,20,,Category 1,"Bloomington, Grant County, WI",Substation 80,Circuit 210,In service,5/17/2017,Permission to Operate,6/29/2017 AE-04089,Solar PV,19,,Category 1,"Bloomington, Grant County, WI",Substation 80,Circuit 209,In service,5/17/2017,Permission to Operate,6/29/2017 AE-04090,Solar PV,20,,Category 1,"Bloomington, Grant County, WI",Substation 80,Circuit 210,In service,5/17/2017,Permission to Operate,6/29/2017 AE-04092,Solar PV,16.4,,Category 1,"Blanchardville, Iowa County, WI",Substation 77,Circuit 192,In service,5/17/2017,Permission to Operate,8/14/2017 AE-04071,Solar PV,18.48,,Category 1,"Spring Green, Iowa County, WI",Substation 218,Circuit 519,In service,5/11/2017,Permission to Operate,9/27/2017 AE-04067,Solar PV,15,,Category 1,"Almond, Portage County, WI",Substation 575,Circuit 1510,In service,5/3/2017,Permission to Operate,8/7/2017 AE-03847,Solar PV,7.6,,Category 1,"Deerfield, Dane County, WI",Substation 147,Circuit 394,In service,5/3/2017,Permission to Operate,6/9/2017 AE-00190,Solar PV,1020,0,Category 3,"Madison, Dane County, WI",,,In service,4/27/2017,Permission to Operate,12/11/2017 AE-03840,Solar PV,6,,Category 1,"St. Cloud, Fond du Lac County, WI",Substation 391,Circuit 976,In service,4/26/2017,Permission to Operate,6/7/2017 AE-03779,Solar PV,19,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1711,In service,4/26/2017,Permission to Operate,7/24/2017 AE-03820,Solar PV,5,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,4/25/2017,Permission to Operate,6/14/2017 AE-03773,Solar PV,3.8,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 628,Circuit 1697,In service,4/14/2017,Permission to Operate,6/1/2017 AE-03770,Solar PV,17.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,4/13/2017,Permission to Operate,6/16/2017 AE-03767,Solar PV,6,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 2000,In service,4/13/2017,Permission to Operate,6/19/2017 AE-03721,Solar PV,7.6,,Category 1,"Mt Horeb, Dane County, WI",Substation 280,Circuit 671,In service,4/13/2017,Permission to Operate,5/2/2017 AE-03752,Solar PV,7.6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,4/13/2017,Permission to Operate,5/12/2017 AE-03750,Solar PV,5,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,4/11/2017,Permission to Operate,5/12/2017 AE-03729,Solar PV,11.4,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 1999,In service,4/5/2017,Permission to Operate,5/19/2017 AE-03552,Solar PV,120,,Category 2,"Madison, Dane County, WI",Substation 76,Circuit 188,In service,4/5/2017,Permission to Operate,6/1/2017 AE-03727,Solar PV,7.6,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1685,In service,4/4/2017,Permission to Operate,6/2/2017 AE-03720,Solar PV,12,,Category 1,"Blue Mounds, Dane County, WI",,Circuit 222,In service,4/4/2017,Permission to Operate,6/8/2017 AE-03717,Solar PV,6,,Category 1,"Manawa, Waupaca County, WI",Substation 433,Circuit 1098,In service,4/3/2017,Permission to Operate,4/24/2017 AE-03712,Solar PV,2.4,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 535,Circuit 1381,In service,4/3/2017,Permission to Operate,6/2/2017 AE-03540,Solar PV,19,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1186,In service,3/23/2017,Permission to Operate,5/2/2017 AE-03534,Solar PV,7,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,3/23/2017,Permission to Operate,9/5/2017 AE-03520,Solar PV,17.6,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 109,In service,3/22/2017,Permission to Operate,4/10/2017 AE-03524,Solar PV,11.4,,Category 1,"Sheboygan , Sheboygan County, WI",Substation 535,Circuit 1381,In service,3/22/2017,Permission to Operate,5/17/2017 AE-03502,Solar PV,7.8,,Category 1,"Bloomington, Grant County, WI",Substation 80,Circuit 210,In service,3/17/2017,Permission to Operate,4/21/2017 AE-03472,Solar PV,20,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 614,In service,3/14/2017,Permission to Operate,5/10/2017 AE-03477,Solar PV,7.6,,Category 1,"Oregon, Dane County, WI",,Circuit 1455,In service,3/13/2017,Permission to Operate,4/18/2017 AE-03474,Solar PV,9.9,,Category 1,"Fox Lake, Dodge County, WI",Substation 22,Circuit 69,In service,3/13/2017,Permission to Operate,4/19/2018 AE-00405,Solar PV,7.6,,Category 1,"Clintonville, Waupaca County, WI",Substation 494,Circuit 1234,In service,3/6/2017,Permission to Operate,3/21/2017 AE-00417,Solar PV,17.5,,Category 1,"Rudolph, Portage County, WI",Substation 630,Circuit 1714,In service,3/6/2017,Permission to Operate,3/12/2019 AE-00353,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1522,In service,2/16/2017,Permission to Operate,5/17/2017 AE-00340,Solar PV,20,,Category 1,"Columbus, Dane County, WI",,Circuit 2000,In service,2/2/2017,Permission to Operate,6/14/2017 AE-00327,Solar PV,3.8,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,1/18/2017,Permission to Operate,2/3/2017 AE-00323,Solar PV,7.6,,Category 1,"New London, Waupaca County, WI",Substation 433,Circuit 1101,In service,1/16/2017,Permission to Operate,2/17/2017 AE-00315,Solar PV,7.6,,Category 1,"Verona, Dane County, WI",Substation 57,Circuit 152,In service,1/12/2017,Permission to Operate,3/3/2017 AE-00307,Solar PV,9,,Category 1,"Baraboo, Sauk County, WI",Substation 418,Circuit 1038,In service,1/9/2017,Permission to Operate,1/27/2017 AE-00303,Solar PV,11.04,,Category 1,"Stoughton, Dane County, WI",Substation 108,Circuit 302,In service,1/6/2017,Permission to Operate,3/3/2017 AE-00291,Solar PV,20,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 1398,In service,1/5/2017,Permission to Operate,1/30/2017 AE-00289,Solar PV,12,,Category 1,"Marshfield, Wood County, WI",Substation 573,Circuit 1508,In service,12/30/2016,Permission to Operate,2/1/2017 AE-00290,Solar PV,15.2,,Category 1,"Fond du Lac, Fond du Lac County, WI",,Circuit 1398,In service,12/29/2016,Permission to Operate,1/30/2017 AE-00248,Solar PV,2.5,,Category 1,"Nekoosa , Wood County, WI",Substation 584,Circuit 1535,In service,12/23/2016,Permission to Operate,2/6/2017 AE-00259,Solar PV,7.6,,Category 1,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1685,In service,12/15/2016,Permission to Operate,1/11/2017 AE-00244,Solar PV,6.72,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1812,In service,12/12/2016,Permission to Operate,1/30/2017 AE-00250,Solar PV,12.5,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1711,In service,12/12/2016,Permission to Operate,2/9/2017 AE-00224,Solar PV,9,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1209,In service,12/5/2016,Permission to Operate,1/4/2017 AE-00237,Solar PV,3.8,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,12/5/2016,Permission to Operate,1/25/2017 AE-00204,Solar PV,0.9,,Category 1,"Fond du Lac, Fond du Lac County, WI",Substation 256,Circuit 624,In service,11/21/2016,Permission to Operate,12/27/2016 AE-00151,Solar PV,66.6,,Category 2,"Cobb, County, WI",Substation 241,Circuit 584,In service,11/16/2016,Permission to Operate,12/22/2016 AE-00195,Solar PV,7.6,,Category 1,"Edgerton, Rock County, WI",Substation 657,Circuit 1795,In service,11/16/2016,Permission to Operate,11/30/2016 AE-00185,Solar PV,16.4,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 670,In service,11/11/2016,Permission to Operate,1/24/2017 AE-00184,Solar PV,6,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1525,In service,11/10/2016,Permission to Operate,11/17/2016 AE-00159,Solar PV,7.56,,Category 1,"Mineral Point, Iowa County, WI",Substation 525,Circuit 1344,In service,10/28/2016,Permission to Operate,12/28/2016 AE-00164,Solar PV,5.4,,Category 1,"Tomah, Monroe County, WI",,Circuit 388,In service,10/27/2016,Permission to Operate,2/13/2017 AE-00782,Solar PV,10,,Category 1,"Berlin, Green Lake County, WI",,Circuit 455,In service,10/26/2016,Permission to Operate,6/12/2017 AE-00150,Solar PV,14.4,,Category 1,"Cobb, Iowa County, WI",Substation 241,Circuit 584,In service,10/20/2016,Permission to Operate,12/22/2016 AE-00980,Solar PV,8,,Category 1,"Arpin, Wood County, WI",Substation 723,Circuit 1974,In service,10/19/2016,Permission to Operate,12/22/2016 AE-01913,Solar PV,10,,Category 1,"Beloit, Rock County, WI",Substation 214,Circuit 502,In service,10/14/2016,Permission to Operate,9/27/2017 AE-02530,Solar PV,5,,Category 1,"Madison, Dane County, WI",,,In service,10/14/2016,Permission to Operate,11/14/2016 AE-00129,Solar PV,10.8,,Category 1,"Warrens, Monroe County, WI",,Circuit 2112,In service,10/12/2016,Permission to Operate,12/8/2016 AE-02461,Solar PV,6,,Category 1,"Plainfield, Waushara County, WI",Substation 575,Circuit 1512,In service,10/12/2016,Permission to Operate,10/25/2016 AE-00130,Solar PV,1.04,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,10/11/2016,Permission to Operate,12/6/2016 AE-01962,Solar PV,8,,Category 1,"Stevens Point, Portage County, WI",Substation 30,Circuit 82,In service,10/6/2016,Permission to Operate,11/2/2016 AE-01952,Solar PV,8,,Category 1,"Sharon, Walworth County, WI",Substation 648,Circuit 1782,In service,9/29/2016,Permission to Operate,12/27/2016 AE-02005,Solar PV,4,,Category 1,"Janesville, Rock County, WI",Substation 482,Circuit 1199,In service,9/27/2016,Permission to Operate,10/18/2016 AE-00106,Solar PV,10,,Category 1,"Oakfield, Fond du Lac County, WI",Substation 538,Circuit 1418,In service,9/27/2016,Permission to Operate,12/15/2016 AE-00105,Solar PV,10,,Category 1,"Randolph, Sauk County, WI",,Circuit 1593,In service,9/26/2016,Permission to Operate,12/9/2016 AE-02591,Solar PV,8,,Category 1,"Black Earth, Dane County, WI",Substation 483,Circuit 1209,In service,9/22/2016,Permission to Operate,10/12/2016 AE-01877,Solar PV,3.8,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 390,In service,9/15/2016,Permission to Operate,5/23/2017 AE-03255,Solar PV,8,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1433,In service,9/12/2016,Permission to Operate,10/31/2016 AE-00653,Solar PV,6,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,9/12/2016,Permission to Operate,9/22/2016 AE-02806,Solar PV,18,,Category 1,"Almond, Portage County, WI",Substation 771,Circuit 2086,In service,9/8/2016,Permission to Operate,12/30/2016 AE-00086,Solar PV,7.68,,Category 1,"Madison, County, WI",Substation 119,Circuit 328,In service,9/2/2016,Permission to Operate,10/20/2016 AE-01061,Solar PV,6,,Category 1,"Rosholt, Portage County, WI",Substation 624,Circuit 1689,In service,9/1/2016,Permission to Operate,11/29/2016 AE-00634,Solar PV,8,,Category 1,"Waunakee, Dane County, WI",,Circuit 2142,In service,8/31/2016,Permission to Operate,10/10/2016 AE-03358,Solar PV,6,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,8/30/2016,Permission to Operate,10/12/2016 AE-03179,Solar PV,6,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 1358,In service,8/29/2016,Permission to Operate,10/2/2017 AE-02132,Solar PV,6,,Category 1,"Cambria, Columbia County, WI",,Circuit 2168,In service,8/26/2016,Permission to Operate,9/14/2016 AE-01239,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 579,Circuit 1521,In service,8/25/2016,Permission to Operate,10/4/2016 AE-02821,Solar PV,5,,Category 1,"Beaver Dam, Dodge County, WI",Substation 278,Circuit 663,In service,8/19/2016,Permission to Operate,1/31/2017 AE-02460,Solar PV,4,,Category 1,"Wild Rose, Waushara County, WI",Substation 771,Circuit 2086,In service,8/18/2016,Permission to Operate,11/9/2016 AE-01004,Solar PV,8,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,8/18/2016,Permission to Operate,8/26/2016 AE-00671,Solar PV,10,,Category 1,"Chili, Wood County, WI",Substation 573,Circuit 1508,In service,8/17/2016,Permission to Operate,11/29/2016 AE-00711,Solar PV,18,,Category 1,"Bloomington, Grant County, WI",Substation 80,Circuit 208,In service,8/11/2016,Permission to Operate,9/16/2016 AE-02417,Solar PV,7,,Category 1,"Howards Grove, Sheboygan County, WI",Substation 346,Circuit 833,In service,8/11/2016,Permission to Operate,9/14/2016 AE-01181,Solar PV,7,,Category 1,"Omro, Winnebago County, WI",Substation 549,Circuit 1446,In service,8/10/2016,Permission to Operate,11/2/2016 AE-03198,Solar PV,3,,Category 1,"Portage, Columbia County, WI",Substation 585,Circuit 1541,In service,8/10/2016,Permission to Operate,9/16/2016 AE-03178,Solar PV,4,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 429,Circuit 1066,In service,8/9/2016,Permission to Operate,9/13/2016 AE-01267,Solar PV,4,,Category 1,"Prairie Du Sac, Columbia County, WI",,Circuit 493,In service,8/4/2016,Permission to Operate,9/27/2016 AE-01024,Solar PV,3,,Category 1,"Highland, Iowa County, WI",Substation 45,Circuit 129,In service,8/3/2016,Permission to Operate,12/5/2016 AE-01926,Solar PV,10,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1733,In service,8/3/2016,Permission to Operate,9/2/2016 AE-00955,Solar PV,4,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1006,In service,7/26/2016,Permission to Operate,11/2/2016 AE-03001,Solar PV,10,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1006,In service,7/26/2016,Permission to Operate,11/2/2016 AE-00739,Solar PV,7.56,,Category 1,"Brooklyn, Green County, WI",Substation 108,Circuit 303,In service,7/25/2016,Permission to Operate,8/24/2016 AE-01275,Solar PV,8,,Category 1,"Dodgeville, Iowa County, WI",,Circuit 1183,In service,7/21/2016,Permission to Operate,8/22/2016 AE-02927,Solar PV,4,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,7/15/2016,Permission to Operate,8/9/2016 AE-02556,Solar PV,6,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,7/15/2016,Permission to Operate,7/24/2009 AE-03337,Solar PV,3.8,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 91,Circuit 248,In service,7/15/2016,Permission to Operate,10/19/2016 AE-01705,Solar PV,15.2,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,In service,7/14/2016,Permission to Operate,7/28/2016 AE-02168,Solar PV,16,,Category 1,"North Freedom, Sauk County, WI",Substation 710,Circuit 1947,In service,7/8/2016,Permission to Operate,8/19/2016 AE-01915,Solar PV,4,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,7/6/2016,Permission to Operate,8/25/2014 AE-02446,Solar PV,4,,Category 1,"Portage, Columbia County, WI",Substation 326,Circuit 778,In service,7/6/2016,Permission to Operate,9/7/2016 AE-01257,Solar PV,16.72,,Category 1,"Livingston, Iowa County, WI",Substation 601,Circuit 1620,In service,6/30/2016,Permission to Operate,9/6/2016 AE-00700,Solar PV,15.6,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 583,In service,6/28/2016,Permission to Operate,7/17/2018 AE-02287,Solar PV,8,,Category 1,"Reedsburg, Sauk County, WI",Substation 216,Circuit 507,In service,6/24/2016,Permission to Operate,9/1/2016 AE-02101,Solar PV,1,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,6/24/2016,Permission to Operate,8/19/2016 AE-02297,Solar PV,15,,Category 1,"Burnett, Dodge County, WI",,Circuit 809,In service,6/17/2016,Permission to Operate,7/7/2016 AE-02524,Solar PV,7,,Category 1,"Neshkoro, Waushara County, WI",Substation 599,Circuit 1614,In service,6/15/2016,Permission to Operate,7/26/2016 AE-03348,Solar PV,42,,Category 2,"Cuba City, Grant County, WI",Substation 67,Circuit 164,In service,6/8/2016,Permission to Operate,7/20/2016 AE-03037,Solar PV,4,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1970,In service,6/7/2016,Permission to Operate,6/24/2016 AE-03103,Solar PV,10,,Category 1,"Janesville, County, WI",Substation 378,Circuit 932,In service,6/7/2016,Permission to Operate,9/12/2016 AE-02699,Solar PV,13,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 433,Circuit 1100,In service,6/3/2016,Permission to Operate,8/18/2016 AE-02404,Solar PV,10,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,5/20/2016,Permission to Operate,6/23/2016 AE-02303,Solar PV,18,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,5/16/2016,Permission to Operate,6/1/2016 AE-03181,Solar PV,8,,Category 1,"Ripon, Winnebago County, WI",,Circuit 170,In service,5/5/2016,Permission to Operate,2/27/2017 AE-00441,Solar PV,12,,Category 1,"Ripon, Adams County, WI",,Circuit 170,In service,5/5/2016,Permission to Operate,1/10/2017 AE-01254,Solar PV,3,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,5/5/2016,Permission to Operate,6/16/2016 AE-01922,Solar PV,7.6,,Category 1,"Edgerton, Rock County, WI",Substation 196,Circuit 451,In service,5/4/2016,Permission to Operate,5/16/2016 AE-04390,"Solar PV, Battery/Storage",206.1,,Category 4,"Madison, Dane County, WI",Substation 31,Circuit 85,In service,5/3/2016,Permission to Operate,5/3/2016 AE-04949,Solar PV,81.679,,Category 2,"Madison, Dane County, WI",Substation 31,Circuit 85,In service,5/3/2016,Permission to Operate,5/3/2016 AE-02440,Solar PV,6,,Category 1,"Pine River, Waushara County, WI",Substation 281,Circuit 673,In service,5/2/2016,Permission to Operate,7/6/2016 AE-00638,Solar PV,10,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 886,In service,5/2/2016,Permission to Operate,6/24/2016 AE-01192,Solar PV,8.2,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 318,In service,4/25/2016,Permission to Operate,6/16/2016 AE-03414,Solar PV,10,,Category 1,"Arpin, Wood County, WI",Substation 43,Circuit 118,In service,4/25/2016,Permission to Operate,6/8/2016 AE-00436,Solar PV,8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,4/18/2016,Permission to Operate,4/28/2016 AE-01269,Solar PV,4,,Category 1,"Avoca, Iowa County, WI",Substation 45,Circuit 128,In service,4/14/2016,Permission to Operate,5/19/2016 AE-01353,Solar PV,16,,Category 1,"Beaver Dam, Dodge County, WI",Substation 53,Circuit 148,In service,4/8/2016,Permission to Operate,6/8/2016 AE-02729,Solar PV,7.6,,Category 1,"Birnamwood, Marathon County, WI",Substation 74,Circuit 181,In service,4/5/2016,Permission to Operate,4/27/2016 AE-00650,Solar PV,10,,Category 1,"Manawa, Waupaca County, WI",Substation 433,Circuit 1101,In service,3/31/2016,Permission to Operate,5/6/2016 AE-02540,Solar PV,8,,Category 1,"Red Granite, Waushara County, WI",Substation 599,Circuit 1615,In service,3/30/2016,Permission to Operate,5/13/2016 AE-01776,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 593,Circuit 1583,In service,3/23/2016,Permission to Operate,5/26/2016 AE-02896,Solar PV,2,,Category 1,"Ridgeway, Winneshiek County, WI",Substation 357,Circuit 860,In service,3/23/2016,Permission to Operate,4/25/2016 AE-00958,Solar PV,6,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1184,In service,3/23/2016,Permission to Operate,5/13/2016 AE-01276,Solar PV,6,,Category 1,"Amherst, Iowa County, WI",Substation 30,Circuit 81,In service,3/21/2016,Permission to Operate,5/2/2016 AE-02111,Solar PV,8,,Category 1,"Prairie Du Chein, Crawford County, WI",Substation 429,Circuit 1066,In service,3/17/2016,Permission to Operate,6/29/2016 AE-02266,Solar PV,4,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,3/16/2016,Permission to Operate,11/12/2013 AE-01156,Solar PV,10,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,3/15/2016,Permission to Operate,4/20/2016 AE-02098,Solar PV,8,,Category 1,"Prairie Du Sac, Sauk County, WI",Substation 710,Circuit 1948,In service,3/14/2016,Permission to Operate,4/2/2016 AE-01036,Solar PV,5,,Category 1,"Mineral Point, Iowa County, WI",Substation 525,Circuit 1344,In service,3/14/2016,Permission to Operate,4/4/2016 AE-03059,Solar PV,3.15,,Category 1,"Deforest, Adams County, WI",,Circuit 479,In service,3/10/2016,Permission to Operate,10/30/2009 AE-00633,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,3/1/2016,Permission to Operate,4/7/2016 AE-00912,Solar PV,8,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,2/25/2016,Permission to Operate,3/31/2016 AE-01266,Solar PV,6,,Category 1,"Belleville, Dane County, WI",Substation 57,Circuit 151,In service,2/25/2016,Permission to Operate,3/28/2016 AE-02220,Solar PV,8,,Category 1,"Sauk City, Sauk County, WI",Substation 461,Circuit 1130,In service,2/22/2016,Permission to Operate,3/24/2016 AE-02232,Solar PV,8,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,2/9/2016,Permission to Operate,4/26/2016 AE-01298,Solar PV,10,,Category 1,"Hollandale, Iowa County, WI",Substation 525,Circuit 1342,In service,2/8/2016,Permission to Operate,2/22/2016 AE-01023,Solar PV,8.2,,Category 1,"Mineral Point, Iowa County, WI",Substation 59,Circuit 161,In service,2/1/2016,Permission to Operate,2/25/2016 AE-01914,Solar PV,4,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,1/15/2016,Permission to Operate,2/22/2016 AE-02159,Solar PV,11,,Category 1,"Neshkoro, Marquette County, WI",Substation 656,Circuit 1792,In service,1/13/2016,Permission to Operate,5/13/2016 AE-02511,Solar PV,5,,Category 1,"Mt. Horeb, Dane County, WI",Substation 483,Circuit 1209,In service,1/6/2016,Permission to Operate,1/13/2016 AE-02498,Solar PV,36,,Category 2,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,1/4/2016,Permission to Operate,4/7/2016 AE-03163,Solar PV,10,,Category 1,"Oregon, Dane County, WI",,Circuit 1458,In service,1/4/2016,Permission to Operate,3/4/2016 AE-00930,Solar PV,144,,Category 2,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,12/23/2015,Permission to Operate,6/15/2016 AE-00929,Solar PV,48,,Category 2,"Cottage Grove, Dane County, WI",Substation 147,Circuit 393,In service,12/23/2015,Permission to Operate,8/30/2017 AE-00890,Solar PV,20,,Category 1,"Brooklyn, Dane County, WI",Substation 15,Circuit 61,In service,12/8/2015,Permission to Operate,8/3/2017 AE-00755,Solar PV,6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,12/4/2015,Permission to Operate,1/4/2016 AE-01105,Solar PV,3,,Category 1,"Williams Bay, Walworth County, WI",,Circuit 2069,In service,11/24/2015,Permission to Operate,4/7/2016 AE-01929,Solar PV,6,,Category 1,"Hatley, Marathon County, WI",Substation 74,Circuit 179,In service,11/22/2015,Permission to Operate,10/11/2012 AE-01369,Solar PV,68,,Category 2,"Darlington, Lafayette County, WI",,Circuit 1605,In service,11/20/2015,Permission to Operate,1/6/2016 AE-01370,Solar PV,68,,Category 2,"Darlington, Lafayette County, WI",,Circuit 1605,In service,11/20/2015,Permission to Operate,1/6/2016 AE-01372,Solar PV,5,,Category 1,"Benton, Lafayette County, WI",Substation 67,Circuit 165,In service,11/18/2015,Permission to Operate,1/6/2016 AE-00587,Solar PV,5,,Category 1,"Vesper, Wood County, WI",Substation 723,Circuit 1976,In service,11/17/2015,Permission to Operate,12/23/2015 AE-02402,Solar PV,4,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 301,In service,11/16/2015,Permission to Operate,12/30/2015 AE-02432,Solar PV,3,,Category 1,"Hillpoint, Sauk County, WI",,Circuit 1057,In service,11/16/2015,Permission to Operate,12/15/2015 AE-01026,Solar PV,10,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,11/13/2015,Permission to Operate,12/30/2015 AE-02034,Solar PV,10,,Category 1,"Deforest, Dane County, WI",,Circuit 472,In service,11/10/2015,Permission to Operate,12/7/2015 AE-01900,Solar PV,4.73,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 202,In service,11/9/2015,Permission to Operate,12/2/2015 AE-00613,Solar PV,8,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,11/6/2015,Permission to Operate,11/18/2015 AE-00741,Solar PV,8,,Category 1,"Monticello, Green County, WI",Substation 481,Circuit 1190,In service,11/6/2015,Permission to Operate,12/10/2015 AE-01246,Solar PV,5,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 81,In service,11/5/2015,Permission to Operate,12/30/2015 AE-02578,Solar PV,11,,Category 1,"Tomah, Monroe County, WI",,Circuit 2113,In service,11/4/2015,Permission to Operate,12/30/2015 AE-00501,Solar PV,8,,Category 1,"Van Dyne, Fon du Lac County, WI",,Circuit 2158,In service,11/3/2015,Permission to Operate,1/6/2016 AE-01120,Solar PV,5,,Category 1,"Mauston, Juneau County, WI",Substation 344,Circuit 824,In service,11/2/2015,Permission to Operate,12/10/2015 AE-01165,Solar PV,8,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1578,In service,11/2/2015,Permission to Operate,12/4/2015 AE-02333,Solar PV,3,,Category 1,"Loganville, Sauk County, WI",Substation 710,Circuit 1946,In service,10/30/2015,Permission to Operate,10/14/2015 AE-01330,Solar PV,6,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,10/30/2015,Permission to Operate,2/17/2016 AE-00727,Solar PV,50,,Category 2,"Monroe, Green County, WI",Substation 360,Circuit 888,In service,10/29/2015,Permission to Operate,5/16/2016 AE-02408,Solar PV,7,,Category 1,"Wisconsin Dells, Columbia County, WI",Substation 387,Circuit 957,In service,10/22/2015,Permission to Operate,11/30/2015 AE-01733,Solar PV,5,,Category 1,"Tunnel City, Monroe County, WI",Substation 277,Circuit 653,In service,10/19/2015,Permission to Operate,11/13/2015 AE-00496,Solar PV,100,,Category 2,"Beaver Dam, Dodge County, WI",,Circuit 1307,In service,10/13/2015,Permission to Operate,11/23/2015 AE-02222,Solar PV,8,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2242,In service,10/13/2015,Permission to Operate,10/26/2015 AE-02016,Solar PV,3.8,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,10/6/2015,Permission to Operate,10/29/2015 AE-02584,Solar PV,3,,Category 1,"Pittsville, Wood County, WI",Substation 573,Circuit 1506,In service,10/5/2015,Permission to Operate,11/13/2015 AE-02521,Solar PV,8,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 82,In service,10/5/2015,Permission to Operate,10/26/2015 AE-03233,Solar PV,10,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,10/5/2015,Permission to Operate,11/4/2015 AE-02133,Solar PV,5,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1434,In service,10/5/2015,Permission to Operate,11/30/2015 AE-00698,Solar PV,8.8,,Category 1,"Burnett, Dodge County, WI",,Circuit 809,In service,10/2/2015,Permission to Operate,10/29/2015 AE-02008,Non-Bio Diesel,846.4,,Category 3,"Kohler, Sheboygan County, WI",,,In service,9/28/2015,Permission to Operate,11/19/2015 AE-00695,Solar PV,4,,Category 1,"Blanchardsville, Green County, WI",Substation 280,Circuit 672,In service,9/25/2015,Permission to Operate,9/13/2013 AE-01893,Solar PV,2268,,Category 4,"Beloit, Rock County, WI",,Circuit 2176,In service,9/25/2015,Permission to Operate,6/21/2016 AE-01336,Solar PV,4,,Category 1,"Barneveld, Iowa County, WI",Substation 280,Circuit 671,In service,9/24/2015,Permission to Operate,10/13/2015 AE-02497,Solar PV,60,,Category 2,"Oregon, Dane County, WI",,Circuit 1458,In service,9/15/2015,Permission to Operate,10/2/2015 AE-01692,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 722,Circuit 1972,In service,9/8/2015,Permission to Operate,10/8/2015 AE-02817,Solar PV,5,,Category 1,"Mineral Point, Mineral Point County, WI",,Circuit 1184,In service,8/31/2015,Permission to Operate,10/2/2015 AE-01204,Solar PV,8,,Category 1,"Hollandale, Iowa County, WI",Substation 525,Circuit 1342,In service,8/27/2015,Permission to Operate,10/27/2015 AE-01864,Solar PV,6,,Category 1,"Belleville, Dane County, WI",Substation 280,Circuit 670,In service,8/24/2015,Permission to Operate,9/28/2015 AE-01014,Solar PV,6,,Category 1,"Waupun, Dodge County, WI",,Circuit 1279,In service,8/24/2015,Permission to Operate,10/14/2015 AE-03282,Solar PV,6,,Category 1,"Bellleville, Dane County, WI",Substation 57,Circuit 152,In service,8/24/2015,Permission to Operate,9/18/2015 AE-02820,Solar PV,6,,Category 1,"White Lake, Langlade County, WI",Substation 578,Circuit 1516,In service,8/18/2015,Permission to Operate,12/9/2015 AE-00521,Solar PV,6,,Category 1,"Rudolph, Wood County, WI",Substation 630,Circuit 1714,In service,8/10/2015,Permission to Operate,10/26/2015 AE-00982,Non-Bio Diesel,500,,Category 3,"Windsor, Dane County, WI",,Circuit 2143,In service,8/4/2015,Permission to Operate,1/19/2016 AE-01362,Solar PV,16,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 462,In service,8/4/2015,Permission to Operate,10/12/2015 AE-01368,Solar PV,16,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 462,In service,8/4/2015,Permission to Operate,10/12/2015 AE-03273,Solar PV,6,,Category 1,"Pardeeville, Columiba County, WI",Substation 448,Circuit 1115,In service,8/3/2015,Permission to Operate,8/26/2015 AE-00658,Solar PV,1,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1666,In service,8/3/2015,Permission to Operate,9/8/2015 AE-02011,Solar PV,5,,Category 1,"Amherst Junction, Portage County, WI",Substation 364,Circuit 892,In service,7/27/2015,Permission to Operate,9/8/2015 AE-03175,Solar PV,13,,Category 1,"Columbus, Columbia County, WI",Substation 335,Circuit 791,In service,7/23/2015,Permission to Operate,11/30/2015 AE-03174,Solar PV,20,,Category 1,"Platteville, Grant County, WI",Substation 343,Circuit 820,In service,7/21/2015,Permission to Operate,10/8/2015 AE-01376,Solar PV,5,,Category 1,"Darlington, Lafayette County, WI",Substation 59,Circuit 161,In service,7/16/2015,Permission to Operate,8/20/2015 AE-01679,Solar PV,10,,Category 1,"Cottage Grove, Dane County, WI",Substation 147,Circuit 392,In service,7/15/2015,Permission to Operate,10/27/2015 AE-02212,Solar PV,3,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,7/14/2015,Permission to Operate,7/28/2015 AE-02445,Solar PV,5,,Category 1,"Black Earth, Dane County, WI",Substation 483,Circuit 1209,In service,7/9/2015,Permission to Operate,10/1/2015 AE-00456,Solar PV,6,,Category 1,"St. Cloud, Fon du Lac County, WI",Substation 391,Circuit 975,In service,7/7/2015,Permission to Operate,12/22/2015 AE-01940,Solar PV,5,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,7/7/2015,Permission to Operate,10/12/2015 AE-00645,Solar PV,100,,Category 2,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,7/6/2015,Permission to Operate,9/24/2015 AE-02659,Solar PV,10,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 584,Circuit 1536,In service,7/3/2015,Permission to Operate,7/28/2015 AE-01146,Solar PV,18,,Category 1,"Junction City, Portage County, WI",Substation 630,Circuit 1712,In service,7/3/2015,Permission to Operate,9/1/2015 AE-02595,Solar PV,20,,Category 1,"Dekorra, Columbia County, WI",Substation 591,Circuit 1576,In service,6/30/2015,Permission to Operate,10/12/2015 AE-01135,Solar PV,5,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1185,In service,6/29/2015,Permission to Operate,10/13/2015 AE-02089,Solar PV,10,,Category 1,"Monroe, Monroe County, WI",Substation 360,Circuit 889,In service,6/24/2015,Permission to Operate,10/8/2015 AE-00808,Solar PV,118,,Category 2,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,6/22/2015,Permission to Operate,8/19/2015 AE-00873,Solar PV,120,,Category 2,"Fond du Lac, Columbia County, WI",Substation 411,Circuit 1025,In service,6/22/2015,Permission to Operate,9/22/2015 AE-00872,Solar PV,120,,Category 2,"Fond du Lac, Columbia County, WI",Substation 411,Circuit 1025,In service,6/22/2015,Permission to Operate,9/22/2015 AE-02910,Solar PV,8,,Category 1,"Rio, Columbia County, WI",Substation 335,Circuit 791,In service,6/17/2015,Permission to Operate,7/28/2015 AE-02045,Solar PV,10,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1711,In service,6/11/2015,Permission to Operate,11/30/2015 AE-02768,Solar PV,16,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,6/8/2015,Permission to Operate,7/28/2015 AE-01984,Solar PV,2,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 526,Circuit 1347,In service,6/2/2015,Permission to Operate,7/7/2015 AE-00556,Solar PV,8,,Category 1,"Mount Calvary, Fon du Lac County, WI",Substation 411,Circuit 1026,In service,5/29/2015,Permission to Operate,8/19/2015 AE-00498,Solar PV,4,,Category 1,"Fond du Lac, Adams County, WI",Substation 256,Circuit 622,In service,5/29/2015,Permission to Operate,8/21/2015 AE-02470,Solar PV,4,,Category 1,"Prairie Du Chen, Crawford County, WI",Substation 91,Circuit 247,In service,5/22/2015,Permission to Operate,10/5/2015 AE-01759,Solar PV,8,,Category 1,"Edgerton, Rock County, WI",Substation 639,Circuit 1744,In service,5/22/2015,Permission to Operate,6/22/2015 AE-03278,Solar PV,3,,Category 1,"Dickeyville, Grant County, WI",Substation 386,Circuit 2179,In service,5/20/2015,Permission to Operate,7/1/2015 AE-02225,Solar PV,4,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1142,In service,5/13/2015,Permission to Operate,7/28/2015 AE-01892,Solar PV,1,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1043,In service,5/11/2015,Permission to Operate,7/7/2015 AE-02104,Solar PV,20,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,5/8/2015,Permission to Operate,6/23/2015 AE-02238,Solar PV,12,,Category 1,"Spring Green, Sauk County, WI",Substation 783,Circuit 2138,In service,5/7/2015,Permission to Operate,9/10/2015 AE-02241,Solar PV,8,,Category 1,"Spring Green, Sauk County, WI",Substation 783,Circuit 2138,In service,5/7/2015,Permission to Operate,9/10/2015 AE-00542,Solar PV,6,,Category 1,"Middleton, Dane County, WI",Substation 579,Circuit 1518,In service,5/7/2015,Permission to Operate,6/23/2015 AE-00491,Solar PV,2,,Category 1,"Eldorodo, Fon du Lac County, WI",,Circuit 686,In service,4/21/2015,Permission to Operate,8/5/2015 AE-00585,Solar PV,7,,Category 1,"Portage, Columbia County, WI",Substation 252,Circuit 606,In service,4/20/2015,Permission to Operate,5/26/2015 AE-01137,Solar PV,2,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1009,In service,4/6/2015,Permission to Operate,6/2/2015 AE-01957,Solar PV,5,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1732,In service,4/1/2015,Permission to Operate,5/13/2015 AE-01048,Solar PV,2,,Category 1,"Mineral Point, Iowa County, WI",Substation 525,Circuit 1344,In service,4/1/2015,Permission to Operate,7/28/2015 AE-01149,Solar PV,9,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 862,In service,3/27/2015,Permission to Operate,6/19/2015 AE-00726,Solar PV,8,,Category 1,"Blanchardville, Green County, WI",Substation 280,Circuit 672,In service,3/17/2015,Permission to Operate,5/11/2015 AE-02309,Solar PV,4,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,3/10/2015,Permission to Operate,3/30/2015 AE-02732,Solar PV,5,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2243,In service,2/27/2015,Permission to Operate,3/20/2015 AE-02281,Biomass - Burn,195,,Category 2,"Neopit, Menominee County, WI",,Circuit 1332,In service,1/28/2015,Permission to Operate,11/23/2015 AE-03382,Solar PV,5,,Category 1,"Necedah, Juneau County, WI",Substation 516,Circuit 1323,In service,1/22/2015,Permission to Operate,1/13/2015 AE-00684,Solar PV,7,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1141,In service,1/19/2015,Permission to Operate,2/20/2015 AE-02941,Solar PV,6,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2243,In service,1/13/2015,Permission to Operate,2/9/2015 AE-03381,Solar PV,0.48,,Category 1,"Montello, Marquette County, WI",Substation 489,Circuit 1219,In service,12/19/2014,Permission to Operate,3/23/2015 AE-02813,Solar PV,11,,Category 1,"Cuba City, Grant County, WI",Substation 386,Circuit 2181,In service,12/18/2014,Permission to Operate,1/2/2015 AE-02996,Solar PV,5,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,12/18/2014,Permission to Operate,1/21/2015 AE-00510,Solar PV,6.8,,Category 1,"Fond du Lac, Adams County, WI",Substation 628,Circuit 1700,In service,12/4/2014,Permission to Operate,1/16/2015 AE-02223,Solar PV,6,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 137,In service,11/24/2014,Permission to Operate,12/18/2014 AE-00760,Solar PV,20,,Category 1,"Markesan, Green Lake County, WI",,Circuit 766,In service,11/21/2014,Permission to Operate,12/30/2014 AE-02398,Solar PV,3,,Category 1,"Nekoosa, Wood County, WI",Substation 345,Circuit 826,In service,11/21/2014,Permission to Operate,1/15/2015 AE-00604,Solar PV,2,,Category 1,"Bagley, Grant County, WI",Substation 80,Circuit 210,In service,11/21/2014,Permission to Operate,12/30/2014 AE-02056,Solar PV,6,,Category 1,"Merrimac, Sauk County, WI",Substation 135,Circuit 359,In service,11/21/2014,Permission to Operate,12/11/2014 AE-02466,Solar PV,11,,Category 1,"Plainfield, Waushara County, WI",Substation 575,Circuit 1510,In service,11/20/2014,Permission to Operate,12/19/2014 AE-03191,Solar PV,20,,Category 1,"Burnett, Burnett County, WI",,Circuit 809,In service,11/20/2014,Permission to Operate,1/2/2015 AE-02597,Solar PV,3,,Category 1,"Port Edwards, Wood County, WI",Substation 584,Circuit 1536,In service,11/20/2014,Permission to Operate,12/4/2014 AE-01891,Solar PV,1,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,11/19/2014,Permission to Operate,12/5/2014 AE-02696,Solar PV,11,,Category 1,"Lone Rock, Richland County, WI",,Circuit 1055,In service,11/17/2014,Permission to Operate,1/2/2015 AE-02289,Solar PV,7,,Category 1,"Hazel Green, Grant County, WI",Substation 386,Circuit 2181,In service,11/14/2014,Permission to Operate,12/10/2014 AE-02012,Solar PV,4,,Category 1,"Cambridge, Dane County, WI",,Circuit 974,In service,11/4/2014,Permission to Operate,12/2/2014 AE-00683,Solar PV,11,,Category 1,"Blanchardville, Green County, WI",Substation 280,Circuit 672,In service,11/3/2014,Permission to Operate,11/24/2014 AE-02047,Solar PV,12,,Category 1,"Milladore, Marathon County, WI",Substation 43,Circuit 120,In service,10/27/2014,Permission to Operate,12/29/2014 AE-01079,Solar PV,3,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 862,In service,10/24/2014,Permission to Operate,12/12/2014 AE-01274,Solar PV,6,,Category 1,"Ridgeway, Iowa County, WI",Substation 357,Circuit 862,In service,10/24/2014,Permission to Operate,12/17/2014 AE-00635,Solar PV,5,,Category 1,"Winneconne, Winnebago County, WI",Substation 766,Circuit 2076,In service,10/23/2014,Permission to Operate,10/29/2014 AE-00880,Solar PV,6,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,10/22/2014,Permission to Operate,11/17/2014 AE-02202,Solar PV,5,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,10/21/2014,Permission to Operate,12/2/2014 AE-00781,Solar PV,10,,Category 1,"Mt. Horeb, Dane County, WI",Substation 483,Circuit 1212,In service,10/17/2014,Permission to Operate,12/3/2014 AE-01970,Solar PV,16,,Category 1,"Beloit, Rock County, WI",Substation 79,Circuit 194,In service,10/17/2014,Permission to Operate,6/9/2016 AE-03430,Solar PV,6,,Category 1,"Platteville, Grant County, WI",Substation 571,Circuit 1503,In service,10/10/2014,Permission to Operate,11/27/2014 AE-01328,Solar PV,1,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 95,In service,10/8/2014,Permission to Operate,10/27/2014 AE-02116,Solar PV,3,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/7/2014,Permission to Operate,10/7/2014 AE-02443,Solar PV,11,,Category 1,"Wautoma, Waushara County, WI",Substation 742,Circuit 2036,In service,10/7/2014,Permission to Operate,10/20/2014 AE-01333,Solar PV,5,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,10/2/2014,Permission to Operate,10/20/2014 AE-00749,Solar PV,8,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 886,In service,9/25/2014,Permission to Operate,10/7/2014 AE-00919,Solar PV,10,,Category 1,"Milladore, Wood County, WI",Substation 630,Circuit 1713,In service,9/24/2014,Permission to Operate,10/16/2014 AE-01925,Solar PV,2,,Category 1,"Lake Geneva, Walworth County, WI",,Circuit 2070,In service,9/12/2014,Permission to Operate,12/1/2014 AE-03232,Solar PV,10,,Category 1,"Vesper, Wood County, WI",Substation 723,Circuit 1976,In service,9/3/2014,Permission to Operate,10/29/2014 AE-03426,Solar PV,10,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,9/3/2014,Permission to Operate,10/31/2014 AE-01923,Solar PV,10,,Category 1,"Milladore, Portage County, WI",Substation 630,Circuit 1713,In service,9/3/2014,Permission to Operate,10/22/2014 AE-01123,Solar PV,5,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,8/27/2014,Permission to Operate,10/16/2014 AE-00796,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1209,In service,8/27/2014,Permission to Operate,8/28/2014 AE-00529,Solar PV,5,,Category 1,"Fond du Lac, Fon du Lac County, WI",Substation 514,Circuit 1288,In service,8/26/2014,Permission to Operate,10/10/2014 AE-00935,Solar PV,10,,Category 1,"Mcfarland, Dane County, WI",,Circuit 1143,In service,8/21/2014,Permission to Operate,9/24/2015 AE-02442,Solar PV,10,,Category 1,"Hancock, Waushara County, WI",Substation 327,Circuit 786,In service,8/15/2014,Permission to Operate,10/8/2014 AE-00632,Solar PV,11,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1972,In service,8/1/2014,Permission to Operate,9/9/2014 AE-02331,Solar PV,5,,Category 1,"North Freedom, Sauk County, WI",Substation 659,Circuit 1807,In service,7/31/2014,Permission to Operate,9/2/2014 AE-02268,Solar PV,4,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,7/30/2014,Permission to Operate,8/13/2014 AE-02099,Solar PV,4,,Category 1,"Baraboo, Sauk County, WI",Substation 659,Circuit 1807,In service,7/29/2014,Permission to Operate,8/14/2014 AE-01041,Solar PV,7,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,7/16/2014,Permission to Operate,12/26/2014 AE-00572,Solar PV,13,,Category 1,"Stitzer, Grant County, WI",Substation 398,Circuit 989,In service,7/16/2014,Permission to Operate,7/29/2014 AE-00551,Solar PV,7,,Category 1,"Lone Rock, Richland County, WI",,Circuit 1056,In service,7/15/2014,Permission to Operate,9/6/2014 AE-00603,Solar PV,5,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,7/10/2014,Permission to Operate,8/20/2014 AE-00528,Solar PV,5,,Category 1,"Malone, Adams County, WI",Substation 411,Circuit 1024,In service,7/10/2014,Permission to Operate,8/21/2014 AE-02022,Solar PV,8,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 672,In service,7/9/2014,Permission to Operate,8/4/2014 AE-00783,Solar PV,4.4,,Category 1,"Princeton, Green Lake County, WI",Substation 596,Circuit 1609,In service,6/27/2014,Permission to Operate,11/19/2014 AE-00661,Solar PV,8,,Category 1,"Monroe, Green County, WI",Substation 481,Circuit 1190,In service,6/15/2014,Permission to Operate,7/9/2014 AE-03055,Solar PV,0.88,,Category 1,"Soldiers Grove, Crawford County, WI",Substation 288,Circuit 696,In service,6/10/2014,Permission to Operate,7/28/2014 AE-02260,Solar PV,4,,Category 1,"Reedsburg, Sauk County, WI",Substation 106,Circuit 294,In service,6/6/2014,Permission to Operate,6/23/2014 AE-03429,Solar PV,8,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,6/5/2014,Permission to Operate,10/22/2014 AE-01271,Solar PV,5,,Category 1,"Neshkoro, Marquette County, WI",Substation 656,Circuit 1792,In service,6/2/2014,Permission to Operate,7/24/2014 AE-03436,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 722,Circuit 1971,In service,5/15/2014,Permission to Operate,4/30/2014 AE-01974,Solar PV,5,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1921,In service,5/9/2014,Permission to Operate,10/15/2015 AE-00949,Solar PV,8,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,5/6/2014,Permission to Operate,7/31/2014 AE-01927,Solar PV,4,,Category 1,"Deforest, Dane County, WI",,Circuit 477,In service,5/6/2014,Permission to Operate,7/3/2014 AE-03445,Solar PV,7,,Category 1,"Mt. Horeb, Dane County, WI",Substation 483,Circuit 1209,In service,5/6/2014,Permission to Operate,5/31/2014 AE-00764,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,4/24/2014,Permission to Operate,5/2/2014 AE-00693,Solar PV,15,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 390,In service,4/24/2014,Permission to Operate,5/14/2014 AE-00688,Solar PV,7,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 358,In service,4/17/2014,Permission to Operate,7/28/2014 AE-01170,Solar PV,6,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2150,In service,4/17/2014,Permission to Operate,6/9/2014 AE-01310,Solar PV,6,,Category 1,"Shawano, Shawano County, WI",Substation 69,Circuit 167,In service,4/2/2014,Permission to Operate,6/3/2014 AE-00848,Solar PV,18,,Category 1,"Rudolph, Wood County, WI",Substation 630,Circuit 1714,In service,4/2/2014,Permission to Operate,4/24/2014 AE-01917,Solar PV,3,,Category 1,"Princeton, Portage County, WI",Substation 596,Circuit 1608,In service,3/28/2014,Permission to Operate,5/9/2014 AE-01842,Solar PV,6,,Category 1,"Beloit, Rock County, WI",Substation 255,Circuit 620,In service,3/28/2014,Permission to Operate,8/30/2013 AE-02286,Solar PV,5,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2146,In service,3/28/2014,Permission to Operate,7/27/2014 AE-02280,Solar PV,3,,Category 1,"Keshena, Menominee County, WI",Substation 652,Circuit 1789,In service,3/19/2014,Permission to Operate,6/17/2014 AE-02713,Solar PV,4,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 326,In service,3/10/2014,Permission to Operate,7/10/2014 AE-02141,Solar PV,7.92,,Category 1,"Delavan, Walworth County, WI",Substation 81,Circuit 228,In service,3/5/2014,Permission to Operate,3/26/2014 AE-02230,Solar PV,10,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,3/5/2014,Permission to Operate,9/23/2015 AE-02379,Solar PV,5,,Category 1,"Reedsburg, Sauk County, WI",Substation 216,Circuit 507,In service,2/27/2014,Permission to Operate,6/23/2014 AE-03328,Solar PV,9,,Category 1,"Lake Geneva, Walworth County, WI",Substation 660,Circuit 1809,In service,2/19/2014,Permission to Operate,10/2/2014 AE-02933,Solar PV,12,,Category 1,"Oregon, Dane County, WI",,Circuit 1881,In service,12/27/2013,Permission to Operate,1/16/2014 AE-01104,Solar PV,4,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,12/23/2013,Permission to Operate,1/17/2014 AE-00657,Solar PV,7.5,,Category 1,"New Glarus, Green County, WI",,Circuit 1327,In service,12/12/2013,Permission to Operate,5/9/2014 AE-02086,Solar PV,7,,Category 1,"Boscobel, Grant County, WI",Substation 86,Circuit 230,In service,11/29/2013,Permission to Operate,1/29/2014 AE-04713,Solar PV,36,,Category 2,"Beloit, Rock County, WI",,Circuit 154,In service,11/15/2013,Permission to Operate,12/1/2013 AE-03419,Solar PV,6,,Category 1,"Pittsville, Wood County, WI",Substation 573,Circuit 1506,In service,11/12/2013,Permission to Operate,12/12/2013 AE-00546,Solar PV,13,,Category 1,"Malone, Fon du Lac County, WI",Substation 256,Circuit 623,In service,11/9/2013,Permission to Operate,12/30/2013 AE-00427,Solar PV,20,,Category 1,"Platteville, Grant County, WI",Substation 475,Circuit 1169,In service,11/1/2013,Permission to Operate,12/10/2013 AE-01770,Solar PV,1,,Category 1,"Beloit, Rock County, WI",Substation 189,Circuit 419,In service,10/28/2013,Permission to Operate,12/5/2013 AE-00754,Solar PV,14,,Category 1,"Green Lake, Green Lake County, WI",,Circuit 456,In service,9/19/2013,Permission to Operate,10/7/2013 AE-02664,Solar PV,9,,Category 1,"Manawa, Waupaca County, WI",Substation 433,Circuit 1098,In service,9/15/2013,Permission to Operate,1/9/2014 AE-00740,Solar PV,7,,Category 1,"Monroe, Green County, WI",Substation 661,Circuit 1815,In service,9/9/2013,Permission to Operate,9/23/2013 AE-00620,Solar PV,4,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 60,In service,8/26/2013,Permission to Operate,10/21/2013 AE-00541,Solar PV,5,,Category 1,"Marshfield, Wood County, WI",Substation 573,Circuit 1508,In service,8/22/2013,Permission to Operate,10/10/2013 AE-01218,Solar PV,4,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 328,In service,8/21/2013,Permission to Operate,10/9/2015 AE-01841,Solar PV,5,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 82,In service,8/19/2013,Permission to Operate,8/30/2014 AE-01840,Solar PV,13,,Category 1,"Blue Mounds, Dane County, WI",Substation 483,Circuit 1211,In service,8/10/2013,Permission to Operate,7/5/2016 AE-02066,Solar PV,18,,Category 1,"North Freedom, Sauk County, WI",,Circuit 494,In service,8/9/2013,Permission to Operate,8/26/2013 AE-02694,Solar PV,3,,Category 1,"Delavan, Walworth County, WI",Substation 207,Circuit 485,In service,7/30/2013,Permission to Operate,8/30/2013 AE-00799,Solar PV,6,,Category 1,"Wonewoc, Juneau County, WI",,,In service,7/24/2013,Permission to Operate,8/22/2013 AE-00798,Wind,12,,Category 1,"Wonewoc, Juneau County, WI",,,In service,7/24/2013,Permission to Operate,8/22/2013 AE-00936,Solar PV,5,,Category 1,"Highland, Iowa County, WI",Substation 406,Circuit 1007,In service,7/11/2013,Permission to Operate,9/26/2013 AE-01371,Solar PV,8,,Category 1,"Blanchardville, Lafayette County, WI",Substation 525,Circuit 1344,In service,7/5/2013,Permission to Operate,10/28/2013 AE-01220,Solar PV,13,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 672,In service,7/5/2013,Permission to Operate,8/8/2013 AE-02412,Solar PV,11.44,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,7/1/2013,Permission to Operate,8/23/2013 AE-03078,Bio Digestor Farm,633,,Category 3,"Sun Prairie, Dane County, WI",,Circuit 2001,In service,6/28/2013,Permission to Operate,3/13/2014 AE-02588,Solar PV,13,,Category 1,"Stratford, Marathon County, WI",Substation 626,Circuit 1690,In service,6/28/2013,Permission to Operate,8/6/2013 AE-02890,Wind,2,,Category 1,"Blue Mounds, Dane County, WI",,Circuit 220,In service,6/26/2013,Permission to Operate,6/26/2013 AE-02127,Solar PV,2,,Category 1,"Amherst Junction, Portage County, WI",Substation 30,Circuit 79,In service,6/17/2013,Permission to Operate,7/26/2013 AE-02145,Solar PV,3.5,,Category 1,"Poynette, Columbia County, WI",,,In service,6/12/2013,Permission to Operate,10/13/2015 AE-00511,Solar PV,18,,Category 1,"Rudolph, Wood County, WI",Substation 630,Circuit 1714,In service,5/16/2013,Permission to Operate,5/31/2013 AE-02523,Solar PV,8,,Category 1,"Mineral Point, Grant County, WI",,Circuit 1186,In service,5/16/2013,Permission to Operate,6/13/2013 AE-02545,Solar PV,7.26,,Category 1,"Sun Prairie, Dane County, WI",,Circuit 1999,In service,5/13/2013,Permission to Operate,10/9/2013 AE-00652,Solar PV,10,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,5/9/2013,Permission to Operate,9/6/2013 AE-02107,Solar PV,9,,Category 1,"Amherst, Portage County, WI",Substation 41,Circuit 2242,In service,5/1/2013,Permission to Operate,5/14/2015 AE-02548,"Solar PV, Battery/Storage",2,,Category 1,"Wautoma, Waushara County, WI",Substation 327,Circuit 783,In service,4/26/2013,Permission to Operate,5/12/2013 AE-02306,Solar PV,3.8,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,4/17/2013,Permission to Operate,6/11/2013 AE-02814,Solar PV,6,,Category 1,"Pine River, Lincoln County, WI",Substation 281,Circuit 673,In service,3/13/2013,Permission to Operate,4/26/2013 AE-02722,Solar PV,4,,Category 1,"Marion, Waupaca County, WI",Substation 111,Circuit 312,In service,3/12/2013,Permission to Operate,3/14/2013 AE-02756,Solar PV,3,,Category 1,"Platteville, Grant County, WI",,,In service,2/18/2013,Permission to Operate,3/1/2013 AE-02441,Solar PV,5,,Category 1,"Berlin, Waushara County, WI",Substation 281,Circuit 673,In service,1/15/2013,Permission to Operate,1/22/2013 AE-01122,Solar PV,5,,Category 1,"Ahmerst, Portage County, WI",Substation 30,Circuit 80,In service,1/15/2013,Permission to Operate,2/4/2013 AE-02174,Solar PV,4,,Category 1,"Baraboo, Sauk County, WI",,Circuit 495,In service,1/15/2013,Permission to Operate,1/15/2013 AE-01678,Solar PV,10,,Category 1,"Poynette, Columbia County, WI",Substation 591,Circuit 1576,In service,12/14/2012,Permission to Operate,9/24/2015 AE-02277,Solar PV,3,,Category 1,"Oregon, DANE County, WI",,Circuit 1458,In service,12/3/2012,Permission to Operate,9/21/2015 AE-01219,Solar PV,10,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1184,In service,11/29/2012,Permission to Operate,1/4/2013 AE-01058,Solar PV,3,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,11/28/2012,Permission to Operate,12/10/2012 AE-00822,Solar PV,10,,Category 1,"Columbus, Dane County, WI",,Circuit 2000,In service,11/26/2012,Permission to Operate,10/8/2015 AE-02231,Solar PV,6,,Category 1,"Rio, Columbia County, WI",,,In service,11/21/2012,Permission to Operate,10/13/2015 AE-00697,Solar PV,18,,Category 1,"Burnett, Dodge County, WI",,Circuit 809,In service,11/13/2012,Permission to Operate,12/4/2012 AE-02015,Solar PV,11,,Category 1,"Oregon, Dane County, WI",,Circuit 1457,In service,11/6/2012,Permission to Operate,9/22/2015 AE-02064,Solar PV,3,,Category 1,"Lancaster, Grant County, WI",Substation 405,Circuit 1004,In service,10/29/2012,Permission to Operate,11/9/2012 AE-00878,Solar PV,0.44,,Category 1,"Ontario, Monroe County, WI",Substation 217,Circuit 514,In service,10/24/2012,Permission to Operate,11/28/2012 AE-02103,Wind,20,,Category 1,"North Freedom, Sauk County, WI",Substation 659,Circuit 1807,In service,10/19/2012,Permission to Operate,5/10/2013 AE-00725,Solar PV,7,,Category 1,"Stoughton, Dane County, WI",,Circuit 1455,In service,10/3/2012,Permission to Operate,11/15/2012 AE-02875,Solar PV,6,,Category 1,"Waupaca, Waupaca County, WI",Substation 651,Circuit 1787,In service,9/25/2012,Permission to Operate,10/1/2012 AE-00499,Solar PV,6,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 302,In service,9/25/2012,Permission to Operate,11/15/2012 AE-02467,Solar PV,8,,Category 1,"Berlin, Waushara County, WI",Substation 633,Circuit 1722,In service,9/24/2012,Permission to Operate,10/26/2012 AE-01888,Solar PV,12,,Category 1,"Belleville, Dane County, WI",Substation 280,Circuit 670,In service,9/18/2012,Permission to Operate,11/13/2012 AE-02151,Solar PV,3,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,9/17/2012,Permission to Operate,10/1/2012 AE-01971,Solar PV,1,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1932,In service,9/6/2012,Permission to Operate,12/11/2012 AE-00493,Bio Digestor Water Treatment Plant,450,,Category 3,"Fond du Lac, Adams County, WI",Substation 524,Circuit 2196,In service,8/22/2012,Permission to Operate,2/1/2013 AE-02172,Solar PV,14,,Category 1,"North Freedom, Sauk County, WI",Substation 659,Circuit 1807,In service,8/17/2012,Permission to Operate,11/14/2012 AE-01857,Solar PV,9,,Category 1,"Marshfield, Wood County, WI",Substation 626,Circuit 1690,In service,8/13/2012,Permission to Operate,10/15/2012 AE-02810,Solar PV,11,,Category 1,"Juneau, Dodge County, WI",Substation 351,Circuit 836,In service,8/9/2012,Permission to Operate,9/6/2012 AE-03083,Solar PV,2,,Category 1,"Cary, Wood County, WI",Substation 573,Circuit 1506,In service,8/1/2012,Permission to Operate,8/23/2012 AE-02662,Solar PV,3,,Category 1,"Rudolph, Wood County, WI",Substation 630,Circuit 1714,In service,8/1/2012,Permission to Operate,8/6/2012 AE-02438,Solar PV,8,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1833,In service,7/31/2012,Permission to Operate,8/27/2012 AE-01248,Solar PV,4,,Category 1,"Lake Geneva, Walworth County, WI",Substation 393,Circuit 981,In service,7/26/2012,Permission to Operate,8/13/2012 AE-02215,Solar PV,7,,Category 1,"Twin Lakes, Kenosha County, WI",,Circuit 1664,In service,7/26/2012,Permission to Operate,8/13/2012 AE-03237,Solar PV,3,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 301,In service,7/24/2012,Permission to Operate,9/5/2012 AE-00889,Solar PV,18,,Category 1,"Scandinavia, Waupaca County, WI",Substation 364,Circuit 895,In service,7/19/2012,Permission to Operate,8/9/2012 AE-03407,Solar PV,4,,Category 1,"Delavan, Walworth County, WI",,Circuit 2065,In service,7/18/2012,Permission to Operate,8/13/2012 AE-02368,Solar PV,0.25,,Category 1,"Merrimac, Sauk County, WI",Substation 466,Circuit 1156,In service,7/9/2012,Permission to Operate,10/19/2012 AE-00618,Solar PV,6,,Category 1,"Manawa, Waupaca County, WI",Substation 433,Circuit 1098,In service,7/9/2012,Permission to Operate,8/6/2012 AE-02502,Solar PV,17.6,,Category 1,"Delavan, Walworth County, WI",Substation 81,Circuit 226,In service,6/18/2012,Permission to Operate,6/20/2012 AE-00863,Solar PV,12,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 615,In service,6/14/2012,Permission to Operate,8/17/2012 AE-00937,Solar PV,18,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 519,In service,6/14/2012,Permission to Operate,7/9/2012 AE-00868,Solar PV,12,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 615,In service,6/14/2012,Permission to Operate,12/17/2012 AE-00864,Solar PV,13,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 615,In service,6/14/2012,Permission to Operate,12/12/2012 AE-00866,Solar PV,12,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 615,In service,6/14/2012,Permission to Operate,12/12/2012 AE-00867,Solar PV,12,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 615,In service,6/14/2012,Permission to Operate,12/12/2012 AE-00865,Solar PV,12,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 615,In service,6/14/2012,Permission to Operate,12/12/2012 AE-02271,Solar PV,3,,Category 1,"Fox Lake, Dodge County, WI",Substation 278,Circuit 662,In service,6/8/2012,Permission to Operate,6/22/2012 AE-01260,Solar PV,9,,Category 1,"Highland, Iowa County, WI",Substation 45,Circuit 129,In service,5/18/2012,Permission to Operate,8/3/2012 AE-02444,Solar PV,5,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,5/16/2012,Permission to Operate,7/11/2012 AE-02509,Solar PV,7,,Category 1,"Marshall, Dane County, WI",Substation 679,Circuit 1877,In service,4/23/2012,Permission to Operate,5/14/2012 AE-01843,Solar PV,1,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,4/10/2012,Permission to Operate,4/16/2012 AE-02003,Solar PV,1,,Category 1,"Janesville, Rock County, WI",,,In service,4/10/2012,Permission to Operate,4/16/2012 AE-02249,Solar PV,4,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,4/6/2012,Permission to Operate,5/1/2012 AE-01935,Solar PV,1,,Category 1,"Janesville, Rock County, WI",,Circuit 1683,In service,4/3/2012,Permission to Operate,4/16/2012 AE-00593,Solar PV,8,,Category 1,"Blanchardville, Green County, WI",,,In service,4/3/2012,Permission to Operate,5/21/2012 AE-02002,Solar PV,2,,Category 1,"Janesville, Rock County, WI",,Circuit 1683,In service,3/26/2012,Permission to Operate,4/16/2012 AE-00843,Solar PV,7,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,3/15/2012,Permission to Operate,8/9/2012 AE-00953,Solar PV,11,,Category 1,"Barneveld, Iowa County, WI",,Circuit 220,In service,3/9/2012,Permission to Operate,7/10/2012 AE-02919,Bio Digestor Water Treatment Plant,700,,Category 3,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 2171,In service,3/5/2012,Permission to Operate,3/17/2012 AE-02919,Bio Digestor Water Treatment Plant,700,,Category 3,"Sheboygan, Sheboygan County, WI",Substation 240,Circuit 2171,In service,3/5/2012,Permission to Operate,3/17/2012 AE-03397,Solar PV,2,,Category 1,"Lake Geneva, Walworth County, WI",,,In service,2/17/2012,Permission to Operate,2/29/2012 AE-03399,Wind,1,,Category 1,"Lake Geneva, Walworth County, WI",,,In service,2/17/2012,Permission to Operate,2/29/2012 AE-03396,Wind,1,,Category 1,"Lake Geneva, Walworth County, WI",,,In service,2/17/2012,Permission to Operate,2/29/2012 AE-03398,Solar PV,0.5,,Category 1,"Lake Geneva, Walworth County, WI",,,In service,2/17/2012,Permission to Operate,2/29/2012 AE-02784,Solar PV,6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,1/20/2012,Permission to Operate,1/20/2012 AE-02539,Solar PV,8,,Category 1,"Berlin, Waushara County, WI",Substation 633,Circuit 1722,In service,1/17/2012,Permission to Operate,4/10/2012 AE-02739,Solar PV,1,,Category 1,"Poynette, Columbia County, WI",Substation 448,Circuit 1112,In service,1/12/2012,Permission to Operate,3/2/2012 AE-02290,Solar PV,6,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 901,In service,12/28/2011,Permission to Operate,1/13/2012 AE-00576,Solar PV,6,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,12/27/2011,Permission to Operate,2/9/2012 AE-02144,Wind,3.5,,Category 1,"Poynette, Columbia County, WI",,,In service,12/23/2011,Permission to Operate,6/10/2013 AE-03202,Wind,20,,Category 1,"Platteville, Grant County, WI",,,In service,12/21/2011,Permission to Operate,1/10/2012 AE-03203,Solar PV,5,,Category 1,"Platteville, Grant County, WI",,,In service,12/21/2011,Permission to Operate,1/10/2012 AE-01725,Solar PV,5,,Category 1,"Madison, Dane County, WI",Substation 579,Circuit 1519,In service,12/12/2011,Permission to Operate,1/5/2012 AE-02082,Solar PV,14,,Category 1,"Mcfarland, Dane County, WI",Substation 146,Circuit 390,In service,12/12/2011,Permission to Operate,12/22/2011 AE-02210,Solar PV,6,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,12/9/2011,Permission to Operate,12/27/2011 AE-01385,Solar PV,5,,Category 1,"Oregon, Dane County, WI",,Circuit 1879,In service,12/9/2011,Permission to Operate,1/30/2012 AE-02803,Solar PV,20,,Category 1,"Lancaster, Grant County, WI",Substation 398,Circuit 989,In service,12/5/2011,Permission to Operate,12/2/2011 AE-02236,Solar PV,4,,Category 1,"Baraboo, Sauk County, WI",Substation 495,Circuit 1241,In service,12/2/2011,Permission to Operate,12/14/2011 AE-02209,Solar PV,6,,Category 1,"Madison, DANE County, WI",Substation 698,Circuit 1922,In service,11/23/2011,Permission to Operate,12/16/2011 AE-01777,Solar PV,30,,Category 2,"Beloit, Rock County, WI",Substation 79,Circuit 198,In service,11/22/2011,Permission to Operate,12/16/2011 AE-02529,Solar PV,3,,Category 1,"Windsor, Dane County, WI",Substation 726,Circuit 1985,In service,11/17/2011,Permission to Operate,4/7/2013 AE-00641,Solar PV,5,,Category 1,"Rudolph, Wood County, WI",Substation 630,Circuit 1714,In service,11/16/2011,Permission to Operate,12/16/2011 AE-02809,Solar PV,5,,Category 1,"Blue Mounds, Dane County, WI",Substation 37,Circuit 96,In service,11/15/2011,Permission to Operate,12/2/2011 AE-02175,Solar PV,11,,Category 1,"Wisconsin Dells, Sauk County, WI",Substation 216,Circuit 508,In service,11/3/2011,Permission to Operate,12/9/2011 AE-00555,Solar PV,7,,Category 1,"Fond du Lac, Fon du Lac County, WI",Substation 628,Circuit 1700,In service,11/1/2011,Permission to Operate,1/3/2012 AE-00945,Solar PV,6,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,10/27/2011,Permission to Operate,11/14/2011 AE-01134,Solar PV,20,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 17,In service,10/24/2011,Permission to Operate,12/12/2011 AE-01715,Solar PV,10,,Category 1,"Tomah, Monroe County, WI",,Circuit 385,In service,10/24/2011,Permission to Operate,12/2/2011 AE-00728,Solar PV,10,,Category 1,"Blanchardville, Green County, WI",Substation 77,Circuit 192,In service,10/19/2011,Permission to Operate,11/29/2011 AE-02608,Wind,68,,Category 2,"Wisconsin Rapids, Wood County, WI",Substation 584,Circuit 1533,In service,10/14/2011,Permission to Operate,2/13/2012 AE-01315,Solar PV,4,,Category 1,"Highland, Iowa County, WI",,,In service,10/6/2011,Permission to Operate,11/1/2011 AE-01312,Wind,3,,Category 1,"Highland, Iowa County, WI",,,In service,10/6/2011,Permission to Operate,11/1/2011 AE-02024,Solar PV,10,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1043,In service,10/3/2011,Permission to Operate,10/17/2011 AE-02279,Wind,2,,Category 1,"Keshena, Menominee County, WI",Substation 652,Circuit 1789,In service,9/27/2011,Permission to Operate,10/27/2011 AE-01098,Solar PV,7,,Category 1,"Black Earth, Dane County, WI",Substation 483,Circuit 1209,In service,9/26/2011,Permission to Operate,10/17/2011 AE-03016,Solar PV,27,,Category 2,"Sheboygan, Sheboygan County, WI",Substation 612,Circuit 1651,In service,9/19/2011,Permission to Operate,11/9/2011 AE-00595,Solar PV,5,,Category 1,"Belleville, Green County, WI",Substation 57,Circuit 151,In service,9/14/2011,Permission to Operate,11/22/2011 AE-00960,Solar PV,92,,Category 2,"Walworth, Walworth County, WI",Substation 52,Circuit 144,In service,9/13/2011,Permission to Operate,9/13/2011 AE-01092,Solar PV,2000,0,Category 4,"Verona, Dane County, WI",,,In service,9/13/2011,Permission to Operate,1/16/2014 AE-00999,Hydro,2500,,Category 4,"Wisconsin Rapids, Wood County, WI",,,In service,9/12/2011,Permission to Operate,1/1/1970 AE-01001,Hydro,300,,Category 3,"Wisconsin Rapids, Wood County, WI",,,In service,9/12/2011,Permission to Operate,1/1/1970 AE-01000,Hydro,2000,,Category 4,"Port Edwards, Wood County, WI",,,In service,9/12/2011,Permission to Operate,1/1/1970 AE-03038,Solar PV,8,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 433,Circuit 1100,In service,8/26/2011,Permission to Operate,9/23/2011 AE-01787,Solar PV,5,,Category 1,"Verona, Dane County, WI",Substation 483,Circuit 1210,In service,8/22/2011,Permission to Operate,9/18/2015 AE-02352,Wind,1,,Category 1,"Loganville, Sauk County, WI",Substation 421,Circuit 1050,In service,8/7/2011,Permission to Operate,12/21/2011 AE-01155,Solar PV,7,,Category 1,"Cobb, Iowa County, WI",Substation 241,Circuit 584,In service,7/28/2011,Permission to Operate,11/8/2011 AE-02397,Solar PV,5,,Category 1,"Rosholt, Portage County, WI",Substation 624,Circuit 1689,In service,7/7/2011,Permission to Operate,7/15/2011 AE-02424,Solar PV,3,,Category 1,"Horicon, Dodge County, WI",Substation 351,Circuit 839,In service,6/24/2011,Permission to Operate,7/6/2011 AE-02121,Solar PV,2,,Category 1,"West Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,6/8/2011,Permission to Operate,8/5/2011 AE-02343,Solar PV,20,,Category 1,"Plain, Sauk County, WI",Substation 710,Circuit 1946,In service,6/6/2011,Permission to Operate,8/23/2011 AE-01884,Wind,10,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,5/23/2011,Permission to Operate,10/4/2012 AE-02569,Solar PV,3,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1432,In service,5/16/2011,Permission to Operate,1/22/2010 AE-02035,Solar PV,7,,Category 1,"Antigo, Langlade County, WI",Substation 578,Circuit 1517,In service,5/13/2011,Permission to Operate,6/22/2011 AE-02462,Solar PV,20,,Category 1,"Wild Rose, Waushara County, WI",Substation 771,Circuit 2086,In service,5/12/2011,Permission to Operate,6/6/2011 AE-00648,Solar PV,4,,Category 1,"Clintonville, Waupaca County, WI",Substation 69,Circuit 169,In service,5/10/2011,Permission to Operate,5/23/2011 AE-01972,Solar PV,19,,Category 1,"Janesville, Rock County, WI",Substation 369,Circuit 908,In service,4/27/2011,Permission to Operate,6/29/2011 AE-02589,Solar PV,4,,Category 1,"Columbus, Columbia County, WI",Substation 335,Circuit 791,In service,4/22/2011,Permission to Operate,9/18/2015 AE-01902,Solar PV,20,,Category 1,"Janesville, Rock County, WI",,Circuit 1683,In service,4/19/2011,Permission to Operate,4/27/2011 AE-02244,Solar PV,10,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 672,In service,4/18/2011,Permission to Operate,5/26/2011 AE-03086,Wind,2,,Category 1,"Cambridge, Jefferson County, WI",Substation 115,Circuit 316,In service,3/15/2011,Permission to Operate,10/13/2015 AE-02630,Solar PV,4,,Category 1,"Darien, Walworth County, WI",Substation 662,Circuit 1821,In service,3/14/2011,Permission to Operate,3/18/2011 AE-01091,Solar PV,500,0,Category 3,"Verona, Dane County, WI",,,In service,3/14/2011,Permission to Operate,1/16/2014 AE-00750,Solar PV,1.52,,Category 1,"Blanchardville, Green County, WI",Substation 77,Circuit 192,In service,3/1/2011,Permission to Operate,3/1/2011 AE-02117,Solar PV,20,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 433,Circuit 1100,In service,2/28/2011,Permission to Operate,4/18/2011 AE-01046,Solar PV,1.5,,Category 1,"Dodgeville, Iowa County, WI",,,In service,2/24/2011,Permission to Operate,7/25/2011 AE-01754,Solar PV,6,,Category 1,"Blue River, Richland County, WI",Substation 100,Circuit 261,In service,1/28/2011,Permission to Operate,2/7/2011 AE-01960,Solar PV,10,,Category 1,"Marshfield, Marathon County, WI",Substation 626,Circuit 1690,In service,1/28/2011,Permission to Operate,6/24/2011 AE-02367,Solar PV,18,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1685,In service,1/28/2011,Permission to Operate,6/17/2011 AE-02779,Solar PV,18,,Category 1,"Wonewoc, Juneau County, WI",,Circuit 1958,In service,1/28/2011,Permission to Operate,8/8/2011 AE-01062,Solar PV,6,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,1/26/2011,Permission to Operate,5/12/2011 AE-00763,Solar PV,3,,Category 1,"Amherst, Portage County, WI",Substation 651,Circuit 1787,In service,12/20/2010,Permission to Operate,1/12/2011 AE-02421,Solar PV,10,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 134,In service,12/2/2010,Permission to Operate,4/28/2011 AE-02085,Solar PV,7,,Category 1,"Boscobel, Grant County, WI",Substation 86,Circuit 230,In service,11/29/2010,Permission to Operate,12/21/2010 AE-02793,Solar PV,11,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,11/18/2010,Permission to Operate,2/25/2011 AE-01899,Solar PV,4,,Category 1,"Clintonville, Waupaca County, WI",Substation 69,Circuit 169,In service,11/12/2010,Permission to Operate,12/16/2010 AE-02171,Solar PV,3.6,,Category 1,"Plain, Sauk County, WI",Substation 710,Circuit 1947,In service,11/11/2010,Permission to Operate,12/2/2010 AE-00975,Wind,2,,Category 1,"Mineral Point, Iowa County, WI",,Circuit 1183,In service,11/5/2010,Permission to Operate,12/1/2010 AE-00464,Solar PV,7,,Category 1,"Fond du Lac, Fon du Lac County, WI",Substation 256,Circuit 622,In service,11/4/2010,Permission to Operate,12/17/2010 AE-00472,Solar PV,8,,Category 1,"Fond du Lac, Fon du Lac County, WI",Substation 256,Circuit 622,In service,11/4/2010,Permission to Operate,12/17/2010 AE-02958,Solar PV,8,,Category 1,"Sauk City, Dane County, WI",Substation 461,Circuit 1130,In service,11/2/2010,Permission to Operate,10/29/2010 AE-02006,Solar PV,12,,Category 1,"Milton, Rock County, WI",Substation 419,Circuit 1044,In service,11/1/2010,Permission to Operate,11/19/2010 AE-03176,Solar PV,15,,Category 1,"Columbus, Columbia County, WI",Substation 335,Circuit 791,In service,10/29/2010,Permission to Operate,9/29/2015 AE-01124,Solar PV,7,,Category 1,"Dodgeville, Iowa County, WI",Substation 783,Circuit 2138,In service,10/26/2010,Permission to Operate,11/3/2010 AE-01119,Solar PV,4,,Category 1,"Dodgeville, Iowa County, WI",Substation 783,Circuit 2138,In service,10/26/2010,Permission to Operate,11/1/2010 AE-02665,Solar PV,8,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 630,Circuit 1714,In service,10/15/2010,Permission to Operate,11/1/2010 AE-02468,Solar PV,20,,Category 1,"Randolph, Dodge County, WI",Substation 278,Circuit 662,In service,10/15/2010,Permission to Operate,10/25/2010 AE-01157,Solar PV,6,,Category 1,"Avoca, Iowa County, WI",Substation 783,Circuit 2138,In service,10/15/2010,Permission to Operate,10/20/2011 AE-01849,Solar PV,20,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1930,In service,10/14/2010,Permission to Operate,10/14/2010 AE-02110,Solar PV,8,,Category 1,"Nekoosa, Wood County, WI",Substation 345,Circuit 827,In service,10/8/2010,Permission to Operate,10/18/2010 AE-03158,Solar PV,6,,Category 1,"Manawa, Waupaca County, WI",Substation 433,Circuit 1100,In service,9/30/2010,Permission to Operate,10/7/2010 AE-01936,Solar PV,4,,Category 1,"Janesville, Rock County, WI",Substation 279,Circuit 664,In service,9/28/2010,Permission to Operate,9/28/2010 AE-00522,Solar PV,6,,Category 1,"Lodi, Columbia County, WI",,Circuit 493,In service,9/20/2010,Permission to Operate,10/8/2010 AE-01052,Solar PV,15,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 5,Circuit 15,In service,9/9/2010,Permission to Operate,2/15/2011 AE-01121,Solar PV,5,,Category 1,"Winneconne, Winnebago County, WI",Substation 766,Circuit 2076,In service,9/7/2010,Permission to Operate,9/17/2010 AE-01933,Solar PV,18,,Category 1,"Lone Rock, Richland County, WI",,Circuit 1057,In service,9/2/2010,Permission to Operate,7/15/2009 AE-01934,Solar PV,17,,Category 1,"Lone Rock, Richland County, WI",,Circuit 1057,In service,9/2/2010,Permission to Operate,10/12/2010 AE-02808,"Solar PV, Battery/Storage",6,,Category 1,"Neshkoro, Marquette County, WI",Substation 656,Circuit 1792,In service,8/18/2010,Permission to Operate,8/20/2010 AE-02918,Solar PV,8,,Category 1,"Sheboygan, Sheboygan County, WI",Substation 254,Circuit 616,In service,8/12/2010,Permission to Operate,11/4/2010 AE-02593,Solar PV,5,,Category 1,"Ogdensburg, Waupaca County, WI",Substation 364,Circuit 895,In service,8/6/2010,Permission to Operate,9/13/2010 AE-01722,Solar PV,2.2,,Category 1,"Janesville, Rock County, WI",Substation 378,Circuit 932,In service,7/27/2010,Permission to Operate,8/3/2010 AE-00786,Bio Digestor Landfill,2400,,Category 4,"Berlin, Green Lake County, WI",,Circuit 170,In service,7/15/2010,Permission to Operate,8/1/2009 AE-00594,Solar PV,3.6,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 270,In service,7/14/2010,Permission to Operate,8/18/2010 AE-00454,Solar PV,20,,Category 1,"Mount Calvary, Fon du Lac County, WI",,Circuit 1398,In service,7/8/2010,Permission to Operate,8/27/2010 AE-00608,Solar PV,19,,Category 1,"Potosi, Grant County, WI",,Circuit 2219,In service,7/2/2010,Permission to Operate,8/18/2010 AE-00950,Solar PV,8,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 583,In service,7/2/2010,Permission to Operate,5/23/2011 AE-01358,Solar PV,3,,Category 1,"Auburndale, Wood County, WI",Substation 43,Circuit 120,In service,6/4/2010,Permission to Operate,9/3/2010 AE-00976,Biomass - Burn,125,,Category 2,"Dodgeville, Iowa County, WI",Substation 218,Circuit 519,In service,6/3/2010,Permission to Operate,7/11/2011 AE-04298,Solar PV,3.19,,Category 1,"Neshkoro, Marquette County, WI",Substation 599,Circuit 1614,In service,6/3/2010,Permission to Operate,8/25/2010 AE-00924,Solar PV,7,,Category 1,"Darien, Walworth County, WI",Substation 662,Circuit 1820,In service,6/2/2010,Permission to Operate,9/16/2010 AE-01924,Solar PV,5,,Category 1,"Wisconsin Dells, Columbia County, WI",Substation 387,Circuit 957,In service,6/2/2010,Permission to Operate,6/2/2010 AE-02709,Hydro,20,,Category 1,"Scandinavia, Waupaca County, WI",Substation 651,Circuit 1786,In service,6/1/2010,Permission to Operate,6/1/2010 AE-01736,Solar PV,10,,Category 1,"Janesville, Rock County, WI",Substation 727,Circuit 1990,In service,5/24/2010,Permission to Operate,8/27/2010 AE-02614,Solar PV,71,,Category 2,"Prairie Du Chien, Crawford County, WI",Substation 338,Circuit 804,In service,5/24/2010,Permission to Operate,7/6/2010 AE-00539,Solar PV,5,,Category 1,"Fond du Lac, Fon du Lac County, WI",Substation 538,Circuit 1418,In service,5/24/2010,Permission to Operate,7/16/2010 AE-02531,Solar PV,20,,Category 1,"Waupaca, Waupaca County, WI",Substation 651,Circuit 1787,In service,5/17/2010,Permission to Operate,8/12/2010 AE-01904,Solar PV,2,,Category 1,"Janesville, Rock County, WI",Substation 705,Circuit 1934,In service,5/10/2010,Permission to Operate,5/10/2010 AE-02219,Solar PV,15,,Category 1,"North Freedom, Sauk County, WI",Substation 659,Circuit 1807,In service,5/6/2010,Permission to Operate,6/15/2010 AE-01193,Solar PV,7,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1009,In service,5/3/2010,Permission to Operate,11/4/2010 AE-00642,Solar PV,3,,Category 1,"Monroe, Green County, WI",Substation 360,Circuit 888,In service,4/22/2010,Permission to Operate,4/22/2010 AE-02023,Wind,10,,Category 1,"Caroline, Shawano County, WI",Substation 111,Circuit 311,In service,4/20/2010,Permission to Operate,4/26/2010 AE-01334,Solar PV,3,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 338,Circuit 804,In service,4/20/2010,Permission to Operate,5/10/2010 AE-00927,Solar PV,6,,Category 1,"Highland, Iowa County, WI",Substation 241,Circuit 584,In service,4/8/2010,Permission to Operate,7/6/2010 AE-02370,Wind,1,,Category 1,"Sauk City, Sauk County, WI",Substation 461,Circuit 1130,In service,3/23/2010,Permission to Operate,3/20/2012 AE-00487,Solar PV,4,,Category 1,"Wisconsin Rapids, Wood County, WI",Substation 636,Circuit 1731,In service,3/16/2010,Permission to Operate,3/25/2010 AE-00816,Wind,20,,Category 1,"Milladore, Wood County, WI",Substation 43,Circuit 120,In service,2/23/2010,Permission to Operate,2/23/2010 AE-02278,Solar PV,20,,Category 1,"Keshena, Menominee County, WI",Substation 384,Circuit 943,In service,2/16/2010,Permission to Operate,10/14/2010 AE-02017,Solar PV,20,,Category 1,"Waupaca, Waupaca County, WI",Substation 651,Circuit 1786,In service,2/1/2010,Permission to Operate,3/5/2010 AE-01163,Solar PV,3,,Category 1,"Hustler, Juneau County, WI",Substation 110,Circuit 308,In service,1/28/2010,Permission to Operate,5/10/2010 AE-01210,Wind,20,,Category 1,"Beaver Dam, Columbia County, WI",,Circuit 1305,In service,1/28/2010,Permission to Operate,9/4/2009 AE-03402,Solar PV,3,,Category 1,"Oregon, Dane County, WI",,Circuit 1460,In service,1/28/2010,Permission to Operate,2/3/2010 AE-02105,Solar PV,7,,Category 1,"Spring Green, Sauk County, WI",Substation 218,Circuit 519,In service,1/25/2010,Permission to Operate,3/18/2010 AE-01195,Solar PV,5,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 519,In service,1/25/2010,Permission to Operate,3/5/2010 AE-03299,Solar PV,3,,Category 1,"Oregon, Dane County, WI",,Circuit 1880,In service,1/19/2010,Permission to Operate,3/15/2010 AE-01081,Wind,10,,Category 1,"Mineral Point, Iowa County, WI",Substation 525,Circuit 1344,In service,1/18/2010,Permission to Operate,4/8/2009 AE-02195,Solar PV,2.88,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,12/15/2009,Permission to Operate,5/11/2010 AE-01043,Wind,2.4,,Category 1,"Dodgeville, Iowa County, WI",,,In service,12/15/2009,Permission to Operate,1/4/2011 AE-01928,Solar PV,6,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,12/8/2009,Permission to Operate,1/13/2010 AE-00532,Solar PV,6,,Category 1,"Waupun, Fon du Lac County, WI",,Circuit 1279,In service,12/8/2009,Permission to Operate,1/13/2010 AE-00784,Solar PV,3,,Category 1,"Deforest, Dane County, WI",Substation 726,Circuit 1986,In service,12/7/2009,Permission to Operate,12/7/2009 AE-01253,Wind,10,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 94,In service,11/4/2009,Permission to Operate,11/4/2009 AE-00729,Wind,3.7,,Category 1,"Juda, Green County, WI",Substation 101,Circuit 269,In service,10/16/2009,Permission to Operate,10/16/2009 AE-02940,Solar PV,10.08,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 22,In service,10/13/2009,Permission to Operate,6/9/2010 AE-02190,Wind,6,,Category 1,"Reedsburg, Sauk County, WI",Substation 421,Circuit 1050,In service,10/9/2009,Permission to Operate,2/1/2010 AE-01773,Solar PV,17,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2146,In service,10/6/2009,Permission to Operate,8/17/2010 AE-02120,Wind,13,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 109,In service,9/29/2009,Permission to Operate,2/22/2010 AE-01309,Solar PV,5.04,,Category 1,"Pardeeville, Columbia County, WI",Substation 448,Circuit 1112,In service,9/28/2009,Permission to Operate,2/8/2010 AE-02312,Solar PV,3,,Category 1,"Amherst Jct, Portage County, WI",Substation 30,Circuit 81,In service,9/28/2009,Permission to Operate,11/20/2009 AE-02150,Solar PV,16,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,9/28/2009,Permission to Operate,7/26/2010 AE-02149,Solar PV,16,,Category 1,"Madison, Dane County, WI",Substation 119,Circuit 323,In service,9/25/2009,Permission to Operate,8/4/2010 AE-00979,Solar PV,5,,Category 1,"Brooklyn, Dane County, WI",Substation 15,Circuit 61,In service,9/22/2009,Permission to Operate,3/20/2010 AE-02084,Solar PV,10,,Category 1,"Boscobel, Grant County, WI",Substation 86,Circuit 230,In service,9/16/2009,Permission to Operate,12/28/2009 AE-01352,Wind,20,,Category 1,"Burnett, Dodge County, WI",Substation 53,Circuit 150,In service,9/14/2009,Permission to Operate,9/14/2009 AE-00565,Wind,20,,Category 1,"Juda, Green County, WI",Substation 101,Circuit 268,In service,9/10/2009,Permission to Operate,9/10/2009 AE-00665,Solar PV,3,,Category 1,"Verona, Dane County, WI",Substation 686,Circuit 1895,In service,8/24/2009,Permission to Operate,5/13/2010 AE-02752,Wind,6,,Category 1,"Deerfield, Dane County, WI",,Circuit 974,In service,8/24/2009,Permission to Operate,8/24/2009 AE-01255,Solar PV,20,,Category 1,"Hollandale, Iowa County, WI",Substation 525,Circuit 1342,In service,8/10/2009,Permission to Operate,11/3/2009 AE-01373,Bio Digestor Water Treatment Plant,335,,Category 3,"Belmont, Lafayette County, WI",Substation 59,Circuit 161,In service,8/7/2009,Permission to Operate,3/14/2011 AE-02125,Wind,2,,Category 1,"Reedsburg, Sauk County, WI",,Circuit 110,In service,8/6/2009,Permission to Operate,9/23/2009 AE-02532,Solar PV,4,,Category 1,"Wild Rose, Waushara County, WI",Substation 771,Circuit 2086,In service,7/24/2009,Permission to Operate,8/26/2009 AE-02907,Solar PV,4,,Category 1,"Iola, Waupaca County, WI",Substation 364,Circuit 893,In service,7/24/2009,Permission to Operate,8/6/2009 AE-01788,Solar PV,3,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,7/21/2009,Permission to Operate,8/5/2009 AE-00974,Solar PV,6,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 91,Circuit 247,In service,7/13/2009,Permission to Operate,10/14/2009 AE-00954,Solar PV,6,,Category 1,"Barneveld, Iowa County, WI",Substation 357,Circuit 859,In service,7/13/2009,Permission to Operate,10/12/2009 AE-00973,Solar PV,3,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 91,Circuit 247,In service,7/13/2009,Permission to Operate,10/7/2009 AE-00488,Solar PV,3,,Category 1,"Fond du Lac, Fon du Lac County, WI",Substation 342,Circuit 813,In service,7/13/2009,Permission to Operate,11/12/2009 AE-00943,Solar PV,20,,Category 1,"Mount Horeb, Dane County, WI",Substation 280,Circuit 670,In service,7/6/2009,Permission to Operate,7/6/2009 AE-02613,Solar PV,18,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 429,Circuit 1065,In service,7/6/2009,Permission to Operate,7/6/2009 AE-01874,Wind,3,,Category 1,"Clintonville, Waupaca County, WI",Substation 69,Circuit 169,In service,6/29/2009,Permission to Operate,7/10/2009 AE-01374,Solar PV,7.56,,Category 1,"Blanchardville, Lafayette County, WI",Substation 525,Circuit 1344,In service,6/29/2009,Permission to Operate,8/3/2009 AE-02868,Solar PV,6,,Category 1,"Pittsville, Wood County, WI",Substation 573,Circuit 1506,In service,6/6/2009,Permission to Operate,9/2/2009 AE-02942,Wind,12,,Category 1,"Brooklyn, Dane County, WI",Substation 108,Circuit 303,In service,6/3/2009,Permission to Operate,6/3/2009 AE-01080,Solar PV,10.08,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 520,In service,5/15/2009,Permission to Operate,7/6/2009 AE-02334,Wind,6,,Category 1,"Reedsburg, Sauk County, WI",Substation 623,Circuit 1687,In service,5/5/2009,Permission to Operate,9/11/2009 AE-01872,Solar PV,7,,Category 1,"Lake Geneva, Walworth County, WI",Substation 784,Circuit 2150,In service,4/20/2009,Permission to Operate,10/2/2009 AE-02037,Solar PV,6,,Category 1,"Janesville, Rock County, WI",Substation 704,Circuit 1928,In service,4/9/2009,Permission to Operate,7/13/2009 AE-02137,Solar PV,3,,Category 1,"Waunakee, Dane County, WI",,Circuit 2142,In service,4/3/2009,Permission to Operate,5/7/2009 AE-00562,Solar PV,3,,Category 1,"Omro, Winnebago County, WI",Substation 549,Circuit 1449,In service,3/31/2009,Permission to Operate,6/29/2009 AE-00550,Solar PV,3,,Category 1,"Madison, Dane County, WI",Substation 31,Circuit 86,In service,3/21/2009,Permission to Operate,9/29/2009 AE-01012,Solar PV,3,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,3/19/2009,Permission to Operate,3/19/2009 AE-03032,Solar PV,2,,Category 1,"Madison, Dane County, WI",Substation 780,Circuit 2128,In service,3/17/2009,Permission to Operate,7/13/2009 AE-00588,Solar PV,3,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 270,In service,3/13/2009,Permission to Operate,3/13/2009 AE-02142,Solar PV,5.04,,Category 1,"Spring Green, Sauk County, WI",Substation 666,Circuit 1831,In service,2/18/2009,Permission to Operate,5/20/2009 AE-01159,Solar PV,3.04,,Category 1,"Dodgeville, Iowa County, WI",Substation 406,Circuit 1007,In service,1/22/2009,Permission to Operate,8/25/2009 AE-00959,Wind,10,,Category 1,"Walworth, Walworth County, WI",Substation 52,Circuit 144,In service,1/13/2009,Permission to Operate,1/13/2009 AE-02537,Hydro,20,,Category 1,"Wild Rose, Waushara County, WI",Substation 771,Circuit 2085,In service,12/1/2008,Permission to Operate,12/1/2008 AE-02224,Solar PV,2,,Category 1,"Madision, Dane County, WI",Substation 119,Circuit 328,In service,11/19/2008,Permission to Operate,11/19/2008 AE-00574,Wind,10,,Category 1,"Mount Horeb, Green County, WI",Substation 280,Circuit 672,In service,11/18/2008,Permission to Operate,2/2/2009 AE-01772,Solar PV,3,,Category 1,"Janesville, Rock County, WI",Substation 465,Circuit 1149,In service,10/23/2008,Permission to Operate,11/24/2008 AE-01375,Wind,2,,Category 1,"Darlington, Lafayette County, WI",Substation 202,Circuit 462,In service,10/3/2008,Permission to Operate,11/24/2008 AE-02413,Solar PV,4,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,10/1/2008,Permission to Operate,10/1/2008 AE-03302,Solar PV,3,,Category 1,"Prairie Du Chien, Crawford County, WI",Substation 429,Circuit 1065,In service,9/15/2008,Permission to Operate,3/3/2009 AE-01128,Wind,17.5,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1120,In service,9/1/2008,Permission to Operate,10/17/2008 AE-01719,Solar PV,5.6,,Category 1,"Janesville, Rock County, WI",Substation 378,Circuit 932,In service,8/28/2008,Permission to Operate,4/7/2009 AE-02000,Solar PV,3,,Category 1,"Clintonville, Waupaca County, WI",Substation 69,Circuit 168,In service,8/28/2008,Permission to Operate,9/5/2008 AE-03108,Solar PV,5.04,,Category 1,"Mazomanie, Dane County, WI",Substation 461,Circuit 1130,In service,8/26/2008,Permission to Operate,7/6/2009 AE-02091,Solar PV,5,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1685,In service,8/20/2008,Permission to Operate,9/2/2008 AE-02039,Solar PV,2,,Category 1,"Janesville, Rock County, WI",Substation 629,Circuit 1710,In service,7/8/2008,Permission to Operate,7/8/2008 AE-01379,Wind,1,,Category 1,"Platteville, Lafayette County, WI",,,In service,6/29/2008,Permission to Operate,7/24/2008 AE-02903,Solar PV,3,,Category 1,"Ferryville, Crawford County, WI",Substation 645,Circuit 1763,In service,6/9/2008,Permission to Operate,7/3/2008 AE-02077,Solar PV,4,,Category 1,"Loganville, Sauk County, WI",Substation 710,Circuit 1947,In service,5/31/2008,Permission to Operate,9/3/2008 AE-02032,Solar PV,3,,Category 1,"Verona, Dane County, WI",Substation 119,Circuit 330,In service,3/18/2008,Permission to Operate,3/18/2008 AE-00996,Fuel Oil,6000,,Category 4,"Nekoosa, Wood County, WI",,,In service,1/31/2008,Permission to Operate,1/31/2008 AE-00998,Fuel Oil,10000,,Category 4,"Nekoosa, Wood County, WI",,,In service,1/31/2008,Permission to Operate,1/31/2008 AE-00997,Fuel Oil,15000,,Category 4,"Nekoosa, Wood County, WI",,,In service,1/31/2008,Permission to Operate,1/31/2008 AE-02707,Hydro,20,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 83,In service,1/19/2008,Permission to Operate,1/19/2008 AE-02090,Hydro,5,,Category 1,"Mayville, Dodge County, WI",Substation 456,Circuit 1120,In service,1/1/2008,Permission to Operate,4/21/2008 AE-02167,Wind,10,,Category 1,"La Valle, Sauk County, WI",,Circuit 110,In service,10/3/2007,Permission to Operate,10/3/2007 AE-02305,Wind,17.5,,Category 1,"Custer, Portage County, WI",Substation 30,Circuit 82,In service,9/13/2007,Permission to Operate,9/13/2007 AE-02173,Solar PV,2,,Category 1,"Baraboo, Sauk County, WI",Substation 368,Circuit 899,In service,9/12/2007,Permission to Operate,10/10/2007 AE-03360,Solar PV,3,,Category 1,"Clintonville, Waupaca County, WI",Substation 69,Circuit 169,In service,9/10/2007,Permission to Operate,9/14/2007 AE-03084,Solar PV,4,,Category 1,"Pittsville, Wood County, WI",Substation 573,Circuit 1506,In service,7/20/2007,Permission to Operate,11/1/2007 AE-02140,Solar PV,4,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 316,In service,6/6/2007,Permission to Operate,6/6/2007 AE-00614,Solar PV,1.2,,Category 1,"Monroe, Green County, WI",Substation 101,Circuit 270,In service,5/12/2007,Permission to Operate,6/6/2007 AE-02130,Solar PV,4,,Category 1,"Spring Green, Sauk County, WI",Substation 406,Circuit 1007,In service,3/15/2007,Permission to Operate,4/5/2007 AE-02535,Hydro,20,,Category 1,"Wild Rose, Waushara County, WI",Substation 281,Circuit 675,In service,2/1/2007,Permission to Operate,2/1/2007 AE-03041,Solar PV,3,,Category 1,"Dodgeville, Wood County, WI",Substation 406,Circuit 1007,In service,1/24/2007,Permission to Operate,1/24/2007 AE-01191,Solar PV,2,,Category 1,"Winneconne, Winnebago County, WI",Substation 766,Circuit 2078,In service,10/6/2006,Permission to Operate,10/6/2006 AE-00942,Solar PV,3,,Category 1,"Arena, Iowa County, WI",Substation 37,Circuit 95,In service,8/24/2006,Permission to Operate,9/11/2006 AE-02500,Solar PV,3,,Category 1,"Berlin, Waushara County, WI",Substation 633,Circuit 1722,In service,7/10/2006,Permission to Operate,7/10/2006 AE-01194,Wind,5,,Category 1,"Mineral Point, Iowa County, WI",Substation 525,Circuit 1344,In service,6/1/2006,Permission to Operate,7/7/2006 AE-02109,Solar PV,3,,Category 1,"Reedsburg, Sauk County, WI",Substation 106,Circuit 294,In service,5/30/2006,Permission to Operate,5/30/2006 AE-02981,Solar PV,3,,Category 1,"Birnamwood, Marathon County, WI",Substation 74,Circuit 181,In service,4/17/2006,Permission to Operate,4/27/2006 AE-03352,Solar PV,2,,Category 1,"Mt Horeb, Dane County, WI",Substation 483,Circuit 1209,In service,4/8/2006,Permission to Operate,6/1/2006 AE-02158,Solar PV,3,,Category 1,"Beaver Dam, Dodge County, WI",,Circuit 18,In service,3/29/2006,Permission to Operate,4/26/2006 AE-02469,Solar PV,3,,Category 1,"Pine River, Waushara County, WI",Substation 281,Circuit 675,In service,2/14/2006,Permission to Operate,3/17/2006 AE-01168,Wind,10,,Category 1,"Mt Horeb, Dane County, WI",Substation 280,Circuit 670,In service,2/13/2006,Permission to Operate,2/13/2006 AE-02818,Solar PV,10,,Category 1,"Milladore, Wood County, WI",Substation 43,Circuit 120,In service,1/19/2006,Permission to Operate,1/19/2006 AE-00941,Solar PV,3,,Category 1,"Blanchardville, Iowa County, WI",Substation 525,Circuit 1342,In service,1/18/2006,Permission to Operate,2/28/2006 AE-00643,Solar PV,4,,Category 1,"Albany, Green County, WI",Substation 15,Circuit 61,In service,1/6/2006,Permission to Operate,3/24/2006 AE-00765,Solar PV,5,,Category 1,"Princeton, Green Lake County, WI",,Circuit 768,In service,11/25/2005,Permission to Operate,11/28/2005 AE-01177,Solar PV,3,,Category 1,"Juneau, Dodge County, WI",Substation 637,Circuit 1736,In service,10/7/2005,Permission to Operate,10/7/2005 AE-01901,Solar PV,1,,Category 1,"Cambridge, Dane County, WI",Substation 115,Circuit 315,In service,8/24/2005,Permission to Operate,8/24/2005 AE-03359,Solar PV,4,,Category 1,"Lodi, Columbia County, WI",Substation 547,Circuit 1432,In service,8/8/2005,Permission to Operate,3/13/2006 AE-03024,Solar PV,2,,Category 1,"Manawa, Waupaca County, WI",,,In service,7/26/2005,Permission to Operate,7/26/2005 AE-03023,Wind,2,,Category 1,"Manawa, Waupaca County, WI",,,In service,7/26/2005,Permission to Operate,7/26/2005 AE-02624,Non-Bio Diesel,2500,,Category 4,"Darien, Walworth County, WI",Substation 746,Circuit 2053,In service,7/15/2005,Permission to Operate,7/15/2005 AE-03379,Solar PV,3,,Category 1,"Milladore, Wood County, WI",,,In service,7/8/2005,Permission to Operate,7/8/2005 AE-03380,Wind,10,,Category 1,"Milladore, Wood County, WI",,,In service,7/8/2005,Permission to Operate,7/8/2005 AE-01728,Bio Digestor Landfill,3075,,Category 4,"Janesville, Rock County, WI",Substation 482,Circuit 1197,In service,11/10/2004,Permission to Operate,11/24/2004 AE-03192,Wind,195,,Category 2,"Hazel Green, Grant County, WI",Substation 386,Circuit 2180,In service,5/13/2004,Permission to Operate,5/13/2004 AE-02931,Solar PV,5.5,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2243,In service,5/3/2004,Permission to Operate,6/17/2004 AE-00826,Solar PV,1,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,1/14/2004,Permission to Operate,1/26/2004 AE-02036,Wind,18,,Category 1,"Columbus, Columbia County, WI",Substation 335,Circuit 791,In service,1/9/2004,Permission to Operate,1/9/2004 AE-03394,Solar PV,8,,Category 1,"Oregon, Dane County, WI",Substation 108,Circuit 302,In service,9/18/2003,Permission to Operate,9/18/2003 AE-03292,Solar PV,2,,Category 1,"Wauzeka, Crawford County, WI",Substation 773,Circuit 2089,In service,6/15/2003,Permission to Operate,6/15/2003 AE-00744,Solar PV,8,,Category 1,"Portage, Columbia County, WI",Substation 135,Circuit 358,In service,2/12/2003,Permission to Operate,2/12/2003 AE-02369,Solar PV,3,,Category 1,"Baraboo, Sauk County, WI",Substation 46,Circuit 138,In service,10/9/2002,Permission to Operate,10/9/2002 AE-01238,Solar PV,5,,Category 1,"Amherst, Portage County, WI",Substation 30,Circuit 80,In service,6/25/2002,Permission to Operate,6/25/2002 AE-00847,Wind,20,,Category 1,"Rudolph, Portage County, WI",Substation 630,Circuit 1714,In service,12/18/2001,Permission to Operate,12/18/2001 AE-00564,Wind,20,,Category 1,"Juda, Green County, WI",Substation 647,Circuit 1775,In service,11/14/2001,Permission to Operate,11/14/2001 AE-02403,Non-Bio Diesel,300,,Category 3,"Baraboo, Sauk County, WI",Substation 495,Circuit 1243,In service,10/24/2001,Permission to Operate,10/24/2001 AE-02315,Solar PV,2,,Category 1,"Milladore, Wood County, WI",Substation 630,Circuit 1713,In service,8/29/2001,Permission to Operate,8/29/2001 AE-02337,Solar PV,2.5,,Category 1,"Rock Springs, Sauk County, WI",Substation 623,Circuit 1685,In service,8/25/2001,Permission to Operate,9/18/2001 AE-03390,Hydro,700,,Category 3,"Shawano, Shawano County, WI",,,In service,4/17/2000,Permission to Operate,4/17/2000 AE-00481,Non-Bio Diesel,1200,,Category 4,"Madison, Dane County, WI",,,In service,1/19/2000,Permission to Operate,1/19/2000 AE-01790,Non-Bio Diesel,3100,,Category 4,"Beloit, Rock County, WI",Substation 493,Circuit 1229,In service,9/27/1999,Permission to Operate,12/1/1999 AE-01790,Non-Bio Diesel,3100,,Category 4,"Beloit, Rock County, WI",Substation 493,Circuit 1226,In service,9/27/1999,Permission to Operate,12/1/1999 AE-02134,Solar PV,1,,Category 1,"Stevens Point, Portage County, WI",Substation 41,Circuit 2243,In service,8/13/1999,Permission to Operate,8/13/1999 AE-02886,Solar PV,1,,Category 1,"Pittsville, Wood County, WI",Substation 573,Circuit 1506,In service,6/2/1999,Permission to Operate,6/2/1999 AE-02575,Hydro,42,,Category 2,"Friendship, Adams County, WI",,,In service,7/21/1998,Permission to Operate,7/21/1998 AE-01854,Hydro,480,,Category 3,"Beloit, Rock County, WI",Substation 79,Circuit 196,In service,7/17/1998,Permission to Operate,7/17/1998 AE-01850,Hydro,500,,Category 3,"Janesville, Rock County, WI",Substation 705,Circuit 1934,In service,5/15/1998,Permission to Operate,5/15/1998 AE-01189,Hydro,20,,Category 1,"Iola, Waupaca County, WI",Substation 364,Circuit 893,In service,2/9/1998,Permission to Operate,2/9/1998 AE-01980,Hydro,20,,Category 1,"Marion, SHAWANO County, WI",Substation 111,Circuit 310,In service,11/10/1997,Permission to Operate,11/10/1997 AE-02512,Hydro,20,,Category 1,"Oxford, Marquette County, WI",Substation 515,Circuit 1313,In service,5/21/1997,Permission to Operate,5/10/1999 AE-01979,Hydro,20,,Category 1,"Pardeeville, Columbia County, WI",Substation 781,Circuit 2133,In service,11/7/1996,Permission to Operate,11/7/1996 AE-00512,Non-Bio Diesel,9200,,Category 4,"Fond du Lac, Adams County, WI",,,In service,10/24/1996,Permission to Operate,10/24/1996 AE-02256,Wind,18.5,,Category 1,"North Freedom, Sauk County, WI",Substation 623,Circuit 1685,In service,2/14/1996,Permission to Operate,5/16/1996 AE-02459,Hydro,250,,Category 3,"Wautoma, Waushara County, WI",Substation 742,Circuit 2036,In service,12/11/1995,Permission to Operate,12/11/1995 AE-00931,Bio Digestor Landfill,650,,Category 3,"Verona, Dane County, WI",Substation 722,Circuit 1969,In service,7/13/1995,Permission to Operate,7/13/1995 AE-00463,Wind,18,,Category 1,"Campbellsport, Fon du Lac County, WI",,Circuit 1400,In service,8/24/1994,Permission to Operate,8/24/1994 AE-02176,Hydro,1,,Category 1,"Wittenberg, Shawano County, WI",,Circuit 834,In service,12/6/1993,Permission to Operate,12/6/1993 AE-00775,Hydro,16,,Category 1,"Kingston, Green Lake County, WI",Substation 436,Circuit 1105,In service,12/2/1993,Permission to Operate,12/2/1993 AE-01883,Non-Bio Diesel,1600,,Category 4,"Beloit, Rock County, WI",,,In service,12/1/1993,Permission to Operate,12/1/1993 AE-03170,Solar PV,1,,Category 1,"Amherst, Waupaca County, WI",Substation 651,Circuit 1787,In service,10/1/1993,Permission to Operate,10/1/1993 AE-01229,Hydro,10,,Category 1,"Ridgeway, Iowa County, WI",Substation 37,Circuit 94,In service,11/1/1992,Permission to Operate,11/1/1992 AE-00530,Hydro,18,,Category 1,"Campbellsport, Fon du Lac County, WI",Substation 391,Circuit 977,In service,5/27/1992,Permission to Operate,5/27/1992 AE-01045,Hydro,180,,Category 2,"Montello, Marquette County, WI",Substation 489,Circuit 1220,In service,3/5/1992,Permission to Operate,3/5/1992 AE-01076,Hydro,20,,Category 1,"Rio, Columbia County, WI",Substation 609,Circuit 1637,In service,7/29/1991,Permission to Operate,7/29/1991 AE-01044,Hydro,230,,Category 3,"Manawa, Waupaca County, WI",,,In service,7/31/1990,Permission to Operate,7/31/1990 AE-01978,Hydro,20,,Category 1,"Caroline, Shawano County, WI",Substation 111,Circuit 311,In service,1/13/1990,Permission to Operate,1/13/1990 AE-01977,Hydro,20,,Category 1,"Phlox, Langlade County, WI",Substation 225,Circuit 543,In service,1/13/1990,Permission to Operate,1/13/1990 AE-02458,Hydro,180,,Category 2,"Pine River, Waushara County, WI",Substation 281,Circuit 675,In service,1/13/1990,Permission to Operate,1/13/1990 AE-01042,Hydro,92,,Category 2,"Neshkoro, Marquette County, WI",Substation 656,Circuit 1792,In service,1/1/1990,Permission to Operate,1/1/1990 AE-02450,Hydro,57,,Category 2,"Poy Sippi, Waushara County, WI",Substation 281,Circuit 675,In service,12/1/1989,Permission to Operate,12/1/1989 AE-01040,Hydro,380,,Category 3,"Big Falls, Waupaca County, WI",Substation 494,Circuit 1234,In service,12/1/1989,Permission to Operate,12/1/1989 AE-03385,Hydro,6667,,Category 4,"Near Strongs Prairie, Juneau County, WI",,,In service,9/1/1985,Permission to Operate,9/1/1985 AE-03384,Hydro,5000,,Category 4,"Necedeh, Adams County, WI",,,In service,9/1/1985,Permission to Operate,9/1/1985 AE-00995,Hydro,3000,,Category 4,"Nekoosa, Wood County, WI",,,In service,1/1/1970,Permission to Operate,1/1/1970 AE-30916,"Solar PV, Battery/Storage",25.15,,Category 1,"Deforest, Dane County, WI",Substation 698,Circuit 1923,Active,,Application Completeness Review, AE-30923,,15.4,,Category 1,"Dodgeville, Iowa County, WI",Substation 218,Circuit 517,Active,,Application Submitted, AE-30812,"Solar PV, Battery/Storage",21.2,,Category 2,"W6121 County Road H, Green County, WI",,Circuit 1327,Active,,Application Completeness Review, AE-30919,,5.9,,Category 1,"Beloit, Rock County, WI",Substation 493,Circuit 1230,Active,,Application Submitted, AE-30410,,5000,,Category 4,"Rudolph, Wood County, WI",,,Active,,Application Completeness Review, AE-30894,,3500,,Category 4,"Princeton, Fond du Lac County, WI",,,Active,,Application Submitted, AE-30698,,5000,,Category 4,"Pella, Shawano County, WI",,,Active,,Application Completeness Review, AE-30889,,5000,,Category 4,"Friendship, Fond du Lac County, WI",,,Active,,Application Submitted, AE-30411,,5000,,Category 4,"Fitchburg, Dane County, WI",,,Active,,Application Completeness Review, AE-30865,,5000,,Category 4,"Windsor, Dane County, WI",,,Active,,Application Submitted, AE-30679,,1250,,Category 4,"Monroe, Green County, WI",,,Active,,Application Submitted, AE-29726,,6.3,,Category 1,"Beaver Dam, Dodge County, WI",,,Active,,Application Submitted, AE-30457,,15,,Category 1,"Birnamwood, Marathon County, WI",,,Active,,Application Submitted, AE-30913,,26.7,20,Category 1,"Fond du Lac, Fond du Lac County, WI",,,Active,,Application Submitted,